prosser pump long beach fire department. basic set- up components main dewatering pump junction box...
TRANSCRIPT
![Page 1: PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord](https://reader035.vdocument.in/reader035/viewer/2022070418/5697bfc71a28abf838ca7c03/html5/thumbnails/1.jpg)
PROSSER PUMP
Long Beach Fire Department
![Page 2: PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord](https://reader035.vdocument.in/reader035/viewer/2022070418/5697bfc71a28abf838ca7c03/html5/thumbnails/2.jpg)
BASIC SET-UP
ComponentsMain dewatering pumpJunction boxAttached power cordAdditional extention cord
![Page 3: PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord](https://reader035.vdocument.in/reader035/viewer/2022070418/5697bfc71a28abf838ca7c03/html5/thumbnails/3.jpg)
BASIC SET-UP
Main unitThe pump can move 300gpm and pump to a height of 50 feet.3” hose with 2 1/2 couplings are used to move water.A knotted rope is used for lowering lowering unit.
![Page 4: PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord](https://reader035.vdocument.in/reader035/viewer/2022070418/5697bfc71a28abf838ca7c03/html5/thumbnails/4.jpg)
BASIC SET-UP
Junction boxHas a handle for the on/ off switch.The junction box also has a 10 ‘ cord to plug in to the outlets on the fireboat and a 50’ cord that is attached to the main power unit.Operations extending past 50’, the 100’ extension cord can be used.
![Page 5: PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord](https://reader035.vdocument.in/reader035/viewer/2022070418/5697bfc71a28abf838ca7c03/html5/thumbnails/5.jpg)
BASIC SET-UP
100’ extension cord is separate from the main pump and is hung in the equipment room.
![Page 6: PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord](https://reader035.vdocument.in/reader035/viewer/2022070418/5697bfc71a28abf838ca7c03/html5/thumbnails/6.jpg)
Basic Set-up
![Page 7: PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord](https://reader035.vdocument.in/reader035/viewer/2022070418/5697bfc71a28abf838ca7c03/html5/thumbnails/7.jpg)
The port outlet and circuit breaker panel are located on the portside bulkhead behind the door leading to the engine room.
Proser Pump Panel
![Page 8: PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord](https://reader035.vdocument.in/reader035/viewer/2022070418/5697bfc71a28abf838ca7c03/html5/thumbnails/8.jpg)
Once the breaker is turned on, the test light will blink red and must be reset. You must hit the reset button and the light will switch and show a solid green light and the pump can be activated.
![Page 9: PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord](https://reader035.vdocument.in/reader035/viewer/2022070418/5697bfc71a28abf838ca7c03/html5/thumbnails/9.jpg)
The 30A 240V outlet is only used for our prosser pump connector. Note the 4-pronged system...
![Page 10: PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord](https://reader035.vdocument.in/reader035/viewer/2022070418/5697bfc71a28abf838ca7c03/html5/thumbnails/10.jpg)
30A 125V will not work...
![Page 11: PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord](https://reader035.vdocument.in/reader035/viewer/2022070418/5697bfc71a28abf838ca7c03/html5/thumbnails/11.jpg)
![Page 12: PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord](https://reader035.vdocument.in/reader035/viewer/2022070418/5697bfc71a28abf838ca7c03/html5/thumbnails/12.jpg)
The starboard outlet is located just outside the pilot house
![Page 13: PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord](https://reader035.vdocument.in/reader035/viewer/2022070418/5697bfc71a28abf838ca7c03/html5/thumbnails/13.jpg)
Once the breaker is turned on, the test light will blink red and must be reset. You must hit the reset button and the light will switch and show a solid green light and the pump can be activated.
![Page 14: PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord](https://reader035.vdocument.in/reader035/viewer/2022070418/5697bfc71a28abf838ca7c03/html5/thumbnails/14.jpg)
The circuit breaker for the starboard connection it located in the pilot house, on the electrical panel.