prostep ivip use case ecad mcad collaboration 1.0
TRANSCRIPT
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
1/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
ECAD/MCAD-Collaboration
General, underlying Use Case
"Moving a mounting hole
May 2007
Chairman: Hans-Ulrich Heidbrink, Mentor GraphicsProSTEP Contact: Dr. Arnulf Frhlich, PROSTEP AG
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
2/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
ECAD/MCAD-Collaboration: Project Aim
Aim of the ProSTEP iViP Associations
ECAD/MCAD-Collaboration is to
facilitate collaboration between the ECADand MCAD domains in such a way that
users in one domain have access to all
relevant information in the other domain.
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
3/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
Current Project Participants
Delphi
Siemens VDO
:em
Mentor Graphics
PDTec
PROSTEP PTC
UGS
xPLM
FU Hagen
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
4/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
Use Case: Moving a mounting hole 1/3
Engineer Knut
Engineer Paula
I want tomove this
hole
to thisnew
position
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
5/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
Use Case: Moving a mounting hole 2/3
Engineer Knut
Engineer Paula
This newposition is
not suitable
what isabout this
one.
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
6/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
Use Case: Moving a mounting hole 3/3
Engineer Knut
Engineer Paula
This newposition is
suitablefor me.
Thankyou!
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
7/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
Use case preconditions
A design of the mechanical surrounding is available (majormechanical/electrical elements were placed (plugs, connections, LEDsetc.))
The PCB board outline is defined within the
mechanical CAD-system The use case can be done in synchronous or asynchronous mode:
In synchronous mode the changes are shown while designers communicatethrough another channel.
In asynchronous mode the information is stored and the designers canupdate the models on demand.
There are there spaces, where data is stored: ECAD: Represents the ECAD-System including the collaboration module
MCAD: Represents the MCAD-System including the collaboration module Collaboration Space: Represents the shared data, where all relevant data
is stored.
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
8/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
1
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
MCAD starts the design of the 3D geometry in the MCAD system.Designs also components with electrical/mechanical function(plugs, LEDs, switches) or big mechanical impact (big ICs,capacitors). Also the mounting holes of the PCB are defined. Thiscomponents need to be marked within the 3D CADmodel in order
to distinguish between the pure 3D geometry like a hole and thesemantic information that this hole represents a "mounting hole"
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
9/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
MCAD starts the design of the
3D geometry in the
MCADsystem. Designs also
components withelectrical/mechanical function(plugs, LEDs, switches) or bigmechanical impact (big ICs,
capacitors). Also the mounting
holes of the PCB are defined.This components need to bemarked within the 3D
CADmodel in order to
distinguish between the pure3D geometry like a hole and thesemantic information that this
hole represents a "mounting
hole"
1
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
Starts the schematic design based on the functionalrequirements.
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
10/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
Starts the schematic design
based on the functional
requirements.
MCAD starts the design of the
3D geometry in the
MCADsystem. Designs also
components withelectrical/mechanical function(plugs, LEDs, switches) or bigmechanical impact (big ICs,
capacitors). Also the mounting
holes of the PCB are defined.This components need to bemarked within the 3D
CADmodel in order to
distinguish between the pure3D geometry like a hole and thesemantic information that this
hole represents a "mounting
hole"
1
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
11/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
2
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
After finishing the first version of the design a 2Dboardoutline with position information about thecomponents with mechanical/electrical interfacefunction needs to be generated
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
12/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
After finishing the first version
of the design a 2D boardoutline
with position information about
the components withmechanical/electrical interfacefunction needs to be generated
2
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
Schematic generates the netlist with the componentsand their interconnection.
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
13/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
Schematics generates the
netlist with the components and
their interconnection.
After finishing the first version
of the design a 2D boardoutline
with position information about
the components withmechanical/electrical interfacefunction needs to be generated
2
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
14/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
MCAD sends board outline to
the Collaboration Space3
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
MCAD sends board outline to the Collaboration Space
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
15/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
Collaboration Space includes all
collaboration relevant parts of
the design.
MCAD sends board outline to
the Collaboration Space3
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
Collaboration Space includes all collaborationrelevant parts of the design.
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
16/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
The synchronization of
components IDs is done within
the communication
Collaboration Space includes all
collaboration relevant parts of
the design.
MCAD sends board outline to
the Collaboration Space3
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
The synchronization of components IDs is done withinthe communication
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
17/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
The synchronization of
components IDs is done within
the communication
Collaboration Space includes all
collaboration relevant parts of
the design.
MCAD sends board outline to
the Collaboration Space3
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
A 1 2 3 3
B 2 3 5 4C 3 4 5 4D 3 4 5 4E 2 3 4 4
A 1 2 3 3B 2 3 5 4C 3 4 5 4D 3 4 5 4E 2 3 4 4
ECAD reads base line from collaboration space andnet list from Schematic, so layout can be done.
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
18/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
ECAD reads base line from
collaboration space and net list
from layout, so layout can bedone.
The synchronization of
components IDs is done within
the communication
Collaboration Space includes all
collaboration relevant parts of
the design.
MCAD sends board outline to
the Collaboration Space3
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
A 1 2 3 3
B 2 3 5 4C 3 4 5 4D 3 4 5 4E 2 3 4 4
A 1 2 3 3B 2 3 5 4C 3 4 5 4D 3 4 5 4E 2 3 4 4
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
19/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
4
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
Due to additional mechanical requirements (blueelement). The position of a mounting hole needs to beupdated. MCAD opens the 3D-model and modifies thehole-feature with the semantic "mounting hole" (an ID
mapping already exist, see step 3)
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
20/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
Due to additional mechanical
requirements (blue element).
The position of a mounting holeneeds to be updated. MCAD
opens the 3D-model andmodifies the hole-feature withthe semantic "mounting hole"
(an ID mapping already exist,
see step 3)
4
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
21/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
5
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
Due to the fact that the electrical designer has done aPCB layout based on the first version the mechanicaldesigner wants see if the placement modification isOK from the PCB point of view. He starts to send the
changes to the collaboration space.
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
22/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
Due to the fact that the
electrical designer has done a
PCB layout based on the firstversion the mechanical
designer wants see if theplacement modification is OKfrom the PCB point of view. He
starts to send the changes to
the collaboration space.
5
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
The collaboration model for the change request isinitialized with reduced information (releasedinformation) and the new position of the mountinghole.
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
23/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
The collaboration model for the
change request is initialized
with reduced information(released information) and the
new position of the mountinghole.
Due to the fact that the
electrical designer has done a
PCB layout based on the firstversion the mechanical
designer wants see if theplacement modification is OKfrom the PCB point of view. He
starts to send the changes to
the collaboration space.
5
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
The change request is send via EDMDService.
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
24/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
The change request is send via
EDMDService.
The collaboration model for the
change request is initialized
with reduced information(released information) and the
new position of the mountinghole.
Due to the fact that the
electrical designer has done a
PCB layout based on the firstversion the mechanical
designer wants see if theplacement modification is OKfrom the PCB point of view. He
starts to send the changes to
the collaboration space.
5
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
Message is received and the user is asked if he wantsto collaborate.
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
25/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
Message is received and the
user is asked if he wants to
collaborate.
The change request is send via
EDMDService.
The collaboration model for the
change request is initialized
with reduced information(released information) and the
new position of the mountinghole.
Due to the fact that the
electrical designer has done a
PCB layout based on the firstversion the mechanical
designer wants see if theplacement modification is OKfrom the PCB point of view. He
starts to send the changes to
the collaboration space.
5
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
After accepting the collaboration request the modelwill be retrieved and opened in collaboration mode,the changes are loaded to the ECAD-System. Howchanges are visualized and shown to the user is up to
the special application (e.g. integrated in the CAD-System, special collaboration viewer, ).
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
26/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
After accepting the
collaboration request the model
will be retrieved and opened incollaboration mode, the
changes are loaded to theECAD-System. How changesare visualized and shown to the
user is up to the special
application (e.g. integrated inthe CAD-System, specialcollaboration viewer, ).
Message is received and the
user is asked if he wants to
collaborate.
The change request is send via
EDMDService.
The collaboration model for the
change request is initialized
with reduced information(released information) and the
new position of the mountinghole.
Due to the fact that the
electrical designer has done a
PCB layout based on the firstversion the mechanical
designer wants see if theplacement modification is OKfrom the PCB point of view. He
starts to send the changes to
the collaboration space.
5
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
Remark:There could be some components with nocorrespondence in the MCAD world and vice versa.
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
27/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
After accepting the
collaboration request the model
will be retrieved and opened incollaboration mode, the
changes are loaded to theECAD-System. How changesare visualized and shown to the
user is up to the special
application (e.g. integrated inthe CAD-System, specialcollaboration viewer, ).
Message is received and the
user is asked if he wants to
collaborate.
The change request is send via
EDMDService.
The collaboration model for the
change request is initialized
with reduced information(released information) and the
new position of the mountinghole.
Due to the fact that the
electrical designer has done a
PCB layout based on the firstversion the mechanical
designer wants see if theplacement modification is OKfrom the PCB point of view. He
starts to send the changes to
the collaboration space.
5
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
Remark:There could be somecomponents with no
correspondence in the
MCAD world and vice versa.
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
28/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
6
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
The ECAD designer checks the change request, in thiscase the new position of the mounting hole. ECADsystem will provide assistance. In this sample themounting hole color turns to red. If there is a special
collaboration viewer it checks the change against thenative data.
LMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
29/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
The ECAD designer checks the
change request, in this case the
new position of the mountinghole. ECAD system will provide
assistance. In this sample themounting hole color turns tored. If there is a special
collaboration viewer it checks
the change against the nativedata.
6
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
L tMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
30/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
7
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
On recognizing the problem the ECAD-System sendsa reject to the collaboration space.
L tMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
31/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
On recognzing the problem the
ECAD-System sends a reject
to the collaboration space.7
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
The changed version is marked as rejected in thecollaboration space.
S h tiLa o tC ll b tiEDMDS iC ll b tiMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
32/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
On recognzing the problem the
ECAD-System sends a reject
to the collaboration space.
The changed version is marked
as rejected in the collaboration
space.7
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
The reject mark is transfered via EDMDService.
SchematicLayoutCollaborationEDMDSer iceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
33/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
On recognzing the problem the
ECAD-System sends a reject
to the collaboration space.
The changed version is marked
as rejected in the collaboration
space.
The reject mark is transfered
via EDMDService.7
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
The MCAD designer is informed about the rejection.
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
34/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
On recognzing the problem the
ECAD-System sends a reject
to the collaboration space.
The changed version is marked
as rejected in the collaboration
space.
The reject mark is transfered
via EDMDService.
The MCAD designer is
informed about the rejection.7
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
35/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
8
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
ECAD designer moves the mounting hole to validposition based in the routing. ECAD supports ECADdesigner by checking the new position against hislayout.
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
36/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
ECAD designer moves the
mounting hole to valid position
based in the routing. ECADsupports ECAD designer by
checking the new positionagainst his layout.
8
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
The new position is loaded to the collaboration space.
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
37/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
ECAD designer moves the
mounting hole to valid position
based in the routing. ECADsupports ECAD designer by
checking the new positionagainst his layout.
The new position is loaded to
the collaboration space.8
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
The new position is send as change request byEDMDService
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
38/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
ECAD designer moves the
mounting hole to valid position
based in the routing. ECADsupports ECAD designer by
checking the new positionagainst his layout.
The new position is loaded to
the collaboration space
The new position is send as
change request by
EDMDService8
Sc e at cLayoutCo abo at oSe ceCo abo at oMCAD
The new position is loaded to MCAD and shown to theuser. It is up to the application in which way this isdone.
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
39/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
ECAD designer moves the
mounting hole to valid position
based in the routing. ECADsupports ECAD designer by
checking the new positionagainst his layout.
The new position is loaded to
the collaboration space
The new position is send as
change request by
EDMDService
The new position is loaded to
MCAD and shown to the user.
It is up to the application inwhich way this is done.
8
LayoutMCAD
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
40/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
9
LayoutMCAD
The MCAD designer checks the change request, inthis case the new position of the mounting hole.MCAD system will provide assistance. If there is aspecial collaboration viewer it checks the change
against the native data.
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
41/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
The MCAD designer checks the
change request, in this case the
new position of the mountinghole. MCAD system will provide
assistance. If there is a specialcollaboration viewer it checksthe change against the native
data.
9
y
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
42/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
10
y
After checking the new data was successfull theMCAD designer accepts the new position of themounting hole.
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
43/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
After checking the new data
was successfull the MCAD
designer accepts the newposition of the mounting hole.
10
y
The changed version is marked as accepted in thecollaboration space.
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
44/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
The changed version is marked
as accepted in the
collaboration space.
After checking the new data
was successfull the MCAD
designer accepts the newposition of the mounting hole.
10
The accept mark is transfered via EDMDService.
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
45/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
The accept mark is transfered
via EDMDService.
The changed version is marked
as accepted in the
collaboration space.
After checking the new data
was successfull the MCAD
designer accepts the newposition of the mounting hole.
10
The ECAD designer is informed about the acceptance.
SchematicLayoutCollaborationEDMDServiceCollaborationMCAD
-
8/3/2019 ProSTEP iViP Use Case ECAD MCAD Collaboration 1.0
46/46
Establishing Leadership in IT-Based Engineering
2007, ProSTEP iViP e.V. 07-08-09
The ECAD designer is informed
about the acceptance.
The accept mark is transfered
via EDMDService.
The changed version is marked
as accepted in the
collaboration space.
After checking the new data
was successfull the MCAD
designer accepts the newposition of the mounting hole.
10