Proton Improvement Plan
Keith Gollwitzer
May 6th, 2013All Experimenters’ Meeting
Thanks to F. Garcia for Linac slides
![Page 2: Proton Improvement Plan Keith Gollwitzer May 6th, 2013 All Experimenters’ Meeting](https://reader036.vdocument.in/reader036/viewer/2022062520/56816530550346895dd7b4ee/html5/thumbnails/2.jpg)
Gollwitzer AEM 2
Overview of Status • RFQ Largely in operations mode – But…
– Still adjusting new sources – spark rates and emittances have improved
• Second Source – with new hardware design has been tested• Linac Commissioning continues while improving
– Efficiency Improving: Up to 90% (current still lower than desired)
• Linac Beam Position Monitor system upgrade complete• Progress on developing Linac modulator for replacement/upgrade; both
in-house (AD/EE support) and by SLAC• Booster commissioning continues with many studies• Booster RF Solid State Upgrade completed• RF cavity refurbishment goes on• Progress in utilities replacement/upgrade
![Page 3: Proton Improvement Plan Keith Gollwitzer May 6th, 2013 All Experimenters’ Meeting](https://reader036.vdocument.in/reader036/viewer/2022062520/56816530550346895dd7b4ee/html5/thumbnails/3.jpg)
Linac Utilities
• Power Distribution– L1 transformer
• Continue with the prep work for the installation of L1 transformer. – Approval from FESS to
proceed - DP-18 complete
– Electrical conduit relocated to clear the area
– Quote on hand for hatch manufactured and installation
Linac L1 transformer – storage
Hatch location
![Page 4: Proton Improvement Plan Keith Gollwitzer May 6th, 2013 All Experimenters’ Meeting](https://reader036.vdocument.in/reader036/viewer/2022062520/56816530550346895dd7b4ee/html5/thumbnails/4.jpg)
• BPM Electronics Upgrade complete
Linac Instrumentation
Diagnostics Room Update existing RF Logamp electronics with
Digital electronics FPGA, ADC, Digital Signal Processing Long term stability Flexibility to modify system as needed
![Page 5: Proton Improvement Plan Keith Gollwitzer May 6th, 2013 All Experimenters’ Meeting](https://reader036.vdocument.in/reader036/viewer/2022062520/56816530550346895dd7b4ee/html5/thumbnails/5.jpg)
Linac - 200 MHz Rf Power System -1• Modulator Upgrade– 35kV, Marx-topology modulator to drive triode (or MBK)
– SLAC – Two cell test stand
Two vernier cells: ripple +/- 37VSpec:+/- 25V (F1-Marx design uses 10 main cells)
![Page 6: Proton Improvement Plan Keith Gollwitzer May 6th, 2013 All Experimenters’ Meeting](https://reader036.vdocument.in/reader036/viewer/2022062520/56816530550346895dd7b4ee/html5/thumbnails/6.jpg)
• Modulator Upgrade (cont.)– 35kV, Marx-topology modulator
to drive triode (or MBK)– AD/EE – One cell test stand– Test: Short circuit
» The Soft Shut Down circuit is used to softly shut down the IGBT if a fault occur
Contribution by: H. Pfeffer
Short circuit current1000A/
Load voltage & shortcollector 200V/
Load current 100A/
Linac - 200 MHz Rf Power System - 2
![Page 7: Proton Improvement Plan Keith Gollwitzer May 6th, 2013 All Experimenters’ Meeting](https://reader036.vdocument.in/reader036/viewer/2022062520/56816530550346895dd7b4ee/html5/thumbnails/7.jpg)
Gollwitzer AEM 7
Booster Aperture Scan
Booster Notch Beam Absorber
Last power supply/kicker system for beam notching system has been commissioned
Many Booster studiesAperture scansLattice Radiation studies
![Page 8: Proton Improvement Plan Keith Gollwitzer May 6th, 2013 All Experimenters’ Meeting](https://reader036.vdocument.in/reader036/viewer/2022062520/56816530550346895dd7b4ee/html5/thumbnails/8.jpg)
Gollwitzer AEM 8
Solid State RF Station in Gallery
New Power Amplifier
Booster Solid State Upgrade is complete!
![Page 9: Proton Improvement Plan Keith Gollwitzer May 6th, 2013 All Experimenters’ Meeting](https://reader036.vdocument.in/reader036/viewer/2022062520/56816530550346895dd7b4ee/html5/thumbnails/9.jpg)
9
Booster RF Work• Solid State Upgrade is complete
– Major benefits to reliability and the cost of operation• Refurbishment continues
– Un-certified a cavity due to RF leak
Booster Cavity WorkRefurbished (15Hz)
SS Prototype SS Upgraded
Cavity Removed
Gollwitzer AEM
![Page 10: Proton Improvement Plan Keith Gollwitzer May 6th, 2013 All Experimenters’ Meeting](https://reader036.vdocument.in/reader036/viewer/2022062520/56816530550346895dd7b4ee/html5/thumbnails/10.jpg)
10
We are now concerned about connection with outer flange
Gollwitzer AEM
Pulled one cavity and have started testing
RF leak from outer flange?
![Page 11: Proton Improvement Plan Keith Gollwitzer May 6th, 2013 All Experimenters’ Meeting](https://reader036.vdocument.in/reader036/viewer/2022062520/56816530550346895dd7b4ee/html5/thumbnails/11.jpg)
Gollwitzer AEM 11
Cavity RefurbishmentThere is always something unexpected: goop epoxy fix from some prior leak
![Page 12: Proton Improvement Plan Keith Gollwitzer May 6th, 2013 All Experimenters’ Meeting](https://reader036.vdocument.in/reader036/viewer/2022062520/56816530550346895dd7b4ee/html5/thumbnails/12.jpg)
Gollwitzer AEM 12
![Page 13: Proton Improvement Plan Keith Gollwitzer May 6th, 2013 All Experimenters’ Meeting](https://reader036.vdocument.in/reader036/viewer/2022062520/56816530550346895dd7b4ee/html5/thumbnails/13.jpg)
Gollwitzer AEM 13
Near Term Plans• RFQ injector – Will be adding a new trim package (improve transmission)
• Installing Booster Utility Transformer• Installing Linac Roof access • Booster aperture studies• Booster Cogging studies• Booster Lattice Studies• Booster Cavity Refurbishment
• Operations:– Higher Intensity Tune-up– Address shielding assessment issues to allow for higher flux