PROVING GROUND FOR VOLKSWAGEN,SOUTH CURVE
Facts Project DescriptionDesign and execution of parabolic south curve of high speed test track. Demolition ofexisting south curve. Construction and stabilisation of embankment. Construction of entryand exit roads. Renewal of an underpass.
PROJECT DATA:Parabolic curve south SBA 1,810 mWidth of bituminous pavement 10.5 - 13 mMaximum inclination of curves 49°Max. design speed 237 km/h
City/Country
Ehra Lessien / Germany
Client
Volkswagen AG Deutschland
Contract Value
€ 8,90 Mio.
Construction Period
1/2007 - 10/2007 (9 months)
.