Project “LAKSHYA”
PS Level-2 training 1
Tutorials
Project Systems
Project “LAKSHYA”
PS Level-2 training 2
Table of Contents 1. Project Definition 3
Creation of Project 3
2. Work Breakdown Structure 8
3. Creation of Internal activity 12
4. Creation of External activity 14
5. Creation of Costs activity 15
6. Creation of Service Activity 16
7. Material Assignment 17
8. PS Texts 18
9. Estimation 19
10. Date Planning /Scheduling 26
11. Cost Planning 28
12. Revenue Planning 32
13. Project Budget 36
Budget will get copied from cost plan for release 41
14. Release Project 41
15. System Status. 42
16. Confirmation 42
T Code: CJ20N 42
17. Closing. 43
Project “LAKSHYA”
PS Level-2 training 3
1. Project Definition
Creation of Project
Transaction code: CJ20N Open the Project Builder either by typing the T code mentioned above or through the drill down menu as shown below
Project Builder: The project Builder is a user-friendly method of accessing Project System, which enables you to edit your projects quickly and efficiently. It consists of three parts: Structure tree, work list and templates and Work Area
Project “LAKSHYA”
PS Level-2 training 4
In the work List Area we can see Last Five projects Processed. If you want to create a project click on “Create” and choose “Project
Project “LAKSHYA”
PS Level-2 training 5
Then it will take you to the Next Screen
Here Enter the Project Definition and its description in the Work Area
Project “LAKSHYA”
PS Level-2 training 6
Select Project Profile (Which is a mandatory field) shown in “Control” Tab
Then press enter Then we can notice that Project definition has been created, and can be seen in structure tree. The Entire screen appears as below
Project “LAKSHYA”
PS Level-2 training 7
We have to give the required organization elements. Once we have selected the project profile, default organization elements will come. Required changes can be made according to your project requirements. Basic data Tab
We have to give the project start date, finish date, factory calendar and Time unit.
Project “LAKSHYA”
PS Level-2 training 8
Press enter and SAVE.
2. Work Breakdown Structure Creation of WBS Element - Level 1—Follow the process
a) select the Project Definition in structure tree
b) Click on the WBS element icon (Yellow triangle)
c) This will display blank rows
Project “LAKSHYA”
PS Level-2 training 9
d) Enter Level 1, with coding mask “ & description of the WBS element
On pressing Enter, WBS at level 1 gets created.
Project “LAKSHYA”
PS Level-2 training 10
Creation of WBS element – Level2 Repeat the same process mentioned above but with level as 2 & entering the coding mask starting with “followed by Activity short code & description as shown below
Project “LAKSHYA”
PS Level-2 training 11
On pressing Enter, WBS at level 2 gets created.
Project “LAKSHYA”
PS Level-2 training 12
Repeat the same for all Level 2 & 3 WBS elements so as to create a project structure.
Press enter and SAVE. Same process can be repeated for the creation of required WBS element levels
3. Creation of Internal activity
Select the WBS element in structure tree & click on activity overview shown by green rectangle
It is an integration of Production Planning and Controlling Modules. Rows will appear at the bottom as shown
Project “LAKSHYA”
PS Level-2 training 13
Enter the activity description & press enter
Repeat the same for other WBS elements so as to create one activity each under each WBS element
Project “LAKSHYA”
PS Level-2 training 14
Press Enter and SAVE.
4. Creation of External activity
Select the WBS element in structure tree and double click on External processing in work list area. This is integration with Materials Management and Finance.
Project “LAKSHYA”
PS Level-2 training 15
Press Enter and SAVE.
5. Creation of Costs activity
Project “LAKSHYA”
PS Level-2 training 16
Select the WBS element in structure tree and double click on Costs in work list area. Here we can mention general costs.
6. Creation of Service Activity
Select the WBS element in structure tree and double click on Service in work list area. This is integration with Materials Management and Finance.
Project “LAKSHYA”
PS Level-2 training 17
Press Enter and SAVE.
7. Material Assignment
Select the activity and Double click on Material. Mention the material and its type also give required quantity and date.
Project “LAKSHYA”
PS Level-2 training 18
Press enter and SAVE.
8. PS Texts
If we want to attach PS texts and Documents, select the WBS Element and double click on PS texts. PS Text for the description and its type and Documents for the attaching the required documents for the WBS Element.
Project “LAKSHYA”
PS Level-2 training 19
9. Estimation
T Code: KKE1 (Create base planning object) Open the transaction either by typing the T code mentioned above or through the drill down menu as shown below
Project “LAKSHYA”
PS Level-2 training 20
Estimation is done using unit costing method. Base Planning object shall be created for defining material, equipment & labour norms. These BPO will then be assigned to WBS elements to get the total cost of the project. Use T code KKE1 for creating a base planning object
Define Unit of measurement & description to this BPO.
A new screen with blank rows will appear.
Project “LAKSHYA”
PS Level-2 training 21
For defining material norms, select Item category M, select material code from material master & enter the norms & rate will be picked from the master which is editable.
Repeat the steps for all materials to be used in this analysis
Project “LAKSHYA”
PS Level-2 training 22
For service item, select Item category N & then select the appropriate service. Enter the norms & rate for the service selected.
Repeat the steps for all services. The system calculates the unit cost of the item at the bottom Assign this BPO to the WBS element in CJ40. Open the transaction either by typing the T code mentioned above or through the drill down menu as shown below
Project “LAKSHYA”
PS Level-2 training 23
Select the WBS element & click on Primary costs
Project “LAKSHYA”
PS Level-2 training 24
Select the Cost element & click on edit Detailed Planning Change / Display as shown
Select B as Item category & select the BPO created & enter the quantity
Project “LAKSHYA”
PS Level-2 training 25
Save the record. This will give the total cost of WBS element. Repeat the steps for all WBS elements & select Edit Total Up which will sum up the costs of all WBS elements.
Project “LAKSHYA”
PS Level-2 training 26
Save the record.
10. Date Planning /Scheduling
T Code: CJ20N We have to mention the dates in Project definition, WBS and Network Levels. We can do the scheduling, if the activities exists. After creation of the activities we have to give the duration for different activities and create the relationships among the activities in project Builder. At the same time if there is any constraints for the activities we need to mention. Next we have to open the project in Project Planning board, choose the project or appropriate WBS for which you wish to do the schduling. Select the appropriate scheduling scenario and the dates you wish to do the update. And then do the scheduling. Update the dates according to the planning method.
Select the activity & define the duration as shown
Project “LAKSHYA”
PS Level-2 training 27
Assign the relationship with respect to other activity displayed as
Enter the superceding activity number, relationship & interval (in days) after which this activity should start
Repeat the steps for all activity. Schedule the project which will give the bar chart for the project
Project “LAKSHYA”
PS Level-2 training 28
11. Cost Planning
T Code: CJ40 Open the transaction either by typing the T code mentioned above or through the drill down menu as shown below
Project “LAKSHYA”
PS Level-2 training 29
Cost planning can be classified in to two categories.
i) Manual planning for WBS Elements
a) Hierachial planning/Overall planning b) Detailed planning c) Unit costing d) Easy cost Planning
ii) Network Costing
We have to use Cj40 for Manual cost planning with cost element Enter the project for which cost planning needs to be done & enter the version as 1
Select the WBS element for which cost planning is to be done & click on the primary costs
Project “LAKSHYA”
PS Level-2 training 30
Enter the costs against resective cost elements & Save.
Project “LAKSHYA”
PS Level-2 training 31
Repeat the steps for all WBS elements. Once the costs are planned for all WBS elements, select Edit in the top menu bar & select the option Total Up
This will sum up costs of all the WBS elements & give the total cost of the project
Project “LAKSHYA”
PS Level-2 training 32
Save the record.
12. Revenue Planning
T Code: CJ42 Open the transaction either by typing the T code mentioned above or through the drill down menu as shown below
Project “LAKSHYA”
PS Level-2 training 33
a) Manual Revenue Planning can be done in CJ42. b) By using billing plan in sale order or WBSe. Enter the project for which revenue planning needs to be done & enter the version as 1
Select the WBS element for which revenue is to be planned & click on the detailed planning button
Project “LAKSHYA”
PS Level-2 training 34
Enter the revenue for the WBS element & the quantity
Save the record Repeat the steps for all WBS elements & select Edit from the top menu bar & select the option Total Up
Project “LAKSHYA”
PS Level-2 training 35
This will sum up the revenues of all the WBS elements for the project
Save the project
Project “LAKSHYA”
PS Level-2 training 36
13. Project Budget
T Code: CJ30 / IMCCP3 Open the transaction either by typing the T code mentioned above or through the drill down menu as shown below
Project “LAKSHYA”
PS Level-2 training 37
Project budget comprises of
• Original Budget • Convert cost plan to budget • Release of budget • Supplement or Return of budget
Once the cost planning is done the same is transferred as an original budget through IMCCP3. User has to enter the cost planning version, project code & controlling area for copying
Project “LAKSHYA”
PS Level-2 training 38
Executing this T code will copy the budget from cost plan version selected as shown
The copied budget is released through T code CJ32 as shown below.
Project “LAKSHYA”
PS Level-2 training 39
Select the WBS elements & select Edit Copy View
Select Current budget
Project “LAKSHYA”
PS Level-2 training 40
Enter percentage as 100% with overwrite option
Project “LAKSHYA”
PS Level-2 training 41
Budget will get copied from cost plan for release
Saving the project will release the budget
14. Release Project
T Code: CJ20N Project release initiates the activity confirmation & procurement cycle. Release can be done at project or WBS or Activity levels as per requirement Select the project & select Edit Status Release as shown
Project “LAKSHYA”
PS Level-2 training 42
Save the project & the project will get released for execution
15. System Status.
The following system statuses are important in Project system
a) CRTD- Create –we can plan but not post the costs b) REL- Release - we can plan and post the costs c) CNF- Confirmed- we can’t plan but can post d) TECO- Technically complete- we can’t plan but can post e) CLSD- Closed- We can’t and post
16. Confirmation
T Code: CJ20N We have to confirm the internal activities for obtaining actual values. Confirmation means mentioning the actual work done. In the Project Builder we have to select the activity and go to Edit in the menu bar choose activity- confirmation and mention the number of units of actual work done.
Project “LAKSHYA”
PS Level-2 training 43
Select the activity requiring confirmation & click on Edit Activity Confirm. This will open a new screen for entering confirmations
Enter Actual start & End date with the quantity executed for that period under consideration
Click on Back button & Save the record. Repeat the steps for all the activity confirmations. ** For external activities, once Goods receipt is done then actual values will be obtained
17. Closing.
There are two impotant closing procedures which will be done by the finance They are Period End closing and Year end closing.
Project “LAKSHYA”
PS Level-2 training 44