ps upgrade

8
PS Upgrade Pascal Perret LPC Clermont 22 June 2010 CALO Upgrade Meeting

Upload: christopher-downs

Post on 03-Jan-2016

29 views

Category:

Documents


1 download

DESCRIPTION

PS Upgrade. 22 June 2010 CALO Upgrade Meeting. Pascal Perret LPC Clermont. PreShower Function. Part of CALO system: SPD, PS, ECAL, HCAL Same granularity than SPD and ECAL 6016 cells used for: Trigger L0: hadron / electron differentiation - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PS Upgrade

PS Upgrade

Pascal Perret

LPC Clermont

22 June 2010

CALO Upgrade Meeting

Page 2: PS Upgrade

2

PreShower Function

Part of CALO system: SPD, PS, ECAL, HCAL Same granularity than SPD and ECAL 6016 cells used for:

Trigger L0: hadron /electron differentiation

Offline: correction of electromagnetic energy measurement

Dynamics of the electronics: • Usefull dynamic range typically from 1 MIP to 100 MIP

10 bit ADC with LSB = 1/10 MIP

Pascal Perret - LPC Clermont22/06/2010

ElectronHadron

Threshold at 5 MIP

1 bit

Page 3: PS Upgrade

3

PS Electronics Characteristics

Dynamics: 10 bits and 1 trigger bit

Pascal Perret - LPC Clermont22/06/2010

Processing in 2 parts: A VFE part (analog) closed to PM: 16 chips dealing 4

channels each (sampling, signal integration, …) A FE part (digital) in racks above the detector (27 m from

VFE): 64 channels per board (ADC, calibration, previous sample residue subtraction, trigger threshold, fetching neighbourhood, SPD data processing, data storage, … )

chips6016 channels:

64 channels/board 100 boardsFE board

VFE board

Cables 27 mTrig

ADCSEQ

Glue

Fe

Page 4: PS Upgrade

4

Common Solutions

Pascal Perret - LPC Clermont22/06/2010

CROC Validationor SPD Multiplicity

FEBPS or ECAL

SEQ

Glue

Trigger and readout

Back plane (6U)

TTC, SPECS and power Back plane (3U)

Common Back plane ECAL, HCAL, PS/SPD FE

Connectors SPD-VFE / PS

Page 5: PS Upgrade

5

Role of PS/SPD at 40 MHzcf Jacques’ presentation 21/04/2010

Pascal Perret - LPC Clermont22/06/2010

To b

e done!

Page 6: PS Upgrade

6

Role of PS/SPD at 40 MHzcf Frederic’s presentation 21/04/2010

Effect on the PID:

Pascal Perret - LPC Clermont22/06/2010

More work

to do!

Page 7: PS Upgrade

7

PS Electronics @ 40MHz

Probably the trigger part is no more useful … Let ‘s assume it

40 MHz part:VFE electronics: already existFE electronics: same or similar

components could be usedMAPMT aging and radiation

hardness to be checked … 1MHz part:

DAQ/ECS: similar solution to XCAL electronics could be used?

Pascal Perret - LPC Clermont22/06/2010

How many optical links? Data compression to be studied … Backplane could be used for optical link in/out …

Cost: similar to current version ?~ 5000€/board?

chips

FE boardVFE board

Trig

ADCSEQ

Glue

Fe

40 MHz 1 MHz

Page 8: PS Upgrade

8

Conclusion

It could be useful to have a PS in the LHCb upgrade project, mainly for PID

A lot of work to do: Motivation to keep/remove the PS Check that the VFE part could be used in high luminosity Data compression and packing to be studied Electronics to be studied …

Manpower …

Pascal Perret - LPC Clermont22/06/2010