PSB INJECTION : Mechanical Design Overview. A. Dallocchio, M. Garlaschè, B. Riffaud, L. Zuccalli. PSB Injection Design – T he Starting Point:. Conceptual design by TE/ABT. EDMS:1244362. PSB Injection Design – January 2013:. Status Legenda :. 0%. 100%. Vacuum : sectorization @ stripping - PowerPoint PPT PresentationTRANSCRIPT
En
gin
eeri
ng
Dep
art
men
tEN
PSB INJECTION:MECHANICAL DESIGN OVERVIEW
A. Dallocchio, M. Garlaschè, B. Riffaud, L. Zuccalli
En
gin
eeri
ng
Dep
art
men
tEN
16/12/2013 EN-MME Marco Garlaschè
PSB Injection Design – The Starting Point:
Conceptual design by TE/ABT
EDMS:1244362
En
gin
eeri
ng
Dep
art
men
tEN
16/12/2013 EN-MME Marco Garlaschè
PSB Injection Design – January 2013:
Vacuum:
• sectorization @ stripping
Dump & monitor:
• SiC? Graphite? • No RP evaluations• Monitor: only plates defined
Chambers, bellows:
• No spec on chamber, bellows• Inconel? Ceramic?
Magnets:
• Support and fixation(no plug & play)
• Fiduciary system not defined
0% 100%
Status Legenda:
En
gin
eeri
ng
Dep
art
men
tEN
16/12/2013 EN-MME Marco Garlaschè
PSB Injection Design – Today:
Vacuum:
• New sectorization & vacuum systems
Dump, monitor:
• different designs and integration studied
• WDP, shielding• Monitor design
Chambers, bellows:
• Spec for : BSWx & BHZx chambers• Bellows design defined• RF contacts, ceramic flanges
Magnets:
• Final design• Support and regulation of magnet• Draft Lifting/Transport equipment
Detailed integration:
• …• Interface w. stripping foil• Interface with BHZx
En
gin
eeri
ng
Dep
art
men
tEN
EN-MME Marco Garlaschè
Open Points:
16/12/2013
Dump (Ti bulk) & monitor:• RP validation, shielding design• Thermostructural check on final geometry• Monitor & cabling details
Magnet & chambers:• Lifting/Transport • Chambers prototypes• Compression tool for bellows• Bus bars
Other:• Support System rigidity check• BLM Integration• Stripping unit?
En
gin
eeri
ng
Dep
art
men
tEN
EN-MME Marco Garlaschè16/12/2013
• Detailed 3D design completed: no showstoppers so far, provided RP green light
NEXT:• BLM integration and design of lifting tool to be tackled
• Design consolidation with prototyping activities priority for next year (chambers, ceramic flanges)
• 2D specification and manufacturing drawings
Conclusions: