psk infrastructures and projects limitedpskinfra.com/resources/psk_brochure.pdfpsk infrastructures...

12
An ISO 9001:2008 Certified Company PSK Infrastructures And Projects Limited

Upload: doxuyen

Post on 02-May-2018

245 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: PSK Infrastructures And Projects Limitedpskinfra.com/resources/psk_brochure.pdfPSK Infrastructures And Projects Limited is committed to ... 18. Kerb Casting Machines 7 ... Concrete

An ISO 9001:2008

Certified Company

PSK Infrastructures AndProjects Limited

Page 2: PSK Infrastructures And Projects Limitedpskinfra.com/resources/psk_brochure.pdfPSK Infrastructures And Projects Limited is committed to ... 18. Kerb Casting Machines 7 ... Concrete

Chairman & Managing Director

Sri P. Sudhakar

Board of Directors

Sri P. Sudhakar

Sri P. Mahesh Kumar

Smt P. Vijaya Lakshmi

Our Promoters

Sri. P. Sudhakar

Smt. P. Vijaya Lakshmi

Sri. P. Venkata Subbaiah

Sri. P. Mahesh Kumar

Sri. P. Prasad

Sri. P. Anand

Sri. P. Shankar

Our Employers

IVRCL Infrastructures & Projects Ltd.

GMR Infrastructures Ltd.

Gammon India Ltd.

Soma Constructions

SEW Infrastructures Ltd.

IL & FS Engineering Services

Government of Karnataka

Our Bankers

Corporation Bank

ICICI Bank

Canara Bank

Tamilnad Mercantile Bank Ltd.

Axis Bank

ING Bank

Page 3: PSK Infrastructures And Projects Limitedpskinfra.com/resources/psk_brochure.pdfPSK Infrastructures And Projects Limited is committed to ... 18. Kerb Casting Machines 7 ... Concrete

Chairman's Message

My memories take me back to some 25 years ago, when I

was blessed to step into this industry. Since then I am

striving myself to prove our organization to be highly

resourceful both with material and man-power, excellent

organizational ability, experienced technical team besides

possessing modern and sophisticated equipment.

My zeal, dedication and infinite energy along with the team

work of efficient staff made it possible to reach the intricate

targets. With over three decades of experience, the

performance of our company speaks of our head to handle

complexities, heart to handle diversities and guts to handle

ambiguities.

We, at PSK Infrastructures And Projects Limited continue to

strive for technical excellence, personalized care and

sincere services to strengthen the nation and make its future

a better place to live.

Founder, Chairman & Managing Director

P. Sudhakar

Perfection in our attitude...

Our demeanor and...

Our workmanship...

Page 4: PSK Infrastructures And Projects Limitedpskinfra.com/resources/psk_brochure.pdfPSK Infrastructures And Projects Limited is committed to ... 18. Kerb Casting Machines 7 ... Concrete

Our StrengthOur Director, Mr P. Mahesh Kumar, son of Mr P. Sudhakar brought a brand new

phase to the company, being the energetic self, with his profound knowledge,

natural flair and with no limits to his calibre, striving hard to make the company

achieve the remarkable success and leave his mark as a leader.

What sets us apart in this competitive industry is our passion for achieving the best

engineered solutions for our clients, aim to change the face of construction

regardless of the technical challenge. We have, by far proved ourselves by

exhibiting efficiency in all the projects that we have taken up. The results so-far have

been overwhelming. Our strength lies in our ability to use the available resources aptly and complete the

projects with high efficiency & quality at optimum prices. Apart from this, we have many efficient & dedicated

employees working our projects to bring out the best possible results.

Our indigenous professional teams are highly experienced and committed. They always strive to bring the best

possible results working in various roots like planning, execution & maintenance.

Page 5: PSK Infrastructures And Projects Limitedpskinfra.com/resources/psk_brochure.pdfPSK Infrastructures And Projects Limited is committed to ... 18. Kerb Casting Machines 7 ... Concrete

About UsWhat could be a better testimony to our excellence than the knowledge and the expertise that has been passed

on over three decades with diligence and absorbed with utmost reverence till date, making us stand amongst

the leaders of this industry?

Starting as a proprietary concern in the year 1979, we undertook various works both in Andhra Pradesh and

Karnataka and later promoted as Special Class contractors, we executed several irrigation projects with CAD of

Andhra Pradesh, Krishna Bhagya Jal Nigam Limited and Karnataka Neeravari Nigam Limited, Karnataka. In the

year 2005 this proprietary concern converted into a partnership firm as M/s Sudhakar Constructions and

entered into national highway projects and as of now completed nine major packages working with leading

construction companies in India. Since then, PSK has evolved itself to become what it is today, M/s PSK

Infrastructures And Projects Limited - a trusted and revered organization accredited with ISO 9001:2008,

creating an extraordinary enterprise with the help of its precious clients and passionate employees.

Our longevity is evidence of a team that is motivated to succeed and dedicated to provide the best possible

service. We blend hard work and commitment without compromising on quality. As an organization, we have

spread across south India and with the support of our people we continue to explore more avenues around the

nation to reach and to succeed.

Page 6: PSK Infrastructures And Projects Limitedpskinfra.com/resources/psk_brochure.pdfPSK Infrastructures And Projects Limited is committed to ... 18. Kerb Casting Machines 7 ... Concrete

CommitmentThe commitment that our organization has towards work is unmatchable.

The quality and precision work reflects the commitment with which our

teams work on our projects. Each project is managed by experienced

personnel who supervise the progress keenly keeping in touch with the

employees at personal level. Weekly supervision is provided at the

corporate level and apt support is given as and when required. The rapport

between the employees, site supervisions and the corporate sector is

excellent thus making each employee more committed to work inturn

making our project successful.

We work with clients as part of their team, from the project conception

through to delivery and on-going operations. With our focus on innovation

we continually strive to develop the solutions which meet and exceed our

client's needs.

Construction StrategyPSK continues to focus on the construction marked as a strategic activity,

based on sound growth and profitability, considerable to generate cash

flow, funding the company's diversification and international expansion.

PSK keep objectives in construction, maintaining its leading position in the

sector and seek greater growth based on:

Ÿ Exceptional growth in projects and increasing the number of new

contracts with private sector customers

Ÿ Increase construction work through direct and indirect (other

company businesses such as infrastructure and services) involvement

in construction projects under the new private financing formulas

Ÿ Increase the stable international presence in markets chosen

because of their stability and future growth capacity

Ÿ Improve profitability by carefully selecting projects, prioritising

returns over volume, seizing opportunities and synergies through

coordination between the various construction businesses and the

group's other activities, creating value and gaining a competitive

edge by providing solutions and technology, improving productivity

by using new technology, always satisfying the customer needs

(improving quality in construction, environmental management etc.)

Page 7: PSK Infrastructures And Projects Limitedpskinfra.com/resources/psk_brochure.pdfPSK Infrastructures And Projects Limited is committed to ... 18. Kerb Casting Machines 7 ... Concrete

Quality MessageAt PSK, quality comes before everything. The success of PSK is based on

their commitment and ability to build profitable projects without

compromising quality, quality of an everlasting nature, quality that adds a

life time of value, quality that is recognized nationally. With technology

challenges ahead and innovations apart it is our commitment to quality that

upholds our company's credibility.

We never compromise on our values. We recognize integrity as one of

such. It is our responsibility to create and contribute to the world and

society we are living in. We always strive to share and contribute at least a

single step in everyone's future success.

Ÿ To consistently deliver quality product by meeting specifications,

contractual, regulatory and statutory requirements

Ÿ To achieve enhanced customer satisfaction through cost effective

and timely completion

Ÿ To update and supplement the procedures complying with

international standard

Ÿ PSK firmly believes that if the quality is evident, our reputation will

follow.

Safety & Eco FriendlyPSK Infrastructures And Projects Limited is committed to being an

employer of choice through action, not just words, and we invest heavily in

our people's safety and for pollution-free environment.

Safety of today's work is vital to finish it tomorrow. Safety is an important

aspect to be observed in work. We ensure the safety of the workforce in our

organization. Everyone's attention is always focused to avoid any accident

or danger. Hazard control and safety measures are observed in all activities.

Our commitment is to turn our client's dreams into reality using most

modern technology but at the same time imposing minimal impact on the

environment. We contribute in every possible way to protect the nature

and take every possible step in maintaining the ecological balance. Avenue

plantation is a part of our work.

Page 8: PSK Infrastructures And Projects Limitedpskinfra.com/resources/psk_brochure.pdfPSK Infrastructures And Projects Limited is committed to ... 18. Kerb Casting Machines 7 ... Concrete

Men & Machinery

Our employees are our most important resource in achieving our targets. To maintain a dynamic corporate culture driven by the

values of quality, innovation and safety, we provide our employees with the most effective tools and technologies required to ensure

our customers are completely satisfied with every stage of their working partnership with PSK. We have the talented and most

experienced men working with us who always strive to make everyday better than the previous and stand as an asset to the company.

Our TeamSome of our key positions

S. No. Key Position No.

01. Project Directors 3

02. Project In-charges 8

03. Technical Engineers 30

04. Highway Engineers 30

05. Structural Engineers 15

06. Surveyors 30

07. Asphalt Paving Staff 110

08. QA/QC Personnel 25

S. No. Key Position No.

09. Planning Engineers and Quantity Surveyors 25

10. Equipment and Plant Engineers 20

11. Safety Engineers 30

12. Supervisory Staff 90

13. Administrative Officers 20

14. Supporting Staff 60

15. Semi-skilled Labour 650

Total 1143

Page 9: PSK Infrastructures And Projects Limitedpskinfra.com/resources/psk_brochure.pdfPSK Infrastructures And Projects Limited is committed to ... 18. Kerb Casting Machines 7 ... Concrete

Details of Plant & Machinery Owned

Our company owns substantial state of art equipment of worth INR 1000 million. For maintenance of this machinery we have in-house

procurement management policy which helps for timely procurement of spares and thereby reducing idleness of the equipment at

work and thereby helps optimising their efficiency.

S. No. Name of the Plant / Machinery No. of Units Make Capacity

01. 3 Stage Crushers 4 Puzzolana 250 TPH (2)

200 TPH

150 TPH

02. Hot Mix Batching Plant 5 Linhoff (3)

Lintech

Speco

240 TPH (2)

160 TPH (3)

03. Electronic Sensor Paver 6 Titan (4)

Vogele

Volvo

9 m (5)

13 m

04. WMM Plant 3 Apollo 250 TPH

200 TPH

160 TPH

05. WMM Sensor Paver 3 Apollo 5.5 m

06. Pneumatic Tyre Rollers 6 Ingersoll-Rand

07. Tandom Rollers 16 Ingersoll-Rand, Escorts

08. Grader 8 Komatsu, Mitsubishi, Caterpillar

09. Wheel Loader 9 JCB 430Z, HM

10. Taurus Tippers 165 Ashok Leyland, TATA Eicher 16 Cum

20 Cum

11. Water Tankers 16 Ashok Leyland, TATA 16KL, 18KL

12. Bitumen Sprayer 10 Apollo, Himalaya

13. Excavator Loader 7 JCB 3DX 1.1 Cum

14. Excavators 12 Tata Ex-200, Volvo-290, 210 1 Cum

15. Vibratory Soil Compactor 10 Escorts, Volvo 10 MT

16. Ready Mix Concrete Batching Plant 3 Polytech, Aquaris 60 Cum/Hr

17. Transit Mixers 12 Greaves 6 Cum

18. Kerb Casting Machines 7 Apollo

19. Kerb Cutting Machines 4 Elkon

20. Concrete Pumping Machine 1 Schwing Stetter

21. Dozers D80 3 Komatsu

Page 10: PSK Infrastructures And Projects Limitedpskinfra.com/resources/psk_brochure.pdfPSK Infrastructures And Projects Limited is committed to ... 18. Kerb Casting Machines 7 ... Concrete

On-going ProjectsEmployer Name of the work Length Client

IVRCL Limited Bituminous Works for Six laning from Km 102.350 to Km 144.680 on the Chengapalli

to the start of Coimbatore bypass section of NH-47 in the State of Tamil Nadu

42 KM NHAI BOT

IL & FS ES Four laning of Pune - Solapur Package from Km 190.000 to Km 220.000 and from

Km 249.000 to Km 251.000 of NH-9 in the State of Maharashtra

32 KM NHAI DBFOT

SEW Four laning from Km 76.000 to Km 125.000 of Delhi - Saharanpur - Yamunotri

Package of SH-57 in the State of Uttar Pradesh

49 KM UPSHA DBFOT

Completed Projects

Employer Name of the work Length Client

IVRCL Limited Widening to 4/6 lanes and upgrading the existing 2 lane road including minor bridges

(up to 30m) service roads and auxiliary works in the State of Andhra Pradesh between

km 97 (Srikakulam) and km 171 (Palasa) of NH-5

74 KM NHAI

SEW AP-1 Package: Widening to 4/6 lanes and upgrading the existing 2 lane road

including minor bridges, service roads and auxiliary works in the state of Andhra

Pradesh between km 49 to km 97 of NH-5

48 KM NHAI

IVRCL Limited Construction of four laning & strengthening of NH-47 from Kumarapalayam to

Chengapalli from km. 53.000 to 100.00 (TN-7) in the State of Tamilnadu

47 KM NHAI BOT

GMR Construction of four laning NH-7 and strengthening of existing two lanes at

Kamareddy, Nizamabad Dist. in the State Andhra Pradesh

30 KM NHAI BOT

IVRCL Limited Construction of four laning & strengthening of existing two lanes of NH-7 from

Madurai to Kanyakumari from km 80.000 to km120.000 Contract, package NS-41 (TN)

in the State of Tamilnadu

40 KM NHAI

GAMMON Strengthening of existing 4 lane dual carriageway from km 200.000 to km301.747 in

Rajahmundry - Tuni section of NH-5 in the State of Andhra Pradesh

101.74 KM NHAI BOT

IVRCL Limited Construction of four laning & strengthening of existing two lanes of NH-7 from

Madurai to Kanyakumari from km 42.000 to km.80.000 contract, package NS-40 (TN)

in the State of Tamilnadu

38 KM NHAI

SOMA Overlaying of Nellore Bypass section of NH-5 in the State of Andhra Pradesh 25 KM NHAI BOT

IVRCL Limited Construction of four laning & Strengthening of NH-47 from Salem to Kumarapalyam

from km 0.00 to km 53 in State of Tamilnadu

53 KM NHAI BOT

Page 11: PSK Infrastructures And Projects Limitedpskinfra.com/resources/psk_brochure.pdfPSK Infrastructures And Projects Limited is committed to ... 18. Kerb Casting Machines 7 ... Concrete

Our Footprint

On-going Projects

Completed Projects

Page 12: PSK Infrastructures And Projects Limitedpskinfra.com/resources/psk_brochure.pdfPSK Infrastructures And Projects Limited is committed to ... 18. Kerb Casting Machines 7 ... Concrete

Strengthens the Nation

PSK Infrastructures And Projects Limited

Phones: +91 40 23418805/06/07Fax: +91 40 23417117Email: [email protected]: www.pskinfra.com

Plot No.51, Nagarjuna Hills, Panjagutta, Hyderabad - 500082