Page 1: PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont

PS/SPD Electronics Installation and Commissioning

17 July 2007

Valentin NiessOn behalf of LPC Clermont

Page 2: PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont

2

PS/SPD FEB Production Status Production & Tests running smoothly now: 16 PS/SPD FEB/week (Thanks

to dedicated test team! - Catherine & Christophe - )

- No more PCB issues : 2/7 boards in preserie II

- PGA programmed before implantation / Delayed production

But … No more PGA problems !!! ( 6/15 boards PGA issues in preserie )

Potential shortcut spotted with RJ45 A2 connectors shielding back manufacturer ( Hitachi )

12 %

RJ 45 A2 connector

C side threshold

Pre

s.

Lo

t 1

Lo

t 2

Lo

t 3

Lo

t 4

16/07 23/0711/0722/06

Pre

s.

Lo

t 1

Lo

t 2

Lo

t 3

Lo

t 4

16/07 23/0711/0722/06 Valid PRS FEB

stat

us

Target is to equip C side before end of July / installation ‘on flight’

10 FEBswith A2 to

be fixed

Fai

llure

Rat

e (

% )

# P

RS

FE

B

Page 3: PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont

3

PRS Electronics Installation Status

All VFE previously installed & cabled April-May

All tested and left OK

Problems: Dead contacts (RJ45 analogic signal/clock) ~1/5 boards VFE not powered / Low Voltage ~1/50 boards

Solved by re-plugging RJ45 or VFE power cable

Notice: RJ45 dead contact occur both on FE and VFE side

2 FE Half crates installed end of June: PRS0 ( SM1 )

PRS3 ( SM4 )

but A2 connector issue de-cabled / re-cabling

What did we learn from this ? + PhoTo

Page 4: PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont

4

FE Installation: 1st Trial

Cabling rate: 1 crate / day … and … Its ‘feasible’ to get boards out after / but in packs of 3-4 …

Traveller Test: Short serie of production Tests ensure travel was good No surprises!

Hunt RJ45 dead contacts with noise measurements ( VFE noise rules )

With VFE

Without VFE

inf( VFE ) > sup( FE )

Dead contacts: easy to see however repairing a contact can endommage another one …

Let’s cross our fingers that the procedure always converges …

Final check required when ‘closing the box’

No excess noise

with HV up to 650 V

Page 5: PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont

5

VFE POWER ISSUES

3 out of 14 VFE tested end of June seemed to be badly powered : They were left functionnal in may !!!

SM1 bottom box opened … 3 screws damaged in the battle

re-plugging power cable on VFE side solved the problem

but … no obvious bad connection spotted …

Further investigation : Access required !!!

Is the problem really mechanical? Never happened @ LPC …

So what’s about regulator boards?

The box SM1 was checked fully functional after closure. And now?

1 RJ45 bad connection spotted on VFE side ( SM4 top ), previously left due to miss-interpretation : … expect others …

Page 6: PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont

6

PS LEDs as Seen with PRS0 FEBs PS/SPD> CROC / FEBs and LED TSB in PRS0 ( temporary )

steered locally ( CAT / PVSS ) Prototype CU + Final HV : operated @ nominal value of 550 V Steering HV for PMTs, VLED via PVSS (final)

Acquisition with PS/SPD FEB FE-PGA spy-RAMs

Test Sequence broadcasted on back-plane by PRS CROC / Triggers - LED TSB - FE-PGA RAM

30 c

ycle

s FE-PGA Read Start

Signal max

t

channelsTotal charge

LED TSB : external

trigger o

ut not seen

(Jumper require

d?)

)( PedVQ i

V1

V2

V3 V4 V5

Tail

Page 7: PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont

7

Measured Charge, Q, in SM1

NO HV(soft bug)

Now Corrected

VFE KO(no power?)

BOTTOM

TOP

14

5

3

10

5

Max / Min is in Green

Half Board

Go

od

Go

od

Bad

Evi

lE

vil

Nominal HV 550 V

Color Map:COLD

MEDIUMHOT

Page 8: PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont

8

The Good : SM1-B-VFE01

Stationary

2 GQ

rms on Q Q vs time

Q stat. dist.

Fluctuation dominated PMT

Q

2

hottest

coldest

hottest

coldest

500 evts / Ch.

2

2

Q

N e

Non uniformity in charge ~5results from:- Gain ( ~1.7 )- Illumination

Deconvoluatefrom source

non uniformities- Assume cte light / Ch. -

Q

Den

sit

y

Time ( s )

Q

Page 9: PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont

9

The Good : Timing, Shape & Gain

1

2

V

V

Gain: Max / Min = 1.5 -1.7 in global agreement with

LPC measurementsBut +/- 0.2 variations by Ch.

Timing:Same t0 for all ChannelsBut … varies …

Corr = 0.8 with N-e

14-33 %

Variableshape factorsbetween Ch.

rms on

~10 % fluctuationswithin a Ch.

1

2

V

V

N-e

) (

% )

Page 10: PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont

10

The Bad: SM1-B-VFE03

G 2 / Q

Additional noise‘pollutes’ signal?

From LEDs?

Gain: 1.6 measured @ LPC

Q stat. dist.OK

coldest

hottest

: 12-23 %

OK PathologicCharge, Q

Gain too high 2.1 vs 1.6

Timing &Shape OK

Compatiblewith X-talk

Q

Den

sit

y

Page 11: PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont

11

The Evil: SM1-T-VFE02

Multiplepeaks

Multiplepeaks

Q: Saturation FE

2 GQ

Q stat. dist.

rms on Q Q vs timehottest

hottest

coldest

coldest

strangest

strangestFluctuations not dominated PM

Q

Time ( s )

Q

Den

sit

y

Q

2

Page 12: PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont

12

The Evil Continued: VLED

Not possible toclose the light !!!

Strange behaviourof noise with VLED

To be investigated furtherIn good cases

Signal saturation for SM1-TOP

)(1033.1)( 4 ADCVVV LEDLED

VLED controlled via PVSS / calibrated with multimeter :

VLED tuned according to SM1-Bottom

Nom

inal value

No signal expected

Q

VLED ( V )VLED ( V )

(

Q )

Page 13: PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont

13

Tentative Tests With SPD VFE

DAQ Tests:

Pattern injection from SPD VFE / PRS2 FEBs

Read SPD data with FEB : result = OK, but …

LED Tests:

Flash SPD LEDs and read with PS/SPD FEBs

Half of the channels have SPD bit inverted !

‘Mis-understanding between Barcelona & LPC’

Where to absorb it now? Not realistic @ FEB level

conclusion … a suivre … voir Rémi

Page 14: PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont

14

Conclusion

PS/SPD FEB production on good way :

C side should be equipped end of July

Investigate VFE Powering issues / Dead contacts simultaneously

LED acquisition with FEBs performed in close to final state

Further investigate noise / more statistics

Investigate VLED behaviour

FE / VFE connection can tested from noise measurements solely

but fragile … requires the crate to be sealed after …

Fill in the Online Calo Logbook …