ptw signatory licensing form (jp)
TRANSCRIPT
PTW SIGNATORY LICENSING
FORM (JP)
ADCO – Permit To Work (PTW)
Volume : 10/3A Revision: 6A
Part : 1 Date: Aug 2017
Section : Appendix U2 Page 1 of 2
CRP-HSE-10-3A- Part 1 Rev6A.doc
Appendix U2: PTW Signatory Licensing Form (JP)
Personal and Job Details
Candidate Name: Masum Ahmad
Candidate Mobile No: 056-7481088
Contractor Name & Project title:
Target Engineering
PTW Role: Job Performer
Licensing Status: New Exist Transfer
Candidate Discipline Mechanical Electrical Instrumentation
Telecom Pipeline Corrosion Inspection Civil Others
Stage 1: Pre-Requisite Training :
1. Prerequisite for PTW User 2. Permit to work –PTW user Certification 3. Confined space Awareness 4. Task Risk assessment
Date Attended :04-Aug-2020 Date Attended :05 & 06-Aug-2020 Date Attended :03-Aug-2020 Date Attended: :28-July-2020
Stage 2: Licensing Training Requirement & Panel Assessment
1. PTW Training Date: Pass / Fail =
2. Discipline HSE Skills Competency Assessment
The assessment should cover the relevant topics related to the employee job (As applicable):
Electrical area classification;
Proximity hazards during crane operations;
Hazards of power tools and hand tools;
Isolation, lockout/ tag-out procedure;
Tie-ins with live equipment;
Access /egress and working at heights;
Protection against Hydrogen Sulphide;
Conflicting activities;
Use of Work Equipment & Machinery;
High Risk Work Activities; Emergency procedures;
Confined space entry;
Gas testing;
Sources of ignition;
Scafftag procedure; etc.
Hot tapping;
Tank cleaning; Excavations;
Welding and cutting;
Radiation protection;
LPR;
Stop policy;
ADCO – Permit To Work (PTW)
Volume : 10/3A Revision: 6A
Part : 1 Date: Aug 2017
Section : Appendix U2 Page 2 of 2
CRP-HSE-10-3A- Part 1 Rev6A.doc
Assessment panel
JP (P & C) Assessed by the following Field / Terminal Panel
Mandatory:
1 Discipline Engineer (Job Originator) : Name: ____________________ Signature: _________________ 2 Sr. Construction Engineer: Name: ____________________ Signature: _________________ 3 P&C / Line HSE Engineer : Name: ____________________ Signature: _________________
Optional:
1 Construction Manager: (Verify 50% of Panel Assessments to ensure Competency)
Name: ____________________ Signature: _________________ 2 VP P&C / VPT (Verify 10% of Panel Assessments to ensure
Competency) Name: ____________________ Signature: _________________
3. Field / Terminal / P&C Panel Assessment Result
Satisfactory
Satisfactory with Conditions
Unsatisfactory with Remarks
Conditions / Remarks ………………………………………………………………………………. ………………………………………………………………………………. ………………………………………………………………………………. ……………………………………………………………………………….
Panel Assessment Date: : / /
Next Panel Date (For Conditions / Remarks ) : / /
Stage 3: Licensing Approval and Registration in e-PTW System
Field / Terminal P&C / Line HSE Engineer
Name: _______________________ Signature: _________________
Date: / /
Contract Administrator (CA) / ADCO Department Manager
Name: Signature: _________________
Date: / /
Note: 1- The above mentioned candidate has been approved on the date signed above to play his
role in PTW as per his specific discipline and within his area of responsibility as stipulated in (section 1) above. In case of relocation or transfer to another discipline he must re-attend a new assessment.
2- By this approval, the candidate is eligible to get his user name and password from the PTWS administrator and can access and use the ADCO electronic PTW.
CV
Page 1 of 4
TARGET ENGINEERING CONSTRUCTION COMPANY LLC Abu Dhabi
Curriculum-Vitae
Masum Ahmad Pre-commissioning and commissioning Activities JOB PERFORMER E-MAIL ADDRESS : [email protected]
CONTACT No. : Mob : + +91-9262587448/8809626104 : +971-567481088
: +971- Career Objective:-
Responsible position with an opportunity for professional challenge and growth while combining area of experience in the field of project to support enhances corporate goal and Objective. Seeking A Challenging Position as an Instrument Supervisor
Personal Profile:-
More than 14 years working experience in India, Middle East & Africa as an Instrument Foreman. Worked in Emetics Egg & Cont., Shah Cont. & Pvt.Ltd, Fujairah Cement Industries (UAE), ETA Star LLC, NESMA & Partners’
co ltd various positions and projects. Till Date in Adonoc project BOROUGE,BUIFD,Al taweelah Alumina Refinery working as a supervisor Under BPJV Trought Target Engg
Career Summary:-
Over 14 Years working experience in the Oil&Gas, Refinery, Petrochemical, Steel Plant Cement Plant Maintenance and Constructions, Precommissioning, commissioning Job. I have been involved in Calibration, Loop Checking And Trouble Shooting Of Flow Pressure Level & Temperature Electronic Non Smart, Field Bus & Profibus Transmitters
(Rosemount, Yokogaya, Siemens, EIM, Honeywel, Biffi, Rotrek & ABB) calibration, Loop Checking & Trouble Shooting of Control Valves .Also SOV, ESDV, MOV & on off Valves Pneumatic Positioner Installation & Function Testing Turbine Vortex & Mass Flow Meters & Vibration System. Proximeter and Trend Master Bentley Nevada , 5000 Calibration of Probes & Monitor with TK3.Executed and Handled Fault Finding and Vendor Assistance for Gas Turbines, Compressor (Nuevo Pig none) Technical /Academic Qualification:-
Diploma in instrumentation Engineering Completed - 2000-2004.
S.S.C. B.S.E. Board, Patna, Bihar. Completed -1999.
Computer/Software Knowledge:
Windows 98/2000/Xp/Vista, MS Office, Internet Browsing.
Calibration Instruments Handled:
Hart Communication (Rosemount and Emerson 475)
Calibration Instrument TK- 3 2G Kit
Druck DP610 Pressure and Vacuum Calibration
Altek RTD/Thermocouple Calibrator
Altek Loop Calibrator Temperature Calibrator
Position Held : Instrument supervisor
Period : April 2018 Till Dtae
Company : Target Engineering Cont com (UAE)
Project : ADNOC Project Buhasa
Able to loop checking commissioning, function test of all types of Instrument control cable gland packing termination of JB, PMS panel.
Schematics P&I, I L D, valve loop diagram, logic diagram, marshalling box connection and Inter connection diagram and process flow diagram.
Analytical Instruments: - online calibration installation and maintenance and look checking trouble shooting.
Responsible for calibration of all types of process Instrument and authorized to make calibration report as per quality standard
Loop package documentation progress report punch list items and data shedule Also coordinate with main client function test Interlock system Pre commissioning-commissioning
Page 2 of 4
Work Experience:
Period
Company
Category/Client/Project Position Total
Experience
Apr 2018 Till Date
Target Engineering
cont (UAE)
Al Taweelah Alumina Refinery(ATA)
Instrument
supervisor Total
Experience
June 2013
Sept 2016
NESMA & Partners’ co ltd.
KSA.
Saudi Arbia kaust project
Jeddah
(Construction,Maintananace)
Instrument
supervisor 04 years
Dec 2011 -
Aug 2012
ETA Star LLC, Dubai
Company, UAE.
Fabrica Cemento de kuwanja
Project - Sumbhe Cuacra,
Angola, South Africa.
Instrument
supervisor 01 years
Oct 2008 –
June 2011 Fujairah Cement Industries
Fujairah Cement Industries,
UAE.
Instrument
supervisor 03 Years
March 2005 -
April 2007
Shah Cont. & Pvt.Ltd.
India.
TATA Iron &Steel Comp
Jamshedpur, India.
Instrument
Foreman 2.1 Years
Jan 2003 –
March 2005
Elmatics Engg & Cont.
India
HOCL Chemical, Raighrah,
India.
Instrument
Foreman 02 .2 years
Total Work Experiences 14 Years
Position Held : Instrument supervisor
Period : June 2013 To Oct 2016
Company : NESMA & Partners’ co ltd, Saudi Arabia.
Project : Saudi Arabia.kaust project jeddah
Duties & Responsibility:-
Assesses project requirements, monitors work and ensures that company's quality plan is in compliance with the approved quality plan.
Provides input for the development of project schedules in cooperation with the construction engineers and planners.
Establishes and maintains communications to ensure the accurate and timely flow of information to and from site in accordance with the project procedures.
Manages all electrical and instrumentation installation. Assists E&I team in pre-construction planning and procurement activities.
Controls change/scope creep, ensuring that all scope changes are quickly and properly documented, communicated to engineering and the client, and that change orders are approved prior to the performance of the work.
Able to loop checking commissioning, function test of all types of Instrument control cable gland packing termination of JB, PMS panel.
Schematics P&I, I L D, valve loop diagram, logic diagram, marshalling box connection and Inter connection diagram and process flow diagram.
Analytical Instruments: - online calibration installation and maintenance and look checking trouble shooting.
Responsible for calibration of all types of process Instrument and authorized to make calibration report as per quality standard
Performing schedule, preventive maintenance work periodic maintenance corrective maintenance and
complete maintenance report Loop package documentation progress report punch list items and data sheet Also coordinate with main client function test Interlock system commissioning pre-commissioning and
start up activity report and Involved in inspection with QC department.
TARGET ENGINEERING CONSTRUCTION COMPANY LLC Abu Dhabi
Page 3 of 4
Conduct weekly and monthly audit as required; internal or external with client or contractor / subcontractor.
Advises Site engineer’s regarding developments or issues that could affect schedule, costs, client relations and public relations.
Assists in preparation of weekly and monthly status reports for the company to keep the client and project management informed of construction progress and the status of costs and schedule as related
to the budgets and previous forecasts. Executes field construction activities in conformance with project drawings, specifications, schedules,
cost estimates, procedures, quality requirements and safety standards. Ensures that daily and weekly short-range planning is maintained down to the foreman level. Reviewed design scope and approach with regard to constructability and submits recommendations for
change. Determines manpower levels to attain schedule milestones and monitors manpower levels and craft
mixes to ensure conformance with the construction plan. Monitors productivity and cost and implements appropriate action to maintain maximum labor
productivity and cost-effectiveness. Implements the site safety and security procedures and project work rules & regulations. Plays an active role in the development of the safety culture on the project, making safety a natural
part of all work performed.
Coordinates the field activities of company and manages their contractual commitments including cost, quality, and schedule.
Position Held : Instrument supervisor
Period : Dec 2011 - Aug 2012
Company : ETA Star LLC, Dubai Company, UAE.
Project : Fabrica Cemento de kuwanja Project -(AFRICA ANGOLA)
Duties & Responsibility :-
Assists I team in pre-construction planning and procurement activities. Controls change/scope creep, ensuring that all scope changes are quickly and properly documented,
communicated to engineering and the client, and that change orders are approved prior to the performance of the work.
report punch list items and data sheet Also coordinate with main client function test Interlock system commissioning pre-commissioning and
start up activity report and Involved in Able to loop checking commissioning, function test of all types of Instrument control cable gland packing termination of JB, PMS panel.
Schematics P&I, I L D, valve loop diagram, logic diagram, marshalling box connection and Inter connection diagram and process flow diagram.
Analytical Instruments: - online calibration installation and maintenance and look checking trouble shooting.
Responsible for calibration of all types of process Instrument and authorized to make calibration report as per quality standard
Performing schedule, preventive maintenance work periodic maintenance corrective maintenance and complete maintenance report
Loop package documentation progress inspection with QC department.
Position Held : Instrumentation supervisor
Period : Oct 2008 – June 2011
Company : Fujairah Cement Industries (UAE),
Project : Fujairah Cement Industries (UAE),
Position Held : Instrument Foreman
Period : March 2005 -April 2007
Company : Shah Cont. & Pvt.Ltd. India.
Process Plant : TATA Iron &Steel Comp Jamshedpur, India.
Position Held : Instrument Foreman
Period : Jan 2003 – March 2005
Company : Elmatics Engg & Cont. India.
Process Plant : HOCL Chemical, Raighrah, India.
TARGET ENGINEERING CONSTRUCTION COMPANY LLC Abu Dhabi
Page 4 of 4
Additional Information:-
Skills At:
Microsoft Office Professional and computerized database tools. Technical contractual requirements and interfaces with other bodies.
Using templates and styles. Working under own initiative, action-oriented, solution based reliable. Flexible response to changing needs and able to cope with complex tasks requiring delivery to short
timescales.
Effective interpersonal and verbal & written communication. Working closely with engineers to ensure coordination of status and distribution. Working with all other project positions in support of overall project success.
Knowledge of:
Key document control process.
Engineering and vendor document flow process. MS Windows Operating Systems in a LAN based environment. A detailed understanding of a project lifecycle. Company Policies. & Engineering Standards.
Personal Information:
NAME : Masum Ahmad FATHER NAME : Raj Mohammad
RELEGION : Islam. DATE OF BIRTH : April 10, 1983
NATIONALITY : Indian PASSPORT No : P- 8945122 PASSPORT ISSUE DATE : 19/05/2017
PASSPORT EAPIRY DATE : 18/04/2027 18/05/2027 PLACE OF ISSUED : Patna
Languages Spoken:
English / Hindi / Urdu/ Portages.
DECLARATION, I declare that all above my declaration are best of my knowledge & I am sure that after going through my experience profile in previous pages you will find sincerity in my qualification & experience for the post of
Instrument Supervisor
Place : UAE
Date: 23 -Aug- 2020 MASUM AHMAD
TARGET ENGINEERING CONSTRUCTION COMPANY LLC Abu Dhabi
EDUCATIONAL
CERTIFICATE
CERTIFICATES
MEDICAL FITNESS CERTIFICATE