Page 1: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Public JSC

“Ukrnaftokhimproect"

Page 2: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Company history

• 1958 Council of Ministers of the USSR State Planning Commission

orders the "Ukrgiproshaht" Institute to be involved in carrying out design,

survey and research works at oil and gas industry enterprises - the

official date of founding of the institute.

• 1992 Reorganization of the SPA "MASMA" and creation of the separate

design institute "Ukrgiproneftehim" with direct subordination to State

Ministry of Chemical Industry of Ukraine.

• 1994 Corporatization. State Commitee for Oil and Gas order established

OJSC "Ukrnaftokhimproect", which became the legal successor of the

Institute "Ukrgiproneftehim".

• 2011 Open Joint Stock Company "Ukrainian Institute for design of refining

and petrochemical plants "Ukrnaftokhimproect" (OJSC

"Ukrnaftokhimproect") was renamed to Public Joint Stock Company

"Ukrainian Institute for design of refining and petrochemical plants

"Ukrnaftokhimproect" (Public JSC "Ukrnaftokhimproect").

Page 3: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK
Page 4: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Company management

organization structure

Chairman of the Board

Technical director Director of Engineering

Head project engineers bureau Supervision department

Control department Technological department

Assembly and mechanical

department

Architecture and construction

department

Electrotechnical department Control and automation

department

Water supply and sanitation

department Heating and ventilation department

Thermal engineering department General layout and transport

department

Engineering survey department Calculation department

Designing works automation

department

Design documentation output and

storage department

Technical director department

New technology and CAD

development sector Quality management system

and licensing sector

Informational analytical sector

Accounting

Branches:

Lviv, Severodonetsk,

Kharkiv, Kherson,

Kremenchug

Offices in:

Russian Federation,

Republic of Belarus,

Republic of Kazakhstan

Administration

Human resources

Planning and contract department

Department of material and technical

maintenance and cleaning Autotransport department

Industrial safety sector Designing support sector

Marketing sector

Page 5: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Russian Federation

Certificate of Self-Regulatory Organization Non-profit partnership

"Neftegazservis" for admission to the types of works on preparation of project

documentation, which affect the safety of capital construction, including

the especially dangerous objects from 22.09.2011 № 005-2

Certificate of Self-Regulatory Organization Non-profit partnership of specialized

enterprises of Oil and gas industry "Neftegazstroy“ for admission to the

types activities that affect the safety of capital construction, including a

particularly dangerous objects from 11.08.2011 № 000867-2011-9909152511-C-041

Certificate of self-regulating organization Non-Profit Partnership "Engineering

Geological Surveying in Construction" for admission to a particular activity or

activities that affect the safety of capital construction, including a

particularly dangerous objects from 03.05.2012 № 0094.01-2012-214891026148-I-

014

Page 6: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Ukraine

State Architectural and Building Inspection license

State Department of Fire Safety of the Department of Emergencies of Ukraine license

Permission for commencement of works of increased danger

State Service of Geodesy, Cartography and Cadastre license

Page 7: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Republic of Belarus

Permission no. 05-984-2011 from 21.07.2011, the Department for Supervision on safe

works conduction in industry. Ministry of Emergency Situations of the Republic of

Belarus (Gospromnadzor)

Development of projects of technological processes and industries, which apply highly

toxic, toxic and potent substances, including their storage, as well as processes and

industries, where formation of explosive atmospheres is possible

Calculation of the relative energy potentials for explosive hazardous technological units

Development of the declaration of industrial safety for hazardous industrial facilities for

the enterprises controlled by the Republic of Belarus Gospromnadzor

Page 8: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Republic of Kazakhstan

Department of the State Architectural and Construction Supervision of Astana.

State license for activities in designing and surveying in the field of

architecture, urban planning and construction

Department of the State Architectural and Construction Supervision of Astana.

State license for performing construction and assembly works in the field of

architecture, urban planning and construction

Department of the State Architectural and Construction Supervision of Astana.

State license for performing expertise works and engineering services in the

field of architecture, urban planning and construction

Committee for State inspection of oil and gas industry. Ministry of Oil and Gas of

the Republic of Kazakhstan. State license for activities on designing

petrochemical and oil and gas processing plants

Page 9: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Quality management system

Quality of Public JSC “Ukrnaftokhimproect”

works has been approved by Quality Management

System certificate according to International

Standard ISO 9001:2008 (initial certification - 2003).

Main goals in quality are: :

- meeting the increasing demands of customers

(consumers) to product quality;

- development of new designing programs to

occupy the leading position in the design and

survey market.

Page 10: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for technological

department

Software name

Functionality

Developer

HYSYS.Process. v 2.4

The program of

constructing flow diagrams,

flows, heat transfer

equipment, pipes, pressure

measurement, the operation of

separation, the column definition

of solids, reactors.

HYSYS

TASK. v 5. 0

The program allows

to simulate the

most complex integrated

circuits. It is possible to

check and analyze the network

performance of heat exchangers

in general, or of any

exchanger separately.

HYSYS

Page 11: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Software name

Functionality

Developer

Predklapan v 2.5 The program is designed to

calculate and select the brand of

safety valves of direct

action, mounted

on vehicles, vessels and

process piping.

Scientific Technical Company

“Truboprovod”

Moscow.

Gidrosistema. v 2.10

Carrying

out hydraulic calculations

for single-

phase flow pumping (liquid or

gas) without heat transfer, as

well as to select and to

determine the diameters of the

bandwidth of a

branched pipeline.

Scientific Technical Company

“Truboprovod”

Moscow.

CAD software for technological

department (continued)

Page 12: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for technological

department (continued)

Software name

Functionality

Developer

SAFETY v 1.2

The program is applicable to

determine the energy

potential of explosive designed

and existing facilities,

preparation of declarations

of security analysis of the

consequences of emergencies.

IKT Service

Moscow.

TOKSI v 2

The program to quantify the

effects of chemical

accidents on industrial facilities

with emissions of hazardous

chemicals into the atmosphere.

IKT Service

Moscow.

Page 13: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Software name

Functionality

Developer

RPMS 2000

RPMS system which is the

most profound in its

capabilities for modeling

technological features at refining

and petrochemical enterprises

and their economic and market

environment.

JV “Perrakom“

Moscow.

VANTAGE PD P&ID v 6.2

VANTAGE PE P &

ID, version 6.2, provides a

solution for developing

and storing project

data integration and process

flow diagrams (P&ID),

developed based on AutoCAD.

AVEVA UK

CAD software for technological

department (continued)

Page 14: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Software name

Functionality

Developer

PV - security

after decompression of device

Accounting for cooling

overheated spilled liquid phase

(LP) when it evaporates.

Calculation of initial conditions

for the composition,

quantities and temperatures of

PGP and LP.

LLC Tehnosoft-Computer Center

Moscow.

“Ecolog - Noise"

Calculation of the noise

characteristics of the

module "Calculation of the

penetrating noise" machine.

Integral

St. Petersburg, Russia

INTERGRAPH P&ID

Is the solution for development

and storage of design

data integration and process

flow diagrams (P&ID).

Intergraph Corp

USA

CAD software for technological

department (continued)

Page 15: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for Assembly and

Mechanics department

Software name

Functionality

Developer

“Start" The program is designed to

calculate the strength and

stiffness of the space of

branched piping for various

purposes under static loading.

SPA Truboprovod

Moscow

VANTAGE PD PDMS v 12

Design of pipelines,

modeling stairs, ladders, access

zones, equipment design.

AVEVA

UK

Page 16: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Software name

Functionality

Developer

GazCAD. Pipe3d The main functions - the

creation of three-dimensional

model with detailed piping and

pipe fitting process and then

get the plans and sections,

isometric diagrams and output

documents.

JSC Khimproect

Severodonetsk, Ukraine

Shtucer - FEM

Used to calculate the strength

and stiffness of the junction with

the vessel nozzle(device) using

the finite element method

(FEM).

SPA Truboprovod

Moscow.

Astra-Nova Applied computer-aided design,

"ASTRANEFTEKHIM"

JSC Astra

Moscow

CAD software for Assembly and

Mechanics department (continued)

Page 17: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for Architecture and

Construction department

Software name

Functionality

Developer

VANTAGE PD PDMS v 12

Design of pipelines,

modeling stairs, ladders, access

zones, equipment design.

AVEVA

UK

«Autodesk Revit Building 11»

System of architectural design,

automating the creation of

project documentation. Building

information

model conveys construction of

the designed object, its size and

quantitative indicators.

AUTODESK

Page 18: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for Architecture and

Construction department (continued)

Software name

Functionality

Developer

Structure CAD (SCAD)

SCAD for Windows -

Wednesday synthesis design

model and analysis

of simulation provides unlimited

possibilities of design

models from the simplest to the

most complex designs.

Sci-tech enterprise at scientific

research institute of

environment and resources

Kyiv.

Kometa

Calculation and design

of components of steel

structures of buildings and

structures in industrial and

civil construction.

Sci-tech enterprise at scientific

research institute of

environment and resources

Kyiv.

Kristall Solution of practical problems of

expertise and design of

steel structures.

Sci-tech enterprise at scientific

research institute of

environment and resources

Kyiv.

Page 19: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Software name

Functionality

Developer

Forum The program is designed to

perform calculations related to

the formation of enlarged

models of the object.

Sci-tech enterprise at scientific

research institute of

environment and resources

Kyiv.

Arbat The program is designed to

perform calculations relating to

the selection and testing of the

existing reinforcement

in reinforced

concrete structures, as well

as for the calculation

of deflections in the light of

cracks in the tension zone of

reinforced concrete.

Sci-tech enterprise at scientific

research institute of

environment and resources

Kyiv.

CAD software for Architecture and

Construction department (continued)

Page 20: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Software name

Functionality

Developer

Kamin The program is designed to

perform calculations relating

to the implementation of

settlements and verifications of

stone and reinforced masonry

structures, as well as

examination of the

damaged structures.

Sci-tech enterprise at scientific

research institute of

environment and resources

Kyiv.

West The program is designed to

perform calculations relating to

the definition of loads and

impacts on building

structures according

to SNiP 2.01.07-85 *.

Sci-tech enterprise at scientific

research institute of

environment and resources

Kyiv.

CAD software for Architecture and

Construction department (continued)

Page 21: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Software name

Functionality

Developer

Monolith The program is designed to

perform calculations related to

the design of reinforced

concrete monolithic

ribbed slabs.

Sci-tech enterprise at scientific

research institute of

environment and resources

Kyiv.

Kross The program is designed to

perform calculations related to

determining the coefficients for

calculating the bed of

foundation structures on an

elastic Winkler foundation.

Sci-tech enterprise at scientific

research institute of

environment and resources

Kyiv.

Lira The simulation program design

models from the simplest to the

most complex designs.

JSC Lira

Kyiv

CAD software for Architecture and

Construction department (continued)

Page 22: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Software name

Functionality

Developer

FOK + LENT - PC 2010

Designing separately

standing foundations under

columns of frame buildings on

the natural, piles and piles

hammer drilled foundation.

GPI Kyiv Promstroyproject

Parus PC

For design (checking) retaining

walls under normal and

seismic conditions of

construction.

GPI Kyiv Promstroyproject

Parus - 3

Program for calculating retaining

walls of the bored piles.

GPI Kyiv Promstroyproject

CAD software for Architecture and

Construction department (continued)

Page 23: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for General layout

and transport department

Software name

Functionality

Developer

Planicad The complex of design of master

plans and grading industrial

facilities, urban and special

objects in the environment

of AutoCAD

GEOCAD

Kyiv.

Topocad + Planicad

The complex of design of master

plans and grading facilities for

industrial use, urban

development and special projects.

GEOCAD

Kyiv.

Page 24: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for control and

automation department

Software name

Functionality

Developer

VANTAGE PD PDMS v 12 3-D model of the equipment and

piping drawings of plans,

sections and isometric

piping, equipment specification.

AVEVA

UK

"Inergraph Smart Plant Instrumentation"

Provides 10

standard, integrated

modules for data processing,

calculation, wiring,

loop drawings, as well as

two separate additions: three-

dimensional data for pipelines

and telecommunications.

Intergraph Corp

USA

Page 25: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for electrotechnical

department

Software name

Functionality

Developer

SAPR-Alpha

Power equipment SAPR-

Alpha-PE

Power one-line electrical diagrams, electrical load calculations, equipment selection and cross-sections of conductors, the setting of protective equipment specification. Drawings of the location of electrical equipment and electrical wiring plans on the premises.

SAPR-Alpha

Moscow

WinELSO 6.2

Placement of equipment and cables on the plans. Formation of electrical circuits Formation of the computational model, and for electrical calculations. Perform lighting calculations. Automated development of design documents

WinELSO

Moscow

Page 26: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for water supply and

sanitation department

Software name

Functionality

Developer

ARS v 9.1

Calculations of the elements of heating

systems in several modes of operation

(heating stations, pipelines, pumping

stations) with automatic water network

operating costs based on

established controls, with

selection throttling devices, with

automatic generation of the

required calculations for input

data. Getting a table of pressure losses.

Y. Kugel

Kyiv

VANTAGE PD PDMS v 12

3-D model of the equipment and

piping drawings of plans, sections

and isometric piping, equipment

specification.

AVEVA UK

Page 27: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for water supply and

sanitation department (continued)

Software name

Functionality

Developer

Inzhcad ver 8

Program for calculating rainwater

drainage

design of external engineering networks

Inzhcad

Kharkiv, Ukraine

Gidrosistema

The hydraulic calculations for transfer of

single-phase flows. Getting a table of

selected sizes and pressure losses.

SPA Truboprovod

Moscow

Page 28: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for thermal

engineering department

Software name

Functionality

Developer

Isolation ver 2.11.03

Calculation and selection

of thermal isolation of equipment and

pipelines.

SPA Truboprovod

Moscow

VANTAGE PD PDMS v 12

3-D model of the equipment and

piping drawings of plans, sections

and isometric piping, equipment

specification.

AVEVA

UK

Page 29: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for heating and

ventilation department

Software name

Functionality

Developer

“PDV-ECOLOG" v 2.50

Program development and formation of project tables of standards of maximum permissible emissions (MPE) of the company.

Integral

St.Petersburg, Russia

VANTAGE PD PDMS v 12

3-D model of the equipment and

piping drawings of plans, sections

and isometric piping, equipment

specification.

AVEVA UK

UPCVP Ecolog

A unified program for calculating the

values of concentrations of pollutants in

the air.

Integral

St.Petersburg, Russia

ARS v 9.1

The calculations of heat exchangers, heat, and engineering calculations.

Y. Kugel

Kyiv

Page 30: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for heating and

ventilation department (continued)

Software name

Functionality

Developer

EOL(GAS)-2000

Automated system for calculating the dispersion of emissions into the atmosphere designed to assess the impact of emissions planned and existing (reconstructed) companies to pollute the atmospheric boundary layer.

LLC “Soft fund"

Kyiv

ARM-ECO

Program designed to generate tables of inventory of emission sources of enterprises, development of an action plan to reduce emissions and reduce concentrations of harmful substances in the atmospheric surface layer.

A.Homenko,

E.Gusha

Kyiv

Page 31: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for engineering survey

department

Software name

Functionality

Developer

TopoGrad 3.22

Automated system for processing the results of geodetic surveys and topographic surveying, performed for large scale mapping.

JV ITES

Kyiv

ТороPlan

Automated system for the formation

of topographic maps from

existing cartographic materials.

JV ITES

Kyiv

TopoMap

Automated system for the formation

of topographic maps from

existing cartographic data

JV ITES

Kyiv

Page 32: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for engineering survey

department (continued)

Software name

Functionality

Developer

Easy Trace v 8.0

Automated digitizing existing plans for cartographic materials.

Easy Trace Group, Ryazan, Russia

WinGEO

Building engineering and geological sections, characterization of soil deformation.

Giosistema

Kyiv

Page 33: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for calculation

department

Software name

Functionality

Developer

GRAND-smeta

Compilation of local budgets in any of the existing methods of calculation (basic, index, resource, compensation, resource-index).

GRAND

Moscow

AVK-5 Designed for automated determination of the cost of construction, carried out in Ukraine.

SPA AVK

Kyiv

Page 34: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CAD software for information

and reference systems

Software name

Functionality

Developer

StroyConsultant - Reglament

Regulatory support of the design and construction organizations of the Russian Federation.

StroyConsultant

Moscow

“Normativ-Pro"

Regulatory support of the design and construction organizations in Ukraine.

Information

and Marketing Center

Kyiv

Page 35: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Project Management System based

on Spider Project software

Spider Project is focused on the implementation of corporate management

standards and the creation of projects models.

Libraries of typical project templates allow avoiding mistakes in the description of technological processes and significantly ease the formation of project models.

The use of reference books and libraries of fragments allows to create regulatory framework ensuring the consistency of the initial information on the projects.

A computer model of the project should properly reflect the reality, to be able

to take into account the uncertainties and risks, and to track trends in time to

signal need to apply corrective action.

In our view, a mature project management - is an optimal project resource

management for achieving the goals.

Page 36: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Project Management System based on

Spider Project software (continued)

creating a library of schedule templates in order to create preliminary project

schedules during contract stage;

creating a database of completed projects in order to fixate labor costs

for project implementation and use the accumulated data in future planning;

time management of the project, including the operational development

schedules and their correction during implementation;

project cost management;

project resource management;

projects portfolio management;

resource conflict solving;

current projects performance control;

acquiring statistics and reports of projects performance;

centralized storage of information, timelines, resources and costs;

the ability to quickly analyze the impact of changes in the

schedule on resource maintenance and financing of the planned works.

Results guaranteed by system implementation :

Page 37: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Licensors of process technologies

UOP LLC, a Honeywell company (USA)

ABB Lummus Global (USA)

Axens (France)

Webster Griffin (Great Britain)

Merichem (USA)

WorleyParsons Resources & Energy (Australia)

Pörner Verfahrenstechnik (Austria)

Sandvik AB (Germany)

Technimont (Italy)

Technip (France)

Boato International (Italy)

Foster Wheeler (Great Britain)

Honeywell company (USA)

Shell (Netherlands)

Page 38: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Full scale design of industrial facilities :

Development of technical and commercial proposals, feasibility studies and studying investment in the construction, reconstruction, expansion, modernization of enterprises and separate processing plants of refining and petrochemical industries

Selection the company - developer of technology processes, analysis of

"initial data" or the base project

Performing commissioning works at the ”turnkey” enterprises

Development of technical specifications for designing.

Preparation of site-local estimates, estimated calculation of the cost of

construction, construction management project

Our activities.

Design

Page 39: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

A full-scale designing of civilian objects : Development of project sketches on civilian objects;

Development of architectural solutions;

Development of carrying and protecting constructions, roof;

Development of gas supply systems, heating, ventilation, water

supply and sewerage of buildings and structures;

Development of power supply systems and telephony;

Development of fire and security alarms

Our activities.

Design. Engineering geological survey and

topographical geodesical works.

Performing engineering geological and topographic geodesical works at

production platforms of any complexity

Page 40: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Our activities.

Commissioning works,

supervision and engineering support of

projects

Performing supervision and engineering support for construction

of industrial and civil facilities to ensure conformity with the

decisions contained in the project documentation

Performing commissioning works on putting into operation separate technological plants and launching oil, gas, refining and petrochemical industry complexes.

Page 41: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Industrial safety (project stage)

Declaration of security for units, offsite facilities, oil storage tank

farms, standalone oil storages.

Declaration of security for company, several plants, offsite

facilities , tank farms.

Calculation of the energy potential of a technology unit, park,

standalone raw material pumping, emergency barn, etc.

Calculation of the energy potential for plant or offsite facilities,

consisting of several units

Page 42: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK
Page 43: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Industrial safety: calculation of fire

danger rating

Calculation of fire danger category

Calculation of excess pressure developed by the combustion of gas-air mixtures indoor

Calculation of areas bounded by the lower flammability limits of gases and vapors

Calculation of drainage sizes

Calculation of steam fire-screens and other calculations

Page 44: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Activities on water recycling - for production facilities.

Activities on atmospheric air protection;

Justification of decisions on wastewater treatment and disposal of neutralized elements, to prevent accidental discharges of wastewater;

The results of calculations of ground level concentrations of pollutants, analysis and proposals for limit values and temporarily agreed emissions;

List of activities to prevent and (or) reduce the possible negative effects:

List of activities for the

environmental protection (project

stage)

Page 45: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Activities for minimizing the possible occurrence of emergency situations at the facility of capital construction and the consequences of their impact on the ecosystem of the region.

Activities for the protection of flora and fauna and their habitats;

Activities for conservation of mineral resources - for production facilities;

Activities for the collection, use, disposal, transportation and disposal of hazardous waste;

Activities for the protection and management of land resources and soil, including activities for reclamation or contaminated land and soil;

List of activities to prevent and (or) reduce the possible negative effects:

List of activities for the

environmental protection (project

stage) (continued)

Page 46: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Situational plan (schematic map) of the construction area with indication of its land borders, provided for the placement of objects of capital construction, the boundaries of sanitary protection zones, residential areas, recreational areas, water protection zones, protection zones of drinking water sources, habitats of animals and plants.

The list and costing of the implementation of environmental activities and compensatory payments;

Program of industrial environmental control (monitoring) of the nature of the changes in all ecosystem components during the construction and operation of the facility, as well as in case of accidents;

Activities, technical solutions and constructions to ensure rational use and protection of water bodies;

List of activities to prevent and (or) reduce the possible negative effects:

List of activities for the

environmental protection (project

stage) (continued)

Page 47: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Situational plan (schematic map) of the construction area with indication of its land borders, provided for the placement of objects of capital construction, specifying the control points, stations, wells and other facilities that provide water samples from surface water and groundwater - relating to industrial objects.

Maps, charts and summary tables with calculation results of air pollution under adverse weather conditions and emissions of substances and combinations of substances with harmful influence summing - relating to industrial objects;

Situational plan (schematic map) of the construction area with indication of its land borders, provided for the placement of objects of capital construction, the location of sources of emissions of polluting substances and devices to clean up these emissions;

List of activities to prevent and (or) reduce the possible negative effects:

List of activities for the

environmental protection (project

stage) (continued)

Page 48: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed by

Public JSC

“Ukrnaftokhimproect”

from 2000 to 2012

Page 49: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

OJSC Rosneft Oil Company -

LLC RN-Komsomolsk Refinery

Year Description of works

2000 Development of Justification of Investments in construction of integrated refining complex

2000 Development of working project for fraction of NK-75oS isomerization unit

2001 Development of working project to expand the transformer substation for isomerization unit in relation with a connection to its facilities

2002 Execution of design works for electrical system installation AT

2002 Development of working documentation for the design of the central operator at deep oil processing plants

Page 50: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2002 Working project of distillates hydrotreating unit at deep oil processing set

2002 Working project of sulfur production unit at deep oil processing

2002 Performing development of start-up complex of the reconstructed set of AT-2

2002 Working project base for storage and shipment of liquefied gases

2003 Working project industrial park of hydrotreated diesel

2003 Working project nitrogen station with air compressor

2003 Working project coking unit at deep oil processing

Projects designed for

OJSC Rosneft Oil Company -

LLC RN-Komsomolsk Refinery (continued)

Page 51: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2003 Working project (approved part) for delayed coking unit

2003 Working project commodity tank farm of the hydrotreated diesel fuel

2003 Working project water treatment unit (tit. 2503/8)

2003 Working project circulating water supply unit hydrotreater distillate (tit. 2503/10)

2003 Working project circulating water supply unit sulfur granulation (tit. 2503/9)

2003 Working project hydrogen concentration unit (CCA) (tit. 2503/5)

Projects designed for

OJSC Rosneft Oil Company -

LLC RN-Komsomolsk Refinery (continued)

Page 52: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2003 Working project high pressure nitrogen unit (tit. 2503/6)

2003 Working project hydrogen sulfide flare (tit. 2503/7)

2003 Working project sour water stripper unit (tit. 2503/11)

2003 Working project modernization of CDU AVT-3 unit

2003 Development of technological regulations for the production of distillate hydrotreating unit and unit of sulfur production

2004 Preparation of tender documentation for the installation of a delayed coking unit with offsite objects

2004 Supervision for the construction and installation of offsite facilities for 1st stage of a delayed coking unit

Projects designed for

OJSC Rosneft Oil Company -

LLC RN-Komsomolsk Refinery (continued)

Page 53: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2004 Consideration and approval of projects developed by FFP

2005 Alignment of regulations for the isomerization unit

2005

Development of the project of electrical heating systems and blocks of production sulfur and distillate hydrotreater

2006 Performing strength calculations and the development of baseline data on the configuration of the transfer pipeline from the furnace P-1 to columns K-1 and R-1A with the placement of support and strength calculations for CDU-AVT-3 unit

2006 Development of approved part for CDU-AVT-3 unit

2006 Supervision for the construction and installation of furnace P-1 at CDU-AVT-3 unit

Projects designed for

OJSC Rosneft Oil Company -

LLC RN-Komsomolsk Refinery (continued)

Page 54: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2006 Development of working documentation on piping for furnace P-1 at CDU-AVT-3 unit

2006 Development of approved part and documentation on a complex of delayed coking of goudron

2006 Development of project of logical schemes PAZ at CDU-AVT-3 unit

2006 Development of working documentation of the transfer line vacuum column K-3 at CDU-AVT-3 unit

2006-2007 Development of working project "delayed coking of goudron unit"

2007 Adjustment of working documentation for the object of delayed coking unit

Projects designed for

OJSC Rosneft Oil Company -

LLC RN-Komsomolsk Refinery (continued)

Page 55: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2007 Supervision for the progress of construction of the complex DCU

2007 Execution of design works on adjusting approved part in the project: Complex DCU. Offsite facilities of a delayed coking

2007 Execution of design works on adjusting the working documents on object: Complex DCU. Offsite facilities of a delayed coking

2007 Working project ”Base for storage and shipment of liquefied gases"

2008 Development of reconstruction of a catalytic reforming unit

2008-2009 Development of modernization of CDU-AVT-2

Projects designed for

OJSC Rosneft Oil Company -

LLC RN-Komsomolsk Refinery (continued)

Page 56: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2009 Adjustment of working documents regarding the binding of furnace-101 at DCU

2009-2010 Development of launch production schedules at DCU

2009-2010 Development of modernization of CDU-AVT-3

in work Development of working documents ”Sulfur production unit. 2nd stage"

in work Commissioning of the facility delayed coking complex. Offsite facilities at DCU

Projects designed for

OJSC Rosneft Oil Company -

LLC RN-Komsomolsk Refinery (continued)

Page 57: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

in work Field supervision during the construction and installation of the project "Reconstruction of the catalytic reformer"

in work Supervision for the progress of construction of the complex DCU.

in work Supervision during the construction and installation of the project Base storage and shipment of liquefied natural gas"

in work Designing of the facility, "Isomerization unit No. 2"

Projects designed for

OJSC Rosneft Oil Company -

LLC RN-Komsomolsk Refinery (continued)

Page 58: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2002 Development of Justification of Investments for the major reconstruction

2004

Comprehensive survey of the existing production of Tuapse refinery, energy supply systems and the issuance of offsite facilities findings and determination of the costs of bringing the existing production and the systems to requirements of the standards

2005 Working project of cooling towers installation BVG-600 "MAKSI" overall Mfr.1050 m3 for circulating water supply system

2005 Review and approval of design documentation installation of diesel tanks and cable racks (without modifying the documentation)

Projects designed for

OJSC Rosneft Oil Company -

LLC RN-Tuapse Refinery

Page 59: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2005 Consideration and approval of the working draft of JSC "PMP" "Node of regeneration of gases purification installation L-35-11/300

2005 Development of specifications for electrical equipment and incomplete C&A, providing frequency control of electric motors and fans, coolers of cooling towers included in the supply of BVG-600 "MAKSI"

2006 Performing ER of the 1st stage reconstruction of the refinery

2006 Development of proposals to install a backup pump for pumping fuel from the tanks of the 2nd park fuel oil

2006 Development of working documentation for bringing furnace P-1 installation L-35-11/300 to existing rules and regulations

Projects designed for

OJSC Rosneft Oil Company -

LLC RN-Tuapse Refinery (continued)

Page 60: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2006 Development of working documentation for additional equipment installation L35-11/300 nodes remote reset gas torch and cutter overflow VSG

2009 Development of working documentation "Combined installation of KU-1. Section5000. Delayed Coking"

in work Development of working documentation "Combined unit no.3 (tit.672-10)

Projects designed for

OJSC Rosneft Oil Company -

LLC RN-Tuapse Refinery (continued)

Page 61: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

in work Performance of design works "Node for receiving and storage of MTBE"

in work Development of working documentation "Mechanical-repair workshop. Engineering Base"

in work Development of working documentation “Circulating water supply node no.2"

in work Development of working documentation “Circulating water supply node no.3"

Projects designed for

OJSC Rosneft Oil Company -

LLC RN-Tuapse Refinery (continued)

Page 62: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2004 Development of working project for offsite centralized operator for current and future facilities

2004 Development of 2 TER variants for delayed coking unit

2006 Development of technological control instrumentation schemes and questionnaires , the specifications of the instrumentation for the transfer section 200 LK-6Us-catalytic reforming with preliminary hydrotreating

2006 Field supervision of construction of a centralized operator

Projects designed for

OJSC Rosneft Oil Company -

OJSC Achinsk Refinery

Page 63: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2007 Development of Working documentation to transfer section 200 LK-6U on DCS

2008 Performance of design works "Construction of offsite centralized operator no 2 on object 'The complex of DCU with a vacuum distillation unit"

in work

Реконструкция комплекса производства нефтяного кокса (в т.ч. установка вакуумной перегонки мазута и установка замедленного коксования)

Projects designed for

OJSC Rosneft Oil Company -

OJSC Achinsk Refinery (continued)

Page 64: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

in work Development of design and working documents of the object ”Sulfur production unit"

in work Development of design and working documentation for facilities of the complex of sulfuric acid alkylation unit.

Projects designed for

OJSC Rosneft Oil Company -

OJSC Angarsk Petrochemical Company

Page 65: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

in work Development of design and working documents of the object Catalytic cracking complex. Gas fractionation plant

Projects designed for

OJSC Rosneft Oil Company -

OJSC Syzran Refinery

Page 66: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

in work Development of design and working documents of the object ”BT unit"

Projects designed for

OJSC Rosneft Oil Company -

LLL Novokuibyshevsk Oils and Additives

Plant

Page 67: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2006 Replacing furnace P-302 with the installation of the evaporator and the I-302 hydro alkylation plant no.58, heating cogeneration block plant codes ”Monomer"

2006 Supervision in the working project for furnace P-302 replacement, installation of the evaporator I-302

2006-2009 Design, commissioning and supervision of construction of visbreaking unit

2007 Development of working project installation of hydrogen and ammonia evolution from the purge and tank gases

Projects designed for

JSC Gazprom neftehim Salavat

Page 68: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

JSC Gazprom neftehim Salavat

(continued)

Year Description of works

2007 Development of working documentation auxiliary facilities at visbreaking complex

2007-2009 Provision of the support on a complex facilities for the production of visbreaking

2008 Development of technological regulations for visbreaking unit

in work Development of working documentation for construction of CDU-AVT-6 plant

Page 69: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

in work Contract supervision and Supervision for the Installation of Synthesis (block number 6), AM-76 ammonia production

in work Supervision for the construction of CDU-AVT-6 unit

in work Development of working documentation for flare unit at CDU-AVT-6

in work

The complex of catalytic cracking. Installing selective hydrotreating catalytic cracking gasoline. Development of design and working documentation

Projects designed for

JSC Gazprom neftehim Salavat

(continued)

Page 70: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

JSC Gazprom Neft – Omsk Refinery

Year Description of works

2005 Working project replacing the furnace unit at AT-9 facility

2005 Pre-commissioning and commissioning of furnace unit at AT-9 facility

Page 71: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

ТNК-BP

JSC Ryazan Oil Refinery Company

Year Description of works

2005 Feasibility of reconstruction of the isomerization unit

in work Development of design and of working documents phased reconstruction of a CL-24/7 unit to produce diesel fuel.

in work Complex of reconstruction of CL-24/7. Installing the CCA.

in work Complex of reconstruction of CL-24/7. Trails connecting the CCA.

in work Development of working documentation of pipeline construction to install SDT CL 24/7 to ASSB.

Page 72: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

OJSC Moscow Refinery

Year Description of works

2006 Working project furnace P-3 with transfer piping on AVT-3 unit

2007 Supervision of construction of furnace P-3 with a transfer pipeline

2010 Development of the project for bringing furnaces P-101 P-102 P-103 P-104 P-105 at LCH-35/11-1000 unit workshop № 2 to the current regulations

Page 73: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

OJSC NC Russneft -

OJSC Orsknefteorgsintez

Year Description of works

2004 Working project refitting CDU-AVT unit

2004 Field supervision of the reconstruction of furnace unit installation L-35-11/300

Page 74: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

OJSC OGC Slavneft -

JSC YARVAZ

Year Description of works

2003-2004 Working project installation preliminary hydrotreating a catalytic reforming unit of raw materials

2004 Construction field supervision and coordination of design solutions for the installation a catalytic reforming unit hydrotreating of raw materials

Page 75: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

LLC Gazneftedobycha

Year Description of works

2008-2009 Commissioning work on a comprehensive gas unit

2009 Tech support, workflow management, the practical training of operating personnel

2010 Development of working documentation for the modernization of process gas desulfurization

Page 76: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2000 Designing of reconstruction of the workshop of production the imide additives to obtain MTBE and the necessary facilities and offsite facilities

2000 Calculation of cost-effectiveness of a enterprise of production of MTBE

2000 Development of working documentation for the installation of water recycling MTBE with delivery construction documents

Public JSC "Ukrnaftokhimproect" - general designer Kremenchug

refinery. Design and survey work and supervision for the plant are

performed for 35 years, including in recent years:

Projects designed for

JSC Ukrtatnafta

Page 77: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2000 Development of technological regulations on of production MTBE

2000-2001 Construction field supervision of MTBE unit

2001 Survey of bearing structures of block of production polybutylene, workshop of production additives such as A-9250 with the purpose of reconstruction for MTBE

2001 Development of working documentation of reconstruction of power supply installed at MTBE

2005 Engineering and geological surveys at the sites of production number 3

2005 Pumping station mixing gasoline and diesel fuels of production № 4

Projects designed for

JSC Ukrtatnafta (continued)

Page 78: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2005 TER modernization of "Ukrtatnafta" "Improving the quality of gasoline and diesel fuels" on the basis of feasibility study the company LG Engineering

2006 Replacement of electrical equipment TA-31

2007 Working documentation for the redevelopment of the building at CDP Energy Center

2007 Biological treatment of a mixture of effluent pumped on evaporation pond

2007 Development of working project "Unloading the equilibrium catalyst regenerators ofcatalytic cracking"

Projects designed for

JSC Ukrtatnafta (continued)

Page 79: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2007 Technical and economic calculations of the program "Improving the quality of gasoline and diesel fuel on the basis of having the technological equipment"

2007 Development of working documentation "Production no 2. Reserve collector hydrogen-containing gas"

2007 Performing inventory and development of documents to substantiate emissions to obtain a permit for discharges of pollutants into atmosphere sources on "Ukrtatnafta"

2007 Technical and economic calculations solutions to the problems of exploitation of technological facilities in order to maintain the fuel-oil version of the enterprise

Projects designed for

JSC Ukrtatnafta (continued)

Page 80: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

JSC Ukrtatnafta (continued)

Year Description of works

2008 Project Stage I modernization of Kremenchug refinery

2008 Inventory of sources of harmful pollutants into the atmosphere

2008 Development of working documentation "Node of inputting additives to gasoline and diesel fuel pumping mix of gasoline and diesel fuel"

2008 Development of working documentation "Biological treatment of a mixture of effluent pumped on evaporation pond"

2009 Development of design estimates for the objects I stage of modernization of the Kremenchug refinery "Ukrtatnafta "

2009 Performing engineering-geological surveys for stage I of modernization of the Kremenchug refinery

Page 81: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

JSC Ukrtatnafta (continued)

Year Description of works

2010 Development of project documentation and execution of construction supervision of the object "Replacing the stripper K-1 and the column flow irrigation from the separator-2 of production at the facility L-35-11/300 no 2"

2010 Development of project documentation and execution of erection supervision works on object ’CC-2 CC-3 / 1 № 2 № 1 production facility. Replacing the distillation column K-8 "

2010 Performing the calculation of the enterprise flare system and flare units including construction of new facilities

in work Development of design documentation for the replacement of the distillation column K-1 on the AT-2 SC-3 / 1 no 2 unit

Page 82: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

JSC Ukrtatnafta (continued)

Year Description of works

in work Survey and issuing recommendations on the modernization of the object "Reconstruction of furnace P-1"

in work Replacement of basic equipment (furnace P-601) and implementing of forced circulation circuit block VSG pre-hydrotreating LCH-35-11/600

in work Project documentation and contract supervision of the object ”KK-2 SC-3 / 1 № 2 № 1 production facility. Replacing the distillation column K-8"

in work Working documentation of the 1st stage of modernization of Refinery. CCA node for compression of the fuel gas (tit. 16/1-1)

in work Stage 1 modernization of Refinery. The combined isomerization, hydrotreating gasoline QC (tit. 105).

in work Reconstruction of desulfurization of dry gases

Page 83: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

JSC Ukrtatnafta (continued)

Year Description of works

in work Development of design documentation for the replacement of the distillation column K-1 to install the AT-2 SC-3 / 1 № 2 № 1 of production

in work Calculation of the flare system of the enterprise and flares F1-4

in work Amine regeneration unit (tit. 27/2-1)

in work Interdepartment communication

in work "Industrial Park of raw materials isomerization unit (tit.32/105-1). Industrial Park of gasoline catalytic cracking (tit.32/105-2). Industrial Park isomerate(tit.32/105-3) »

Page 84: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

JSC LINIK

Year Description of works

2006 Biochemical treatment of wastewater sewer systems II

2007 Development of working project "Reconstruction of the loading rack heavy petroleum products"

2007 Development of working project to replace the field instrumentation of CDU-AVT-8 unit no.2

2007 Development of working project on re-piping tanks from the of vacuum gas oil for commercial gasoline

2007 Development of working project re-piping column K-2 reforming unit to separate catalytic cracking gasoline

Public JSC "Ukrnaftokhimproect" - general designer of Lisichansk

refinery. Design and survey work for the plant are performed since the

founding of the plant to date, including in recent years:

Page 85: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

JSC LINIK (continued)

Year Description of works

2007 Working project monitoring and control of column K-2 reforming unit

2007-2009 Development and coordination technological regulations isomerization, catalytic cracking, bitumen production units

2009-2010 Development of working project "Reconstruction of hydrotreating and isomerization of the gasoline fraction of NK-70°C"

in work Development of working project of reconstruction of L-35-11/1000 to selective hydrotreating catalytic cracking gasoline and obtaining MTAE

Page 86: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2005 Project and working documents of reconstruction of CDU-AVT

2006 Working documentation of electrical lines of vacuum gas oil and fuel oil

2006 Working documentation of conjunction of nitric station to the existing communications

2007 Working documentation on the pump pumping oil, diesel and gasoline fractions

2008 Supervision of construction of the object "conjunction of nitric station to the existing communications"

Projects designed for

JSC Lukoil-Odessa Refinery

Page 87: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

JSC Lukoil-Odessa Refinery

(continued)

Year Description of works

2007-2009 Development of technological regulations to facilities

2009 Performance of design works on the reconstruction of railroad of petroleum products loading rack

2009 Development of working project of reconstruction of the tank farm commodity workshop with the construction of the tank no.129 for the storage of petroleum

2009-2010 Technological calculations to improve the efficiency of the pipes furnace P-1redistillation the gasoline unit (UVPB) TC number 2

in work Field supervision of the reconstruction of railroad of petroleum products loading rack

Page 88: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

JSC Kherson Refinery

Year Description of works

2007 Surveying the industrial site for refinery

2007 Feasibility study "Reconstruction of JSC "Kherson Refinery"

2007-2009 Reconstruction of CDU-AVT-2 JSC "Kherson Refinery"

2008 Development of working documentation of electrical networks cable rack

2009 Performing examination of condition of buildings and structures with the issuance of conclusions and decisions

Public JSC "Ukrnaftokhimproect" - general designer of

Kherson refinery. Design and survey works and supervision for the

plant are performed from 1959 to present, including over the past

5 years:

Page 89: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

JSC CPP Galichina -

Drogobych Refinery

Year Description of works

2007-2009 Feasibility for reconstruction of the plant

2007-2009 Engineering-geological surveys for the modernization

2007-2009 Project for hydrotreating unit of diesel fuel

2007-2009 Project for gasoline hydrotreating unit

2007-2009 Project for objects of offsite facilities

2007-2009 Project isomerisation sections

2007-2009 Development and coordination of technological regulations

2007-2009 Development of required standards of water consumption and sewage

Page 90: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

LLC Karpatneftekhim

Year Description of works

2007-2009 Development of working documentation "Construction of a suspension PVC with capacity of 300 tons / year"

2009-2010 Supervision for Construction of a suspension PVC unit

2009-2010 Development of the project "Single-stage design of the boiler plant of PVC with a capacity of 300 tons / year"

Page 91: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

JSC Montazhspetzstroy Company (Republic of Kazakhstan)

Year Description of works

2007-2008 Carrying out commissioning works and putting into operation of facilities in North Offsite Zone.

2007-2008 Engineering support of works on the installation of equipment and technological facilities in North Offsite Zone.

Page 92: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

JSC Harcon

(Republic of Kazakhstan)

Year Description of works

2007-2009 Development of working documentation of the project Substation number 7 of the northern off-site areas complex "the Pilot Program for the Development of the Kashagan field"

Page 93: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

JSC Ukrnafta

Year Description of works

2001 Working project for furnace reconstruction OFG-132

2002 Supervision for furnace reconstruction OFG-132

2004 Development of working documentation for capital repairs of furnace with flameless combustion PB-6-2 UKNP Gnedintsevo GPP

2005 Supervision of construction of the object Reconstruction of furnace with flameless combustion PB-6-2 UKNP Gnedintsevo GPP

2008 Development of working project "Reconstruction of furnace with flameless combustion PB-9 at USN-1 Gnedintsevo GPP"

2008 Development of working project Construction of the furnace OFG-133 at Glinsk-Rozbyshevsk CPG at Kachanovsk GPP

Page 94: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

SPA Belorusneft

Year Description of works

2006 Field supervision of construction the pilot-industrial underground storage for the disposal of drill slurry to the provision of scientific and technical assistance.

Page 95: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Projects designed for

JSC Naftan -

Novopolotsk Refinery

Year Description of works

2007-2009 Site preparation for construction of a delayed coking of petroleum residues.

Page 96: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2008 Development of working documentation of pipelines removal from the overpass oiltankers loading area at the tank farm in urban village Borodyanka in Kyiv region.

2009 Working project on dispensing additives node for petroleum products at tank farm in Boryspil

Year Description of works

2009 Pre-reconstruction works on petroleum storage depot in Obukhov district, Kyiv region.

2009 Pre-reconstruction works petroleum storage depot in Vasilkiv (Kyiv region)

FDI Lukoil Ukraine

LLC ТNК-ВР Commerce

Projects designed (continued)

Page 97: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Year Description of works

2007 Surveying, geotechnical engineering and meteorological survey for the expansion and renovation of existing treatment facilities and collector trails

2009 Designing of the fuel filling system of platform "D"

Boryspil Airport (Kyiv)

State Holding Titanium of Ukraine (Crimea)

Year Description of works

2008-2009 Working construction project for the production of sulfuric acid with capacity of 1818.2 tons / day.

JSC “Crimean Titanium"

Year Description of works

2009 Field supervision of construction of a sulfuric acid production with capacity of 1818.2 tons / day

Projects designed (continued)

Page 98: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

CDU-AVT-2 plant – primary oil processing in vacuum unit.

Capacity of crude oil - 2 million tones / year.

Put into operation in December 2002.

“Turn-key” projects:

OJSC Rosneft Oil Company -

LLC RN-Komsomolsk Refinery

Page 99: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Isomerization unit of NC-750C faction - Production of high-octane

isomerate - a component of gasoline with an octane number of 95.

Capacity of raw materials - 160 thousand tons / year.

Put into operation in April 2002.

“Turn-key” projects:

OJSC Rosneft Oil Company -

LLC RN-Komsomolsk Refinery

Page 100: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Hydrotreating unit of diesel fuels, obtaining trade diesel fuels with a low content of sulfur and nitrogen . Capacity of raw materials 800 thousand tons / year. Put into operation in

September 2005.

Sulfur production unit with sour water stripper unit and granulation of sulfur.

Capacity 38 tons / day of solid sulfur. Put into operation in September 2005.

“Turn-key” projects:

OJSC Rosneft Oil Company -

LLC RN-Komsomolsk Refinery

Page 101: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

“Turn-key” projects: JSC "Transbunker"

(Vanino port, Khabarovskiy Krai)

Unit for preparation of boiler fuels and bunker oil. fuels for power systems, plants,

Capacity - 500 thousand tons / year. Put into operation in 2001.

Page 102: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

“Turn-key” projects:

OJSC OGC Slavneft –

OJSC Yaroslavnefteorgsintez

Hydrotreating unit of diesel fuels. Productivity - 1 million tons / year.

Put into operation in September 2003.

Page 103: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

“Turn-key” projects:

PJSC Ukrtatnafta

Plant for the production of methyl tret-butyl ether.

Capacity of initial raw material - 60 thousand tons / year.

Productivity - 14 thousand tons / year.

Put into operation in 2001.

Page 104: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Customers’ testimonials

Page 105: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Customers’ testimonials

Page 106: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Customers’ testimonials

Page 107: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Customers’ testimonials

Page 108: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Honors

The Cabinet of Ministers of Ukraine.

Certificate of Merit for significant

contribution to the development of oil

and gas refining and petrochemical

industries.

Page 109: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Honors

Diploma of the winner of the contest for

the best houses and buildings built and

put into operation in Ukraine in 2004, for

the high quality of design.

Page 110: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Honors

1 degree diploma for Kharkiv branch

of OJSC "Ukrnaftokhimproect" -

winner of the best buildings and

facilities constructed and put into

operation in Ukraine in 2010 in the

category "Industrial plants and

facilities for production purposes”

Page 111: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Company’s development strategy

Development and usage of new technologies

Usage of modern computer software

Upgrading PCs, servers, and copying equipment

Further integration of branch networks

Improving project management system

Page 112: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

More than 50 years experience in designing

Using modern technologies

Compliance with safety

regulations and environmental protection

Broad reference of completed projects

Assured quality and reliability

The company focuses on long-term cooperation

Our advantages

Page 113: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Contacts – Head Office (Kyiv)

Address:

Ukraine, 04655, Kyiv, Kudryavskiy uzviz, 5-B

Phone: +38 (044) 417-84-80

Fax: +38 (044) 272-18-03, 272-18-51

E-mail: [email protected]

Site: www.unxp.com.ua

Acting Chairman of the Board - Anatoliy Levandovskiy Acting Director of Engineering - Alla Konoplina

Technical director -

Yuriy Vozniuk

Page 114: Public JSC Ukrnaftokhimproect - unxp.com.uaunxp.com.ua/2012eng.pdf · VANTAGE PD PDMS v 12 Design of pipelines, modeling stairs, ladders, access zones, equipment design. AVEVA UK

Thank you for attention!