Page 1: PUBLIC RECORDS AND INFORMATION. What type of records are available? Site plans As Built Surveys – Limited availability Building Plans Permit Forms Land

PUBLIC RECORDS AND INFORMATION

Page 2: PUBLIC RECORDS AND INFORMATION. What type of records are available? Site plans As Built Surveys – Limited availability Building Plans Permit Forms Land

What type of records are available?

• Site plans• As Built Surveys – Limited availability• Building Plans• Permit Forms• Land use cases• Survey plat – Recorded and stored by State of

Alaska DNR – 400 Willoughby Ave, 3rd floor.

Page 3: PUBLIC RECORDS AND INFORMATION. What type of records are available? Site plans As Built Surveys – Limited availability Building Plans Permit Forms Land

What can you copy?

• Some documents are protected by Copyright.– Plans stamped by an Architect / Engineer– Plans plainly marked as Copyrighted

• Some plans are copy restricted to protect privacy– Interior floor plans

• Copyrighted documents require owners written permission to copy.

However, all documents are public record, and available for viewing.

Page 4: PUBLIC RECORDS AND INFORMATION. What type of records are available? Site plans As Built Surveys – Limited availability Building Plans Permit Forms Land

Due Diligence

• Beware purchasing a property before checking for open and or required permits. – Many open permits have already had the work

completed, and merely need a final inspection to close the permit.

– On occasion, it may be less expensive to “restore” a structure to its original condition vs. completing the project.

Page 5: PUBLIC RECORDS AND INFORMATION. What type of records are available? Site plans As Built Surveys – Limited availability Building Plans Permit Forms Land

Who is responsible?

• Regardless of who applies for a permit, remember that the current property owner is ultimately responsible.

• Our staff are always willing to work with applicants to ensure a safe community.