public safety fy 2016 proposed budget work session · inf: iccv software update from 9.2.2 to 9.3...
TRANSCRIPT
FY 2016 Proposed Budget
Work Session
Wednesday, April 8, 3:00 – 6:00
Public Safety
2
Agenda
Wednesday, April 8, 2015
3:00 – 6:00 PM
Related FAAC Report: Sheriff, Fire
Department / Topic Book pgs Web pgs Web Link
Office of Emergency
Management
189 - 191 349 - 361 Click here
Fire 197 - 198 392 - 406 Click here
Police 193 - 195 362 - 391 Click here
Sheriff 175 - 177 290 - 309 Click here
Office of Emergency Management
Proposed FY 2016 Budget Highlights
April 8, 2015
4
OEM Budget at a Glance
• Proposed budget totals $11.7M– A 2% increase from FY 2015 due to:
• Personnel increases due to:
– Step increases and an increase to County’s cost for employee health
insurance, offset by adjustments to retirement contributions
• Non-personnel increases due to:
– Contractual and allowable Increases: $104,573
– Revenue Supported Grant Increases: $62,753
• Total FTEs: 74.50– No change from FY 2015
5
OEM Infographic
Proposed Reduction Option
Hold Deputy Director Vacant 8 Months: $140,000
• Description: Position is responsible for staff supervision, National
Incident Management System (NIMS) compliance, continuity of
operations, and public safety liaison efforts.
• Impact of Reduction: OEM would re-organize day-to-day
responsibilities and overall staff supervision would be assumed by
the Director.
• For full description see book page 29 / web page 43
6
Major Initiatives in FY 2016
• Succession Planning: Hiring of Two Deputy Director’s (ECC
Administrator and Emergency Management Deputy Director)
– Replace 2 Critical Leadership Positions in FY 2016
– Future retirements
• 9-1-1 System Replacement – (Capital Project)
– $2.4 Million Overhaul of 9-1-1 Telephone System
– Project includes back-room servers, equipment and material for Voice Over
Internet Protocol (VoIP) Communications
– Current system reaches end of life June 30, 2015 and will be supported during
the transition
7
FY 2017 and Beyond
• Relocation of EM Operations, Emergency Operations Center
from Court Square West – ETA CY 2017
– Build out of EOC, AECC, EM Offices
• Grant Sustainment
– UASI Grants and VDEM grants account for 5.0 of 13.0 FTEs in
Emergency Management
– Also account for one-time equipment costs
• Public Safety Capital IT Refreshment:
– Replacement of Public Safety Radios
– ECC Video System
• Succession Planning
8
Arlington County Fire Department
Proposed FY 2016 Budget Highlights
April 8, 2015
10
ACFD Budget at a Glance
• Proposed budget totals $55.3M– A 3% increase from FY 2015 due to:
• Standard personnel increases and annual adjustments to recruit class
expenses based on FY 2016 projections
• Non-personnel increases due to:
– Normal contractual increases: $6,754
– Annual Adjustment for recruit class costs: $24,567
– Wearing apparel and operating supplies funded by the Fire Programs
grant: ($40,260)
– Master lease payments for Fire Station #6 ladder truck and engine:
$357,980 (reimbursed by Falls Church Revenue)
• Total FTEs: 321.00
11
ACFD Highlights
• EMS Transformation and Demand Management
• SAFER Grant
We serve the community with compassion, integrity and commitment through prevention, education and a professional response to all hazards.
15,920
1,186
9,351
2014 Total Incidents
Fire RelatedIncidents
MedicalEmergencies
PublicService
98 38
149
70
502
2014 Time Critical Incidents
Cardiac Arrests
PersonsChokingStrokes
Heart Attacks
Fires
Girl’s Fire Camp Rescue Task Force
Major Initiatives
• Professional Development
– Meeting the needs of our workforce
• Fire Station Planning
– Relocating Fire Stations 8 (Lee Highway) and 10 (Rosslyn)
– Fire Station 4 (Clarendon)
13
FY 2017 and Beyond
• 56 Hour Work Week
• Regionalism
– Co-locating and co-hosting CAD and communication centers
• Technology and Data
– Virginia Tech Study
• EMS Demand Management
14
Arlington County Police Department
Proposed FY 2016 Budget Highlights
April 8, 2015
16
ACPD Budget at a Glance
• Proposed budget totals $65.6M
– A 1% increase from FY 2015 due to:• Standard personnel increases and one-time funding for additional
overtime for the Rosslyn Pedestrian Safety Initiative during major
construction efforts ($176,400)
• Non-personnel changes due to:
– Normal contractual increases: $8,226
– Adjustment to the annual expense and maintenance of County
vehicles: $105,409
– Removal of one-time expenses related to the COPS grant:
$113,156
• Total FTEs: 470.00
17
ACPD Highlights
• For the FY 2016 proposed budget, the County Manager
included ongoing funding for the following:
– Continued participation in the Regional Gang Task Force
($25,000)
– Additional overtime to provide additional staffing in Clarendon
business district to meet weekend and special event demands
($113,378)
Proposed Reduction Options
Personnel Adjusted for Expected Vacancies: $154,806
• Description: The Police Department provides a wide range of public
safety services with uniformed and non-uniformed positions.
• Impact of Reduction: The Police Department has experienced
personnel expenditure savings due to position vacancies in non-
uniform positions and in uniform positions where minimum staffing
levels are not required. The reduction in anticipated personnel costs
will not affect the operation of the Police Department in FY 2016.
• For full description see book page 23/ web page 37
18
Major Initiatives
• Firing Range at Dulles Airport– Currently reviewing construction bids
– Range will close for Fall 2015 firearms qualification
– Range will reopen in time for Spring 2016 qualifications
• Staggered opening of range elements to meet qualification needs
• Police/Sheriff Records Management System– Combination of capital/seized asset funding
– Contract signed in December 2014
– Now in early implementation stage (data conversion/software
installation prep)
– Anticipate system build to occur in Summer 2015
– Expect to “Go-Live” in First Quarter of 2016
20
Major Initiatives
• Public Safety IT Consolidation– Application and Infrastructure Assessment Complete
– Consolidation in the following areas:
• Project management and budget process for IT initiatives
• Staffing
• Help Desk function
– Major IT Projects (1- 3 years)
• Police/Sheriff RMS, ImageTrend and Fire RMS deployment
• Proliferation of video technology
• Upgrade to radio system
• Next Gen 911
• Body Cameras
21
Public Safety IT Portfolio
22
FY 15 FY 16
Dept: Project Name Pri Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16
ALL: MCM 2015 IT Planning
ALL: Police/Fire World Games
DTS: Move network closet in Fire Academy DTS project
FD,OEM: Calculated Routing/Dispatch GIS Map layer updates Implementation/Testing
FD,OEM: Westnet Upgrade TriTech (Tiburon)
FD: Active911 - Mapping CAD data on iPads Research / Purchase
FD: Analysis - Streaming TVs in FS common rms Survey Submit TIP request for recs.
FD: Bomb Truck vBrick replcmt research (task) Proof of Concept
FD: CodePal upgrade (PSIT Oversight) DTS/ITC
FD: Fire Mobile Command Vehicle Upgrades Specs
FD: Fire Alarm Tracking Fire ITC and DTS - Sharepoint
FD: Forms Project DTS - Enterprise Solution Research
FD: FRMS - Consultant amendment Purchasing Approval Process
FD: FRMS - FRMS Procurement Dep. On Consultant Amendment being approved by Purchasing
FD: FRMS - System Update Test and implement
FD: Imagetrend State goes live end of April Training/GoLive
FD: Learning Management System Purchasing Implementation
INF: Advanced Authentication (MDCs) Install/Setup MDC/User configuration
INF: Enterprise Backup Migration Configuration
INF: Front Porch Server Rebuild (task) for ImgTrd, Bair
INF: ICCV Software update from 9.2.2 to 9.3 Upgrade - TBD
INF: ICCV Software update to 9.2.2 (Task) Prereq for new ICCV
INF: Increase internet circuit to CTP Research/TIP Request
INF: MDC Image For Adv. Auth (320) Field Reporting/CJRMS (320) - Placeholder
INF: MDC Refresh/Replacement Research and Evaluation
INF: Relocate Inferno server Research Reloc.
INF: RMS terminal image and deployment Deployment (110) New CJRMS (110) - Placeholder
OEM: 911 Phone System Upgrade (planning) Contractor selection Planning stage - May move up in timeline
OEM: Backup Radio Support SOW SOW Development, Contract Amendment
OEM: CAD Assessment CAD Assessment (possible RFI or RFP)
OEM: EMD (APCO) Protocols into CAD Site Visits On Holding Pending CAD decisions
OEM: Radio System and Nice/Inform Upgrade 1 Prep work for upgrade Radio Upgrade
OEM: System Upgrade Agreement Windborne writing SUA and Purchasing Approval Radio system covered by SUA within 30 days of Radio System Upgrade implementation
OEM: Text to 911 Procurement - FFX rider Implementation
PD,FD: Telestaff DB conversion and migration Merge, Convert DB, Migrate to hosted
PD,SO: CJRMS 1 CJRMS implementation through Final Acceptance
PD,SO: CJRMS Wireless Aps
PD: Bair Analytics Dep. on Front Porch Server Rebuild
PD: E-Ticketing Eticketing Procurement and Negotiation
PD: Mobile Command Vehicle Retrofit DTS equip, Training
PD: Parking Ticket System Refresh RFP Out RFP review Vendor Selection/Negotiation Implementation (Jan '16 goal)
PD: PC Replacement DTS/PSIT coordination
PD: Remote Access Options for MDCs Research
PD: Vmware Cluster Upgrade Upgrade/Configure
SO: ICARE program
SO: Livescan Upgrade
SO: Swanson Update Fed Compliance
SO: Telestaff
Video: ICCV Mark 3 installs for ACPD Dependant on ICCV 9.2.2 upgrade
Video: ICCV for ACSO Research
Video: PD Body-worn cameras Policy Development
Video: PD Video Camera Upgrades PD/DTS and outside contractors VA -OAG Grant funding has hard end date - no extensions
FY 2017 and Beyond
• Staffing study– Workload-based versus population-based
23
Arlington County Sheriff’s Office
Proposed FY 2016 Budget Highlights
April 8, 2015
25
Sheriff’s Office Budget at a Glance
• Proposed budget totals $39.5M
– A 1% increase from FY 2015 due to:• Standard personnel increases
• Non-personnel increases due to:
– Normal contractual increases: $102,835
– Adjustment to the annual expense for maintenance and
replacement of County vehicles: $2,840
• Total FTEs: 272.00
26
Graphic Department Summary
FY 16 Additional Budget Requests
• Increase training budget to pre-2009 levels -
$48,000
• New Uniforms for Sheriff’s Office - $400,000
27
Major Initiatives
• Implement findings of staffing and vulnerability studies
– Executive Summary shows the need for a significant
increase in staffing to keep the facility and
Courthouse safe and secure
• Replacement weapons ($40K over a 3 year period – 10
year life cycle)
• Records Management System Implementation
• Combined Firearms Range
• Electrical Power Upgrade for the Justice Center
• Security Access Card Upgrade for the Justice Center
28
FY 2017 and Beyond
• Succession Planning
• PCRJ Debt service to end in 2017
• Firearms Training – Return to twice a year
• Update workspace of Central Control in
the Detention Facility - $268,158
• Kitchen/Medical refurbishment
• Increased Ammunition Budget ($100,000)
• Combined Body Cameras Initiative
29