Public Works Project (PWP) Item No. 4355DS
The Government of the Hong Kong Special Administrative Region
Drainage Services Department
Public Consultation Forum
Outlying Islands Sewerage Stage 2
- Lamma Village Sewerage Phase 2
11 June 2011
Agenda
Project Overview
Background
Project Description
Project Schedule
Enquiry and Suggestion
Background
No public sewerage system in Lamma Island at present
Sewage is treated by individual septic tank in general
Nearby rivers and waters at Yung Shue Wan may be polluted and hygiene of the area may be affected by leakage from poorly maintained septic tank
Public sewerage system is proposed to improve the water quality and environmental hygiene condition of Yung Shue Wan
Project Description
The Lamma Village Sewerage Project is conducted in 2 stages
Stage 1
Works commenced in early 2008. The scope of works comprises provision of sewerage system for central part of Yung Shue Wan, Sha Po (part) and Po Wah Yuen (part) ; construction of sewage treatment plant and submarine outfall
Stage 2
The Project, which is currently under detailed design, includes:
Provision of sewerage system for 18 villages and areas
Construction of 3 sewage pumping stations at O Tsai, Tai Wan and Hung Shing Ye
• O Tsai • Tai Peng • Po Wah Yuen (part) • Yung Shue Long New
Village
• Yung Shue Long Old
Village
• Tai Shan West • Tai Shan Central • Tai Shan East
• Tai Yuen Village • Sha Po Old Village (part) • Sha Po New Village (part) • Wang Long
• Yung Shue Wan Back
Street (part)
• Tai Wan Kau Tsuen • Tai Wan San Tsuen • Ko Long (Part)
• Tai Wan To • Hung Shing Ye
Coverage of the Proposed Sewerage System
Legend:
Stage 1 Sewerage Network
Stage 2 Sewerage Network
Stage 2 Sewage Pumping Station
Method of Sewer Laying
Most of the sewers will be laid
in narrow village accesses.
Owing to the site constraints,
open-cut excavation conducted
section by section is proposed
to minimize length of trench
excavation and nuisance to
public.
Traffic Impact Assessment
Suitable traffic mitigation
measures will be implemented
during construction (such as
temporary pedestrian access
and deck-over on the trench
during peak hours)
Sufficient width will be
maintained for vehicular
passage in the main accesses
Minimize the inconvenience
caused to villagers
Temporary pedestrian access
Deck-over on trench
Environmental Impact and
Mitigation Measures
According to the preliminary environmental review, no unacceptable environmental impacts are anticipated during construction and operation after applying suitable mitigation measures
Recommended mitigation measures during construction include:
Use of quiet plant and temporary noise barrier
Dust suppression by regular water spraying
Stockpile of construction materials and wastes will be covered with tarpaulin
Site runoff will be treated and controlled strictly
Quieter equipment
Sewage Pumping Stations (SPS)
Due to topographical constraints, 3 sewage pumping stations have to be built at O Tsai, Tai Wan and Hung Shing Ye
In addition to technical feasibility, the followingfactors have also been considered in site selection: Public nuisance and opinions from residents
Environmental impacts
Maintenance and operation issues
Land resumption
Tai Wan SPS
Hung Shing Ye SPSO Tsai SPS
Environmental Mitigation
Measures for SPS
Adopt activated carbon deodorizers
Use of quieter plant
Provision of silencer
Greenery and enhanced architectural design
Tai Wan SPS
O Tsai SPS
Hung Shing Ye SPS
Figures shown above are photomontage of preliminary layout and are subject to change
Land Requirement
To avoid affecting private land development,
sewerage design will have the following
considerations Minimize resumption of
private land
Avoid bisecting private lot
Sewer to be laid at
unobstructed access as
far as possible
Avoid affecting the
facilities of the village
houses
Sewer alignment to minimize the impact to
private land development
Sewerage Connection by
Property Owner
Public Consultation
First-round public consultation commenced
in October 2008
Notice posting for the proposed SPS sites
Consultation with Lamma Island (North)
Rural Committee
Site visit with Village Representatives and
residents to collect their views
Recent public consultation commenced in
May 2011
Lamma Island (North) Rural Committee
supports the project
Sewerage layout plans have been posted at
Rural Committee and notice board for public
inspection and collecting suggestions
Consultation with Islands District Council will
be held in July 2011
Project Schedule
Major Activities Tentative Programme
Preliminary design Jan 2008 – Aug 2010
Site investigation (survey for
topography, underground utilities,
background noise and built heritage
etc.)
Jul 2008 – Sep 2009
Detailed design Aug 2010 – Jul 2011
Public consultation and design review Oct 2008 – Dec 2011
Gazette of sewerage scheme Aug 2011 – Oct 2011
Commencement of construction Late 2012 / Early 2013
Anticipated completion date 2017
Please feel free to raise any
enquiry or suggestion
Public Works Project (PWP) Item No. 4355DS
Outlying Islands Sewerage Stage 2
- Lamma Village Sewerage Phase 2