    1.0 Line Protection Requirement

    a Limit voltage variation as per grid code

    b Unbalance in the phase angle and magnitude of voltage at the interconnection point

    beyond the limits prescribed.

    c All Users shall take all possible measures to ensure that the grid frequency always

    remains within the 49.7 50.2 Hz band.

    d

    All distribution licensees / STU shall provide automatic under-frequency and df/dt

    relays for (1) load shedding in their respective systems, to arrest frequency decline

    that could result in a collapse/disintegration of the grid, as per the plan separately

    finalized by the SLDC and shall ensure its effective application to prevent cascade

    tripping of generating units in case of any contingency and (2) to effect islanding.

    e

    All distribution licensees, STU shall ensure that the above under-frequency and df/dt

    load shedding/islanding schemes are always functional. The provisions regarding

    under frequency and df/dt relays of relevant CEA Regulations shall be complied with.

    SLDC shall carry out periodic inspection of the under frequency and df/dt relays and

    maintain proper records of the inspection. SLDC shall decide and intimate the action

    required by distribution licensee and STUs to get required load relief from under

    frequency and df/dt relays. All distribution licensee and STUs shall abide by these

    decisions. SLDC shall keep a comparative record of expected load relief and actual load

    relief obtained in Real time system operation.

    2.0 132 kV and 66 kV Transmission Lines Requirement

    a

    A single distance protection scheme, which shall be numeric, with four independent

    zones (three forward and one reverse), non-switched (with separate measurement for

    all phase to phase and phase to ground faults) fast acting distance protection scheme

    with permissible inter-trip at remote end (in case of zone-2 fault). The scheme shall

    have inbuilt features of power swing blocking, fault recorder, disturbance recorder,event logger, relevant communication ports, single and three phase auto re-closing

    (with deadline charging and synchro- check facility), Local Breaker Backup (LBB), VT

    fail, broken conductor and sufficient LEDs to display faulty phases and zones.

    Maximum operating time of relay on fault should not exceed 50 ms.

    For back-up protection, a numerical directional IDMTL over current (for each phase)

    and earth fault relay shall be provided.

    For short transmission lines, appropriate alternative protection schemes may be

    adopted such as pilot wire protection schemes

    3.0 Transformer Requirements

    a The following minimum protections should be provided for transformers:

  • 8/10/2019 Punjab Relay Scheeme

    2/2

    b

    All power transformers shall be provided with numeric fast acting differential, REF,

    open delta (Neutral Displacement Relay) and over-fluxing relays. In addition, there

    shall be back up IDMTL over current and earth fault protection. For parallel operation,

    such back up protection shall have inter-tripping of both HV and LV breakers. For

    protection against heavy short circuits, the over current relays should incorporate a

    high set instantaneous element. In addition to electrical protection, transformer own

    protection viz. buchholz, OLTC oil surge, gas operated relays, winding temperature

    protection, oil temperature protection, PRV relay shall be provided for alarm and tripfunctions.

    c

    For 132 kV, 66 kV and 33 kV class transformers of capacity above 5 MVA, the

    protection shall be same as mentioned above except over-fluxing, REF and PRV relays.

    However, REF shall also be provided for transformers of capacity equal to or more

    than 20 MVA.

    d In addition to electrical protection, gas operated relays, winding temperature

    protection and oil temperature protection shall be provided.

    4.0 Sub-Station Protection

    a

    All circuit breakers installed in the sub-station from 11 kV to 132 kV level should clear

    the faults in two and half cycles and above 132 kV level in two cycle. The total time of

    clearing fault including main protection relay shall not exceed that specified as At

    generating stations, line faults should be cleared at the generating station end within

    the critical clearing time so that the generators remain in synchronism.