BID DOCUMENT CATEGORY A External Signage
Package 1 (Lot – 1) Rawalpindi and Gujranwala
SUPPLY AND INSTALLATION OF SIGN BOARDS IN PRIMARY & SECONDARY
HEALTHCARE DEPARTMENT ESTABLISHMENTS OF PUNJAB
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 1 of 242
PRIMARY & SECONDARY HEALTHCARE
DEPARTMENT
GOVERNMENT OF THE PUNJAB
BIDDING DOCUMENT
For
SUPPLY AND INSTALLATION OF SIGN BOARDS IN
PRIMARY & SECONDARY HEALTHCARE
DEPARTMENT ESTABLISHMENTS OF PUNJAB
January 2019
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 2 of 242
Bid Reference #:_____________
Those wishing to submit comments or questions, or to obtain additional information on
procurement under this project, are encouraged to contact:
Farhan Waheed
Project Manager (Civil)
Project Management Unit, Primary & Secondary Healthcare Department
31-E/1, Shahrah-e-Imam Hussain, Gulberg-III,
Lahore.
Phone No. : 042-99231208
Mob : +92 3314427972
Email : [email protected]
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 3 of 242
Foreword
1. This Bidding Document has been prepared by the Primary & Secondary Healthcare
Department’s Procuring Agency” for Selection of Supplier. The document was
prepared by procurement committee of the Procuring Agency and reflects what are
considered “best practices”.
2. This Bid Document has been structured in the following manner:
Part I: Invitation to Bid
Part II: Form of Contract
Part III: Scope of Work
3. The text written in Italics is “Notes to the Bidders”. It provides guidance to the entity
in preparing Bid Document. “Notes to the Bidders” should be deleted from the final
proposals submitted by the short-listed Suppliers.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 4 of 242
Addendum
Sr No Description
1 Specifications of LED Modules, ACP Panels, Paint are
Mentioned wherever being used
2 In external Gantry Signage (EG-1 and EG 2 additional
members are added in the frame to withhold the acrylic
letters)
3 The specifications of translucent polycarbonate sheet in D1
is changed with transparent polycarbonate sheet
4 In B1 and D1(A) Signage, acrylic sheet is added behind the
acrylic letters for anchoring the letters.
5 The specifications of EG1 to EG8 are described in more
details
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 5 of 242
TABLE OF CONTENTS
TABLE OF CONTENTS ...........................................................................................................5
PART – I REQUEST FOR PROPOSAL ...................................................................................8
SECTION - I: LETTER OF INVITATION FOR BIDS ............................................................8
SECTION - II: INSTRUCTIONS TO BIDDERS .....................................................................9
A. DEFINITIONS ............................................................................................. 10
B. INTRODUCTION .............................................................................................. 11
ITB1. Scope of Bid and Source of Funds .............................................................. 11
ITB2. Eligible Bidders ........................................................................................... 11
ITB3. Eligible Goods and Services ....................................................................... 12
ITB4. Cost of Bidding ............................................................................................ 12
C: PREPARATION OF BIDS ................................................................................ 13
ITB5.Contents of Bidding Documents ................................................................... 13
ITB6. Clarification of Bidding Documents ............................................................. 13
ITB7.Amendment of Bidding Documents .............................................................. 14
ITB8. Language of Bid& Notifications ................................................................... 14
ITB9. Documents Comprising the Bid ................................................................... 15
ITB10. Sufficiency of Bid ....................................................................................... 15
ITB11. Bid Prices, Currency of Bid and Payment ................................................. 16
ITB12. Documents Establishing Bidder’s Eligibility and Qualification ................... 16
ITB13. Documents Establishing Services’ Conformity to Bidding Documents ...... 16
ITB14. Bid Security ............................................................................................... 17
ITB15.Validity of Bids, Format, Signing and Submission of Bid ............................ 17
D. SUBMISSION OF BIDS ................................................................................... 18
ITB16. Deadline for Submission, Modification & Withdrawal of Bids .................... 18
E. BID OPENING AND EVALUATION .................................................................. 19
ITB17. Bid Opening .............................................................................................. 19
ITB18. Clarification of Bids ................................................................................... 19
ITB19.Preliminary Examination & Determination of Responsiveness of Bids ....... 20
ITB20. Conversion to Single Currency .................................................................. 23
ITB21. Detailed Evaluation of Bids ....................................................................... 23
ITB22. Process to be Confidential ........................................................................ 23
F. AWARD OF CONTRACT ................................................................................. 24
ITB23. Post Qualification ...................................................................................... 24
ITB24. Award Criteria &Procuring Agency’s Right ................................................ 24
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 6 of 242
ITB25. Notification of Award & Signing of Contract .............................................. 25
ITB26. Performance Security ................................................................................ 25
ITB27. Integrity Pact ............................................................................................. 25
SECTION - III: BIDDING DATA SHEET .............................................................................26
SECTION - IV: BID FORM & SCHEDULES........................................................................57
A - FINANCIAL FORM& SCHEDULE ................................................................... 58
FORM OF BID ...................................................................................................... 58
B- TECHNICAL FORMS ....................................................................................... 64
C- STANDARDFORMS ...................................................................................... 100
PART –II CONTRACT .........................................................................................................100
SECTION A: GENERAL CONDITIONS OF CONTRACT (GCC) ....................................104
1. General Provisions ............................................................................................ 104
1.1 Definitions ......................................................................................................................................... 104 1.2 Applicable Law ................................................................................................................................. 105 1.3 Language ........................................................................................................................................... 105 1.4 Notices ............................................................................................................................................... 105 1.5 Location ............................................................................................................................................ 105 1.6 Authorized Representatives ............................................................................................................... 105 1.7 Inspection and Audit by the Procuring Agency ................................................................................. 106 1.8 Taxes and Duties ............................................................................................................................... 106 2. Commencement, Completion, Modification, and Termination of Contract .............. 106
2.1 Effectiveness of Contract ................................................................................................................... 106 2.3 Intended Completion Date ................................................................................................................ 107 2.4 Modification ...................................................................................................................................... 109 2.4.1 Orders for variations to be in writing ................................................................................................... 110 2.5 Force Majeure ................................................................................................................................... 111 2.6 Termination ....................................................................................................................................... 112 2.7 Review of Progress .................................................................................................................................. 113 3. Obligations of the Supplier ................................................................................ 114
3.1 General ............................................................................................................................................. 114 3.2 Conflict of Interests ........................................................................................................................... 116 3.3 Confidentiality ................................................................................................................................... 116 3.4 Insurance to be Taken Out by theSupplier ............................................ Error! Bookmark not defined. 3.5 Supplier’s Actions Requiring Procuring Agency’s Prior Approval .................................................. 117 3.6 Reporting Obligations ....................................................................................................................... 117 3.7 Documents Prepared by the Supplier to Be the Property of the Procuring Agency.......................... 117 3.8 Liquidated Damages ......................................................................................................................... 117 3.9 Performance Security ........................................................................................................................ 118 4. Supplier’s Personnel ......................................................................................... 124
4.1 Description of Personnel ................................................................................................................... 124 4.2 Removal and/or Replacement of Personnel ...................................................................................... 124 5. Obligations of the Procuring Agency .................................................................. 125
5.1 Assistance and Exemptions ............................................................................................................... 125 5.2 Change in the Applicable Law .......................................................................................................... 125 5.3 Services and Facilities ...................................................................................................................... 125 6. Payments to the Supplier ................................................................................... 125
6.1 Lump-Sum Remuneration .................................................................................................................. 125 6.2 Contract Price ................................................................................................................................... 126
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 7 of 242
6.3 Payment for Additional Services ....................................................................................................... 126 7. Quality Control................................................................................................. 129
7.1 Identifying Defects ............................................................................................................................ 129 7.2 Correction of Deficiencies, and Non-Performance Penalty ............................................................ 129 8. Settlement of Disputes....................................................................................... 130
8.1 Amicable Settlement .......................................................................................................................... 130 8.2 Dispute Settlement ............................................................................................................................. 131
SECTION B. SPECIAL CONDITIONS OF CONTRACT ..................................................132
PART –III SCOPE OF WORK ................................................................................................0
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 8 of 242
PART – I INVITATION TO BID
SECTION - I: LETTER OF INVITATION FOR BIDS
Sealed tenders are invited from firms / companies, registered with Sales Tax and Income Tax
Departments for “FRAME WORK CONTRACT FOR SUPPLYING AND
INSTALLATION OF SIGN BOARDS IN PRIMARY & SECONDARY
HEALTHCARE DEPARTMENT ESTABLISHMENTS OF PUNJAB” through Primary
& Secondary Healthcare Department, under Punjab Procurement Rules 2014.
Bidding documents containing the detailed specifications can be obtained @ Rs. 1000/- (non-
refundable) from Procurement Wing, Project Management Unit on written request from
under mentioned address during office hours. Single Stage Two Envelope Procedure will be
adopted according to PPRA.
Bidding documents may also be downloaded from PPRA website
(www.pprapunjab.gov.pk) & P&SHD website (www.pshealth.punjab.gov.pk).
The last date for submission of bids along with bid security mentioned in bidding documents
is January 24, 2019 till 03:00 pm and will be opened on the same day at 3:30 pm at below
mentioned address.
A pre-bid meeting shall be held on the 3rd of January 2019 at 03:00pm.
Procurement Specialist
Project Management Unit (PMU)
Primary & Secondary Healthcare Department
31-E/1, Shahra-e-Imam Hussain, Gulberg-III, Lahore
E-mail: [email protected]
Tel: +924299231208 Mob: 0331-4427972
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 9 of 242
SECTION - II: INSTRUCTIONS TO BIDDERS
[Note: Instructions to Bidders (ITB) shall not be modified, except in accordance with the provisions
of Punjab Procurement Rules, 2014. Any necessary changes, acceptable to the Government of
Punjab, or Procuring Agency, to address specific issues, shall be introduced only through the
Bidding Data Sheet (e.g., by adding new reference paragraphs)]
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 10 of 242
A. DEFINITIONS
(a) Procuring Agency or Owner-Shall mean PMU, Primary and Secondary Healthcare
Department, Lahore.
(b) Engineer - Shall mean the person so designated by Procuring Agency to supervise the
work, or his duly authorized assistant.
(c) Engineers - Shall mean PMU, Primary and Secondary Healthcare Department, Lahore or
their authorized representative.
(d) Supplier - Shall mean M/s. _________________________ and shall include his (their)
legal representatives’ assign/s or successor/s, which individual/firm has undertaken the
works by virtue of this Contract.
(e) Site - Shall mean the site of the Contract works, including any development works,
building and erections thereon, and any other land (inclusive) as aforesaid, allotted by the
Procuring Agency for the Supplier's execution of the scope of work.
(f) Works or Work - Shall mean the works to be executed by virtue of this Contract, whether
temporary or permanent, and whether original, altered, substituted or additional.
(g) This Contract - Shall mean the Articles of Agreement, the Special Conditions, the
Conditions of Contract, the Appendices, the Bill of Quantities, the Specification, and the
Drawings attached hereto and duly signed, and the written instructions issued from time to
time by the Engineer/Engineer. All these documents taken together shall be deemed to
form one Contract and shall be complimentary to one another.
(h) Notice in writing - Shall mean a notice in written, typed or printed characters, sent (unless
delivered personally or otherwise proved to have been received) by registered post to last
known private or business address or registered office of the addressee, and shall be
deemed to have been received when in the ordinary course of post it would have been
delivered.
(i)Approved, Directed or Selected - Shall mean the approval, direction, or selection by the
Engineer/Procuring Agency.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 11 of 242
B. INTRODUCTION
ITB1. Scope of Bid and
Source of Funds
1.1 The Procuring Agency as defined in the BDS intends to receive
Bids for the Goods summarized in the BDS. Bidders will be
selected in accordance with the method of selection specified in
BDS. The Bidder must quote for the complete scope of service.
Any Bid covering partial scope of services will be rejected as non-
responsive.
1.2 The Procuring Agency has arranged funds from the Government of
Punjab.
ITB2. Eligible Bidders 2.1 Bidding is open to all Companies / firms / JVs /Associations.
2.2 All partners of the JV shall at all times and under all
circumstances be liable jointly and severally to Procuring Agency
for the execution of the entire Contract in accordance with the
Contract terms and conditions and a statement to this effect shall
be included in the authorization mentioned under para (2.4) below
as well as in the Form of Bid and Form of Contract (in case of a
successful bidder).
2.3 The partner-in-charge shall be authorized to incur liabilities,
receive payments and receive instructions for and on behalf of any
or all partners of the JV.
2.4 A copy of the Contract entered into by the JV partners shall be
submitted with the bid stating the conditions under which it will
function, its period of duration, the persons authorized to represent
and obligate it and which persons will be directly responsible for
due performance of the Contract and can give valid receipts on
behalf of the JV, the proportionate participation of the several
firms forming the JV, and any other information necessary to
permit a full appraisal of its functioning. No amendments /
modifications whatsoever in the JV Contract shall be agreed to
between the JV partners without prior written consent of the
Procuring Agency.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 12 of 242
ITB3. Eligible Goods and
Services
3.1 All Goods & ancillary Services to be supplied under this Contract
shall have their origin in eligible countries as per ITBs and all
expenditures made under the Contract will be limited to such
Goods and Services, if agreed otherwise.
3.2 For purpose of this Clause, “origin” means the place where the
Goods are mined, grown or produced or from where the ancillary
services are supplied. Goods are produced when, through
manufacturing, processing or substantial and major assembling of
components, a commercially recognized product results that is
substantially different in basic characteristics or in purpose or
utility from its components.
3.3 The origin of Goods and Services may be distinct from the
nationality of the Bidder.
ITB4. Cost of Bidding 4.1 The Bidder shall bear all costs associated with the preparation and
submission of its bid and the Procuring Agency will in no case be
responsible or liable for those costs, regardless of the conduct or
outcome of the bidding process.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 13 of 242
C: PREPARATION OF BIDS
ITB5.Contents of Bidding
Documents
5.1 In addition to Invitation for Bids, the Bidding Documents are
those stated below, and should be read in conjunction with any
Addendum issued in accordance with Sub-Clause ITB7.1.
1. Instructions to Bidders & Bidding Data
2. Schedules to Bid comprising the following:
Financial Schedule
i) Schedule A to Bid: Schedule of Prices
Technical Schedule
i) Schedule B to Bid: Technical Proposal Form
ii) Schedule C to Bid: Company Profile
iii) Schedule D to Bid: General Experience
iv) Schedule E to Bid: Relevant Experience
v) Schedule F to Bid: Human Resource
vi) Schedule G to Bid: Financial Situation
vii) Schedule H to Bid: Relevant Machinery
viii) Schedule I to Bid: Project Plans
ix) Schedule J to Bid: Integrity Pact
Other Forms
i) Form of Bid Security
ii) Form of Performance Guarantee
3. Form of Contract, General & Specific conditions
4. Scope of Work
ITB6. Clarification of
Bidding Documents 6.1 A prospective Bidder requiring any clarification(s) in respect of
the Bidding Documents may notify the Procuring Agency at the
Procuring Agency’saddress indicated in the BDS.
6.2 The Procuring Agency will respond to any request for clarification
within a day which it receives earlier than five (5) Days prior to the
deadline for the submission of Bids. Copies of the Procuring
Agency’s response will be forwarded to all prospective Bidders, at
least three (3) Days prior to dead line for submission of Bids, who
have received the Bidding Documents including a description of
the enquiry but without identifying its source.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 14 of 242
ITB7.Amendment of
Bidding Documents 7.1 At any time prior to the deadline for submission of Bids, the
Procuring Agency may, for any reason, whether at his own
initiative or in response to a clarification requested by a
prospective Bidder, modify the Bidding Documents by issuing
addendum.
7.2 Any addendum thus issued shall be part of the Bidding
Documents pursuant to Sub-Clause 7.1 hereof, and shall be
communicated in writing to all purchasers of the Bidding
Documents within 2 days of its approval. Prospective Bidders
shall acknowledge receipt of each addendum in writing to the
Procuring Agency.
7.3 To afford prospective Bidders reasonable time in which to take an
addendum into account in preparing their Bids, the Procuring
Agency may at its discretion extend the deadline for submission of
Bids.
ITB8. Language of Bid&
Notifications 8.1 The bid prepared by the Bidder and all correspondence and
documents relating to the Bid, exchanged between the Bidder and
the Procuring Agency shall be written in the English language.
Whereas, any printed literature furnished by the Bidder may be
written in another language so long as accompanied by an English
translation of its pertinent passages in which case, for purposes of
interpretation of the quotation, the English translation shall
govern.
8.2 Announcements and notifications shall be made through registered
mail or maybe delivered by hand against signature. The Procuring
Agency may make announcements through electronic mail or fax,
provided that the electronic mail addresses and fax number is
given on the form. Announcements with reference to proposal
letter made through this electronic address or fax numbers hall be
accepted.
8.3 For the notifications made through registered mail, the date of
notification shall be seventh day following the deposit of letter to
the postal service for local Applicants and fourteenth day for the
foreign Applicants. In case Applicants receive the notification
before such date, actual notification date shall be taken as basis.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 15 of 242
8.4 For the announcements made through electronic mail or fax, the
date of announcement shall be taken as the notification date.
Notification made in such away must be confirmed by the
Procuring Agency on the same day. Notifications which are not
confirmed on the same day shall be considered as not realized. In
order to ensure the confirmation as realized, it will be enough to
make the notification through registered mail. Notifications made
through electronic mail or fax will be documented in such a way
to contain the date of notification and its content.
8.5 Notifications through electronic mail will be made by using the
official electronic mail address of the Procuring Agency.
8.6 Notifications and announcements to the JV or Partnership will be
made to the Lead Partner or Pilot Partner or Coordinator associate.
ITB9. Documents
Comprising the Bid
9.1 The bid prepared by the Bidder shall comprise of the following
documents:
(a) Covering Letter
(b) Form of Bid duly filled, signed and sealed, in accordance with Sub-
Clause ITB15. (c) Schedules (A to J) to Bid duly filled and initialed, in accordance
with the instructions contained therein & in accordance with Sub-
Clause ITB15.
(d) Bid Security furnished in accordance with Clause ITB14.
(e) Documentary evidence in accordance with Clause ITB12.
(f) Documentary evidence in accordance with Clause ITB13.
ITB10. Sufficiency of Bid
10.1 Each Bidder shall satisfy himself before Bidding as to the
correctness and sufficiency of his Bid and of the rates and prices
entered in the Schedule of Prices, which rates and prices shall
except in so far as it is otherwise expressly provided in the
Contract, cover all his obligations under the Contract and all
matters and things necessary for the proper completion of the
Services stipulated in PART III: Scope of work, which is part and
parcel to this document.
10.2 The Bidder is advised to obtain for himself at his own cost and
responsibility all information that may be necessary for preparing
the bid and entering into an Contract for execution of the Services.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 16 of 242
ITB11. Bid Prices,
Currency of Bid and
Payment
11.1 The Bidder shall fill up the Schedule of Prices (Schedule A to
Bid) indicating the unit rates and prices of the Services to be
performed under the Contract. Prices in the Schedule shall be
entered keeping in view the instructions contained in the Preamble
to Schedule of Prices.
11.2 During the Bidder’s performance of the Contract, unless otherwise
stipulated in the Contract, prices quoted by the Bidder shall
remain fixed and not subject to variation on any account.
11.3 The unit rates and prices in the Schedule of Prices shall be quoted
by the Bidder in the currency as stipulated in Bidding Data.
ITB12. Documents
Establishing Bidder’s
Eligibility and
Qualification
12.1 Bidder/Manufacturer must possess capability and the experience
as stipulated in Bidding Data and the Qualification Criteria
stipulated in the Bidding Documents.
12.2 Pursuant to Clause ITB9 and 12.1, the Bidder shall furnish, as part
of its bid, documents establishing the Bidder’s eligibility to bid
and its qualifications to perform the Contract.
ITB13. Documents
Establishing Services’
Conformity to Bidding
Documents
13.1 The documentary evidence of the Services’ conformity to the
Bidding Documents may be in the form of literature, maps and
data and the Bidder shall furnish documentation as set out in
Bidding Data.
13.2 The Bidder shall note that standards for workmanship, material
and equipment, and references to brand names or catalogue
numbers, if any, designated by the Procuring Agency in the
Technical Proposal. Provisions are intended to be descriptive only
and not restrictive.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 17 of 242
ITB14. Bid Security
14.1 Each Bidder shall furnish, as part of his bid, a Bid Security
equivalent to the amount stipulated in Bidding Data either in the
form of Deposit at Call or a Bank Guarantee issued by a
Scheduled Bank in Pakistan in favor of the Procuring Agency,
valid for a period of One Hundred and Twenty (120) Days from
the last date for submission of bid. In case of the guarantee is
from a foreign bank, it shall be counter guaranteed by a scheduled
bank in Pakistan.
14.2 Any bid not accompanied by an acceptable Bid Security shall be
rejected by the Procuring Agency as non-responsive.
14.3 The Bid Security of unsuccessful Bidders will be returned upon
award of Contract to the successful Bidder or on the expiry of
validity of Bid Security whichever is earlier.
14.4 The Bid Security of the successful Bidder will be returned when
the Bidder has furnished the required Performance Security,
pursuant to Clause ITB22 and signed the Contract, pursuant to
Sub-Clauses ITB25.2 & 25.3.
14.5 The Bid Security may be forfeited under either of the following
circumstances:
(a) if a Bidder withdraws his bid during the period of bid
validity; or
(b) if a Bidder does not accept the correction of his Bid Price,
pursuant to Sub-Clause 19.2 here of; or
(c) in the case of a successful Bidder, if he fails to:
(i) furnish the required Performance Security in accordance
with Clause ITB26, or
(ii) sign the Contract, in accordance with Sub-Clauses ITB25.2
& 25.3
ITB15.Validity of Bids,
Format, Signing and
Submission of Bid
15.1 Bids shall remain valid for the period stipulated in the Bidding
Data after the date of bid opening.
15.2 All Schedules to Bid are to be properly filed, completed and
signed.
15.3 No alteration is allowed in the Form of Bid. Incase of any
alteration the bid shall be rejected.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 18 of 242
15.4 Each Bidder shall prepare Original and number of copies specified
in the Bidding Data of the documents comprising the bid as
described in Clause ITB5 and clearly mark them “ORIGINAL”
and “COPY” as appropriate. In the event of discrepancy between
them, the original shall prevail.
15.5 The original and all copies of the bid shall be typed or written in
indelible ink and shall be signed by a person or persons duly
authorized to sign (in the case of copies, photostats are also
acceptable). All pages of the bid documents shall be initialed by
the authorized person or persons along with the affixed official
seal.
15.6 The Bid shall be delivered in person or sent by registered mail at
the address as given in Bidding Data.
D. SUBMISSION OF BIDS
ITB16. Deadline for
Submission,
Modification &
Withdrawal of Bids
16.1 Sealed Bids must be received by the Procuring Agency at the
address provided in Bidding Data not later than the time and date
stipulated therein.
16.2 Bids submitted through telegraph, telex, fax or e-mail shall not be
considered.
16.3 Any bid received by the Procuring Agency after the deadline for
submission prescribed in Bidding Data will be returned unopened
to such Bidder.
16.4 Any Bidder may withdraw his bid after bid submission provided
that the modification or written notice of withdrawal is received
by the Procuring Agency prior to the deadline for submission of
bids.
16.5 Withdrawal of a bid during the interval between the deadline for
submission of bids and the expiration of the period of bid validity
specified in the Form of Bid may result in forfeiture of the Bid
Security pursuant to Sub-Clause ITB 26.3.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 19 of 242
E. BID OPENING AND EVALUATION
ITB17. Bid Opening
17.1 A committee consisting of nominated members by the Procuring
Agency will open the Bids (including withdrawals, substitution
and modifications made pursuant to Clause ITB16) in the
presence of Bidders’ representatives who choose to attend, at the
time, date and location stipulated in the Invitation for Bids.
Technical Bids will be opened first. At the end of the evaluation
of the Technical Bids, the Procuring Agency will invite
technically substantially responsive Bidders, eligible for award,
to attend opening of the Financial Bids.
The Bidders’ representatives who are present shall sign in a
register evidencing their attendance.
17.2 Envelopes marked “MODIFICATION”, “SUBSTITUTION” or
“WITHDRAWAL” shall be opened and read out first and the
name of the Bidder shall be read out. Bids for which an
acceptable notice of withdrawal has been submitted pursuant to
Clause ITB16 shall not be opened.
17.3 The Bidder’s name, Bid Prices, unit rates, any discount offered,
Bid modifications, substitutions and withdrawals, the presence or
absence of Bid Security, and such other details as the Procuring
Agency at its discretion may consider appropriate, will be
announced by the Procuring Agency at the Bid opening. The
Procuring Agency will record minutes of Bid opening.
Any Bid Price or discount which is not read out and recorded at
Bid opening will not be taken into account in the evaluation of
Bid.Any discount offered by the Bidder on its quoted prices, shall
only be considered if such discount is either shown on the duly
filled-in, signed & stamped Form of Bid/Letter of price bid or on
the Summary Page of the quoted amount for Lump sum
Contract/bill of quantities as applicable. In case of any
discrepancy or difference in the rate or amount of discount
mentioned in the Form of Bid/Letter of price bid (as duly filled-in
and signed), and on the Summary Page of the Schedule of Prices,
the discount shown on the Schedule of Price shall prevail.
Discount, if offered, through a separate letter of discount
submitted with the Bid, will not be entertained and shall be
considered null & void.
17.4 Discounts offered for lesser period than the Bid validity shall not
be considered in evaluation.
ITB18. Clarification of
Bids
18.1 To assist in the examination, evaluation and comparison of Bids,
the committee may, at its discretion, ask the Bidder for a
clarification of its Bid. The request for clarification and the
response shall be in writing and no change in the price or
substance of the Bid shall be sought, offered or permitted.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 20 of 242
ITB19.Preliminary
Examination &
Determination of
Responsiveness of
Bids
19.1 Prior to detailed evaluation pursuant to Clause ITB21, the
evaluation committee will determine the responsiveness of the
Bids in the following manner:
(a) the Committee will examine the Bids to determine
whether;
Technical areas
(i) The Bid is complete and does not deviate from the scope;
(ii) Completion period offered is within specified limits;
(iii) Bidder/Manufacturer meet the desired eligibility criteria
including the requisite experience;
(iv) Bid does not deviate from basic technical requirements;
(v) Bid is generally in order;
(vi) Required sureties have been furnished; and
(vii) Documents have been properly signed.
Financial areas
(i) Bid is valid till required period;
(ii) Bid prices are the same during currency of Contract if it
is a fixed price bid; and
(iii) No computational error has been made.
(iv) The rates quoted in the financial bid should be valid for
year 2016-17 & 2017-18 as per the requirement of frame
work contract
(v) The bid should be inclusive of all taxes
(b) the bid shall not to be considered, if:
(i) It is unsigned;
(ii) Its validity is less than specified period;
(iii) It is submitted for incomplete scope of work;
(iv) It indicates completion period later than specified;
(v) It indicates that the works and services materials to be
supplied do not meet eligibility requirements;
(vi) It indicates that Bid prices do not include the amount
of taxes;
(vii) It indicates alteration in Form of Bid;
(vix) It is received after the deadline for submission of
Bids;
(xv) It is submitted through fax, telex, telegram or email;
(xvi) It indicates that prices quoted are not firm during
currency of the Contract whereas the Bidders are
required to quote fixed price(s);
(xvii) The Bidder refuses to accept arithmetic correction;
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 21 of 242
(xviii) It is materially and substantially different from the
Conditions/ Specifications of the Bidding Documents;
and
(xix) Submission of Conditional Bid.
After determining the responsiveness of Bids in the light of basis
stated in para 19.1, further action on technical evaluation will be
taken.
19.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and total price that
is obtained by multiplying the unit price and quantity, the unit
price shall prevail and the total price shall be corrected. If there is
a discrepancy between the words and figures the amount in words
shall prevail. If there is a discrepancy between the total Bid price
entered in Form of Price Bid and the total shown in Schedule of
Prices Summary, the amount stated in the Form of Price Bid will
be corrected by the evaluation committee in accordance with the
Corrected Schedule of Prices.
If the Bidder does not accept the corrected amount of Bid, his Bid
will be rejected and his Bid Security will be forfeited.
19.3 Prior to the detailed evaluation, pursuant to Clause ITB21 the
Evaluation Committee will determine the substantial
responsiveness of each Bid to the Bidding Documents. For
purpose of these Clauses, a substantially responsive Bid is one
which conforms to all the terms and conditions of the Bidding
Documents without material deviations.
A material deviation or reservation is one:
(i) which affect in any substantial way, the scope, quality or
performance of the Works;
(ii) which limits in any substantial way, inconsistent with the
Bidding Documents, the Procuring Agency rights or the
Bidder’s obligations under the Contract; or
(iii) Whose rectification/adoption would affect unfairly the
competitive position of other Bidders presenting
substantially responsive Bids?
The Evaluation Committee’s determination of a Bid
responsiveness will be based on the contents of the Bid itself
without recourse to irrelevant evidence.
19.4 A Bid determined as substantially non-responsive will be rejected
and will not subsequently be made responsive by the Bidder by
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 22 of 242
correction.
19.5 Any minor informality or non-conformity or irregularity in a Bid
which does not constitute a material deviation may be waived by
Procuring Agency, as long as the waiver does not prejudice or
affect the relative ranking of any Bidder.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 23 of 242
ITB20. Conversion to
Single Currency 20.1 To facilitate evaluation and comparison, the Evaluation
Committee will convert all Bid Prices, expressed in the amounts
in various currencies in which bid Price is quoted, to Pak Rupees
at the telegraphic Transfer and Over Draft (TT&OD) composite
selling exchange rate published/authorized by the State Bank of
Pakistan and applicable to similar transaction, on the date of bid
opening.
ITB21. Detailed Evaluation
of Bids 21.1 Only the Bids previously determined to be substantially
responsive pursuant to Clause ITB19 will be evaluated and
compared in detail by the Procuring Agencies per the
requirements given hereunder:
21.2 Evaluation and Comparison of Bids
(a) Bids will be evaluated for complete scope of work.
(b) Basis of Price Comparison
The prices will be compared on the basis of the Lowest
Evaluated Bid Price.
(c) Technical Evaluation
It will be examined in detail whether the Services / Goods
offered by the Bidder comply with the Technical
Provisions of the Bidding Documents. For this purpose,
Personnel capabilities, equipment and services standards
offered by the Bidder will be reviewed for which the
Bidder’s data submitted with the Bid will be compared
with the technical features/criteria prescribed by the
Procuring Agency in Scope of Work PART III. Other
technical information submitted with the Bid regarding
the Scope of Work will also be reviewed including
importations, if any, required.
ITB22. Process to be
Confidential 22.1 Subject to Sub-Clause ITB19.1 heretofore, no Bidder shall
contact Procuring Agency on any matter relating to its Bid from
the time of the Bid opening to the time the bid evaluation result is
announced by the Procuring Agency. The evaluation result shall
be announced at least ten (10) Days prior to award of Contract.
The announcement to all Bidders will include table(s) comprising
read out prices, discounted prices, price adjustments made, final
evaluated prices and recommendations against all the bids
evaluated.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 24 of 242
22.2 Any effort by a Bidder to influence Procuring Agency in the Bid
evaluation, Bid comparison or Contract Award decisions may
result in the rejection of his Bid. Whereas, any Bidder feeling
aggrieved may lodge a written complaint not later than fifteen
(15) Days after the announcement of the bid evaluation result,
however, mere fact of lodging a complaint shall not warrant
suspension of procurement process.
F. AWARD OF CONTRACT
ITB23. Post Qualification
23.1 The Procuring Agency, at any stage of the bid evaluation, having
credible reasons for or prima facie evidence of any defect in
supplier’s or Supplier’s capacities, may require the suppliers or
Suppliers to provide information concerning their professional,
technical, financial, legal or managerial competence whether
already pre-qualified or not.
Provided that such qualification shall only be laid down after
recording reasons thereof in writing. They shall form part of the
records of that bid evaluation report.
23.2 The evaluation will take into account the Bidder’s financial and
technical capabilities. It will be based upon an examination of the
documentary evidence of the Bidders’ qualifications submitted
under Clause ITB12, as well as such other information required
in the Bidding Documents.
ITB24. Award Criteria
&Procuring Agency’s
Right
24.1 Subject to Sub-Clause ITB24.2, the Procuring Agency will award
the Contract to the Bidder whose bid has been determined to be
substantially responsive to the Bidding Documents and who has
offered the lowest evaluated Bid Price, provided that such Bidder
has been determined to be qualified to satisfactorily perform the
Contract in accordance with the provisions of Clause ITB 23.
24.2 Notwithstanding Sub-Clause ITB 24.1, the Procuring Agency
reserves the right to accept or reject any bid, and to annul the
bidding process and reject all bids, at any time prior to award of
Contract, without thereby incurring any liability to the affected
Bidders or any obligation to inform the affected Bidders of the
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 25 of 242
grounds for the Procuring Agency ’s action except that the
grounds for its rejection of all bids shall upon request be
communicated, to any Bidder who submitted a bid, without
justification of the grounds. Notice of the rejection of all the bids
shall be given promptly to all the Bidders.
ITB25. Notification of
Award & Signing of
Contract
25.1 Prior to expiration of the period of bid validity prescribed by the
Procuring Agency, the Procuring Agency will notify the
successful Bidder in writing (“Letter of Acceptance”) that his bid
has been accepted.
25.2 Within seven (7) Days from the date of furnishing of acceptable
Performance Security under the Contract, the Procuring Agency
will send the successful Bidder the Form of Contract provided in
the Bidding Documents, incorporating all Contracts between the
parties.
25.3 The formal Contract between the Procuring Agency and the
successful Bidder shall be executed within seven (7) Days of the
receipt of Form of Contract by the successful Bidder from the
Procuring Agency.
ITB26. Performance
Security 26.1 The successful Bidder shall furnish to the Procuring Agency
minimum 5% Performance Security of the Contract Price in the
form and the amount stipulated in the Contract within a period of
14 Days after the award of each work.
26.2 The performance security shall be in the form of Bank guarantee
issued by the scheduled Bank as per “State Bank of Pakistan” in
favor of Procuring Agency “Primary & Secondary Healthcare
Department. In case the performance security is from a Foreign
Bank, it shall be counter guaranteed by a scheduled bank of
Pakistan.
26.3 Failure of the successful Bidder to comply with the requirements
of Sub-Clauses ITB16.5, 24.1, 26. and 27.1shall constitute
sufficient grounds for the annulment of the award and forfeiture
of the Bid Security.
ITB 27. Continuing
Performance security 27.1 The successful bidder shall deposit the amount of Rs. 100,000/- in
the form of CDR, Bank Guarantee, Pay Order or Demand Draft
after initial acceptance from bidder
ITB28. Integrity Pact
28.1 The Bidder shall sign and stamp the Form of Integrity Pact
provided at Schedule-J to Bid in the Bidding Document for all
Federal/Provincial Government procurement contracts exceeding
Rupees ten (10) million. Failure to provide such Integrity Pact
shall make the bid non-responsive.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 26 of 242
SECTION - III: BIDDING DATA SHEET
The following specific data for the goods to be procured shall complement, supplement, or amend the provisions in the ITB Section II. Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
A. General
ITB 1.1 Procuring Agency: Project Management Unit, Primary & Secondary Healthcare
Department.
ITB 1.2 The Procuring Agency has arranged the Funds from the Government of the
Punjab.
ITB 1.3
Name of Contract “Frame work contract of supplying and installation of sign
board for establishments of primary and secondary healthcare department
Punjab”.
ITB 1.4 The procurement shall be made under Punjab Procurement Rules 2014 “Single
Stage Two Envelop (SSTE) process”.
ITB 1.5
The Bid Security of Rs. 100,000/-shall be furnished in Deposit at Call / CDR /
Pay Order/ Bank Guarantee from the scheduled Bank as per “State Bank of
Pakistan” in favour of Procuring Agency “Project Director, Project Management
Unit, Primary & Secondary Healthcare Department”.
ITB 1.6
Bidder shall submit ORIGINAL & Two COPIES of “Technical
Proposal”,Original & one Copy of “Financial Proposal” and one soft copy in
CD/DVD/USB on the prescribed forms.
Bids to be delivered as per Punjab Procurement Rules 2014 for Single Stage Two
Envelope Procedure. Original Bid (Except Financial forms and schedule) along
with all copies shall be placed in a sealed, stamped and duly signed enveloped
marked “Technical Proposal”.
Similarly, the Financial Proposal (Form of Bid & Schedule of Prices) along with
copies shall be placed in a sealed, stamped and duly signed enveloped clearly
marked “Financial Proposal” followed by the name of assignment and with
warning “Do Not Open with the Technical Proposal”.
The envelope containing the Technical and Financial Proposals shall be properly
sealed, stamped and duly signed and shall be placed into an outer envelope and
marked as “Proposal for Supply and Installation of Signage in DHQ and THQ
Hospitals of Punjab”.
ITB 1.7
Bid validity period
The bid should remain valid for Ninety (90) Days from the last date for
submission of bid.
ITB 1.8 Deadline for submission of Bids is 3:00 pm on 24th January, 2019.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 27 of 242
ITB 1.8.1
Venue, Time and Date of Technical Bid Opening
Time: 03:30 pm on 24th January, 2019
Venue: Project Mangement Unit,Primary & Secondary Healthcare Department
31-E/1, Shahra-e-Imam Hussain, Gulberg-III,Lahore.
Phone No.: 042-99231208
Mob : +92 331 4427972
Email: [email protected]
The Financial Bids of the “technically responsive” Bidder(s) will be opened at a
date provided later on. The sealed financial bids of “technically non-responsive”
Bidders will be returned unopened.
ITB 1.9 Bid shall be quoted entirely in Pakistani Rupees only.
ITB 1.10
The Bidder shall submit Performance Security equivalent to 5% of the Contract
Price per contract in the form of CDR, Demand Draft and Bank Guarantee.
The performance security shall be in the form of Bank guarantee issued by the
scheduled Bank as per “State Bank of Pakistan” in favor of Procuring Agency
“Project Director, Project Management Unit, Primary & Secondary Healthcare
Department”. In case the performance security is from a Foreign Bank, it shall be
counter guaranteed by a scheduled bank of Pakistan.
ITB 1.11
The bidder shall submit continuing performance security as per the requirement of
framework contract amounting Rs. 100,000/- in the form of CDR, Demand Draft
and Bank Guarantee. The security shall be submitted within fourteen (14) days of
the advance acceptance of bid, and shall be retained during the currency of the
Contract, and shall be released after one month of the expiry of the Contract upon
satisfactory performance of work according to the Terms & Conditions of the
contract.
B. Preparation and Submission of Bids
ITB 19, 21
QUALIFICATION REQUIREMENTS
Evaluation and Comparison of Bids
(a) Bids will be evaluated for their responsiveness to the complete
scope of work.
(b) Basis of Price Comparison - The Bids shall be evaluated on the
basis of the qualified, responsive lowest Evaluated Bid.
(c) The bid prices shall be compared, after arithmetic correction, if any,
on the basis of quantities given in the Price Schedule. However, it may be noted that
the quantities given in the price schedule are only for evaluation purpose, and the
quantities of the framework contract have been mentioned below the Evaluation
Criteria.
(d) Technical Evaluation
Responsiveness (Knock-Down) Criteria:
• Registration documents as Company/Firm
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 28 of 242
• Client Satisfaction documents of Projects currently in hand or completed
projects (for past 2 years from the date of submitting bid)
(i) It will be examined in detail whether the Services / Goods offered
by the Bidder comply with the Technical Provisions of the Bidding
Documents. For this purpose, Personnel capabilities, equipment
and services standards offered by the Bidder will be reviewed for
which the Bidder’s data submitted with the Bid will be compared
with the technical features/criteria prescribed by the Procuring
Agency in Scope of work PART III. Other technical information
submitted with the Bid regarding the Scope of Work will also be
reviewed.
(ii) The criteria of proportionate marking will be used for technical
scoring, i.e. the firm shall be evaluated proportionately with
reference to each other on the basis of their inter-se credentials
(iii)The criteria for evaluation of technical bid shall be as per
following details:
Sr. No. Category Marks
A1 Company/firm Profile 5
A2
A3
General Experience
Relevant Experience
10
20
A4
A5
Human Resource
Sign Board manufacturing related machinery
10
10
A6 Financial Strength 25
A7 Working Methodology 20
Total
100
The breakup of the each of the category is given hereunder:
A1 Company Profile
A1 Company Profile Points
a) Status and Ownership of the Company/firm 20
b) Registration from the competent authority 20
c) Age of Company 20
d) Office Establishment 10
e) Company experience in Signage
Manufacturing
30
Total A1 100
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 29 of 242
A2 General Experience
A2 General Experience Points
a) Number of successfully completed
assignments
50
b) Average cost of successfully completed
projects
50
Total A2 100
A3 Relevant Experience
A3 Relevant Experience Points
a) Number of successfully completed
assignments
50
b) Average cost of successfully completed
projects
50
Total A3 100
A4 Human Resource
S. No.
Proposed Position Points
1 Number of operational Managers 40
2 Number of Skilled labor of sign board
installation 30
3 Number of Laborers 30
TOTAL A4 100
A5 Machinery related to sign board manufacturing
Sr. Proposed Position Points
No.
1 Number of Digital printing machines (UV
Printer, Vinyl Printing etc.) 35
2 Number of Cutting Machines (CNC, Water
Jet, Laser machines etc.) 35
3 Number of Welding Plants 30
TOTAL A5 100
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 30 of 242
A6 Financial Strength
A6 Financial Strength Points
a) Annual Turn Over 40
b) Current Ratio 30
c) Net Worth 30
Total A6 100
Financial Evaluation Criteria
Annual Turn Over Current Ratio Net Worth
40 30 30
Criteria, sub-criteria, and points system for the evaluation of Expression of Interest (EOIs) are as follows: Score = A1[05%] + A2[10%] + A3[20%] + A4[10%] + A5[10%] + A6[25%] + A7[20%]
The bids shall also be evaluated with reference to their responsiveness by the
above criteria:
Financial bids of only technically qualified bidders (having minimum 65 marks) shall be opened. Financial bids shall be compared on the basis of prices quoted against the BOQs mentioned against Annexure A
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 31 of 242
CRITERIA FOR EVALUATION OF BIDS
Description
It may be noted that all the quantities mentioned here are merely for the purpose of evaluation only,
and the quantities of the framework contract are mentioned below this table * All text should be written in Urdu and English Language Both Side by Side for all signage types **SS where used will be of 304 Grade *** All signage types which are back-lit and electrification is involved, the cost of electrical wires, power supply etc. should be included in rate ****The text mentioned underlined are instructions regarding changing size of signage component ***** For each signage type installation charges should be separately mentioned keeping in the view that all signage will be installed in one single go by installation team ******Wherever, the concrete foundation is mentioned, typical steel reinforcement is desired where required. *******LED Modules where used should be having warranty of 5 years, IP 68 module rating, USA or European Origin, L70 greater than 50,000 Hours
Sr. No
Signage Type
Component
Specifications Supply Installatio
n
External Signage (1) Unit Rate (2) Unit Rate
(3)
Total 4=
(2+3)
Quantity (5)
Amount 6=
(4*5)
EG-1
Gantry Signage
(ACP and Acrylic Letters)
Excavation
& Foundation
4' x 4' x 5' (Depth) Class A Concrete (1:2:4)
6" Projection projected above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1" diameter and 5 feet length with 4 stiffener plates of 15" x 5" having
thickness of 15 mm. Two such foundations are required
one at end of each pipe
Rate of Structure pipes and
foundation (1)
_________
Rate of only horizontal
running pipe (2)
________ Rate of
Channels, Rear Frame and Signage plate (2 in
Nos) (3)
5
Structure
Pipes
2 Nos. GI Pipe outer diameter 8" having thickness of 6mm and length of
18'6" (Vertical Direction) 1 Nos. of GI Pipe of above
specifications having length of 16 feet (Horizontal direction)
Pipes should be attached to each other via appropriate size, diameter and numbers of bolts and stiffeners
plates Rate of horizontal pipe will be divided by its length and for any Gantry other than 16' wide, the price of horizontal
pipe will be added /subtracted accordingly
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 32 of 242
Channels and Rear
Frame
4 Nos of GI channels (1.5" x 3" x 1.5" thickness = 4mm) having total length
of 4' placed in vertical direction (running at 4' interval in any other
size) Rear Frame of 2" x 2" SWG 16 GI with
dimensions of 16' x 4' having 4' vertical bracing members 9 in Nos.
and three horizontal members of 16' The channels should be attached with Structure pipe via stiffener plates of
appropriate size and thickness (All connections are welded)
Two such frames of above framing systems may be required at front and
back of horizontal structure pipe
Total cost (1+3)=
__________
Signage
Plate
ACP sheet of approved color having thickness not less 4 mm (Aluminum coating not less than 0.3mm having
PVDF Coating) and size of 16' x 4' Rate of Channels, Rear Frame and
Signage plate will be divided with its area and will govern for different sized
gantry
EG-2
Gantry Signage
(ACP and Acrylic Letters)
Excavation
& Foundation
4' x 4' x 6' (Depth) Class A Concrete (1:2:4)
6" projection above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1.5" diameter and 6 feet length. with 4 stiffener plates of 15" x 5" having
thickness of 15 mm. Two such foundations are required
one at end of each pipe
Rate of Structure
pipes, horizontal truss and
foundation (1)
_________ Rate of only horizontal
running pipes (2)
Rate of only truss system
(3)
__________ Rate of Rear Frame and
5
Structure
Pipes and
Truss syste
m
2 Nos. GI Pipe outer diameter 10" having thickness of 6mm and length of
18'6" (Vertical pipes) 2 Nos. of GI Pipe of 6" diameter and thickness 5mm having length of 25
feet (Horizontal pipes) Horizontal pipes will be crossed
through the vertical pipes and should be held/attached with appropriate
numbers and size of studs Truss made of GI pipe of of 4"
diameter and thickness = 4mm running after each 5 feet length in vertical position along with inclined
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 33 of 242
members of same specifications The rate of horizontal pipe and truss system will be divided by its length and it will be added/subtracted for
any Gantry having different size
Signage plate (2 in Nos)
(4)
Total Cost (1+4)
Rear Frame
Rear Frame of 2" x 2" SWG 16 GI with dimensions of 25' x 4' having 4'
vertical bracing members 9 in Nos. and three horizontal members of 16'
at center
Signage
Plate
ACP sheet having thickness not less 4 mm (Aluminum coating not less than 0.3mm having PVDF Coating) and size
of 25' x 4'. Rate of Rear Frame and Signage plate will be divided with its area and will
govern for different sized gantry
EG-3
Gantry Signage
(MS Sheet and Paint)
Excavation
& Foundation
4' x 4' x 5' (Depth) Class A Concrete (1:2:4)
6" Projection projected above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1" diameter and 5 feet length with 4 stiffener plates of 15" x 5" having
thickness of 15 mm. Two such foundations are required
one at end of each pipe
Rate of Structure pipes and
foundation
(1)
___________
Rate of only horizontal
running pipe (2)
_________
Rate of
Channels, Rear Frame and Signage
Plate (3)
1
Structure
Pipes
2 Nos. GI Pipe outer diameter 8" having thickness of 6mm and length of
18'6" (Vertical Direction) 1 Nos. of GI Pipe of above
specifications having length of 16 feet (Horizontal direction)
Pipes should be attached to each other via appropriate size, diameter and numbers of bolts and stiffeners
plates Rate of horizontal pipe will be divided by its length and for any Gantry other than 16' wide, the price of horizontal
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 34 of 242
pipe will be added /subtracted accordingly
Total Cost (1+3)
__________
Channels and Rear
Frame
4 Nos of GI channels (1.5" x 3" x 1.5" thickness = 4mm) having total length
of 4' placed in vertical direction (running at 4' interval in any other
size) Rear Frame of 2" x 2" SWG 16 GI with
dimensions of 16' x 4' having 4' vertical bracing members 9 in Nos.
and one horizontal member of 16' at center
The channels should be attached with Structure pipe via stiffener plates of
appropriate size and thickness (All connections are welded)
Two such frames of above framing systems may be required at front and
back of horizontal structure pipe
Signage
Plate
16' x 4' MS Sheet of SWG 16 welded to the frame with high quality matt finish
enamel paint 2 such sheets are required at front
and back Rate of Channels, Rear Frame and
Signage plate will be divided with its area and will govern for different sized
gantry
EG-4
Gantry Signage
(MS Sheet and Paint)
Excavation
& Foundation
4' x 4' x 5' (Depth) Class A Concrete (1:2:4)
6" Projection projected above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1" diameter and 5 feet length with 4 stiffener plates of 15" x 5" having
thickness of 15 mm. Two such foundations are required
one at end of each pipe
Rate of Structure
pipes, horizontal truss and
foundation
(1)
___________
Rate of only
1
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 35 of 242
Structure
Pipes and
Truss syste
m
2 Nos. GI Pipe outer diameter 10" having thickness of 6mm and length of
18'6" (Vertical pipes) 2 Nos. of GI Pipe of 6" diameter and thickness 5mm having length of 25
feet (Horizontal pipes) Horizontal pipes will be crossed
through the vertical pipes and should be held/attached with appropriate
numbers and size of studs Truss made of GI pipe of 4" diameter and thickness = 4mm running after
each 5 feet length in vertical position along with inclined members of same
specifications The rate of horizontal pipe and truss system will be divided by its length and it will be added/subtracted for
any Gantry having different size
horizontal running pipes
(2)
___________ Rate of only truss system
(3)
_________ Rate of Rear Frame and
Signage plate (2 in Nos)
(4)
Total Cost (1+4) _________
Rear Frame
Rear Frame of 2" x 2" SWG 16 GI with dimensions of 25' x 4' having 4'
vertical bracing members 9 in Nos. and one horizontal member of 16' at
center
Signage
Plate
16' x 4' MS Sheet of SWG 16 welded to the frame with high quality enamel
paint matt finish 2 such sheets may be required at front
and back Rate of Rear Frame and Signage plate will be divided with its area and will
govern for different sized gantry
EG-5
Gantry Signage (GI and
reflective sheet)
Excavation
& Foundation
4' x 4' x 5' (Depth) Class A Concrete (1:2:4)
6" Projection projected above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1" diameter and 5 feet length with 4 stiffener plates of 15" x 5" having
thickness of 15 mm. Two such foundations are required
one at end of each pipe
Rate of Structure pipes and
foundation (1)
___________
Rate of only horizontal
running pipe (2)
__________
1
Structure
Pipes
2 Nos. GI Pipe outer diameter 8" having thickness of 6mm and length of
18'6" (Vertical Direction) 1 Nos. of GI Pipe of above
specifications having length of 16 feet (Horizontal direction)
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 36 of 242
Pipes should be attached to each other via appropriate size, diameter and numbers of bolts and stiffeners
plates Rate of horizontal pipe will be divided by its length and for any Gantry other than 16' wide, the price of horizontal
pipe will be added /subtracted accordingly
Rate of Channels,
Rear Frame and Signage
Plate (3)
Total Cost
(1+4)
__________
Channels and Rear
Frame
4 Nos of GI channels (1.5" x 3" x 1.5" thickness = 4mm) having total length
of 4' placed in vertical direction (running at 4' interval in any other
size) Rear Frame of 2" x 2" SWG 16 GI with
dimensions of 16' x 4' having 4' vertical bracing members 9 in Nos.
and one horizontal member of 16' at center
The channels should be attached with Structure pipe via stiffener plates of
appropriate size and thickness (All connections are welded)
Two such frames of above framing systems may be required at front and
back of horizontal structure pipe
Signage
Plate
16' x 4' GI Sheet of SWG 16 welded to the frame with Direct Digital Printing
on Diamond Grade or equivalent Reflective Sheeting with UV Inks & Over laminate Sheeting, including
warranty letter of up to 10 years in terms of reflection & colors from the sheeting manufacturer. (For e.g. 3M)
2 such sheets are required at front and back
Rate of Channels, Rear Frame and Signage plate will be divided with its
area and will govern for different sized gantry
EG-6
Gantry Signage (GI and
reflective sheet)
Excavation
& Foundation
4' x 4' x 6' (Depth) Class A Concrete (1:2:4)
6" projection above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1.5" diameter and 6 feet length. with 4 stiffener plates of 15" x 5" having
thickness of 15 mm.
Rate of Structure
pipes, horizontal truss and
foundation (1)
___________
1
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 37 of 242
Two such foundations are required one at end of each pipe
Rate of only horizontal
running pipes
(2)
Rate of only truss system
(3)
Rate of Rear Frame and
Signage plate (2 in Nos)
(4)
Total Cost
(1+4)
__________
Structure
Pipes and
Truss syste
m
2 Nos. GI Pipe outer diameter 10" having thickness of 6mm and length of
18'6" (Vertical pipes) 2 Nos. of GI Pipe of 6" diameter and thickness 5mm having length of 25
feet (Horizontal pipes) Horizontal pipes will be crossed
through the vertical pipes and should be held/attached with appropriate
numbers and size of studs Truss made of GI pipe of 4" diameter and thickness = 4mm running after
each 5 feet length in vertical position along with inclined members of same
specifications The rate of horizontal pipe and truss system will be divided by its length and it will be added/subtracted for
any Gantry having different size
Rear Frame
Rear Frame of 2" x 2" SWG 16 GI with dimensions of 25' x 4' having 4'
vertical bracing members 9 in Nos. and one horizontal member of 16' at
center
Signage
Plate
25' x 4', MS Sheet of GI SWG 16 welded to the frame with Direct
Digital Printing on Diamond Grade or equivalent Reflective Sheeting with UV
Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection & colors
from the sheeting manufacturer. (For e.g. 3M)
2 such sheets may be required at front and back
Rate of Rear Frame and Signage plate will be divided with its area and will
govern for different sized gantry
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 38 of 242
EG-7
Gantry Signage
(HQ printed
Flex)
Excavation
& Foundation
4' x 4' x 5' (Depth) Class A Concrete (1:2:4)
6" Projection projected above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1" diameter and 5 feet length with 4 stiffener plates of 15" x 5" having
thickness of 15 mm. Two such foundations are required
one at end of each pipe
Rate of Structure pipes and
foundation (1)
Rate of only horizontal
running pipe (2)
Rate of
Channels, Rear Frame and Signage
Plate (3)
Total Cost
(1+4)
1
Structure
Pipes
2 Nos. GI Pipe outer diameter 8" having thickness of 6mm and length of
18'6" (Vertical Direction) 1 Nos. of GI Pipe of above
specifications having length of 16 feet (Horizontal direction)
Pipes should be attached to each other via appropriate size, diameter and numbers of bolts and stiffeners
plates Rate of horizontal pipe will be divided by its length and for any Gantry other than 16' wide, the price of horizontal
pipe will be added /subtracted accordingly
Channels and Rear
Frame
4 Nos of GI channels (1.5" x 3" x 1.5" thickness = 4mm) having total length
of 4' placed in vertical direction (running at 4' interval in any other
size) 6” deep Cubical frame with
Rear Frame of 2" x 2" SWG 16 GI with dimensions of 16' x 4' having 4'
vertical bracing members 9 in Nos. and one horizontal member of 16' at
center And front frame of 16’ x 4’ and 4” corner members. (Flex will stretched at front frame) The channels should be attached with Structure pipe via stiffener plates of appropriate size and thickness (All connections are welded) Two such frames of above framing systems may be required at front and back of horizontal structure pipe
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 39 of 242
Signage
Plate
16' x 4' High Quality printed Flex (above 600 grams/m2) stretched
through the above frame with appropriate members to make a back
lit box. Back sheet and side faces should be covered with SWG GI 22 Sheet Back litting should be done
through LED Modules 2 such systems are required (front and
back) Rate of Channels, Rear Frame and
Signage plate will be divided with its area and will govern for different sized
gantry
EG-8
Gantry Signage
(HQ printed
Flex)
Excavation
& Foundation
4' x 4' x 6' (Depth) Class A Concrete (1:2:4)
6" projection above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1.5" diameter and 6 feet length. with 4 stiffener plates of 15" x 5" having
thickness of 15 mm. Two such foundations are required
one at end of each pipe
Rate of Structure
pipes, horizontal truss and
foundation (1)
___________ Rate of only horizontal
running pipes (2)
___________
Rate of only truss system
(3)
Rate of Rear Frame and
Signage plate (2 in Nos)
(4)
__________
Total Cost (1+4)
__________
1 Struct
ure Pipes and
Truss syste
m
2 Nos. GI Pipe outer diameter 10" having thickness of 6mm and length of
18'6" (Vertical pipes) 2 Nos. of GI Pipe of 6" diameter and thickness 5mm having length of 25
feet (Horizontal pipes) Horizontal pipes will be crossed
through the vertical pipes and should be held/attached with appropriate
numbers and size of studs Truss made of GI pipe of 4" diameter and thickness = 4mm running after
each 5 feet length in vertical position along with inclined members of same
specifications The rate of horizontal pipe and truss system will be divided by its length and it will be added/subtracted for
any Gantry having different size
Rear Frame
6” deep Cubical frame with Rear Frame of 2" x 2" SWG 16 GI with
dimensions of 25' x 4' having 4' vertical bracing members 9 in Nos.
and one horizontal member of 25' at
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 40 of 242
center And front frame of 25’ x 4’ and 4”
corner members. (Flex will stretched at front frame)
Signage
Plate
25' x 4' High Quality printed Flex (above 600 grams/m2) stretched
through the above frame with appropriate members to make a back
lit box. Back sheet and side faces should be covered with SWG GI 22 Sheet Back letting should be done
through LED Modules 2 such systems may required (front
and back) Rate of Rear Frame and Signage plate will be divided with its area and will
govern for different sized gantry
EL-1
Acrylic Letters with SS Casing
Lettering
Materials
Acrylic letter having total thickness of 4" and Total Vertical length of letter
equal to 2' (Thickness of acrylic sheet = 5 mm) in the SS Casing of thickness
of 1mm Myriad, Arial or approved font for
English letters Irani Nastaleeq for Urdu Letters
The rate of one letter will be divided by 2 (height of signage), and rate per running feet will govern for size other than 2'. The Urdu joint alphabets will
be considered as one letter and in that length will be measured horizontally (The length may vary from 6" to 3.5', thickness of letter will be 3" in case of length less than 1' and cost of signage
will be calculated accordingly by dividing thickness also)
300
Back Litting
LED Modules of appropriate numbers and backside of letter should be covered with SWG GI 22 sheet of
similar pattern complete in all aspects with concealed wiring
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 41 of 242
EL-2 Acrylic Letters
Lettering
Materials
Acrylic letter having Total Vertical length of letter equal to 2' (Thickness
of acrylic sheet = 5 mm) Thickness of letters should be 2.5" for
6" to 2' height and 4" for more than 2' height
Myriad, Arial or approved similar font for English letters
Irani Nastaleeq or approved similar font for Urdu Letters
The rate of one letter will be divided by 2 (height of signage), and rate per running feet will govern for size other than 2'. The urdu joint alphabets will
be considered as one letter and in that length will be measured horizontally.
The rate will also be divided by thickness in case of different
thicknesses
150
Back Litting
LED Modules of appropriate numbers and backside of letter should be covered with SWG GI 22 sheet of
similar pattern complete in all aspects with concealed wiring
EL-3 Stainless
Steel Letters
Lettering
Materials
Stainless Steel having Total Vertical length of letter equal to 2' Thickness
made with SS SWG 24 Thickness of letters should be 2.5" for
6" to 2' height and 4" for more than 2' height
Myriad, Arial or approved similar font for english letters
Irani Nastaleeq or approved similar font for Urdu Letters
The rate of one letter will be divided by 2 (height of signage), and rate per running feet will govern for size other than 2'. The urdu joint alphabets will
be considered as one letter and in that length will be measured horizontally
The rate will also be divided by thickness in case of different
thicknesses
50
A1
External Platform/Road Sign
Boards (Circular)
Excavation
& Foundation
1.5' x 1.5' with 1.5' height Class A Concrete (1:2:4) with 6'' projected
above the NSL
25
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 42 of 242
Pipe
G.I Pipe, Outer Dia: 3'', Thickness: 14 SWG, Quantity: 1 No's, Length: 9'
(including pipe in the foundation of 1'3" length). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14 with depth of 2" strip and 1' in length (2 such anchors needed on front and
back) Sheet
of Signag
e
G.I Sheet of size 60cm Dia, Thickness: 14 SWG.
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection &
colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2
No's, Length: 21'' (each)
Clumps
G.I Clumps of 14 SWG 2 in Nos. having appropriate width w.r.t channel width
and appropriate length to hold the signage plate on pipe fixed with G.I
Nuts & Bolts with appropriate length, diameter and numbers
A2
External Platform/Road Sign
Boards (Triangula
r)
Excavation
& Foundation
1.5' x 1.5' with 1.5' height Class A Concrete (1:2:4) with 6'' projected
above the NSL
10 Pipe
G.I Pipe, Outer Dia: 3'', Thickness: 14 SWG, Quantity: 1 No's, Length: 9'
(including pipe in the foundation of 1'3" length). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14 with depth of 2" strip and 1' in length (2 such anchors needed on front and
back) Sheet
of Signag
e
G.I Sheet of size 60cm (each side) with chamfered edges, Thickness: 14 SWG
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 43 of 242
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection
&colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2
No's, Length: 18'' and 8"
Clumps
G.I Clumps of 14 SWG 2 in Nos. having appropriate width w.r.t channel width
and appropriate length to hold the signage plate on pipe fixed with G.I
Nuts & Bolts with appropriate length, diameter and numbers
B1
Main Entrance
Signage (2 Sided)
Foundation
2 Foundations (One under each column) of 2' x 2' in size of Class A P.C.C of 1:2:4 and total depth of 3'6" with 6" projected outsides the NSL
5
Columns
Two 8"x8" columns (filled with 1:2:4 concrete) made with G.I SWG 14 , 8'6" in height from top of foundation with development length of not less than 3'6", cladded with Aluminum Composite Panels of approved color. (Total length of pipes 12')
Framing
4' x 8' frame made with 2"x2" pipe of G.I 16 SWG with same size bracing running at interval of 2' of 4' length. 2 such frames are required on front and back of columns(All welded connections)
Sheet of
Signage
The above frame shall be covered with Aluminum composite panels (ACP) (of approved color) from all 6 faces (ACP thickness = 4mm Aluminum coating not less than 0.3mm having PVDF Coating)
Connection
of Frame
& Signag
e
The column should be welded with frames throughout its length and it should be made flush longitudinally
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 44 of 242
Text
8mm thick acrylic letters of approved color, laser cut with appropriate contours and collars pushed through from inside of ACP panel to extrude out to about 4mm. Back Lit with Appropriate number of LED Modules with appropriate lighting. (2 sided writing) (Where collars are not feasible due to size of letters, anchoring with 4mm clear acrylic sheet should be provided behind the ACP)
B1 (A)
Main Entrance
Signage (1 Sided)
Foundation
2 Foundations (One under each column) of 2' x 2' in size of Class A P.C.C of 1:2:4 and total depth of 3'6" with 6" projected outsides the NSL
5
Columns
Two 8"x8" columns (filled with 1:2:4 concrete) made with G.I SWG 14 , 8'6" in height from top of foundation with development length of not less than 3'6", cladded with Aluminum Composite Panels of approved color. (Total length of pipes 12')
Framing
4' x 8' frame made with 2"x2" pipe of G.I 16 SWG with same size bracing running at interval of 2' of 4' length. (All welded connections)
Sheet of
Signage
The above frame shall be covered with Aluminum composite panels (ACP) (of approved color) from all 6 faces (ACP thickness = 4mm Aluminum coating not less than 0.3mm having PVDF Coating)
Connection
of Frame
& Signag
e
The column should be welded with frames throughout its length and it should be made flush longitudinally
Text
8mm thick acrylic letters of approved color, laser cut with appropriate contours and collars pushed through from inside of ACP panel to extrude out to about 4mm. Back Lit with Appropriate number of LED Modules with appropriate lighting (Where collars are not feasible due to size of letters, anchoring with 4mm clear acrylic sheet should be provided
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 45 of 242
behind the ACP)
B2
Main Entrance Signage 2 - Double
Sided writing
Foundation
2 Foundations (One under each column) of 2' x 2' in size of Class A
P.C.C of 1:2:4 and total depth of 3'6" with 6" projected outsides the NSL
5
Connection
of frame and
foundation
GI J bolts of 12 mm diameter having length of 3'6", joined with base plate
having dimensions of 15" x 15" x 0.75" (One Under each column)
Columns
Two 8"x8" columns (filled with 1:2:4 concrete) on edges of longer side
made with G.I SWG 15 , 12' in height from top of foundation
Framing
Total 2 types of frames are required: 1. (Bottom Frames) Frames of 4' x 8' size made with 2"x2" pipe of G.I 16
SWG with same size bracing running at interval of 2' of shorter size. 2 such frames are required on front and back
of columns(All welded connections) 2. (Top Frames) Frames of 3'6" x 8' size made with 2"x2" pipe of G.I 16
SWG with same size bracing running at interval of 2' of shorter size. 2 such frames are required on front and back of columns (All welded connections)
The distance between top and bottom frame will be 6"
Sheet of
Signage
The above frame shall be covered with Aluminum composite panels (ACP) (of
approved color) from all six faces. (ACP thickness = 4mm Aluminum
coating not less than 0.3mm having PVDF Coating)
Direct printing on ACP Sheet with UV inks and scratch resistant is required
on ACP sheet as background color Connection
of Frame
& Signag
e
The column should be welded with frames throughout its length and it should be made flush longitudinally
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 46 of 242
Text
8mm thick acrylic symbol in top frame and letters in bottom frame of approved color, laser cut with
appropriate contours and collars pushed through from inside of ACP
panel to extrude out to about 4mm on both sides of the board. In addition to
acrylic letter, bottom frame ACP should be partially colored with direct
digital printing on ACP Backlit with appropriate number of
LED Modules. (2 sided writing) (Where collars are not feasible due to
size of letters, anchoring with 4mm clear acrylic sheet should be provided
behind the ACP)
B2(A)
Main Entrance Signage 2
- Single Sided
writing
Foundation
2 Foundations (One under each column) of 2' x 2' in size of Class A
P.C.C of 1:2:4 and total depth of 3'6" with 6" projected outsides the NSL
5
Connection
of frame and
foundation
GI J bolts of 12 mm diameter having length of 3'6", joined with base plate
having dimensions of 15" x 15" x 0.75" (One Under each column)
Columns
Two 8"x8" columns (filled with 1:2:4 concrete) on edges of longer side
made with G.I SWG 15 , 12' in height from top of foundation
Framing
Total 2 types of frames are required: 1. (Bottom Frame) Frame of 4' x 8' size made with 2"x2" pipe of G.I 16
SWG with same size bracing running at interval of 2' of shorter size. (All
welded connections) 2. (Top Frame) Frame of 3'6" x 8' size made with 2"x2" pipe of G.I 16 SWG
with same size bracing running at interval of 2' of shorter size. (All
welded connections) The distance between top and bottom
frame will be 6"
Sheet of
Signage
The above frame shall be covered with Aluminum composite panels (ACP) (of
approved color) from all six faces. (ACP thickness = 4mm Aluminum
coating not less than 0.3mm having PVDF Coating)
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 47 of 242
Direct printing on ACP Sheet with UV inks and scratch resistant is required
on ACP sheet as background color
Connection
of Frame
& Signag
e
The column should be welded with frames throughout its length and it should be made flush longitudinally
Text
8mm thick acrylic symbol in top frame and letters in bottom frame of approved color, laser cut with
appropriate contours and collars pushed through from inside of ACP
panel to extrude out to about 4mm on both sides of the board. In addition to
acrylic letter, bottom frame ACP should be partially colored with direct
digital printing on ACP Backlit with appropriate number of
LED Modules. (Where collars are not feasible due to
size of letters, anchoring with 4mm clear acrylic sheet should be provided
behind the ACP)
C1
Directional Board (Single Sheet)
Foundation
1.5' x 1.5' with 2' Class A Concrete (1:2:4) with 6'' projected above the
NSL
25
Pipe
G.I Pipe, Outer Dia: 3'', Thickness: 14 SWG, Quantity: 2 No's, Length: 8'
(including pipe in the foundation of length 1'8"). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14
with depth of 2" strip and 1'6" in length (2 such anchors needed on
front and back) Sheet
of Signag
e
G.I Sheet of size 1' (height) x 5' (width), Thickness: 14 SWG, Quantity:
1 No's
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection
&colors from the sheeting manufacturer. (For e.g. 3M)
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 48 of 242
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2 No's (Each Sheet), Length: 54'' (Each
Channel)
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe fixed with G.I Nuts & Bolts with
appropriate length, diameter and numbers
C2
Directional Board (Two
Sheets)
Foundation
2' x 2' with 2' height Class A Concrete (1:2:4) with 6'' projected above the
NSL
25
Pipe
G.I Pipe, Outer Dia: 3'', Thickness: 14 SWG, Quantity: No's, Length: 9'3" (including pipe in the foundation of 1'8" length). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14
with depth of 2" strip and 1'6" in length (2 such anchors needed on
front and back)
Sheet of
Signage
G.I Sheet of size 1' (height) x 5' (width), Thickness: 14 SWG, Quantity:
2 No's Vertical Spacing between sheets
should be 1"
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection
&colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2 No's for Each Sheet, Length: 54'' (Each
Channel)
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe fixed with G.I Nuts & Bolts with
appropriate length, diameter and numbers
C3 Directiona
l Board (Three
Foundation
2' x 2' with 2.5' depth Class A Concrete (1:2:4) with 6'' projected above the
NSL
10
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 49 of 242
Sheets)
Pipe
G.I Pipe, Outer Dia: 3'', Thickness: 14 SWG, Quantity: 2 No's, Length: 11'
(including pipe in the foundation with 2'2" length). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14 with depth of 2" strip and 2' in length (2 such anchors needed on front and
back)
Sheet of
Signage
G.I Sheet of size 1' (height) x 5' (width), Thickness: 14 SWG, Quantity:
3 No's Vertical Spacing between sheets
should be 1"
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting , including warranty letter of up to 10 years in terms of reflection &
colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2 No's for Each Sheet, Length: 54'' (Each
Channel)
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe fixed with G.I Nuts & Bolts with
appropriate length, diameter and numbers
C4
Directional Board (Four
Sheets)
Foundation
2' x 2' with 2.5' depth Class A Concrete (1:2:4) with 6'' projected above the
NSL
5 Pipe
G.I Pipe, Outer Dia: 3'', Thickness: 14 SWG, Quantity: 2 No's, Length: 12' (including pipe in the foundation of 2'2" length). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14 with depth of 2" strip and 1' in length (2 such anchors needed on front and
back) Sheet
of Signag
e
G.I Sheet of size 1' (height) x 5' (width), Thickness: 14 SWG, Quantity:
4 No's
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 50 of 242
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection
&colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2 No's (Each Sheet), Length: 54'' (Each
Channel)
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe fixed with G.I Nuts & Bolts with
appropriate length, diameter and numbers
C5
Directional Board
(Five Sheets)
Foundation
2' x 2' with 3' depth Class A Concrete (1:2:4) with 6'' projected above the
NSL
15
Pipe
G.I Pipe, Outer Dia: 4'', Thickness: 14 SWG, Quantity: 2 No's, Length: 13'6" (including pipe in the foundation of length 2'8"). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14
with depth of 2" strip and 2'6" in length (2 such anchors needed on
front and back)
Sheet of
Signage
G.I Sheet of size 1' (height) x 5' (width), Thickness: 14 SWG, Quantity:
5 No's Vertical Spacing between sheets
should be 1"
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection
&colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2 No's for Each Sheet, Length: 54'' (Each
Channel)
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 51 of 242
fixed with G.I Nuts & Bolts with appropriate length, diameter and
numbers
C6
Directional Board
(Six Sheets)
Foundation
2' x 2' with 3' depth Class A Concrete (1:2:4) with 6'' projected above the
NSL
15
Pipe
G.I Pipe, Outer Dia: 4'', Thickness: 14 SWG, Quantity: 2 No's, Length: 14'6" (including pipe in the foundation of length 2'6"). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14
with depth of 2" strip and 2'6" in length (2 such anchors needed on
front and back)
Sheet of
Signage
G.I Sheet of size 1' (height) x 5' (width), Thickness: 14 SWG, Quantity:
6 No's Vertical Spacing between sheets
should be 1"
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection
&colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2 No's for Each Sheet, Length: 54'' (Each
Channel)
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe fixed with G.I Nuts & Bolts with
appropriate length, diameter and numbers
C7
Additional Panel (For Fixation
on existing
Foundation & Posts)
Sheet of
Signage
G.I Sheet of size 1' (height) x 5' (width), Thickness: 14 SWG, Quantity:
1 No's
10 Reflec
tive Sheeti
ng
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection
&colors from the sheeting manufacturer. (For e.g. 3M)
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 52 of 242
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2 No's (Each Sheet), Length: 54'' (Each
Channel)
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe fixed with G.I Nuts & Bolts with
appropriate length, diameter and numbers
D1
Departmental
Signage on
Building (Printed)
Signage
Plate
4' (height) by 8' (width) of transparent solid polycarbonate sheet having thickness not less than 6 mm. The signage text should be printed on
backside of the front face. Poly carbonate sheet should cover all sides
of signage
10
Frame of
Signage
2 Nos. 4' by 8' frames with total depth of 3" made up of 1.5"x1.5" GI 16 SWG
square hollow pipe, with one 4' member of 1.5"x1.5" bracing of
square hollow pipe 16 SWG welded at center. Fixed on wall through
appropriate channels running at sides (Running after each 4' length)
Backing
Sheet
Backside of frame should be covered with GI Sheet 24 SWG
Text and
Lighting
Appropriate number of LED Modules are required to be screwed for
backilghting The rate of signage will be divided by its area (8' x 4') and per SFT rate will
govern for different sizes
D1 (A)
Departmental
Signage on
Building (Letters)
Signage
Plate
4' (height) by 8' (width) of ACP sheet having thickness not less than 4 mm.
(ACP thickness = 4mm Aluminum coating not less than 0.3mm having PVDF Coating) The ACP Panel should be routed as per desired text. Front face will be 7'6" x 3'6". All faces of signage will be covered with ACP
45
Frame of
Signage
2 Nos. 7'6" by 3'6" frames with total depth of 3" made up of 1.5"x1.5" GI
16 SWG square hollow pipe, with one 4' member of 1"x 1" bracing of square hollow pipe 16 SWG welded at center in one frame. Fixed on wall through
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 53 of 242
appropriate channels running at sides
Backing
Sheet
Backside of frame should be covered with GI Sheet 24 SWG
Text and
Lighting
8mm thick acrylic letters of approved color, laser cut with appropriate
contours and collars pushed through from inside of ACP panel to extrude
out to about 4mm. (Where collars are not feasible due to size of letters, anchoring with 4mm clear acrylic
sheet should be provided behind the ACP)
Back Lit with Appropriate number of LED Modules with appropriate lighting The rate of signage will be divided by its area (7.5' x 3.5') and per SFT rate will govern for different sizes (20 SFT
to 100 SFT range)
E1 External
Map Boards
Foundation
1.5' x 1.5' with 2' depth Class A Concrete (1:2:4) with 6'' projected
above the NSL
Total Price
__________
Cost of only sheet and reflective sheeting
__________
10
Pipe
G.I Pipe, Outer Dia: 4'', Thickness: 14 SWG, Quantity: 2 No's, Length: 11' (including pipe in the foundation of length 1'8"). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14
with depth of 2" strip and 1'6" in length (2 such anchors needed on
front and back) Sheet
of Signag
e
G.I Sheet of size 6' x 4' , Thickness: 14 SWG
(per SFT will govern for any signage having different dimensions)
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective Sheeting with, UV Inks & Over
laminate Sheeting, including warranty letter of up to 10 years in terms of
reflection &colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels, Thickness: 14 SWG, Quantity: 3 (No's, Length: 4' (each
channel) Running after 2 foot
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 54 of 242
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe fixed with G.I Nuts & Bolts with
appropriate length, diameter and numbers
Reflective
Sheet
Reflective
Sheet
Reflective Sheet with Direct Digital Printing on Diamond Grade or
equivalent Reflective Sheeting with, UV Inks & Over laminate Sheeting,
including warranty letter of up to 10 years in terms of reflection &colors
from the sheeting manufacturer. (For e.g. 3M)
The price will be divided by total area and per SFT rate will be governed for
any size of sheet
100 SFT
EF1 Back lit
Flex Board Signage
Frame
6” deep Cubical frame with 6’ x 8’ front frame having members of
2” x 2”, SWG 16 GI with bracing members running after each 4’
And 6’ x 8’ from frame with appropriate numbers of 4” corner members to make cubical frame Covered with SWG 22 GI Sheet
5
Back Lit
Flex
High resolution digital direct printing on flex (600 grams/m2) back lit with appropriate number of LED Modules
Complete in all respects inkling power supply, wires etc.
(Rate will be divided with area i.e. 6 x 8 feet and per square feet rate will
govern for any size other than 6’ x 8’)
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 55 of 242
Quantities of Frame work The framework quantities under this contract are given below. The quantities shall be valid for the
Financial Years 2018-19 & 2019-20.
Sr. No Signage Type Numbers
EG-1 Gantry Signage (ACP and Acrylic
Letters) 50
EG-2 Gantry Signage (ACP and Acrylic
Letters) 50
EG-3 Gantry Signage (MS Sheet and
Paint) 50
EG-4 Gantry Signage (MS Sheet and
Paint) (21' to 30') 50
EG-5 Gantry Signage (GI and reflective
sheet) 50
EG-6 Gantry Signage (GI and reflective
sheet) 50
EG-7 Gantry Signage (HQ printed Flex) 50
EG-8 Gantry Signage (HQ printed Flex) 50
EL-1 Acrylic Letters with SS Casing 3000
EL-2 Acrylic Letters 3000
EL-3 Stainless Steel Letters 3000
A1 External Platform/Road Sign Boards
(Circular)
250
A2 External Platform/Road Sign Boards
(Triangular)
250
B1 Main Entrance Signage (2 Sided) 100
B1 (A) Main Entrance Signage (1 Sided) 100
B2 Main Entrance Signage 2 - Double
Sided writing
100
B2(A) Main Entrance Signage 2 - Single
Sided writing
100
C1 Directional Board (Single Sheet) 250
C2 Directional Board (Two Sheets) 250
C3 Directional Board (Three Sheets) 100
C4 Directional Board (Four Sheets) 50
C5 Directional Board (Five Sheets) 150
C6 Directional Board (Six Sheets) 150
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 56 of 242
C7 Additional Panel (For Fixation on
existing Foundation & Posts)
100
D1 Departmental Signage on Building
(Printed)
100
D1 (A) Departmental Signage on Building
(Letters) 450
E1 External Map Boards 100
EF 1 Back Lit Flex 1000 Reflective Sheet 1000 SFT
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 57 of 242
SECTION - IV: BID FORM & SCHEDULES
A - FINANCIAL FORM& SCHEDULE
• Form of Bid
• Schedule A to Bid: Schedule of Prices
B - TECHNICAL FORMS
• Schedule B to Bid: Technical Proposal Submission Form
• Schedule C to Bid: Company Profile
• Schedule D to Bid: General Experience
• Schedule E to Bid: Relevant Experience
• Schedule F to Bid: Human Resource
• Schedule G to Bid: Net worth, Current Ratio and Annual Turn Over
• Schedule H to Bid: Relevant Machinery
• Schedule I to Bid: Project Related Plans
• Schedule J to Bid: Integrity Pact
C–STANDARD FORMS
• Form of Bid Security
• Form of Contract
• Form of Performance Guarantee
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 58 of 242
A - FINANCIAL FORM& SCHEDULE
FORM OF BID
(LETTER OF OFFER)
{Ref Number}
{Date}
To:
Azhar Hayat Khan
Procurement Specialist,
Primary & Secondary Healthcare Department
Subject: Bid Reference No. ___________________
“Supply and Installation of Sign Boards in Primary and Secondary Healthcare Establishments
of Punjab”
Dear Sir
1. We, the undersigned, offer to provide the “Framework Contract of Supplying and
Installation of Sign Boards for establishments of primary and secondary healthcare
department Punjab – Year 2018-19 & 2019-20” in accordance with your Invitation of Bids
dated (insert date) and our Technical Proposal. Our attached Financial Proposal is inclusive
of all taxes.
Our Financial Proposal shall be binding upon us subject to the modifications resulting from
Contract negotiations, up to expiration of the validity period of the Proposal, i.e. before the
date indicated in _______ of the Proposal Data Sheet.
We also declare that the Government of Pakistan/ Punjab has not declared us or any Sub-
Suppliers for any part of the Contract, ineligible on charges of engaging in corrupt,
fraudulent, collusive, or coercive practices. We furthermore, pledge not to indulge in such
practices in competing for or in executing the Contract, and are aware of the relevant
provisions of the Proposal Document.
We understand you are not bound to accept any Proposal you receive.
Dated this_______________Day of _____________, 20__
Signature ________________
in the capacity of _____________duly authorized to sign bid for and on behalf of
_______________________________
(Name of Bidder in Block Capitals)
(Seal)
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 59 of 242
Address
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
Witness:
(Signature)______________________________
Name: _______________________________________________________________
Address: _____________________________________________________
_____________________________________________________________________
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 60 of 242
SCHEDULE A TO BID - SCHEDULE OF PRICES
Sr. No. Page No.
1. Preamble to Schedule of Prices 26
2. Schedule of Prices for Central Zone (Package 1) 30
*(a) Summary of Bid Prices
* (b) Detailed Schedule of Prices
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 61 of 242
Guidelines for submission of SCHEDULE OF PRICES
1. General
1.1 The Schedule of Prices shall be read in conjunction with the Contract, together
with the Specifications and Maps, if any.
1.2 The Contract shall be for the whole of the Services as described in these
Bidding Documents. Bids must be for the complete scope of services.
2. Description
2.1 The general directions and descriptions of services and materials are not
necessarily repeated nor summarized in the Schedule of Prices. References to
the relevant sections of the Bidding Documents shall be made before entering
prices against each item in the Schedule of Prices.
3. Rates and Prices
3.1 Except as otherwise expressly provided under the Contract, the rates and
amounts entered in the Schedule of Prices shall be the rates at which the
Supplier shall be paid and shall be the full inclusive value of the services set
forth or implied in the Contract; except for the amounts reimbursable, if any to
the Supplier under the Contract.
3.2 Unless otherwise stipulated in the Contract, the rates and prices entered by the
Bidder shall not be subject to adjustment during the performance of the
Contract.
3.3 All duties, taxes and other levies payable by the Supplier shall be included in
the rates and prices.
3.4 The whole cost of complying with the provisions of the Contract shall be
included in the items provided in the Schedule of Prices, and where no items
are provided, the cost shall be deemed to be distributed among the rates and
prices entered for the related items of the Services and no separate payment
will be made for those items.
3.5 The rates, prices and amounts shall be entered against each item in the
Schedule of Prices. Any item against which no rate or price is entered by the
Bidder will not be paid for by the Procuring Agency when executed and shall
be deemed covered by the rates and prices for other items in the Schedule of
Prices.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 62 of 242
3.6 (a) The Bidder shall be deemed to have obtained all information as to and
all requirements related thereto which may affect the bid price.
(b) The Supplier shall be responsible to make complete arrangements for
the transportation of the Signage Materials, Machinery and Equipment
to the Site.
3.7 The Supplier shall provide for all parts of the Services to be completed in
every respect. Notwithstanding that any details, accessories, etc. required for
the complete installation and satisfactory operation of the services, are not
specifically mentioned in the scope of work, such details shall be considered
as included in the Contract Price.
4. Bid Prices
4.1 Break-up of Bid Prices
The various elements of Bid Prices shall be quoted as detailed by the
Procuring Agency in the format of Schedule of Prices.
The Bidder shall recognize such elements of the costs which he expects to
incur in the performance of the Services and shall include all such costs in the
rates and amounts entered in the Schedule of Prices.
4.2 Total Bid Price
The total of bid prices in the Schedule of Prices shall be entered in the
Summary of Bid Prices.
5. Provisional Sums
5.1 Provisional Sums included and so designated in the Schedule of Prices if any,
shall be expended in whole or in part at the direction and discretion of the
Procuring Agency. The Supplier will only receive payment in respect of
Provisional Sums if he has been instructed by the Procuring Agency to utilize
such sums.
6. -Invoicing & Payment
6.1 The Supplier shall be entitled to be paid the value of the Services executed
according to criteria devised in clause 6.8.1 of G.C.C. The Supplier shall
submit, to the Procuring Agency, an invoice showing the amounts to which he
considers himself entitled based on the schedule/criteria mentioned in 6.8.1 of
G.C.C.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 63 of 242
The monthly performance of the Supplier will be determined by the Procuring
Agency in accordance with the performance criteria determined in the
Contract. A progress payment report will be issued within one week by the
end of proceeding month. Based on this report an invoice shall be issued by
the Supplier and the payment shall be made within 30 days after the
submission of the invoice to the Procuring Agency.
7. Instruction for Financial Bids
The Supplier will follow the under mentioned instructions while filling the bid
documents:
(i) The Contract will be “unit price contract” and made for the price in PKR the
sum of the amounts are calculated by means of multiplying the amount of each
work item as indicated in the list prepared by the Procuring Agency with the
unit price quoted by the Supplier for that work item. The payment for each
work performed shall be based on the unit price quoted by the Supplier in the
bid used for the determination of the Contract price.
(ii) The term of the Contract shall be for a period of two financial years (2018-19
& 2019-20) (including holidays and weekends) after the commencement date
of the start of work which will be initiated after work site will be delivered
upon signing of work site delivery note.
(iii) Minimum wage as notified by the Government of Punjab shall be applicable
for the period of Contract. The Minimum wage for Financial Year 2018-19 is
Rs. 15,000/- per worker per month as per Rules of Government of Punjab.
(iv) Child Labor will not be employed under the Contract; the minimum age
as per the Pakistani law is 18 years.
(v) All the labor laws including social security and EOBI etc. shall be
applicable in the Contract and shall be the responsibility of the Supplier.
(vi) Pursuant to the laws of Pakistan, all payable taxes and duties required to
be paid by the Supplier are included in the bid price including
withholding income tax, sales tax and custom duties etc. Change in
amount of taxes by the government shall be adjustable, accordingly.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 64 of 242
8. The numbers given in the bid price schedule are not the total number of sign
boards of this package. The maximum number of sign boards for this package are shown
in detail after the bid price schedule.
B- TECHNICAL FORMS
SCHEDULE - B TO BID - TECHNICAL PROPOSAL SUBMISSION FORM
{Ref Number}
{Date}
To:
Azhar Hayat Khan
Procurement Specialist,
Primary & Secondary Healthcare Department
Subject: Bid Reference No. ___________________
“Supply and Installation of Sign Boards in Primary & Secondary Healthcare Department
Establishments of Punjab”
Dear Sir
We, the undersigned, offer to provide the Framework Contract of Supplying and
Installation of Sign Boards – Year 2018-19 & 2019-20 for establishments of primary and
secondary healthcare department Punjab in accordance with your Request for Proposal
dated [Insert Date] and our Proposal. We are hereby submitting our Proposal, which
includes this Technical Proposal, and a Financial Proposal sealed under a separate envelope.
We hereby declare that all the information and statements made in this Proposal are
true and accept that any misinterpretation contained in it may lead to our disqualification.
If negotiations for contract finalization are held during the period of validity of the
Proposal, we undertake to negotiate on the basis of the proposed staff. Our Proposal is
binding upon us and subject to the modifications resulting from Contract finalization.
We undertake, if our Proposal is accepted, to initiate the consulting services related to
the assignment not later than the date given by the Procuring Agency.
We understand you are not bound to accept any Proposal you receive.
Dated this_______________Day of _____________, 20__
Signature ________________
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 65 of 242
in the capacity of _____________duly authorized to sign bid for and on behalf of
_______________________________
(Name of Bidder in Block Capitals)
(Seal)
Address
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
Witness:
(Signature)______________________________
Name: _______________________________________________________________
Address: _____________________________________________________
_____________________________________________________________________
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 66 of 242
SCHEDULE C TO BID – COMPANY PROFILE
a. Name and Ownership of the company: Describe the name of the company and
owners name of company. Briefly describe the details and number of partners
involved if any. Moreover, if company is associated with other company or any joint
venture for this specific project.
b. Registration from the competent authority: Provide the registration of company from
various authorities relevant to both business and signage supplying and installation.
Documentary proves should be attached.
c. Age of Company: Provide the document showing the date of registration of company
in order to asses the age of company. Please attach documentary proof of
incorporation or registration. In case of association or joint venture 50 % weightage
to age of each company will be taken into account.
d. Office Establishment: Provide the documentary proof of ownership of office setup.
In other cases attach the rental agreement or any other document in order to describe
the status of ownership of office setup. In case of association or joint venture 50 %
weightage to age of each company will be taken into account
e. Company experience in sign boards manufacturing: Mention the year from which
the company is in the business of sign boards. The experience will be calculated
from the year of first contract related to sign boards. Please provide details including
title of project, Procuring Agency name, project period. (Please limit page count to
no more than one page). In case of association or joint venture 50 % weightage to
age of each company will be taken into account.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 67 of 242
SCHEDULE D TO BID – GENERAL EXPERIENCE
Number of successfully completed assignments: Please provide list of successfully
completed assignments of general category to demonstrate general experience and ability to
provide the required services on a scale or scope comparable to the bidding document. Please
provide details including title of project, Procuring Agency name, project period, & value of
assignment. Client satisfaction certificates are essentially required. At most 10 projects can
be evaluated. (Please limit page count to no more than two pages)
Average cost of completed projects: Please provide list of completed projects average cost of
general category to demonstrate the volume of business in hand and volume of business
completed. Please provide details including title of project, Procuring Agency name and
value of assignment. (Please limit page count to no more than two pages)
TITLE PROCURING AGENCY NAME DURATION VALUE
Completed Projects:
SCHEDULE E TO BID – RELEVANT EXPERIENCE
Number of successfully completed assignments: Please provide list of on successfully
completed assignments of specific category to demonstrate specific experience and ability to
provide the required services on a scale or scope comparable to the bidding document. Please
provide details including title of project, Procuring Agency name, project period, & value of
assignment. Client satisfaction certificate is essentially required. At most 10 projects can be
taken into evaluation. (Please limit page count to no more than two pages)
Average cost of completed projects: Please provide list of completed projects average cost of
specific category to demonstrate the volume of business in hand and volume of business
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 68 of 242
completed. Please provide details including title of project, Procuring Agency name and
value of assignment. (Please limit page count to no more than two pages)
TITLE PROCURING AGENCY NAME DURATION VALUE
Completed Projects:
Sr.1
Assignment name:
Value of the contract (in current PKR)
Country:
Location within country:
Duration of assignment (months):
Name of Procuring Agency:
Total No of staff-months (by your firm) on the assignment:
Start date (month/year):
Completion date (month/year):
Value of services provided by your firm under the contract
(in current PKR ):
Name of associated Consultants, if any:
No of professional staff-months provided by associated
Consultants:
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 69 of 242
Name of senior professional staff of your firm involved and functions performed (indicate most significant
profiles such as Project Director/Coordinator, Team Leader):
Narrative description of Project:
Description of actual services provided by your staff within the assignment:
SCHEDULE F TO BID – HUMAN RESOURCE
a. Organization and Staffing: {Please describe the structure and composition of your
team, including the list of the Key Experts, Non-Key Experts and relevant technical and
administrative support staff.} The Execution Schedule and human resource allocation
including:
ii. Organizational structure at supervisory level and arrangements to handle
contractual obligations with Procuring Agency’s representatives
i.Role and Responsibility of Project Team i.e. JDs of the Core
ii.Curriculum vitae of CEO/Owner/Managing Partner, Operational Managers
Curriculum Vitae (CV)
1. Proposed Position [only one candidate shall be nominated for each position]:
2. Name of Firm [Insert name of firm proposing the staff]:
3. Name of Staff [Insert full name]:
4. Date of Birth: Nationality:
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 70 of 242
5. CNIC No (if Pakistani): or Passport No:
6. Education:
Degree Major/Minor Institution Date
(MM/YYYY)
7. Membership of Professional Associations:
8. Other Training [Indicate significant training since degrees under 6 – Education were
obtained]:
9. Languages [For each language indicate proficiency: good, fair, or poor in speaking,
reading, and writing]:
10. Employment Record [Starting with present position, list in reverse order every
employment held by staff member since graduation, giving for each employment (see
format here below): dates of employment, name of employing organization, positions
held.]:
Procuring Agency Position From
(MM/YYYY)
To (MM/YYYY)
11. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
[Among the assignments in which the staff has been involved, indicate the following
information for those assignments that best illustrate staff capability to handle the tasks
listed under point 11.]
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 71 of 242
1) Name of assignment or project:
Year:
Location:
Procuring Agency:
Main project features:
Positions held:
Activities performed:
2) Name of assignment or project:
Year:
Location:
Procuring Agency:
Main project features:
Positions held:
Activities performed:
3) Name of assignment or project:
Year:
Location:
Procuring Agency:
Main project features:
Positions held:
Activities performed:
[Unroll the project details group and continue numbering (4, 5, …) as many times as is
required]
12. Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV
correctly describes myself, my qualifications, and my experience. I understand that
any wilful misstatement described herein may lead to my disqualification or
dismissal, if engaged.
Date:
[Signature of staff member or authorized representative of the staff] Day/Month/Year
Full name of authorized representative:
Operational Managers:
Please provide the details of Operational Managers according to above details
(HR of Minimum Bachelors level will be considered of this category
(b) Skilled Labors for Sign boards Installation: Please provide the number of skilled labors
for sign boards installation. Mention the name of persons, CNIC Numbers and their
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 72 of 242
experience in a table and attach the copies of their CNIC cards.
(c) Laborer: Describe the number of laborers executing the site. Mention the name of
persons, CNIC Numbers and their experience in a table and attach the copies of their CNIC
cards.
SCHEDULE G TO BID – NETWORTH, CURRENT RATIO AND ANNUAL TURN OVER
Net worth, Current Ratio and Annual Turn Over: Please provide the two years income
statement and balance sheet in order to asses net worth, current ratio and annual turn over.
SCHEDULE H TO BID – MACHINERY RELATED TO SIGN BOARDS
MANUFACTURING
Digital Printing Machine:
Please provide the details of digital printing machines in a table showing the make, model
and capacity of machine. Attach the purchase or rental slips if any
Cutting Machines:
Please provide the details of cutting machines in a table showing the make, model and
capacity of machine. Attach the purchase or rental slips if any
Welding Plants:
Please provide the details of welding plants in a table showing the make, model and capacity
of machine. Attach the purchase or rental slips if any
SCHEDULE I TO BID –PROJECT RELATED PLANS
Please provide the working plans and methodology plans related to project in order to
express the strategy and project management related to signage supply and installation.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 73 of 242
SCHEDULE J TO BID - INTEGRITY PACT
DECLARATION OF FEES, COMMISSION AND BROKERAGE ETC.
PAYABLE BY THE SUPPLIERS OF GOODS, SERVICES & SERVICES IN
CONTRACTS WORTH RS. 10.00 MILLION OR MORE
Contract No.________________ Dated __________________
Contract Value: ________________
Contract Title: _________________
………………………………… [Name of Supplier] hereby declares that it has not obtained
or induced the procurement of any contract, right, interest, privilege or other obligation or
benefit from Government of Punjab (GoPb) or any administrative subdivision or agency
thereof or any other entity owned or controlled by GoPb through any corrupt business
practice.
Without limiting the generality of the foregoing, [name of Supplier] represents and warrants
that it has fully declared the brokerage, commission, fees etc. paid or payable to anyone and
not given or agreed to give and shall not give or agree to give to anyone within or outside
Pakistan either directly or indirectly through any natural or juridical person, including its
affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or
subsidiary, any commission, gratification, bribe, finder’s fee or kickback, whether described
as consultation fee or otherwise, with the object of obtaining or inducing the procurement of a
contract, right, interest, privilege or other obligation or benefit in whatsoever form from
GoPb, except that which has been expressly declared pursuant hereto.
[name of Supplier] certifies that it has made and will make full disclosure of all Contracts and
arrangements with all persons in respect of or related to the transaction with GoPb and has
not taken any action or will not take any action to circumvent the above declaration,
representation or warranty.
[name of Supplier] accepts full responsibility and strict liability for making any false
declaration, not making full disclosure, misrepresenting facts or taking any action likely to
defeat the purpose of this declaration, representation and warranty. It agrees that any contract,
right, interest, privilege or other obligation or benefit obtained or procured as aforesaid shall,
without prejudice to any other rights and remedies available to GoPb under any law, contract
or other instrument, be voidable at the option of GoPb.
Notwithstanding any rights and remedies exercised by GoPb in this regard, [name of
Supplier] agrees to indemnify GoPb for any loss or damage incurred by it on account of its
corrupt business practices and further pay compensation to GoPb in an amount equivalent to
ten time the sum of any commission, gratification, bribe, finder’s fee or kickback given by
[name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of
any contract, right, interest, privilege or other obligation or benefit in whatsoever form from
GoPb.
Name of Procuring Agency: ……………… Name of Supplier:
Signature: …………………… Signature: …………………………
[Seal] [Seal]
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 74 of 242
CRITERIA FOR EVALUATION OF BIDS
Description
It may be noted that all the quantities mentioned here are merely for the purpose of evaluation only,
and the quantities of the framework contract are mentioned below this table * All text should be written in Urdu and English Language Both Side by Side for all signage types **SS where used will be of 304 Grade *** All signage types which are back-lit and electrification is involved, the cost of electrical wires, power supply etc. should be included in rate ****The text mentioned underlined are instructions regarding changing size of signage component ***** For each signage type installation charges should be separately mentioned keeping in the view that all signage will be installed in one single go by installation team ******Wherever, the concrete foundation is mentioned, typical steel reinforcement is desired where required. *******LED Modules where used should be having warranty of 5 years, IP 68 module rating, USA or European Origin, L70 greater than 50,000 Hours
Sr. No
Signage Type
Component
Specifications Supply Installatio
n
External Signage (1) Unit Rate (2) Unit Rate
(3)
Total 4=
(2+3)
Quantity (5)
Amount 6=
(4*5)
EG-1
Gantry Signage
(ACP and Acrylic Letters)
Excavation
& Foundation
4' x 4' x 5' (Depth) Class A Concrete (1:2:4)
6" Projection projected above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1" diameter and 5 feet length with 4 stiffener plates of 15" x 5" having
thickness of 15 mm. Two such foundations are required
one at end of each pipe
Rate of Structure pipes and
foundation (1)
_________
Rate of only horizontal
running pipe (2)
________ Rate of
Channels, Rear Frame and Signage plate (2 in
Nos) (3)
5
Structure
Pipes
2 Nos. GI Pipe outer diameter 8" having thickness of 6mm and length of
18'6" (Vertical Direction) 1 Nos. of GI Pipe of above
specifications having length of 16 feet (Horizontal direction)
Pipes should be attached to each other via appropriate size, diameter and numbers of bolts and stiffeners
plates Rate of horizontal pipe will be divided by its length and for any Gantry other than 16' wide, the price of horizontal
pipe will be added /subtracted accordingly
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 75 of 242
Channels and Rear
Frame
4 Nos of GI channels (1.5" x 3" x 1.5" thickness = 4mm) having total length
of 4' placed in vertical direction (running at 4' interval in any other
size) Rear Frame of 2" x 2" SWG 16 GI with
dimensions of 16' x 4' having 4' vertical bracing members 9 in Nos.
and three horizontal members of 16' The channels should be attached with Structure pipe via stiffener plates of
appropriate size and thickness (All connections are welded)
Two such frames of above framing systems may be required at front and
back of horizontal structure pipe
Total cost (1+3)=
__________
Signage
Plate
ACP sheet of approved color having thickness not less 4 mm (Aluminum coating not less than 0.3mm having
PVDF Coating) and size of 16' x 4' Rate of Channels, Rear Frame and
Signage plate will be divided with its area and will govern for different sized
gantry
EG-2
Gantry Signage
(ACP and Acrylic Letters)
Excavation
& Foundation
4' x 4' x 6' (Depth) Class A Concrete (1:2:4)
6" projection above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1.5" diameter and 6 feet length. with 4 stiffener plates of 15" x 5" having
thickness of 15 mm. Two such foundations are required
one at end of each pipe
Rate of Structure
pipes, horizontal truss and
foundation (1)
_________ Rate of only horizontal
running pipes
5
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 76 of 242
Structure
Pipes and
Truss syste
m
2 Nos. GI Pipe outer diameter 10" having thickness of 6mm and length of
18'6" (Vertical pipes) 2 Nos. of GI Pipe of 6" diameter and thickness 5mm having length of 25
feet (Horizontal pipes) Horizontal pipes will be crossed
through the vertical pipes and should be held/attached with appropriate
numbers and size of studs Truss made of GI pipe of of 4"
diameter and thickness = 4mm running after each 5 feet length in vertical position along with inclined
members of same specifications The rate of horizontal pipe and truss system will be divided by its length and it will be added/subtracted for
any Gantry having different size
(2)
Rate of only truss system
(3)
__________ Rate of Rear Frame and
Signage plate (2 in Nos)
(4)
Total Cost (1+4)
Rear Frame
Rear Frame of 2" x 2" SWG 16 GI with dimensions of 25' x 4' having 4'
vertical bracing members 9 in Nos. and three horizontal members of 16'
at center
Signage
Plate
ACP sheet having thickness not less 4 mm (Aluminum coating not less than 0.3mm having PVDF Coating) and size
of 25' x 4'. Rate of Rear Frame and Signage plate will be divided with its area and will
govern for different sized gantry
EG-3
Gantry Signage
(MS Sheet and Paint)
Excavation
& Foundation
4' x 4' x 5' (Depth) Class A Concrete (1:2:4)
6" Projection projected above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1" diameter and 5 feet length with 4 stiffener plates of 15" x 5" having
thickness of 15 mm. Two such foundations are required
one at end of each pipe
Rate of Structure pipes and
foundation
(1)
___________
Rate of only horizontal
running pipe
1
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 77 of 242
Structure
Pipes
2 Nos. GI Pipe outer diameter 8" having thickness of 6mm and length of
18'6" (Vertical Direction) 1 Nos. of GI Pipe of above
specifications having length of 16 feet (Horizontal direction)
Pipes should be attached to each other via appropriate size, diameter and numbers of bolts and stiffeners
plates Rate of horizontal pipe will be divided by its length and for any Gantry other than 16' wide, the price of horizontal
pipe will be added /subtracted accordingly
(2)
_________
Rate of Channels,
Rear Frame and Signage
Plate (3)
Total Cost (1+3)
__________
Channels and Rear
Frame
4 Nos of GI channels (1.5" x 3" x 1.5" thickness = 4mm) having total length
of 4' placed in vertical direction (running at 4' interval in any other
size) Rear Frame of 2" x 2" SWG 16 GI with
dimensions of 16' x 4' having 4' vertical bracing members 9 in Nos.
and one horizontal member of 16' at center
The channels should be attached with Structure pipe via stiffener plates of
appropriate size and thickness (All connections are welded)
Two such frames of above framing systems may be required at front and
back of horizontal structure pipe
Signage
Plate
16' x 4' MS Sheet of SWG 16 welded to the frame with high quality matt finish
enamel paint 2 such sheets are required at front
and back Rate of Channels, Rear Frame and
Signage plate will be divided with its area and will govern for different sized
gantry
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 78 of 242
EG-4
Gantry Signage
(MS Sheet and Paint)
Excavation
& Foundation
4' x 4' x 5' (Depth) Class A Concrete (1:2:4)
6" Projection projected above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1" diameter and 5 feet length with 4 stiffener plates of 15" x 5" having
thickness of 15 mm. Two such foundations are required
one at end of each pipe
Rate of Structure
pipes, horizontal truss and
foundation
(1)
___________
Rate of only horizontal
running pipes
(2)
___________ Rate of only truss system
(3)
_________ Rate of Rear Frame and
Signage plate (2 in Nos)
(4)
Total Cost (1+4) _________
1
Structure
Pipes and
Truss syste
m
2 Nos. GI Pipe outer diameter 10" having thickness of 6mm and length of
18'6" (Vertical pipes) 2 Nos. of GI Pipe of 6" diameter and thickness 5mm having length of 25
feet (Horizontal pipes) Horizontal pipes will be crossed
through the vertical pipes and should be held/attached with appropriate
numbers and size of studs Truss made of GI pipe of 4" diameter and thickness = 4mm running after
each 5 feet length in vertical position along with inclined members of same
specifications The rate of horizontal pipe and truss system will be divided by its length and it will be added/subtracted for
any Gantry having different size
Rear Frame
Rear Frame of 2" x 2" SWG 16 GI with dimensions of 25' x 4' having 4'
vertical bracing members 9 in Nos. and one horizontal member of 16' at
center
Signage
Plate
16' x 4' MS Sheet of SWG 16 welded to the frame with high quality enamel
paint matt finish 2 such sheets may be required at front
and back Rate of Rear Frame and Signage plate will be divided with its area and will
govern for different sized gantry
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 79 of 242
EG-5
Gantry Signage (GI and
reflective sheet)
Excavation
& Foundation
4' x 4' x 5' (Depth) Class A Concrete (1:2:4)
6" Projection projected above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1" diameter and 5 feet length with 4 stiffener plates of 15" x 5" having
thickness of 15 mm. Two such foundations are required
one at end of each pipe
Rate of Structure pipes and
foundation (1)
___________
Rate of only horizontal
running pipe (2)
__________
Rate of Channels,
Rear Frame and Signage
Plate (3)
Total Cost
(1+4)
__________
1
Structure
Pipes
2 Nos. GI Pipe outer diameter 8" having thickness of 6mm and length of
18'6" (Vertical Direction) 1 Nos. of GI Pipe of above
specifications having length of 16 feet (Horizontal direction)
Pipes should be attached to each other via appropriate size, diameter and numbers of bolts and stiffeners
plates Rate of horizontal pipe will be divided by its length and for any Gantry other than 16' wide, the price of horizontal
pipe will be added /subtracted accordingly
Channels and Rear
Frame
4 Nos of GI channels (1.5" x 3" x 1.5" thickness = 4mm) having total length
of 4' placed in vertical direction (running at 4' interval in any other
size) Rear Frame of 2" x 2" SWG 16 GI with
dimensions of 16' x 4' having 4' vertical bracing members 9 in Nos.
and one horizontal member of 16' at center
The channels should be attached with Structure pipe via stiffener plates of
appropriate size and thickness (All connections are welded)
Two such frames of above framing systems may be required at front and
back of horizontal structure pipe
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 80 of 242
Signage
Plate
16' x 4' GI Sheet of SWG 16 welded to the frame with Direct Digital Printing
on Diamond Grade or equivalent Reflective Sheeting with UV Inks & Over laminate Sheeting, including
warranty letter of up to 10 years in terms of reflection & colors from the sheeting manufacturer. (For e.g. 3M)
2 such sheets are required at front and back
Rate of Channels, Rear Frame and Signage plate will be divided with its
area and will govern for different sized gantry
EG-6
Gantry Signage (GI and
reflective sheet)
Excavation
& Foundation
4' x 4' x 6' (Depth) Class A Concrete (1:2:4)
6" projection above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1.5" diameter and 6 feet length. with 4 stiffener plates of 15" x 5" having
thickness of 15 mm. Two such foundations are required
one at end of each pipe
Rate of Structure
pipes, horizontal truss and
foundation (1)
___________
Rate of only horizontal
running pipes
(2)
Rate of only truss system
(3)
Rate of Rear Frame and
Signage plate (2 in Nos)
(4)
1
Structure
Pipes and
Truss syste
m
2 Nos. GI Pipe outer diameter 10" having thickness of 6mm and length of
18'6" (Vertical pipes) 2 Nos. of GI Pipe of 6" diameter and thickness 5mm having length of 25
feet (Horizontal pipes) Horizontal pipes will be crossed
through the vertical pipes and should be held/attached with appropriate
numbers and size of studs Truss made of GI pipe of 4" diameter and thickness = 4mm running after
each 5 feet length in vertical position along with inclined members of same
specifications The rate of horizontal pipe and truss system will be divided by its length and it will be added/subtracted for
any Gantry having different size
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 81 of 242
Rear Frame
Rear Frame of 2" x 2" SWG 16 GI with dimensions of 25' x 4' having 4'
vertical bracing members 9 in Nos. and one horizontal member of 16' at
center
Total Cost
(1+4)
__________
Signage
Plate
25' x 4', MS Sheet of GI SWG 16 welded to the frame with Direct
Digital Printing on Diamond Grade or equivalent Reflective Sheeting with UV
Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection & colors
from the sheeting manufacturer. (For e.g. 3M)
2 such sheets may be required at front and back
Rate of Rear Frame and Signage plate will be divided with its area and will
govern for different sized gantry
EG-7
Gantry Signage
(HQ printed
Flex)
Excavation
& Foundation
4' x 4' x 5' (Depth) Class A Concrete (1:2:4)
6" Projection projected above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1" diameter and 5 feet length with 4 stiffener plates of 15" x 5" having
thickness of 15 mm. Two such foundations are required
one at end of each pipe
Rate of Structure pipes and
foundation (1)
Rate of only horizontal
running pipe (2)
Rate of
Channels, Rear Frame and Signage
Plate (3)
Total Cost
1
Structure
Pipes
2 Nos. GI Pipe outer diameter 8" having thickness of 6mm and length of
18'6" (Vertical Direction) 1 Nos. of GI Pipe of above
specifications having length of 16 feet (Horizontal direction)
Pipes should be attached to each other via appropriate size, diameter and numbers of bolts and stiffeners
plates Rate of horizontal pipe will be divided by its length and for any Gantry other than 16' wide, the price of horizontal
pipe will be added /subtracted accordingly
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 82 of 242
Channels and Rear
Frame
4 Nos of GI channels (1.5" x 3" x 1.5" thickness = 4mm) having total length
of 4' placed in vertical direction (running at 4' interval in any other
size) 6” deep Cubical frame with
Rear Frame of 2" x 2" SWG 16 GI with dimensions of 16' x 4' having 4'
vertical bracing members 9 in Nos. and one horizontal member of 16' at
center And front frame of 16’ x 4’ and 4” corner members. (Flex will stretched at front frame) The channels should be attached with Structure pipe via stiffener plates of appropriate size and thickness (All connections are welded) Two such frames of above framing systems may be required at front and back of horizontal structure pipe
(1+4)
Signage
Plate
16' x 4' High Quality printed Flex (above 600 grams/m2) stretched
through the above frame with appropriate members to make a back
lit box. Back sheet and side faces should be covered with SWG GI 22 Sheet Back litting should be done
through LED Modules 2 such systems are required (front and
back) Rate of Channels, Rear Frame and
Signage plate will be divided with its area and will govern for different sized
gantry
EG-8
Gantry Signage
(HQ printed
Flex)
Excavation
& Foundation
4' x 4' x 6' (Depth) Class A Concrete (1:2:4)
6" projection above NSL of 20" x 20" size
Base Plate of 18" x 18" with 1" thickness made with Galvanized Iron.
4 Nos. of anchor bolts having 1.5" diameter and 6 feet length. with 4 stiffener plates of 15" x 5" having
thickness of 15 mm. Two such foundations are required
one at end of each pipe
Rate of Structure
pipes, horizontal truss and
foundation (1)
___________ Rate of only horizontal
running pipes
1
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 83 of 242
Structure
Pipes and
Truss syste
m
2 Nos. GI Pipe outer diameter 10" having thickness of 6mm and length of
18'6" (Vertical pipes) 2 Nos. of GI Pipe of 6" diameter and thickness 5mm having length of 25
feet (Horizontal pipes) Horizontal pipes will be crossed
through the vertical pipes and should be held/attached with appropriate
numbers and size of studs Truss made of GI pipe of 4" diameter and thickness = 4mm running after
each 5 feet length in vertical position along with inclined members of same
specifications The rate of horizontal pipe and truss system will be divided by its length and it will be added/subtracted for
any Gantry having different size
(2)
___________
Rate of only truss system
(3)
Rate of Rear Frame and
Signage plate (2 in Nos)
(4)
__________
Total Cost (1+4)
__________ Rear Frame
6” deep Cubical frame with Rear Frame of 2" x 2" SWG 16 GI with
dimensions of 25' x 4' having 4' vertical bracing members 9 in Nos.
and one horizontal member of 25' at center
And front frame of 25’ x 4’ and 4” corner members. (Flex will stretched
at front frame)
Signage
Plate
25' x 4' High Quality printed Flex (above 600 grams/m2) stretched
through the above frame with appropriate members to make a back
lit box. Back sheet and side faces should be covered with SWG GI 22 Sheet Back letting should be done
through LED Modules 2 such systems may required (front
and back) Rate of Rear Frame and Signage plate will be divided with its area and will
govern for different sized gantry
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 84 of 242
EL-1
Acrylic Letters with SS Casing
Lettering
Materials
Acrylic letter having total thickness of 4" and Total Vertical length of letter
equal to 2' (Thickness of acrylic sheet = 5 mm) in the SS Casing of thickness
of 1mm Myriad, Arial or approved font for
English letters Irani Nastaleeq for Urdu Letters
The rate of one letter will be divided by 2 (height of signage), and rate per running feet will govern for size other than 2'. The Urdu joint alphabets will
be considered as one letter and in that length will be measured horizontally (The length may vary from 6" to 3.5', thickness of letter will be 3" in case of length less than 1' and cost of signage
will be calculated accordingly by dividing thickness also)
300
Back Litting
LED Modules of appropriate numbers and backside of letter should be covered with SWG GI 22 sheet of
similar pattern complete in all aspects with concealed wiring
EL-2 Acrylic Letters
Lettering
Materials
Acrylic letter having Total Vertical length of letter equal to 2' (Thickness
of acrylic sheet = 5 mm) Thickness of letters should be 2.5" for
6" to 2' height and 4" for more than 2' height
Myriad, Arial or approved similar font for English letters
Irani Nastaleeq or approved similar font for Urdu Letters
The rate of one letter will be divided by 2 (height of signage), and rate per running feet will govern for size other than 2'. The urdu joint alphabets will
be considered as one letter and in that length will be measured horizontally.
The rate will also be divided by thickness in case of different
thicknesses
150
Back Litting
LED Modules of appropriate numbers and backside of letter should be covered with SWG GI 22 sheet of
similar pattern complete in all aspects
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 85 of 242
with concealed wiring
EL-3 Stainless
Steel Letters
Lettering
Materials
Stainless Steel having Total Vertical length of letter equal to 2' Thickness
made with SS SWG 24 Thickness of letters should be 2.5" for
6" to 2' height and 4" for more than 2' height
Myriad, Arial or approved similar font for english letters
Irani Nastaleeq or approved similar font for Urdu Letters
The rate of one letter will be divided by 2 (height of signage), and rate per running feet will govern for size other than 2'. The urdu joint alphabets will
be considered as one letter and in that length will be measured horizontally
The rate will also be divided by thickness in case of different
thicknesses
50
A1
External Platform/Road Sign
Boards (Circular)
Excavation
& Foundation
1.5' x 1.5' with 1.5' height Class A Concrete (1:2:4) with 6'' projected
above the NSL
25
Pipe
G.I Pipe, Outer Dia: 3'', Thickness: 14 SWG, Quantity: 1 No's, Length: 9'
(including pipe in the foundation of 1'3" length). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14 with depth of 2" strip and 1' in length (2 such anchors needed on front and
back) Sheet
of Signag
e
G.I Sheet of size 60cm Dia, Thickness: 14 SWG.
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection &
colors from the sheeting
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 86 of 242
manufacturer. (For e.g. 3M)
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2
No's, Length: 21'' (each)
Clumps
G.I Clumps of 14 SWG 2 in Nos. having appropriate width w.r.t channel width
and appropriate length to hold the signage plate on pipe fixed with G.I
Nuts & Bolts with appropriate length, diameter and numbers
A2
External Platform/Road Sign
Boards (Triangula
r)
Excavation
& Foundation
1.5' x 1.5' with 1.5' height Class A Concrete (1:2:4) with 6'' projected
above the NSL
10
Pipe
G.I Pipe, Outer Dia: 3'', Thickness: 14 SWG, Quantity: 1 No's, Length: 9'
(including pipe in the foundation of 1'3" length). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14 with depth of 2" strip and 1' in length (2 such anchors needed on front and
back) Sheet
of Signag
e
G.I Sheet of size 60cm (each side) with chamfered edges, Thickness: 14 SWG
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection
&colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2
No's, Length: 18'' and 8"
Clumps
G.I Clumps of 14 SWG 2 in Nos. having appropriate width w.r.t channel width
and appropriate length to hold the signage plate on pipe fixed with G.I
Nuts & Bolts with appropriate length,
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 87 of 242
diameter and numbers
B1
Main Entrance
Signage (2 Sided)
Foundation
2 Foundations (One under each column) of 2' x 2' in size of Class A P.C.C of 1:2:4 and total depth of 3'6" with 6" projected outsides the NSL
5
Columns
Two 8"x8" columns (filled with 1:2:4 concrete) made with G.I SWG 14 , 8'6" in height from top of foundation with development length of not less than 3'6", cladded with Aluminum Composite Panels of approved color. (Total length of pipes 12')
Framing
4' x 8' frame made with 2"x2" pipe of G.I 16 SWG with same size bracing running at interval of 2' of 4' length. 2 such frames are required on front and back of columns(All welded connections)
Sheet of
Signage
The above frame shall be covered with Aluminum composite panels (ACP) (of approved color) from all 6 faces (ACP thickness = 4mm Aluminum coating not less than 0.3mm having PVDF Coating)
Connection
of Frame
& Signag
e
The column should be welded with frames throughout its length and it should be made flush longitudinally
Text
8mm thick acrylic letters of approved color, laser cut with appropriate contours and collars pushed through from inside of ACP panel to extrude out to about 4mm. Back Lit with Appropriate number of LED Modules with appropriate lighting. (2 sided writing) (Where collars are not feasible due to size of letters, anchoring with 4mm clear acrylic sheet should be provided behind the ACP)
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 88 of 242
B1 (A)
Main Entrance
Signage (1 Sided)
Foundation
2 Foundations (One under each column) of 2' x 2' in size of Class A P.C.C of 1:2:4 and total depth of 3'6" with 6" projected outsides the NSL
5
Columns
Two 8"x8" columns (filled with 1:2:4 concrete) made with G.I SWG 14 , 8'6" in height from top of foundation with development length of not less than 3'6", cladded with Aluminum Composite Panels of approved color. (Total length of pipes 12')
Framing
4' x 8' frame made with 2"x2" pipe of G.I 16 SWG with same size bracing running at interval of 2' of 4' length. (All welded connections)
Sheet of
Signage
The above frame shall be covered with Aluminum composite panels (ACP) (of approved color) from all 6 faces (ACP thickness = 4mm Aluminum coating not less than 0.3mm having PVDF Coating)
Connection
of Frame
& Signag
e
The column should be welded with frames throughout its length and it should be made flush longitudinally
Text
8mm thick acrylic letters of approved color, laser cut with appropriate contours and collars pushed through from inside of ACP panel to extrude out to about 4mm. Back Lit with Appropriate number of LED Modules with appropriate lighting (Where collars are not feasible due to size of letters, anchoring with 4mm clear acrylic sheet should be provided behind the ACP)
B2
Main Entrance Signage 2 - Double
Sided writing
Foundation
2 Foundations (One under each column) of 2' x 2' in size of Class A
P.C.C of 1:2:4 and total depth of 3'6" with 6" projected outsides the NSL 5
Connection
of
GI J bolts of 12 mm diameter having length of 3'6", joined with base plate
having dimensions of 15" x 15" x 0.75"
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 89 of 242
frame and
foundation
(One Under each column)
Columns
Two 8"x8" columns (filled with 1:2:4 concrete) on edges of longer side
made with G.I SWG 15 , 12' in height from top of foundation
Framing
Total 2 types of frames are required: 1. (Bottom Frames) Frames of 4' x 8' size made with 2"x2" pipe of G.I 16
SWG with same size bracing running at interval of 2' of shorter size. 2 such frames are required on front and back
of columns(All welded connections) 2. (Top Frames) Frames of 3'6" x 8' size made with 2"x2" pipe of G.I 16
SWG with same size bracing running at interval of 2' of shorter size. 2 such frames are required on front and back of columns (All welded connections)
The distance between top and bottom frame will be 6"
Sheet of
Signage
The above frame shall be covered with Aluminum composite panels (ACP) (of
approved color) from all six faces. (ACP thickness = 4mm Aluminum
coating not less than 0.3mm having PVDF Coating)
Direct printing on ACP Sheet with UV inks and scratch resistant is required
on ACP sheet as background color Connection
of Frame
& Signag
e
The column should be welded with frames throughout its length and it should be made flush longitudinally
Text
8mm thick acrylic symbol in top frame and letters in bottom frame of approved color, laser cut with
appropriate contours and collars pushed through from inside of ACP
panel to extrude out to about 4mm on both sides of the board. In addition to
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 90 of 242
acrylic letter, bottom frame ACP should be partially colored with direct
digital printing on ACP Backlit with appropriate number of
LED Modules. (2 sided writing) (Where collars are not feasible due to
size of letters, anchoring with 4mm clear acrylic sheet should be provided
behind the ACP)
B2(A)
Main Entrance Signage 2
- Single Sided
writing
Foundation
2 Foundations (One under each column) of 2' x 2' in size of Class A
P.C.C of 1:2:4 and total depth of 3'6" with 6" projected outsides the NSL
5
Connection
of frame and
foundation
GI J bolts of 12 mm diameter having length of 3'6", joined with base plate
having dimensions of 15" x 15" x 0.75" (One Under each column)
Columns
Two 8"x8" columns (filled with 1:2:4 concrete) on edges of longer side
made with G.I SWG 15 , 12' in height from top of foundation
Framing
Total 2 types of frames are required: 1. (Bottom Frame) Frame of 4' x 8' size made with 2"x2" pipe of G.I 16
SWG with same size bracing running at interval of 2' of shorter size. (All
welded connections) 2. (Top Frame) Frame of 3'6" x 8' size made with 2"x2" pipe of G.I 16 SWG
with same size bracing running at interval of 2' of shorter size. (All
welded connections) The distance between top and bottom
frame will be 6"
Sheet of
Signage
The above frame shall be covered with Aluminum composite panels (ACP) (of
approved color) from all six faces. (ACP thickness = 4mm Aluminum
coating not less than 0.3mm having PVDF Coating)
Direct printing on ACP Sheet with UV inks and scratch resistant is required
on ACP sheet as background color
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 91 of 242
Connection
of Frame
& Signag
e
The column should be welded with frames throughout its length and it should be made flush longitudinally
Text
8mm thick acrylic symbol in top frame and letters in bottom frame of approved color, laser cut with
appropriate contours and collars pushed through from inside of ACP
panel to extrude out to about 4mm on both sides of the board. In addition to
acrylic letter, bottom frame ACP should be partially colored with direct
digital printing on ACP Backlit with appropriate number of
LED Modules. (Where collars are not feasible due to
size of letters, anchoring with 4mm clear acrylic sheet should be provided
behind the ACP)
C1
Directional Board (Single Sheet)
Foundation
1.5' x 1.5' with 2' Class A Concrete (1:2:4) with 6'' projected above the
NSL
25
Pipe
G.I Pipe, Outer Dia: 3'', Thickness: 14 SWG, Quantity: 2 No's, Length: 8'
(including pipe in the foundation of length 1'8"). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14
with depth of 2" strip and 1'6" in length (2 such anchors needed on
front and back) Sheet
of Signag
e
G.I Sheet of size 1' (height) x 5' (width), Thickness: 14 SWG, Quantity:
1 No's
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection
&colors from the sheeting manufacturer. (For e.g. 3M)
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 92 of 242
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2 No's (Each Sheet), Length: 54'' (Each
Channel)
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe fixed with G.I Nuts & Bolts with
appropriate length, diameter and numbers
C2
Directional Board (Two
Sheets)
Foundation
2' x 2' with 2' height Class A Concrete (1:2:4) with 6'' projected above the
NSL
25
Pipe
G.I Pipe, Outer Dia: 3'', Thickness: 14 SWG, Quantity: No's, Length: 9'3" (including pipe in the foundation of 1'8" length). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14
with depth of 2" strip and 1'6" in length (2 such anchors needed on
front and back)
Sheet of
Signage
G.I Sheet of size 1' (height) x 5' (width), Thickness: 14 SWG, Quantity:
2 No's Vertical Spacing between sheets
should be 1"
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection
&colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2 No's for Each Sheet, Length: 54'' (Each
Channel)
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe fixed with G.I Nuts & Bolts with
appropriate length, diameter and numbers
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 93 of 242
C3
Directional Board (Three Sheets)
Foundation
2' x 2' with 2.5' depth Class A Concrete (1:2:4) with 6'' projected above the
NSL
10
Pipe
G.I Pipe, Outer Dia: 3'', Thickness: 14 SWG, Quantity: 2 No's, Length: 11'
(including pipe in the foundation with 2'2" length). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14 with depth of 2" strip and 2' in length (2 such anchors needed on front and
back)
Sheet of
Signage
G.I Sheet of size 1' (height) x 5' (width), Thickness: 14 SWG, Quantity:
3 No's Vertical Spacing between sheets
should be 1"
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting , including warranty letter of up to 10 years in terms of reflection &
colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2 No's for Each Sheet, Length: 54'' (Each
Channel)
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe fixed with G.I Nuts & Bolts with
appropriate length, diameter and numbers
C4
Directional Board (Four
Sheets)
Foundation
2' x 2' with 2.5' depth Class A Concrete (1:2:4) with 6'' projected above the
NSL
5
Pipe
G.I Pipe, Outer Dia: 3'', Thickness: 14 SWG, Quantity: 2 No's, Length: 12' (including pipe in the foundation of 2'2" length). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14 with depth of 2" strip and 1' in length (2 such anchors needed on front and
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 94 of 242
back)
Sheet of
Signage
G.I Sheet of size 1' (height) x 5' (width), Thickness: 14 SWG, Quantity:
4 No's
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection
&colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2 No's (Each Sheet), Length: 54'' (Each
Channel)
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe fixed with G.I Nuts & Bolts with
appropriate length, diameter and numbers
C5
Directional Board
(Five Sheets)
Foundation
2' x 2' with 3' depth Class A Concrete (1:2:4) with 6'' projected above the
NSL
15 Pipe
G.I Pipe, Outer Dia: 4'', Thickness: 14 SWG, Quantity: 2 No's, Length: 13'6" (including pipe in the foundation of length 2'8"). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14
with depth of 2" strip and 2'6" in length (2 such anchors needed on
front and back)
Sheet of
Signage
G.I Sheet of size 1' (height) x 5' (width), Thickness: 14 SWG, Quantity:
5 No's Vertical Spacing between sheets
should be 1"
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 95 of 242
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection
&colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2 No's for Each Sheet, Length: 54'' (Each
Channel)
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe fixed with G.I Nuts & Bolts with
appropriate length, diameter and numbers
C6
Directional Board
(Six Sheets)
Foundation
2' x 2' with 3' depth Class A Concrete (1:2:4) with 6'' projected above the
NSL
15
Pipe
G.I Pipe, Outer Dia: 4'', Thickness: 14 SWG, Quantity: 2 No's, Length: 14'6" (including pipe in the foundation of length 2'6"). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14
with depth of 2" strip and 2'6" in length (2 such anchors needed on
front and back)
Sheet of
Signage
G.I Sheet of size 1' (height) x 5' (width), Thickness: 14 SWG, Quantity:
6 No's Vertical Spacing between sheets
should be 1"
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection
&colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2 No's for Each Sheet, Length: 54'' (Each
Channel)
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 96 of 242
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe fixed with G.I Nuts & Bolts with
appropriate length, diameter and numbers
C7
Additional Panel (For Fixation
on existing
Foundation & Posts)
Sheet of
Signage
G.I Sheet of size 1' (height) x 5' (width), Thickness: 14 SWG, Quantity:
1 No's
10
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective
Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection
&colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels (C Section, made from 5'' strip), Thickness: 14 SWG, Quantity: 2 No's (Each Sheet), Length: 54'' (Each
Channel)
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe fixed with G.I Nuts & Bolts with
appropriate length, diameter and numbers
D1
Departmental
Signage on
Building (Printed)
Signage
Plate
4' (height) by 8' (width) of transparent solid polycarbonate sheet having thickness not less than 6 mm. The signage text should be printed on
backside of the front face. Poly carbonate sheet should cover all sides
of signage
10
Frame of
Signage
2 Nos. 4' by 8' frames with total depth of 3" made up of 1.5"x1.5" GI 16 SWG
square hollow pipe, with one 4' member of 1.5"x1.5" bracing of
square hollow pipe 16 SWG welded at center. Fixed on wall through
appropriate channels running at sides (Running after each 4' length)
Backing
Backside of frame should be covered with GI Sheet 24 SWG
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 97 of 242
Sheet
Text and
Lighting
Appropriate number of LED Modules are required to be screwed for
backilghting The rate of signage will be divided by its area (8' x 4') and per SFT rate will
govern for different sizes
D1 (A)
Departmental
Signage on
Building (Letters)
Signage
Plate
4' (height) by 8' (width) of ACP sheet having thickness not less than 4 mm.
(ACP thickness = 4mm Aluminum coating not less than 0.3mm having PVDF Coating) The ACP Panel should be routed as per desired text. Front face will be 7'6" x 3'6". All faces of signage will be covered with ACP
45
Frame of
Signage
2 Nos. 7'6" by 3'6" frames with total depth of 3" made up of 1.5"x1.5" GI
16 SWG square hollow pipe, with one 4' member of 1"x 1" bracing of square hollow pipe 16 SWG welded at center in one frame. Fixed on wall through
appropriate channels running at sides Backin
g Sheet
Backside of frame should be covered with GI Sheet 24 SWG
Text and
Lighting
8mm thick acrylic letters of approved color, laser cut with appropriate
contours and collars pushed through from inside of ACP panel to extrude
out to about 4mm. (Where collars are not feasible due to size of letters, anchoring with 4mm clear acrylic
sheet should be provided behind the ACP)
Back Lit with Appropriate number of LED Modules with appropriate lighting The rate of signage will be divided by its area (7.5' x 3.5') and per SFT rate will govern for different sizes (20 SFT
to 100 SFT range)
E1 External
Map Boards
Foundation
1.5' x 1.5' with 2' depth Class A Concrete (1:2:4) with 6'' projected
above the NSL
Total Price
10
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 98 of 242
Pipe
G.I Pipe, Outer Dia: 4'', Thickness: 14 SWG, Quantity: 2 No's, Length: 11' (including pipe in the foundation of length 1'8"). An anchor should be
welded with GI Pipe inside the foundation made of GI strip of SWG 14
with depth of 2" strip and 1'6" in length (2 such anchors needed on
front and back)
__________
Cost of only sheet and reflective sheeting
__________
Sheet of
Signage
G.I Sheet of size 6' x 4' , Thickness: 14 SWG
(per SFT will govern for any signage having different dimensions)
Reflective
Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective Sheeting with, UV Inks & Over
laminate Sheeting, including warranty letter of up to 10 years in terms of
reflection &colors from the sheeting manufacturer. (For e.g. 3M)
Channels
G.I Channels, Thickness: 14 SWG, Quantity: 3 (No's, Length: 4' (each
channel) Running after 2 foot
Clumps
G.I Clumps of 14 SWG 2 in Nos. (per sheet) having appropriate width w.r.t channel width and appropriate length
to hold the signage plate on pipe fixed with G.I Nuts & Bolts with
appropriate length, diameter and numbers
Reflective
Sheet
Reflective
Sheet
Reflective Sheet with Direct Digital Printing on Diamond Grade or
equivalent Reflective Sheeting with, UV Inks & Over laminate Sheeting,
including warranty letter of up to 10 years in terms of reflection &colors
from the sheeting manufacturer. (For e.g. 3M)
The price will be divided by total area and per SFT rate will be governed for
any size of sheet
100 SFT
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 99 of 242
EF1 Back lit
Flex Board Signage
Frame
6” deep Cubical frame with 6’ x 8’ front frame having members of
2” x 2”, SWG 16 GI with bracing members running after each 4’
And 6’ x 8’ from frame with appropriate numbers of 4” corner members to make cubical frame Covered with SWG 22 GI Sheet
5
Back Lit
Flex
High resolution digital direct printing on flex (600 grams/m2) back lit with appropriate number of LED Modules
Complete in all respects inkling power supply, wires etc.
(Rate will be divided with area i.e. 6 x 8 feet and per square feet rate will
govern for any size other than 6’ x 8’)
Total Cost of the Bid (For Evaluation purposes only)
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 100 of 242
C- STANDARDFORMS
FORM OF BID SECURITY
(Bank Guarantee)
Guarantee No._____________________
Executed on _____________________
Expiry date _____________________
(g) Guidelines for submission of schedule of prices
() Schedule of Prices
forthwith and without any reference to the Principal or any other person.
IN WITNESS WHEREOF, the above-bounden Guarantor has executed this Instrument under its
seal on the date indicated above, the name and corporate seal of the Guarantor being hereto
affixed and these presents duly signed by its undersigned representative, pursuant to authority of
its governing body.
_______________
Guarantor (Bank)
Witness:
1. _______________________ Signature _______________
_______________________ Name __________________
Corporate Secretary (Seal) Title ___________________
2. _______________________
_______________________ _______________________
Name, Title & Address Corporate Guarantor (Seal)
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 101 of 242
PART –II CONTRACT
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 102 of 242
FORM OF CONTRACT
This CONTRACT (hereinafter called the “Contract”) is made the [day] day of the month of
[month], [year], between, on the one hand, [name of Procuring Agency and related parties]
(hereinafter called the “Procuring Agency”) and administrative head of hospitals [name of
Hospital MS and related parties] , on the other hand, [name of Supplier] (hereinafter called
the “Supplier”).
[Note: In the text below text in brackets is optional; all notes should be deleted in final text.
If the Supplier consist of more than one entity, the above should be partially amended to read
as follows: “…(hereinafter called the “Procuring Agency”) and, on the other hand, a joint
venture consisting of the following entities, each of which will be jointly and severally liable
to the Procuring Agency for all the Supplier’s obligations under this Contract, namely, [name
of Supplier] and [name of Supplier] (hereinafter called the “Supplier”).]
WHEREAS
(a) the Procuring Agency has requested the Supplier to supply and install sign
boards as defined in the General Conditions of Contract attached to this
Contract (hereinafter called the “Services”);
(b) the Supplier, having represented to the Procuring Agency that they have the
required professional skills, and personnel and technical resources, have
agreed to provide the Services on the terms and conditions set forth in this
Contract for amount of……………………;
(c) the Procuring Agency has received budget from the Government of Punjab. It
intends to apply a portion of the proceeds of this budget to eligible payments,
if any, under the contract.
NOW THEREFORE the parties hereto hereby agree as follows:
1. The following documents shall be deemed to form and be read and construed as part of
this Contract, and the priority of the documents shall be as follows:
(a) the Letter of Acceptance;
(b) the Special Conditions of Contract;
(c) the General Conditions of Contract;
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 103 of 242
(d) the Scope of Services;
(e) Performance Specifications and Drawings;
(f) Annexures; and
(g) the Supplier’s Proposal.
2. The mutual rights and obligations of the Procuring Agency and the Supplier shall be as
set forth in the Contract, in particular:
(a) the Supplier shall carry out the Services in accordance with the provisions of
the Contract; and
(b) the Procuring Agency shall make payments, if any, to the Supplier in
accordance with the provisions of the Contract.
IN WITNESS, WHEREOF, the Parties hereto have caused this Contract to be signed in their
respective names as of the day and year first above written.
For and on behalf of [name of Procuring Agency]
[Authorized Representative]
For and on behalf of [name of Supplier]
[Authorized Representative]
[Note: If the Supplier consists of more than one entity, all these entities should appear as
signatories, e.g., in the following manner:]
For and on behalf of each of the Members of the Supplier
[name of member]
[Authorized Representative]
[name of member]
[Authorized Representative]
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 104 of 242
SECTION A: GENERAL CONDITIONS OF CONTRACT (GCC)
1. General Provisions
1.1 Definitions Unless the context otherwise requires, the following terms whenever
used in this Contract have the following meanings:
a) The Arbitrator is the person appointed jointly by the Procuring
Agency and the Supplier to resolve disputes in the first instance,
as provided for in Sub-Clause 8.2 hereunder.
b) “Contract” means the Contract signed by the Parties, to which
these General Conditions of Contract (GCC) are attached,
together with all the documents listed in Clause 1 of such signed
Contract;
c) “Contract Price” means the price to be paid for the performance
of the Services, in accordance with Clause 6;
d) “Day works” means varied work inputs subject to payment on a
time basis for the Supplier’s employees and equipment, in
addition to payments for associated materials and
administration.
e) “Defect” means an error or flaw in the process affecting
performance and potentially causing harm, a shortcoming that
may lead to damage or critically altering the construction of
goods, materials and rendering of services leading to their
obliteration.
f) “Procuring Agency” means Project Management Unit (PMU),
Primary & Secondary Healthcare Department, Government of
Punjab, 31 E 1 Gulberg III, Lahore.
g) “Foreign Currency” means any currency other than the currency
of the country of the Procuring Agency;
h) “GCC” means these General Conditions of Contract;
i) “Government” means the Government of the Punjab;
j) “Local Currency” means Pak Rupee (PKR);
k) “Member,” in case the Supplier consist of a joint venture of
more than one entity, means any of these entities; “Members”
means all these entities, and “Member in Charge” means the
entity specified in the Special Conditions to act on their behalf
in exercising all the Supplier’ rights and obligations towards the
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 105 of 242
Procuring Agency under this Contract;
l) “Party” means the Procuring Agency or the Supplier, as the case
may be, and “Parties” means both of them;
m) “Personnel” means persons hired by the Supplier as employees
and assigned to the performance of the Services or any part
thereof;
n) “Supplier” is a person or corporate body whose Proposal to
provide the Services has been accepted by the Procuring
Agency;
o) “Supplier’s Proposal” means the completed Proposal document
submitted by the Supplier to the Procuring Agency
p) “SCC” means the Special Conditions of Contract by which the
GCC may be amended or supplemented;
q) “Specifications” means the specifications of the service included
in the Proposal document submitted by the Supplier to the
Procuring Agency
r) “Services” means the work to be performed by the Supplier
pursuant to this Contract, as described in Section C – Scope of
services, Proposal document and attached Annexure.
1.2 Applicable Law The Contract shall be interpreted in accordance with the laws of
Islamic Republic of Pakistan.
1.3 Language This Contract has been executed in the language specified in the
SCC, which shall be the binding and controlling language for all
matters relating to the meaning or interpretation of this Contract.
1.4 Notices Any notice, request, or consent made pursuant to this Contract shall
be in writing and shall be deemed to have been made when delivered
in person to an authorized representative of the Party to whom the
communication is addressed, or when sent by registered mail, telex,
telegram, or facsimile to such Party at the address specified in the
SCC.
1.5 Location The Services shall be performed at such locations as are specified in
Section C – Scope of services and/or Appendix D, in the
specifications and, where the location of a particular task is not so
specified, at such locations, whether in the Government’s country or
elsewhere, as the Procuring Agency may approve.
1.6 Authorized
Representatives
Any action required or permitted to be taken, and any document
required or permitted to be executed, under this Contract by the
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 106 of 242
Procuring Agency or the Supplier may be taken or executed by the
officials specified in the SCC.
1.7 Inspection and
Audit by the
Procuring
Agency
The Supplier shall permit the Procuring Agency to inspect its
accounts and records relating to the performance of the Services and
to have them audited by auditors appointed by the Procuring
Agency, if so required.
1.8 Taxes and
Duties
1.9 Secrecy of
contract documents
and information
2.0 Action in
Absence of
Specification 2.Objects of
Antiquity
The Supplier and their Personnel shall pay such taxes, duties, fees,
and other impositions as may be levied under the Applicable Law.
The Supplier shall not, without the Procuring Agency's prior written
consent, disclose the Contract, or any provision thereof, or any
specification, plan, drawing, pattern, sample or information
furnished by or on behalf of the Procuring Agency in connection
therewith, to
any person other than a person employed by the Supplier in
performance of the Contract. Disclosure to any such employed
person shall be made in confidence and shall extend only so far, as
may be necessary for purposes of such performance.
The Supplier shall not, without the Procuring Agency's prior written
consent, make use of any document or information except for
purposes of performing the Contract.
Any document, other than the Contract itself, shall remain the
property of the Procuring Agency and shall be returned (in all
copies) to the Procuring Agency on completion of the Supplier's
performance under the Contract if so required by the Procuring
Agency.
In the case of any class of work for which there is no such
specification mentioned in the Contract, such work shall be carried
out in accordance with Engineer’s specifications, and in the event of
there being no such specifications, then the work shall be carried out
in all respects in accordance with the instructions and requirements
of the Engineer or other competent authority. All objects of value or antiquity found on the site shall remain the
property of the Procuring Agency or the Government of Pakistan as
per the Applicable Law, and such findings shall be immediately
reported to the Engineer/Procuring Agency.
2. Commencement, Completion, Modification, and Termination of Contract
2.1 Effectiveness of
Contract
This Contract shall come into effect on the date the Contract is
signed by both parties or such other later date as may be stated in
the SCC.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 107 of 242
2.2Commencement
of Services
2.2.1Work
Program
The Supplier shall submit a Schedule & Chart detailing the
scheduled program of works and schedule of procurement of
materials, as per the time frame specified in this tender, and
approved by the Procuring Agency/ Engineer/Architect. The said
Schedule & Chart shall be submitted subsequent to the acceptance
of the tender and within seven days of the final agreement made
between the Procuring Agency and the Supplier. The Schedule &
Chart shall be considered part of the final agreement, and shall be
binding upon the Supplier.
The Schedule shall be revised and brought up-to-date every month
and copies of the same shall be forwarded to the Engineer/Procuring
Agency. It is the Supplier's responsibility to see that these schedules
are adhered to. The Procuring Agency will not entertain any claim
by of the Supplier and Signage Suppliers on account of delay in
delivery of materials by the Procuring Agency.
2.2.2 Starting Date
2.2.3 Written Order
to Commence Work
The Supplier shall start carrying out the Services seven (07) days
after the date the Contract becomes effective, or at such other date
as may be specified in the SCC for each particular job.
After acceptance of the tender, the Engineer shall issue a written
order to the successful tenderer to commence the work, and the
Supplier shall supply and fix the items according the gestation
mentioned in the Work Order.
The Supplier shall enter upon or commence any portion of work
only with the written authority and instructions of the Engineer.
Without such instructions the Supplier shall have no claim to
demand for measurements of or payment for work done by him.
2.3 Intended
Completion Date
2.3.1 Grant of
Extension of Time
Unless terminated earlier pursuant to Sub-Clause 2.6, the Supplier
shall complete the activities by the Intended Completion Date, as is
specified in the SCC. If the Supplier does not complete the
activities by the Intended Completion Date, it shall be liable to pay
liquidated damage as per Sub-Clause 3.8. In this case, the
Completion Date will be the date of completion of all activities.
If the Supplier shall desire an extension of the time for completion
of the work on the ground of his having been unavoidably hindered
in its execution or on any other ground, he shall apply in writing to
the Engineer before the expiration of the period stipulated in the
tender or before the expiration of thirty days from the date on which
he was hindered as aforesaid or on which the cause for asking for
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 108 of 242
2.3.2 Certificate of
Completion
extension occurred, whichever is earlier; and the Engineer or other
competent authority may, if in his opinion there are reasonable
grounds for granting an extension, grant such extension as he thinks
necessary or proper. The decision of such competent authority in
this matter shall be final. The time limit for completion of the work shall be extended
commensurate with its increase in cost occasioned by alterations or
additions, and the certificate of the Engineer or other competent
authority as to such proportion shall be conclusive.
If the delay is attributable to reasons beyond the control of the
Supplier, requisite extension of time shall be granted by the
Engineer in after obtaining the approval of his higher authorities
wherever necessary.
On completion of the Entire Works, the Supplier shall report in
writing to the Engineer the completion of such work, and the
Engineer shall issue a certificate of Virtual Completion stating in
writing that the work has been so completed. The Maintenance
/Defects Liability Period shall commence from the date of such
certificate.
The works shall not be considered as completed until the
Engineer/Architect has certified in writing that they have been
virtually completed.
However, no such certificate shall be given nor shall the work be
considered to be complete until the Supplier shall have removed
from the premises on which the work shall have been executed all
surplus materials and rubbish, and shall have cleaned thoroughly all
finished surfaces, in or upon which the work has been executed, nor
until the works shall have been measured by the Engineer or other
competent authority, or where the measurements have been taken
by his subordinates until they have received the approval of the
Engineer or other competent authority, the said measurements being
binding and conclusive against the Supplier. If the Contractor shall
fail to comply with the requirements of this clause as to the removal
of scaffolding, surplus materials and rubbish, and cleaning the
premises, on or before the date fixed for the completion of the work,
the Engineer or other competent authority may, at the expense of
the Supplier, remove such surplus materials and rubbish and dispose
of the same as he thinks fit and clean off such dirt etc. as aforesaid;
and Supplier shall be liable to pay the amount of all expenses so
incurred, but shall have no claim in respect of any such surplus
materials as aforesaid except for any sum actually realized by the
sale thereof.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 109 of 242
2.3.3 Notice to be
given before work is
covered up
2.4 Modification
The Supplier shall give not less than five days notice in writing to
the Engineer before covering up or otherwise placing beyond the
reach of measurement any work, in order that the same may be
measured, and correct dimensions thereof taken before the same is
so covered up or placed beyond the reach of measurement; and shall
not cover up or place beyond the reach of measurement any work
without the consent in writing of the Engineer or other competent
authority or his subordinate in charge of work. If any work shall be
covered up or placed beyond the reach of measurement without
such notice having been given or consent obtained, the same shall
be uncovered at the Supplier’s expense, and in default thereof no
payment or allowance shall be made for such work or for the
materials with which the same was executed.
The Engineer, in concurrence with the Procuring Agency, may from
time to time issue further Drawings and/or written instructions,
details, directions and explanations, which are hereafter collectively
referred to as “instructions" in regard to: The variation or
modification of the design, quality or quantity of works or the
addition or omission or substitution of any work. Any discrepancy
in the Drawings or between the Schedule of quantities and/or
drawings and/or specification. The removal from the site of the
materials brought thereon by the Contractor and the substitution of
the other material thereof. The removal and/or re-execution of any
works executed by the Contractor.
The opening up for inspection of any work covered up. The
amending and making good of any work as executed. The
Contractor shall forthwith comply with and duly execute any work
comprised in such Engineer’s instructions, directions and
explanations, given to the Supplier or his representative upon the
works by the Engineer; which shall, if involving a variation, be
confirmed in writing by the Supplier within seven days, and if not
dissented from in writing within a further seven days by the
Engineer, such shall be deemed to be Engineer’s instructions within
the scope of the Contract. If compliance with the Engineer’s
instruction, as aforesaid, involves work and/or expense and loss
beyond that contemplated by the Contract, then, unless the same
were issued owing to some breach of this Contract by the Supplier,
the Procuring Agency shall pay to the Supplier at the
Engineer/Engineer’s Certificate the price of the said work (as an
extra to be valued as hereinafter provided and/or expense and/or
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 110 of 242
2.4.1 Orders for
variations to be in
writing
2.4.2 Variation not
to Vitiate Contract
2.4.3 Determination
of rates for
additional,
substituted or
altered items of
work
loss). Any alterations made to the work made based on technical;
/aesthetic values as per the instructions of the Engineer shall be
considered as part of the work undertaken by the Supplier under this
Contract, and shall be executed as such.
No such variations shall be made by the Supplier without an order
in writing of the Engineer. If for any reason the Engineer shall
consider it desirable to give any such order verbally, the Supplier
shall comply with such order and any confirmation in writing of
such verbal order given by the Engineer, whether before or after the
carrying out of the order, shall be deemed to be an order in writing
within the meaning of this clause; and if the Supplier shall within
seven days confirm the order in writing to the Engineer and if such
confirmation is not contradicted in writing within fourteen days by
the Engineer, it shall be deemed to be an order in writing by the
Engineer.
Any additional work which the Supplier may be directed to, in the
manner above specified, as part of the work, shall be carried out by
the Supplier on the same conditions in all respects on which he
agreed to do the main work and at the same rates as are specified in
the tender for the main work.
No alteration, omission, deletion or variation shall vitiate this
Contract, but in case the Engineer thinks proper at any time during
the progress of the works to make any alterations in or additions to
or omissions from the works or any alteration in the kind or quality
of the materials to be used therein, and shall give notice thereof in
writing under his hand to the Supplier, the Supplier shall alter, add
to or omit from, as the case may require, in accordance with such
notice, but the Supplier shall not do any work extra to or make any
deviation from any of the provisions of the Contract, stipulation,
specification or Contract drawings, without the previous consent in
writing of the Engineer; and the value of such extras, alterations,
additions or omissions shall in all cases be determined by the
Engineer and payment to be on sole discretion of the competent
authority.
If the additional, substituted or altered work includes any class of work for which no rate is specified in the Contract, then such work
shall be carried out at the rates specified for or derived from similar
item of work in the Contract. With regard to the question whether
the additional, substituted or altered item/items of work/works
is/are similar or not to that/those in the Schedule of Rates, the
decision of the Engineer shall be final and binding on the Supplier.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 111 of 242
2.4.4 Variations in
quantity
In the absence of similar items in Contract, the Supplier shall
within seven days of the date of receipt by him of the order to carry
out the work, inform the Engineer of the rates at which it is his
intention to charge for such class of work, supported by analysis of
the rate or rates claimed. The rate analysis submitted by the
Supplier shall be based on actual prevailing market rates of
materials, labor and any other incidental charges, plus 15% (fifteen
percent) overheads and profits, inclusive of all taxes. There upon
the Engineer shall determine the rates or rates on the basis of
observed data, and failing this, on the basis of prevailing market
rates. Under no circumstance shall the Supplier suspend the work
on the plea of non-settlement of rates for items falling under this
clause. In the event of any dispute regarding the rates for such
items the decision of the Engineer shall be final.
There may be large variations to the quantities mentioned in the
Bill of Quantities, and the Engineer reserves the right to decrease or
increase or delete any quantity of the item of work as required. The
Supplier should note that the rate quoted is per one unit; hence no
claims on escalation will be entertained due to variation in
quantities.
2.5 Force Majeure
Notwithstanding the provisions of the contract the Supplier shall not
be liable for forfeiture of its performance security, liquidated
damages or termination for default, if and to the extent that, its
delay in performance or other failure to perform its obligations
under the Contract is the result of an event of Force Majeure.
For purposes of this Clause, "Force Majeure" means an event
beyond the control of the Supplier and not involving the Supplier's
fault or negligence and not foreseeable. Such events may include,
but are not limited to, acts of the Procuring Agency either in its
sovereign or contractual capacity, wars or revolutions, fires, floods,
epidemics, quarantine restrictions and freight embargoes.
If a Force Majeure situation arises, the Supplier shall promptly
notify the Procuring Agency in writing of such conditions and the
cause thereof. Unless otherwise directed by the Procuring Agency
in writing, the Supplier shall continue to perform its obligations
under the Contract as far as is reasonably practical, and shall seek
all reasonable alternative means for performance not prevented by
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 112 of 242
the Force Majeure event.
2.6 Termination
2.6.1 By the
Procuring
Agency
2.6.1.1 If the Supplier, being an individual or a firm, commit any
“Act of Insolvency” or shall be adjudged as Insolvent or, being an
incorporated company, shall have an order for compulsory winding
up made against it, or pass an effective resolution for winding up
voluntarily or subject to the supervision of the court and of the
Official Assignee of the Liquidator in such acts of insolvency, or on
winding up shall be unable within seven days after notice to him
requiring him to do so, to show to the reasonable satisfaction of the
Engineer/Architect/Procuring Agency that he is able to carry out
and fulfill the Contract, and to give security therefore, if so
required by the Engineer/Architect or the Procuring Agency, or if
the Supplier (whether an individual, Firm or Incorporated
Company) shall suffer execution to be issued, or shall suffer any
payment under this Contract to be attached by or on behalf of any
of the creditors of the Supplier, or shall assign or sublet this
Contract without the consent in writing of the Architect first
obtained, or shall charge or encumber this Contract or any
payments due or which may become due to the Supplier there
under, or if the Engineer/Architect shall certify in writing to the
Procuring Agency that the Supplier:
2.6.1.2 Has abandoned the Contract, or
2.6.1.3 Has failed to commence the works, or has without any
lawful excuse under these conditions suspended the progress of the
works, or
2.6.1.4 Has failed to proceed with the works with such due
diligence and failed to make such due progress as would enable the
works to be completed within the time agreed upon, or
2.6.1.5 Has failed to remove rejected materials from the site or to
pull down and replace rejected work upon receiving from the
Engineer/Procuring Agency written notice that the said materials or
work were condemned and rejected by the Engineer/Procuring
Agency under these conditions, or
2.6.1.6 Has neglected or failed persistently to observe and perform
all or any of the acts, matters or things by this Contract to be
observed and performed by the Supplier, after written notice shall
have been given to the Supplier requiring the Supplier to observe or
perform the same, or
2.6.1.7 Has to the detriment of good workmanship, or in defiance of
the Engineer’s instructions to the contrary, sublet any part of the
Contract,
2.6.1.8 Then and in any of the said cases, the Procuring Agency
with the written recommendation of the Engineer may,
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 113 of 242
notwithstanding any previous waiver, after giving fifteen days’
notice in writing to the Supplier, terminate the Contract.
2.6.1.9 Further, the Procuring Agency or his agent or his servants,
may enter upon and take possession of the works and all signage,
tools, scaffoldings, sheds, machinery, and other power utensils and
materials lying upon the premises or the adjoining lands or roads,
and use the same as his own property or may employ the same by
means of his own servants and workmen in carrying out and
completing the works, or by employing any other Suppliers or
other person or persons to complete the works, and the Supplier
shall not in any way interrupt or do any act, matter or thing to
prevent or hinder such other Supplier or other person or persons
employed for completing and finishing or using the materials and
signage for the works. Upon completion, or as soon thereafter as
convenient, the Engineer/Procuring Agency shall give a notice in
writing to the Supplier to remove his surplus materials, and should
the Supplier fail to do so the Procuring Agency shall sell the same
by public auction, and shall give credit to the Supplier for the
amount realized.
2.6.2 By the
Supplier
The Supplier may terminate this Contract, by not less than thirty
(30) days’ written notice to the Procuring Agency, such notice to be
given after the occurrence of any of the events specified in
paragraphs (a) and (b) of this Sub-Clause 2.6.2:
(a) if the Procuring Agency fails to pay any monies due to the
Supplier within agreed timeline pursuant to this Contract, and
not subject to dispute pursuant to Clause 7, the Supplier shall
issue first notice that such payment is overdue. After forty-five
(45) days of giving written first-notice, if the Procuring
Agency still fails to pay, Supplier shall issue second written
notice. After fifteen days(15) of no response on second notice,
Supplier may give thirty (30) days termination notice; or
(b) if, as the result of Force Majeure, the Supplier is unable to
perform a material portion of the Services for a period of not
less than twenty-one (21) days with mutual consultation with
Procuring Agency.
2.6.3 Suspension
of Payment
2.7 Review of
Progress
If the Supplier has not received sums due to by the due date stated in
the SCC in accordance with Clause 6 the Supplier may issue a notice
as per sub-clause 2.6.2.
The progress of works shall be reviewed periodically by the
Procuring Agency/Engineer, as per the Schedule & Chart submitted
by the Supplier at the time of final agreement and revised
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 114 of 242
periodically.
3. Obligations of the Supplier
3.1 General
3.1.1 Framework Contract
The Supplier shall perform the Services in accordance with the
Specifications and Scope, and carry out its obligations with all due
diligence, efficiency, and economy, in accordance with generally
accepted professional techniques and practices, and shall observe
sound management practices, and employ appropriate advanced
technology and safe methods. The Supplier shall always act, in
respect of any matter relating to this Contract or to the Services, as
faithful adviser to the Procuring Agency, and shall at all times
support and safeguard the Procuring Agency’s legitimate interests
in any dealings with third parties.
During the total period of the contract, the Supplier shall be bound
by the Procuring Agency to provide the Sign Boards from time to
time on Framework Contract up to a quantity as specified in the
following schedule:
Quantities of Frame work The framework quantities under this contract are given below. The quantities shall be valid for the Financial Years 2018-19 & 2019-20.
Sr. No Signage Type Numbers
EG-1 Gantry Signage (ACP and Acrylic Letters)
50
EG-2 Gantry Signage (ACP and Acrylic Letters)
50
EG-3 Gantry Signage (MS
Sheet and Paint) 50
EG-4 Gantry Signage (MS Sheet and Paint) (21'
to 30')
50
EG-5 Gantry Signage (GI and reflective sheet)
50
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 115 of 242
EG-6 Gantry Signage (GI and reflective sheet)
50
EG-7 Gantry Signage (HQ
printed Flex) 50
EG-8 Gantry Signage (HQ
printed Flex) 50
EL-1 Acrylic Letters with SS
Casing 3000
EL-2 Acrylic Letters 3000
EL-3 Stainless Steel Letters 3000
A1 External Platform/Road Sign Boards (Circular)
250
A2 External Platform/Road
Sign Boards (Triangular)
250
B1 Main Entrance Signage
(2 Sided) 100
B1 (A) Main Entrance Signage
(1 Sided) 100
B2 Main Entrance Signage
2 - Double Sided writing
100
B2(A) Main Entrance Signage 2 - Single Sided writing
100
C1 Directional Board
(Single Sheet) 250
C2 Directional Board (Two
Sheets) 250
C3 Directional Board (Three Sheets)
100
C4 Directional Board (Four
Sheets) 50
C5 Directional Board (Five
Sheets) 150
C6 Directional Board (Six
Sheets) 150
C7 Additional Panel (For Fixation on existing Foundation & Posts)
100
D1 Departmental Signage on Building (Printed)
100
D1 (A) Departmental Signage on Building (Letters)
450
E1 External Map Boards 100
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 116 of 242
3.2 Conflict of
Interests
EF 1 Back Lit Flex 1000 Reflective Sheet 1000 SFT
3.2.1 Supplier
Not to
Benefit
from
Commissio
ns and
Discounts.
The remuneration of the Supplier pursuant to Clause 6 shall
constitute the Supplier’s sole remuneration in connection with this
Contract or the Services, and the Supplier shall not accept for their
own benefit any trade commission, discount, or similar payment in
connection with activities pursuant to this Contract or to the
Services or in the discharge of their obligations under the Contract,
and the Supplier shall use their best efforts to ensure that the
Personnel and agents of either of them similarly shall not receive
any such additional remuneration.
3.2.2 Supplier
and
Affiliates
Not to be
Otherwise
Interested
in Project
The Supplier agree that, during the term of this Contract and after
its termination, the Supplier and its affiliates, shall be disqualified
from providing goods, works, or Services (other than the Services
and any continuation thereof) for any project resulting from or
closely related to the Services.
3.2.3 Prohibition
of
Conflicting
Activities
Neither the Supplier nor the Personnel shall engage, either directly
or indirectly, in any of the following activities:
(a) during the term of this Contract, any business or professional
activities which would conflict with the activities assigned to
them under this Contract;
(b) during the term of this Contract, Supplier shall not hire such
public employees, in active duty or on any type of leave,
which would conflict with the activities assigned to Supplier
to perform any activity under this Contract;
(c) after the termination of this Contract, such other activities as
may be specified in the SCC.
3.3 Confidentiality The Supplier, and the Personnel of either of them shall not, either
during the term or within two (2) years after the expiration of this
Contract, disclose any proprietary or confidential information
relating to the Project, the Services, this Contract, or the Procuring
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 117 of 242
Agency’s business or operations without the prior written consent
of the Procuring Agency.
3.4 Supplier’s
Actions
Requiring
Procuring
Agency’s Prior
Approval
The Supplier shall obtain the Procuring Agency’s prior approval in
writing before taking any of the following actions:
(a) entering into a subcontract for the performance of any part of
the Services,
(b) appointing such members of the Personnel not listed by name
in Scope (“Key Personnel”),
(c) changing the Program of activities; and
(d) any other action that may be specified in the SCC.
3.5 Reporting
Obligations
The Supplier shall submit to the Procuring Agency the reports and
documents specified in Scope in the form, in the numbers, and
within the periods set forth in the said scope.
3.6 Documents
Prepared by the
Supplier to Be
the Property of
the Procuring
Agency
All plans, drawings, specifications, designs, reports, and other
documents and software submitted by the Supplier in accordance
with Sub-Clause 3.6 shall become and remain the property of the
Procuring Agency, and the Supplier shall, not later than upon
termination or expiration of this Contract, deliver all such
documents and software to the Procuring Agency, together with a
detailed inventory thereof. The Supplier may retain a copy of such
documents and software. Restrictions about the future use of these
documents, if any, shall be specified in the SCC.
3.7 Liquidated
Damages
3.7.1 Payments of
Liquidated
Damages
The Supplier shall pay liquidated damages to the Procuring Agency
at the rate per day stated in the SCC for each day that the
Completion Date is later than the Intended Completion Date. The
total amount of liquidated damages shall not exceed the amount
defined in the SCC. The Procuring Agency may deduct liquidated
damages from payments due to the Supplier. Payment of liquidated
damages shall not affect the Supplier’s liabilities.
3.7.2 Correction
for Over-
payment
If the Intended Completion Date is extended after liquidated
damages have been paid, the Procuring Agency shall correct any
overpayment of liquidated damages by the Supplier by adjusting
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 118 of 242
the next payment certificate. The Supplier shall be paid interest on
that sum, calculated from the date of payment to the date of
repayment, at the rates specified in Clause 6.
3.7.3 Lack of
performanc
e penalty
If the Supplier, after receipt of written notice from the
Engineer/Procuring Agency requiring compliance, fails to comply
with such further drawing and/or Engineer’s instructions, the
Procuring Agency, with the recommendation of the Engineer, may
employ and pay other persons to execute any such work whatsoever
that may be necessary to give effect thereto, and all costs incurred
in connection therewith shall be recoverable from the Supplier by
the Procuring Agency, on the Certificate of the Engineer, as a debt,
or may be deducted by him from any moneys due or to become due
to the Supplier
3.8 Performance
Security
3.9 Execution of
Works
Within 14 days after the Contractor’s receipt of each order, the
Contractor shall furnish Performance Security to the Procuring
Agency for an amount of 5% of the contract value, valid up to 60
days after the date of completion of contract obligations.
The proceeds of the performance security shall be payable to the
Procuring Agency as compensation for any loss resulting from the
Contractor's failure to complete its obligations under the Contract.
The Performance Security shall be Bank Guarantee in favor of the
Procuring Agency.
The performance security will be discharged by the Procuring
Agency and returned to the Contractor not later than 60 days
following the date of completion of the Contractor's performance
obligations.
In the event of any contract amendment, the Contractor shall,
within 7 days of receipt of such amendment, furnish the
amendment to the performance security, rendering the same valid
for the duration of the contract, as amended for further period of 60
days thereafter.
The Contractor shall execute the whole and every part of the work
in the most sound and substantial and workman-like manner, and
in strict accordance with the specifications both as regard to
materials and workmanship. The Contractor shall also conform
exactly, fully and faithfully to the designs, drawings and
instructions in writing relating to the work signed by the Engineer
or other competent authority and lodged in his office, and to which
the Supplier shall be entitled to have access, during office hours, at
such office or on the site of the work, for the purpose of inspection.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 119 of 242
3.11 Bound by
Engineer Instructions
3.12 Defects Liability
Period/Maintenance
Period
The Supplier shall, if he so requires, be entitled at his own expense
to obtain copies of the specifications and of all such designs,
drawings and instructions as aforesaid. The Supplier shall also be
responsible for the delivery of assigned job as per complete
satisfaction of the Engineer and the execution of the work strictly
in accordance with the specifications of work
The Supplier shall be bound to carry out the work in accordance
with any instructions in this connection which may be given to him
in writing signed by the Engineer, his authorized representative or
other competent authority.
Any instructions given verbally shall be noted in the Instruction
Book and got signed by the Engineer, or his authorized
representative, and deemed as instructions for the proper execution
of the work and, when considered necessary by the Engineer,
followed up in writing.
The whole of the work must be proceeded with in such sections and
at such times as directed by the Engineer.
If the Supplier or his workmen knowingly or unknowingly break,
damage, deface, injure or destroy any part of the fixed or part of
unfixed development in which they may be working, or any
building, road, fence, enclosure or grass land or cultivated ground
contiguous to the premises on which the work or any part thereof
is being executed, or if any damage shall be done to the work
while it is in progress, from any cause whatever, or if any damage
of any kind is done to the signge material incorporated in the work,
any imperfections become apparent in it within twelve months of
the grant of a Certificate of Completion, final or otherwise, by the
Engineer or other competent authority, the Supplier shall make
good the same at his own expense, or in default, the Engineer or
other competent authority may cause the same to be made good by
other workmen, and deduct the expenses (of which the certificate
of the Engineer or other competent authority shall be final) from
any sums that may be due or may thereafter become due to the
Supplier, or from his security deposit or the proceeds of sale
thereof, or of a sufficient portion thereof.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 120 of 242
3.13 Responsibility for
the Delay
3.14 Materials and
Workmanship
3.15 Samples of Work
3.17 Adherence to
Time Schedule
3.18 Setting out Work
In case the progress achieved falls short by more than 25 percent of
the cumulative program, the reasons for such shortfall shall be
examined and a record made thereof apportioning the
responsibilities for the delay between the Supplier and the
Procuring Agency. This record should be signed in full and dated
both by the Engineer and the Supplier.
All materials and workmanship shall, so far as procurable, be of the
respective kinds described in the schedule of quantities and/or
specification and in accordance with the Engineer/Engineer
instructions. The Supplier shall, upon the request of the
Engineer/Procuring Agency, furnish him with all invoices,
accounts, receipts, and other vouchers to prove that the materials
comply therewith.
All signage materials to be used on the work shall comply with the
requirements of the specifications in case of not confirming, shall
be established as the best available in the market by the Engineer
on due verification before approving the same to be installed on
site.
The Supplier shall be entirely responsible for the proper and
efficient carrying out of the work. The work shall be done in the
best and most workmen like manner. The samples of the best
available signage materials shall be provided by the Supplier at site
and shall be inspected by the Engineer or his designated staff
before being loaded for transport to the site.
The Supplier shall provide samples of all the signage materials at
site at his own cost before supply / installation at site.
The completion period, as stated in the Contract, shall be strictly
adhered to by the Supplier, and shall be reckoned from the date on
which the order to commence the work is issued to the Supplier in
writing by the Procuring Agency. It is the Supplier’s responsibility
to maintain the rate of progress as stipulated in the periodic
Schedule & charts.
The Supplier shall set out the works and shall be responsible for the
true and perfect setting out of the same and for the correctness of
the position, levels, dimensions and alignment of all parts thereof in
accordance with the drawing, if at any time any error in this respect
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 121 of 242
3.19 Time Limits for
Unforseen Claims
3.20 Suppliers Supervision of Works
3.21 Supplier Liable for Damages in Work Area
shall appear during the progress of the works, the Supplier shall, at
his own expense, rectify such error as required, to the satisfaction
of the Engineer.
The Supplier shall have to clear the site as directed before the work
is commenced, without any extra cost.
Under no circumstances whatever shall the Supplier be entitled to
any compensation from the Procuring Agency on any account
unless the Supplier shall have submitted a claim in writing to the
Engineer or other competent authority within thirty days of the
cause of such claim occurring.
The Supplier shall, at all times during the usual working hours, and
at all other times at which reasonable notice of the intention of the
Engineer or other competent authority or his subordinate to visit the
work shall have been given to the Supplier, either himself be
present to receive orders and instructions, or have a responsible
agent, duly accredited in writing, present for the purpose. Orders
given to the Supplier’s duly authorized agent shall be considered to
have the same force and effect as if they had been given to the
Supplier himself.
The Supplier shall protect from injury/damages from any cause
whatsoever all work and supply to any other requisite protection for
the whole work executed by him or special damage caused must be
made good by the Supplier at his own expense.
Should the work be suspended by reason of rain, strike, lockouts or
any other disturbing cause, the Supplier shall take all precautions
necessary for the protection of the work at his own expense, and
shall make good any damage arising from any of the causes.
Compensation for all damages done by Supplier or his men
whether in or beyond the limits of project shall be estimated by the
Engineer, and the estimate of the Engineer, subject to the decision
of the Engineer on appeal, shall be final. The Supplier shall be
bound to pay the amount of the assessed compensation on demand,
failing which the same will be recovered from the Supplier as
damages in the manner herein prescribed or deducted by the
Engineer or other competent authority from any sums that may be
due or become due from Procuring Agency, to the Supplier under
this Contract or otherwise.
The Supplier shall be responsible for all injury to persons, animals
or things, and damage to structural and decorative works and
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 122 of 242
3.22 Insurance in
Respect of Damages to
Persons and Property
damage to neighboring property, which may arise from the
operation or neglect of himself or of any nominated Signage
Suppliers or their employees, whether such injury or damage arise
from carelessness, accident or any other cause which is in any way
connected with the carrying out of this Contract. This clause shall
be held to include, inter alia, any damage to buildings and works
forming the subject of this Contract by frost or other inclemency of
weather. The Supplier shall indemnify the Procuring Agency and
hold him harmless in respect of all and any expense arising from
any such injury or damage to persons or property as aforesaid, and
also in respect of any claim made in respect of injury or damage
under any Act of Government or otherwise, and also in respect of
any award of compensation or damages consequent upon such
claim.
The Supplier shall reinstate all damage to property of every sort
mentioned in this clause, so as to deliver up the whole of the
contract works complete and perfect in every respect, and so as to
make good or otherwise satisfy all claims for damage to the
property of third parties.
The Supplier shall indemnify the Procuring Agency against all
claims which may be made against the Procuring Agency by any
member of the public or other third party, in respect of anything
which may arise in connection to the works or in consequence
thereof. The Supplier shall, at his own expense, arrange to effect
and maintain, until the virtual completion of the Contract, a policy
of Insurance against such risks, in the joint names of the Procuring
Agency and the Supplier, with an approved office; and deposit such
policy or policies with the Architect/Procuring Agency from time
to time during the currency of this Contract.
The Supplier shall similarly indemnify the Procuring Agency
against all claims which may be made upon the Procuring Agency,
whether under the Workmen's Compensation Act or any other
statute in force during the currency of this Contract, or at common
Law in respect of any employee of the Supplier or any Signage
Supplier and shall at his own expense effect and maintain until the
virtual completion of the Contract, with an approved office, a
policy of Insurance in the joint names of the Procuring Agency and
the Supplier against such risks, and deposit such policy or policies
with Architect/Procuring Agency from time to time during the
currency of the Contract.
The Supplier shall be responsible for anything which may be
excluded from the Insurance policies above referred to, and also for
all other damages to any property arising out of and incidental to
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 123 of 242
3.24 Procuring
Agency’s Safety Policy
the negligent or defective carrying out of this Contract. He shall
also indemnify the Procuring Agency in respect of any costs,
charges or expenses arising out of any claim or proceeding, and
also in respect of any award of or compensation of damage arising
there from.
The Procuring Agency, with the concurrence of the Architect,
shall be at liberty and is hereby empowered to deduct the amount
of any damage, compensation, costs, charges and expense arising
or accruing from or in respect of any such claims or damage, from
any sum or sums due or to become due to the Supplier.
The Supplier shall provide everything necessary for the proper
execution of the works according to the intent and meaning of the
Drawings, Schedule of Quantities and Specification taken together,
whether the same may or may not be particularly shown or
described therein, provided that the same can reasonably be
inferred there from.
The occupational safety, health and welfare of all employees
engaged in the construction of the project is of primary concern to
the Procuring Agency.
The Safety Policy is to manage the Project to ensure compliance
with all of the provisions of Government Standards and Procedures
and Project Environmental, Safety and Health Plan.
Throughout the execution of the work, Suppliers shall conform to
all lawful requirements, which in any way affect or are applicable
to the work and shall observe and comply with applicable safety
and health rules and regulations.
The Safety of the Workers employed by the Supplier will be the
exclusive responsibility of the Supplier and the Supplier will ensure
compliance with all Site Safety regulations in force on the site.
The Supplier will be responsible for the insurance as per the laws
of Pakistan, of his workers and employees employed or otherwise
present on the site and the Supplier indemnifies the Procuring
Agency against any claims or suits arising out of any adverse event
occurring in the execution of this contract
The safety provisions will include
The Supplier shall provide all persons working at site with
equipment, for ensuring safety from injury.
The Supplier, from the time of being placed in possession of the
site, shall provide safety & security for watching, lighting and
protecting the work, the site and surrounding property by day, by
night, on Sundays or other holidays, at no extra cost to the
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 124 of 242
3.3 Laboratory
Testing
Procuring Agency.
The Supplier shall provide any necessary temporary enclosures,
gates, entrances etc., for the protection of the work and materials,
and for altering and adopting same as may be required, and remove
the same at completion of the works and make good all works
disturbed.
The Supplier shall display all danger signs, contains notices at the
site to notify all about the safety aspects.
The Supplier shall provide all necessary fencing and lights
required to protect the public from accident.
The Supplier shall be responsible for any damage occurred during
the installation of Sign Boards in hospital due to patients’
attendants’ invasion into the work area. Supplier must make liaison
with the security personnel to devise a plan to avoid any untoward
incident. Randomly 1 sample out of 100 sign boards will be tested in third
party laboratory. The approval and acceptance of all sign boards
will be subjected to the successful results of these tested samples.
To arrange these in all aspects will be obligation of the supplier.
However, the selection of samples will be from the client’s side.
4. Supplier’s Personnel
4.1 Description of
Personnel
The titles, agreed job descriptions, minimum qualifications, and
estimated periods of engagement in the carrying out of the Services
of the Supplier’s Key Personnel are described in Scope of services.
4.2 Removal and/or
Replacement of
Personnel
4.3
Measurement/Assess
ment of work
(a) If the Procuring Agency finds that any of the Personnel have
(i) committed serious misconduct or have been charged with
having committed a criminal action, or (ii) have reasonable
cause to be dissatisfied with the performance of any of the
Personnel, then the Supplier shall, at the Procuring Agency’s
written request specifying the grounds thereof, provide as a
replacement a person with qualifications and experience
acceptable to the Procuring Agency.
(b) The Supplier shall have no claim for additional costs arising
out of or incidental to any removal and/or replacement of
Personnel.
The Engineer may, from time to time, intimate to the Supplier that
he requires the works to be measured, and the Supplier shall
forthwith assist or send a qualified agent to assist the Engineer (or
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 125 of 242
their representative) in taking such measurements and calculations,
and to furnish all particulars or to give all assistance required by
either of them. The Supplier shall agree to all such measurements
recorded on the spot.
Before taking any measurements of the works, the Engineer shall
give minimum 24 hours notice to the Supplier and Supplier shall
make arrangement of manpower, measuring tools or if any either
required
Should the Supplier not attend or neglect or omit to send such Agent
within a week of the specified time period, the measurement taken
by the Engineer/Procuring Agency or approved by him shall be
taken to be the correct measurement of the works, and shall be
binding on the Supplier, and the Supplier shall have no right to
dispute the same.
5. Obligations of the Procuring Agency
5.1 Assistance and
Exemptions
The Procuring Agency shall use its best efforts to ensure that the
Government shall provide the Supplier such assistance and exemptions
as specified in the SCC.
5.2 Change in the
Applicable
Law
If, after the date of this Contract, there is any change in the Applicable
Law with respect to taxes and duties which increases or decreases the
cost of the Services rendered by the Supplier, then the remuneration
and reimbursable expenses otherwise payable to the Supplier under
this Contract shall be increased or decreased accordingly by Contract
between the Parties, and corresponding adjustments shall be made to
the amounts referred to in Sub-Clauses 6.2 (a) or (b), as the case may
be.
5.3 Services and
Facilities
The Procuring Agency shall make available to the Supplier the
Services and Facilities listed under Section – C, Scope of Services.
Provision of site free from all encumbrances for construction activity
shall be the responsibility of the Procuring Agency, failure to provide a
clear-site is a compensation event
6. Payments to the Supplier
6.1 Lump-Sum
Remuneration
The Supplier’s remuneration shall not exceed the Contract Price and
shall be a fixed lump-sum including all costs, and all other costs
incurred by the Supplier in carrying out the Services described in
Section C and scope of services of Proposal document. Except as
provided in Sub-Clause 5.2, the Contract Price may only be increased
above the amounts stated in Sub-Clause 6.2 if the Parties have agreed
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 126 of 242
to additional payments in accordance with Sub-Clauses 2.4 and 6.3.
6.2 Contract Price (a) The price payable in Pak Rupees (PKR) is set forth in SCC.
(b) The price payable in foreign currency is set forth in the SCC.
6.3 Payment for
Additional
Services
6.4 No
Compensation for
Deletion of Work
6.5 Possession of
Site for Work 6.6 Retention
Money
6.7 Submission of
Bills
6.3.1 For the purpose of determining the price for additional Services
as may be agreed under Sub-Clause 2.4, a breakdown of the
price is to be provided in Appendix C.
If at any time after the execution of the Contract documents, the
Engineer or other competent authority shall, for any reason
whatsoever, require the whole or any part of the work, as specified in
the tender, to be stopped for any period or require the whole or part of
the work (i) not to be carried out at all or (ii) not to be carried out by
the tendered Contractor, he shall give notice in writing of the fact to
the Contractor, who shall thereupon suspend or stop the work totally or
partially as the case may be. In any such case, the Contractor shall
have no claim to any payment of compensation whatsoever on account
of any profit or advantage which he might have derived from the
execution of the work in full but which he did not so derive in
consequence of the full amount of the work not having been carried
out, or on account of any loss that he may be put on account of
materials purchased or agreed to be purchased or for unemployment of
labor recruited by him. He shall also not have any claim for
compensation by reason of any alterations having been made in the
original specification, drawings, designs, and instructions which may
involve any curtailment of the work as originally contemplated.
Every endeavor shall be made to give clear possession of site in one
lot, and if it is not possible to do so, in more than one lot for which
delay, if any, no claim shall be entertained for the Contractor, but
extension of time of completion, if justified, may be granted, without
affecting the contract price.
An amount equivalent to 5% of price of contract amount shall be
retained till successful completion of Defects Liability Period /
Maintenance Period, which will be deducted 5% of the running bill
and will be released on successful completion of maintenance period.
All bills shall be prepared in the prescribed printed or typed form in
quadruplicate along with same indicated clearly on the copy of the
drawing for physical location details of the job work and handed over
to the Engineer in charge and acknowledgment obtained.
The charges to be made in the bills shall always be entered at the rates
specified in the tender, in full or in part as the case may be. In the case
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 127 of 242
6.8 Payment of
Bills
of any extra work ordered in pursuance of these conditions, and not
mentioned or provided for in the tender, the charges in the bills shall
be entered at the rates herein provided for such work.
One copy of the passed bill shall be given to the Supplier without any
charge.
The details furnished by the Supplier in the bill should be completely
scrutinized and the said work should be checked to be in accordance
with the measurements recorded on the spot. The countersignature of
the Supplier or his agent in the Measurement Book and drawing shall
be sufficient proof as to the correctness of measurements, and shall be
binding on the Supplier in all respects.
Payment Terms based on the item rates for the quantum of the
certified virtual completion of the work shall be as follows;
6.8.1 Development works:
The bills for the payments shall be submitted separately for each
hospital of respective package based on execution work by the
following schedule/criteria: The format of IPC is annexed at B.
Sr.
NO.
Name and No.
of Package
Name of
Hospital
IPC
NO.
Amount of Bill
a. Sign Boards would be considered as per number of
boards as per specification provided in the
drawing/BOQ, and their rates would be measured
according to numbers or in square feet, as specified for
each case individually.
An amount equivalent to 5% of the billed amount will be retained till
the successful completion of the warranty period. Defects / Liability
Period / Maintenance Period. Which shall be one year
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 128 of 242
6.9 Taxes and
Duties
6.8.3 Payments shall be made promptly by the Procuring Agency but
in no case later than thirty (30) days after acceptance of item and
submission of the invoice or claim by the Supplier.
6.8.4 Payment shall be made in currency as indicated in the order.
6.8.5 The Supplier shall be entitled to the payment of the Final
balance in accordance with the Final Certificate to be issued in
writing by the Engineer at the expiration of the maintenance period
referred to as “the Defects Liability Period” in the Appendix hereto,
or as soon after the expiration of such period as the works shall have
been finally completed and all defects made good according to the
true intent and meaning hereof, whichever shall last happen, provided
always that the issue by the Engineer of any Certificate during the
progress of the works or at or after their completion shall not relieve
the Supplier of his liability in cases of fraud, dishonesty, or fraudulent
concealment relating to the works or materials or to any matter dealt
with in the certificate, and in case of all defects and insufficiencies in
the works or materials which a reasonable examination would not
have disclosed.
6.8.6 No certificate of the Engineer shall of itself be conclusive
evidence that any work or materials to which it relates are in
accordance with the Contract.
6.8.7 The Engineer shall have power to withhold any certificate if the
works or any parts thereof are not being carried out to his satisfaction.
6.8.8 The Engineer may, by any certificate, make any correction in
any previous certificate which shall have been issued by him.
6.8.10 The final bill shall be submitted by the Supplier within one
month of the date of actual completion of the work in all respects.
Suppliers shall be entirely responsible for all taxes, duties, license
fees, octroi, road permits, etc., incurred until delivery and installation
of the contracted Goods to the Procuring Agency.
Being the purchases for Hospitals the customs/Excise duty Sales Tax
exemptions are applicable and these should be taken into account in
preparing the bids.
The Supplier and their employees shall be responsible for payment of
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 129 of 242
all their income tax, sales tax and other taxes on income arising out of
the Contract and the rates and prices stated in the Contract shall be
deemed to cover all such taxes, and the client will not deduct any such
taxes.
7. Quality Control
7.1 Identifying
Defects
The principle and modalities of Inspection of the Services by the
Procuring Agency shall be as indicated in the SCC and scope of
services. The Procuring Agency shall check the Supplier’s
performance and notify him of any Defects that are found. Such
checking shall not affect the Supplier’s responsibilities. The
Procuring Agency may instruct the Supplier to search for a Defect
and to uncover and test any service that the Procuring Agency
considers may have a Defect. The building defects liability period is
12 months, starting from date mentioned on “Completion
Certificate”.
7.2 Correction of
Deficiencies,
and Non-
Performance
Penalty
7.3 Shortfall in
Progress made up
Subsequently 7.4 Penalty for
Delay
(a) The Procuring Agency shall give notice to the Supplier of any
Defects before the end of the Contract. The Defects liability
period shall be extended for as long as Deficiencies remain to
be corrected.
(b) Every time notice of Deficiency is given, the Supplier shall
correct the notified Deficiency within the length of time
specified by the Procuring Agency’s notice.
(c) If the Supplier has not corrected a Deficiency within the time
specified in the Procuring Agency’s notice, the Procuring
Agency will assess the cost of having the Deficiency corrected,
the Supplier will pay this amount, and a Penalty for Non-
Performance calculated as described in Sub-Clause 3.8.
To the extent, the shortfall is assessed, as due to the delay on the part
of the Supplier, a notice shall be issued to him by the Engineer and
penalty shall be levied.
When the shortfall in the progress of work is determined to be due to
delay on the part of the Supplier, he shall be held to be responsible
for the same and shall be liable to pay penalty. In respect of the
shortfall in progress, assessed as due to the delay on part of the
Supplier the Supplier shall be liable to pay as penalty an amount of
0.1% of contract amount per day, up to a maximum amount of 10%
in contract sum, after which the Procuring Agency reserves the right
to terminate the Contract.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 130 of 242
7.5 Sub-standard
Work
7.6 Acceptance of
Sub-standard Work
7.7 Work Open to
Inspection
In the case of any failure by the Supplier to pay such penalty, the
Engineer or other competent authority may rectify or remove, and
re-execute the work or remove and replace the materials or articles
complained of, as the case may be, at the risk and expense in all
respects of the Supplier.
If at any time before the security deposit is refunded to the Supplier,
it shall appear to the Engineer or other competent authority, that any
work has been executed with unsound, imperfect or unskillful
workmanship or with materials of inferior quality, or that any
materials or articles provided by the Supplier for the execution of the
work are unsound, or of a quality inferior to that contracted for or
are otherwise not in accordance with the Contract, it shall be lawful
for the Engineer or other competent authority to intimate this fact in
writing to the Supplier, who shall then be bound forthwith to rectify,
or remove and reconstruct the work so specified in whole or in part
as the case may require, or if so required, shall remove the materials
or articles at his own charge and cost, within such reasonable time as
may be specified in the order.
Should the Engineer or other competent authority for any valid
reasons consider that any such inferior work or materials as
described above is to be accepted or made use of, it shall be within
his discretion to accept the same at such reduced rates he may fix
thereof.
The decision of the Engineer, regarding the quantum of reduction as
well as justification thereof in respect of rates for sub-standard work
which may be decided to be accepted, will be final and would not be
open to arbitration.
The Engineer (and his representative) and the Procuring Agency
shall, at all reasonable times, have free access to the work and/or to
the workshops factories, or other places where materials are lying or
from which they are being obtained, and the Supplier shall give
every facility to the Engineer necessary for inspections and
examination and test of the materials and workmanship.
All works under or in course of execution or executed in pursuance
of the Contract shall at all times be open to the inspection and
supervision of the Engineer or other competent authority and his
subordinates.
8. Settlement of Disputes
8.1 Amicable The Parties shall use their best efforts to settle amicably all disputes
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 131 of 242
Settlement arising out of or in connection with this Contract or its interpretation
through negotiations in case of a dispute as a first step.Each Party shall
identify an officer who shall try to resolve the dispute for a period not
exceeding 10 days. In case of a failure, the matter shall be referred to
the arbitration.
8.2 Dispute
Settlement
8.3 Arbitration
8.2.1 If any dispute or difference of any kind whatsoever were to arise
between the Engineer and the Supplier regarding the following
matters, namely:
8.2.2 The meaning of the specifications designs, drawings and
instructions herein before mentioned;
8.2.3 The quality of workmanship or materials used on the work; and
8.2.4 Any other question, claim, right, matter, thing whatsoever, in
any way arising out of or relating to the Contract, design, drawings,
specification estimates, instructions, or orders, or those conditions or
failure to execute the same whether arising during the progress of the
work, or after the complete termination or abandonment thereof,
8.2.5 The dispute shall be referred to the Engineer who has
jurisdiction over the work specified in the Contract. The Engineer
shall, within a period of thirty days from the date of being requested
by the Supplier to do so, give written notice of his decision to the
Supplier In case disputes are not resolved under provision of Clause, then the
dispute shall be settled in accordance with provision of Arbitration Act
1940, as amended from time to time.
The venue of the arbitration shall be Lahore, Pakistan.
Annexure - B
Sr.
NO.
Description Unit Total BOQ Since Previous Current Bill
Quantity Amount Quantity Amount Quantity Amount
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 132 of 242
SECTION B. SPECIAL CONDITIONS OF CONTRACT
Number of
GC Clause
Supplements to, Clauses in the General Conditions of Contract
1.1 The Arbitrator is: To be mutually decided in accordance with Arbitration
Act of 1940.
1.1 The contract name is: SUPPLY AND INSTALLATION OF SIGN
BOARDS IN PRIMARY & SECONDARY HEALTHCARE
DEPARTMENT ESTABLISHMENTS OF PUNJAB
1.1 The Procuring Agency is: Project Management Unit, Primary and
Secondary Healthcare Department, Government of Punjab
1.2 The Applicable Law is:Laws of Islamic Republic of Pakistan
1.3 The language is:English
1.4 The addresses are:
Procuring Agency:
Project Management Unit, Primary and Secondary Health Department,
Government of Punjab
31-E/1, Shahrah-e-Imam Hussain, Gulberg III, Lahore
Attention: Project Director, PMU
Tel: +924299231208
Mob:0331-4427972
Email: [email protected]
Supplier:
Attention:
Tel:
Email:
1.6 The Authorized Representatives are:
For the Procuring Agency:
Name:
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 133 of 242
Number of
GC Clause
Supplements to, Clauses in the General Conditions of Contract
Designation: Director Infrastructure, PMU
Tel:
Email:
For the Supplier:
Name:
Designation:
Tel:
Email:
2.1 The Contract shall come into force on such date as is mentioned in the work
order.
2.2.2 The Starting Date for the commencement of Services shall be such as
mentioned in the work order.
2.3 The Intended period of contract is:2 years from the date of
commencement; the execution must be completed within (45) forty-five
days from the date of commencement of each Contract.
3.8.1 The liquidated damages rate is 0.1% per day
The maximum amount of liquidated damages for the whole contract is
equivalent to 10%contract amount.
6, 6.2(a) The amount in Pak Rupees is:
6.5 Payment shall be made within 30 days of receipt of verified invoice, relevant
documents and successful completion of work.
OUTSOURCING OF SOLID WASTE MANAGEMENT
FUNCTIONS IN CITY DISTRICT GOVERNMENT
FAISALABAD
Page 0 of 242
PART –III SCOPE OF WORK
Background
Primary & Secondary Healthcare Department (the Procuring Agency) invites bids from
Companies/Firms for the Supplying and Installation of Sign Boards in all the Primary &
Secondary Healthcare Facilities of Punjab.
The Procuring Agency delivers quality healthcare services to the community through an
efficient and effective service delivery system that is accessible, equitable, culturally
acceptable, affordable and sustainable. The Procuring Agency aims to improve the health and
quality of life of all, particularly women and children, through access to essential health
services and strives to reform and strengthen the critical aspects of the health systems and
enable it to:
• Provide and deliver a basic package of quality essential health care services
• Develop and manage competent and committed health care providers
• Generate reliable health information to manage and evaluate health services
• Adopt appropriate health technology to deliver quality services
• Finance the costs of providing basic health care to all
• Reform the health administration to make it accountable to the public
Procuring Agency is the key department entrusted by the people of Punjab with the
fundamental responsibility for the health of communities and the entire population. The
Procuring Agency is committed to deliver primitive, preventive as well as curative health
care services of Primary Health Care level to Secondary Health Care level.
Free of cost consultation, diagnostic facilities and medicines are provided to the patients
particularly focusing on the poor and marginalized segments of the society. The Procuring
Agency also provides different programs like:
• Hepatitis Control Program
• Aids Control Program
• Expanded Program for Immunization
• TB Control Program
• IRMNCH
• Malaria Control Program
• Infection Control Program
Besides measures to prevent, treat and control other communicable diseases and Epidemics /
Disasters, these vaccines are provided through Expanded Program on Immunization (EPI) for
children under 2 years and pregnant ladies. Health Department is producing its own trained
and qualified Human Resource keeping the HR development needs and requirements of
Health Care Infrastructure in mind.
Scope of Work
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 1 of 242
All the works, pertaining to the Sign board works, will have to be done by the Supplier at the
allotted Health Facilities within a period of forty-five days from the date of award of each
individual contract as per the conditions of the contract. The signage works require dedicated
effort for ensuring durability and the sign boards materials requires appropriate level of
expertise and experiences in handling of the work. The installation shall be in stages,
primarily as per the availability of the site after completion of the Civil Works on the desired
stretch. The broad scope of work is mentioned as below while the detailed performance of the
Supplier shall be gauged based on the schedules as provided and the detailed specifications
and BOQ Items:
1. Speedy Work: Follow-up with the Civil Contractor for handing over of the site in
desired state for speedy signage works. Owner shall not be responsible for any delay
on account of the said reasons whatsoever.
2. Site Clearance: The sign board Supplier shall ensure the area of concern to be
cleared of all the unwanted materials like cement mix, aggregates, debris, and wastes
of any type or left over of the civil contractor before starting his work. The same
should be cleared off by the civil contractor and to be followed-up by the sign board
supplier. In-event of the same not being removed off the site by the civil contractors,
Signage Supplier shall be required to get the undesirable waste cleared off the site as
per instruction of the Engineer. The site clearance and preparation shall be at no
additional cost but part and parcel of the signage works. The site shall be signed off
for signage works only after sign-off by the Engineer on joint inspection with the
Signage Supplier.
GENERAL GUIDELINES FOR EXTERNAL SIGNAGE
Each sign board plate showing the name of facility should be in such a format that it should
display name of the facility in both URDU and ENGLISH languages with relevant symbol of
facility and its pointing arrow.
Each health facility should be given a specific intrinsic color (e.g. red for emergency) which
must be used for that facility signage plate in background for all signage types. The final
decision for each color lies with the Procuring Agency, and the color codes are conditional to
approval. Moreover, background color and text with symbol should be digitally printed on
one sheet.
Type EG-1 to EG-8: Gantry Signage:
These signage are to be installed at the main gate of the hospital. The width of main gate vary
from hospital to hospital. Hence, the rate of horizontal structure pipe should be given
separately so that it can be added or subtracted from signage amount separately.
Type EL: Lettering:
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 2 of 242
This signage type is desired to install at façade or facia of hospitals building or in above
mentioned Gantry signage. This should be complete in all aspects including electrical wiring,
LED Modules etc.
Type A: External Platform/Road Signage:
These signage are to be installed on the shoulder of metaled asphalt road or any other external
platform for instance tough paver, P.C.C etc. The text on this sign board will be giving
information regarding road/traffic e.g. speed limit, or left/right turn symbols etc.
Type B: Main Directional Board:
This signage type should be installed on the main gate entrances inside the complex. The
purpose of this signage is to flash information regarding the location of major facilities of
hospital, and it shall serve as a monumental monolith structure.
Type C: Directional Board:
The directional board signage should be installed on the shoulder of the road/external
pathways as well as on junctions. They shall also be installed on the outside of each
department.
Type D: Departmental Signage on Building:
This signage type is required to be installed on the façade of block displaying the name of the
block
Type E: External Map Boards:
This signage type is required to be installed just few feet away from the main gate entrances.
This signage type should display layout plan (not to the scale) of hospital with necessary
directions, as well as building blocks highlighted in color codes.
Internal Signage
GENERAL INFORMATION REGARDING INTERNAL SIGNAGE:
Each signage plate showing the name of facility should be in such a format that it should
display name of the facility in both URDU and ENGLISH languages with relevant symbol of
facility and its pointing arrow. Moreover, background color and text with symbol should be
digitally printed on one sheet.
Type F: Internal Hanging Sign Boards:
This signage should be hanged with ceiling of building and is desired to be installed at the
main entrances as well as in corridors. This signage type should display the name of the main
health facilities ahead and above, and in adjoining corridors. The sizes shall vary according to
the space available.
Type H: Specialist name plaque fixed on wall:
These name plaques are desired to be fixed outsides the consultant/specialist rooms. The
name plaque should display the specialty of the doctor e.g. “Child Specialist” in URDU and
ENGLISH languages
Type J and K: Room Name Plaques and Numbers fixed on Wall:
This is a combination of two plaques combined into one. The first one, the room number,
shall be of Stainless steel, with approximately 1/3rd area used for text. The negative area shall
be used as a back drop from the second plate, which shall be of glass, and placed one inch
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 3 of 242
above the negative area on the SS. The glass plates shall be two in quantity for each room,
with text stenciled and pasted in between them.
Type L: Internal Wall Signage
These wall sign boards shall be on all corners and junctions, and shall act to further elaborate
the main Internal Hanging Sign Boards (Type F).
Type Q1: Internal Departmental, Floor map board, and Caution Signage
These signage are need to be installed at main entrance of departments of hospital building,
Floor map boards or any caution signage.
GENERAL INFORMATION REGARDING INTERNAL SIGNAGE:
Each signage plate showing the name of facility should be in such a format that it should
display name of the facility in both URDU and ENGLISH languages with relevant symbol of
facility and its pointing arrow. As for the final placement of each text, arrow, color code and
symbol, the Supplier shall obtain the details and approval from the Procurement Agency.
GENERAL INFORMATION
The Supplier shall be awarded contracts individually for each Health Facility according to the
availability of site, in which he shall be conveyed the actual total numbers of sign boards
required for each type. After each award of contract, the Supplier is expected to fabricate and
install them on site within 45 days. The final payments are conditional to the inspections of
the relevant committee(s) at site on time of installation or in warehouse before installation.
The content to be written on signage will be given by the department and service provider has
to produce the art work of that content and got it approved by the department.
The quantities mentioned in this Package 1 are for the Primary and Secondary Healthcare
Establishment in the following Districts of Rawalpindi and Gujranwala Division:
1. Attock
2. Chakwal
3. Jehlum
4. Rawalpinidi
5. Gujranwala
6. Gujrat
7. Hafizabad
8. Mandi Bahaud Din
9. Narowal
10. Sialkot
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 4 of 242
BID DOCUMENT CATEGORY B Internal Signage
Package 1 (Lot – 1) Rawalpindi and Gujranwala
SUPPLY AND INSTALLATION OF SIGN BOARDS IN PRIMARY & SECONDARY
HEALTHCARE DEPARTMENT ESTABLISHMENTS OF PUNJAB
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 5 of 242
PRIMARY & SECONDARY HEALTHCARE
DEPARTMENT
GOVERNMENT OF THE PUNJAB
BIDDING DOCUMENT
For
SUPPLY AND INSTALLATION OF SIGN BOARDS IN
PRIMARY & SECONDARY HEALTHCARE
DEPARTMENT ESTABLISHMENTS OF PUNJAB
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 6 of 242
January 2019
Bid Reference #:_____________
Those wishing to submit comments or questions, or to obtain additional information on
procurement under this project, are encouraged to contact:
Farhan Waheed
Project Manager (Civil)
Project Management Unit, Primary & Secondary Healthcare Department
31-E/1, Shahrah-e-Imam Hussain, Gulberg-III,
Lahore.
Phone No. : 042-99231208
Mob : +92 3314427972
Email : [email protected]
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 7 of 242
Foreword
3. This Bidding Document has been prepared by the Primary & Secondary Healthcare
Department’s Procuring Agency” for Selection of Supplier. The document was
prepared by procurement committee of the Procuring Agency and reflects what are
considered “best practices”.
4. This Bid Document has been structured in the following manner:
Part I: Invitation to Bid
Part II: Form of Contract
Part III: Scope of Work
3. The text written in Italics is “Notes to the Bidders”. It provides guidance to the entity
in preparing Bid Document. “Notes to the Bidders” should be deleted from the final
proposals submitted by the short-listed Suppliers.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 8 of 242
Addendum
1 Specifications of ACP Panel are Mentioned wherever being
used
2 The specifications of F1 are described in more details
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 9 of 242
TABLE OF CONTENTS
TABLE OF CONTENTS ...........................................................................................................5
PART – I REQUEST FOR PROPOSAL ...................................................................................8
SECTION - I: LETTER OF INVITATION FOR BIDS ............................................................8
SECTION - II: INSTRUCTIONS TO BIDDERS .....................................................................9
A. DEFINITIONS ............................................................................................. 10
B. INTRODUCTION .............................................................................................. 11
ITB1. Scope of Bid and Source of Funds .............................................................. 11
ITB2. Eligible Bidders ........................................................................................... 11
ITB3. Eligible Goods and Services ....................................................................... 12
ITB4. Cost of Bidding ............................................................................................ 12
C: PREPARATION OF BIDS ................................................................................ 13
ITB5.Contents of Bidding Documents ................................................................... 13
ITB6. Clarification of Bidding Documents ............................................................. 13
ITB7.Amendment of Bidding Documents .............................................................. 14
ITB8. Language of Bid& Notifications ................................................................... 14
ITB9. Documents Comprising the Bid ................................................................... 15
ITB10. Sufficiency of Bid ....................................................................................... 15
ITB11. Bid Prices, Currency of Bid and Payment ................................................. 16
ITB12. Documents Establishing Bidder’s Eligibility and Qualification ................... 16
ITB13. Documents Establishing Services’ Conformity to Bidding Documents ...... 16
ITB14. Bid Security ............................................................................................... 17
ITB15.Validity of Bids, Format, Signing and Submission of Bid ............................ 17
D. SUBMISSION OF BIDS ................................................................................... 18
ITB16. Deadline for Submission, Modification & Withdrawal of Bids .................... 18
E. BID OPENING AND EVALUATION .................................................................. 19
ITB17. Bid Opening .............................................................................................. 19
ITB18. Clarification of Bids ................................................................................... 19
ITB19.Preliminary Examination & Determination of Responsiveness of Bids ....... 20
ITB20. Conversion to Single Currency .................................................................. 23
ITB21. Detailed Evaluation of Bids ....................................................................... 23
ITB22. Process to be Confidential ........................................................................ 23
F. AWARD OF CONTRACT ................................................................................. 24
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 10 of 242
ITB23. Post Qualification ...................................................................................... 24
ITB24. Award Criteria &Procuring Agency’s Right ................................................ 24
ITB25. Notification of Award & Signing of Contract .............................................. 25
ITB26. Performance Security ................................................................................ 25
ITB27. Integrity Pact ............................................................................................. 25
SECTION - III: BIDDING DATA SHEET .............................................................................26
SECTION - IV: BID FORM & SCHEDULES........................................................................57
A - FINANCIAL FORM& SCHEDULE ................................................................... 58
FORM OF BID ...................................................................................................... 58
B- TECHNICAL FORMS ....................................................................................... 64
C- STANDARDFORMS ...................................................................................... 100
PART –II CONTRACT .........................................................................................................100
SECTION A: GENERAL CONDITIONS OF CONTRACT (GCC) ....................................104
1. General Provisions ............................................................................................ 104
1.1 Definitions ......................................................................................................................................... 104 1.2 Applicable Law ................................................................................................................................. 105 1.3 Language ........................................................................................................................................... 105 1.4 Notices ............................................................................................................................................... 105 1.5 Location ............................................................................................................................................ 105 1.6 Authorized Representatives ............................................................................................................... 105 1.7 Inspection and Audit by the Procuring Agency ................................................................................. 106 1.8 Taxes and Duties ............................................................................................................................... 106 2. Commencement, Completion, Modification, and Termination of Contract .............. 106
2.1 Effectiveness of Contract ................................................................................................................... 106 2.3 Intended Completion Date ................................................................................................................ 107 2.4 Modification ...................................................................................................................................... 109 2.4.1 Orders for variations to be in writing ................................................................................................... 110 2.5 Force Majeure ................................................................................................................................... 111 2.6 Termination ....................................................................................................................................... 112 2.7 Review of Progress .................................................................................................................................. 113 3. Obligations of the Supplier ................................................................................ 114
3.1 General ............................................................................................................................................. 114 3.2 Conflict of Interests ........................................................................................................................... 116 3.3 Confidentiality ................................................................................................................................... 116 3.4 Insurance to be Taken Out by theSupplier ............................................ Error! Bookmark not defined. 3.5 Supplier’s Actions Requiring Procuring Agency’s Prior Approval .................................................. 117 3.6 Reporting Obligations ....................................................................................................................... 117 3.7 Documents Prepared by the Supplier to Be the Property of the Procuring Agency.......................... 117 3.8 Liquidated Damages ......................................................................................................................... 117 3.9 Performance Security ........................................................................................................................ 118 4. Supplier’s Personnel ......................................................................................... 124
4.1 Description of Personnel ................................................................................................................... 124 4.2 Removal and/or Replacement of Personnel ...................................................................................... 124 5. Obligations of the Procuring Agency .................................................................. 125
5.1 Assistance and Exemptions ............................................................................................................... 125 5.2 Change in the Applicable Law .......................................................................................................... 125 5.3 Services and Facilities ...................................................................................................................... 125
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 11 of 242
6. Payments to the Supplier ................................................................................... 125
6.1 Lump-Sum Remuneration .................................................................................................................. 125 6.2 Contract Price ................................................................................................................................... 126 6.3 Payment for Additional Services ....................................................................................................... 126 7. Quality Control................................................................................................. 129
7.1 Identifying Defects ............................................................................................................................ 129 7.2 Correction of Deficiencies, and Non-Performance Penalty ............................................................ 129 8. Settlement of Disputes....................................................................................... 130
8.1 Amicable Settlement .......................................................................................................................... 130 8.2 Dispute Settlement ............................................................................................................................. 131
SECTION B. SPECIAL CONDITIONS OF CONTRACT ..................................................132
PART –III SCOPE OF WORK ................................................................................................0
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 12 of 242
PART – I INVITATION TO BID
SECTION - I: LETTER OF INVITATION FOR BIDS
Sealed tenders are invited from firms / companies, registered with Sales Tax and Income Tax
Departments for “FRAME WORK CONTRACT FOR SUPPLYING AND
INSTALLATION OF SIGN BOARDS IN PRIMARY & SECONDARY
HEALTHCARE DEPARTMENT ESTABLISHMENTS OF PUNJAB” through Primary
& Secondary Healthcare Department, under Punjab Procurement Rules 2014.
Bidding documents containing the detailed specifications can be obtained @ Rs. 1000/- (non-
refundable) from Procurement Wing, Project Management Unit on written request from
under mentioned address during office hours. Single Stage Two Envelope Procedure will be
adopted according to PPRA.
Bidding documents may also be downloaded from PPRA website
(www.pprapunjab.gov.pk) & P&SHD website (www.pshealth.punjab.gov.pk).
The last date for submission of bids along with bid security mentioned in bidding documents
is January 24, 2019 till 03:00 pm and will be opened on the same day at 3:30 pm at below
mentioned address.
A pre-bid meeting shall be held on the 3rd of January 2019 at 03:00pm.
Procurement Specialist
Project Management Unit (PMU)
Primary & Secondary Healthcare Department
31-E/1, Shahra-e-Imam Hussain, Gulberg-III, Lahore
E-mail: [email protected]
Tel: +924299231208 Mob: 0331-4427972
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 13 of 242
SECTION - II: INSTRUCTIONS TO BIDDERS
[Note: Instructions to Bidders (ITB) shall not be modified, except in accordance with the provisions
of Punjab Procurement Rules, 2014. Any necessary changes, acceptable to the Government of
Punjab, or Procuring Agency, to address specific issues, shall be introduced only through the
Bidding Data Sheet (e.g., by adding new reference paragraphs)]
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 14 of 242
B. DEFINITIONS
(i) Procuring Agency or Owner-Shall mean PMU, Primary and Secondary Healthcare
Department, Lahore.
(j) Engineer - Shall mean the person so designated by Procuring Agency to supervise the
work, or his duly authorized assistant.
(k) Engineers - Shall mean PMU, Primary and Secondary Healthcare Department, Lahore or
their authorized representative.
(l) Supplier - Shall mean M/s. _________________________ and shall include his (their)
legal representatives’ assign/s or successor/s, which individual/firm has undertaken the
works by virtue of this Contract.
(m) Site - Shall mean the site of the Contract works, including any development works,
building and erections thereon, and any other land (inclusive) as aforesaid, allotted by the
Procuring Agency for the Supplier's execution of the scope of work.
(n) Works or Work - Shall mean the works to be executed by virtue of this Contract, whether
temporary or permanent, and whether original, altered, substituted or additional.
(o) This Contract - Shall mean the Articles of Agreement, the Special Conditions, the
Conditions of Contract, the Appendices, the Bill of Quantities, the Specification, and the
Drawings attached hereto and duly signed, and the written instructions issued from time to
time by the Engineer/Engineer. All these documents taken together shall be deemed to
form one Contract and shall be complimentary to one another.
(p) Notice in writing - Shall mean a notice in written, typed or printed characters, sent (unless
delivered personally or otherwise proved to have been received) by registered post to last
known private or business address or registered office of the addressee, and shall be
deemed to have been received when in the ordinary course of post it would have been
delivered.
(i)Approved, Directed or Selected - Shall mean the approval, direction, or selection by the
Engineer/Procuring Agency.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 15 of 242
B. INTRODUCTION
ITB1. Scope of Bid and
Source of Funds
1.2 The Procuring Agency as defined in the BDS intends to receive
Bids for the Goods summarized in the BDS. Bidders will be
selected in accordance with the method of selection specified in
BDS. The Bidder must quote for the complete scope of service.
Any Bid covering partial scope of services will be rejected as non-
responsive.
1.2 The Procuring Agency has arranged funds from the Government of
Punjab.
ITB2. Eligible Bidders 4.1 Bidding is open to all Companies / firms / JVs /Associations.
2.2 All partners of the JV shall at all times and under all
circumstances be liable jointly and severally to Procuring Agency
for the execution of the entire Contract in accordance with the
Contract terms and conditions and a statement to this effect shall
be included in the authorization mentioned under para (2.4) below
as well as in the Form of Bid and Form of Contract (in case of a
successful bidder).
2.3 The partner-in-charge shall be authorized to incur liabilities,
receive payments and receive instructions for and on behalf of any
or all partners of the JV.
2.4 A copy of the Contract entered into by the JV partners shall be
submitted with the bid stating the conditions under which it will
function, its period of duration, the persons authorized to represent
and obligate it and which persons will be directly responsible for
due performance of the Contract and can give valid receipts on
behalf of the JV, the proportionate participation of the several
firms forming the JV, and any other information necessary to
permit a full appraisal of its functioning. No amendments /
modifications whatsoever in the JV Contract shall be agreed to
between the JV partners without prior written consent of the
Procuring Agency.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 16 of 242
ITB3. Eligible Goods and
Services
3.1 All Goods & ancillary Services to be supplied under this Contract
shall have their origin in eligible countries as per ITBs and all
expenditures made under the Contract will be limited to such
Goods and Services, if agreed otherwise.
3.2 For purpose of this Clause, “origin” means the place where the
Goods are mined, grown or produced or from where the ancillary
services are supplied. Goods are produced when, through
manufacturing, processing or substantial and major assembling of
components, a commercially recognized product results that is
substantially different in basic characteristics or in purpose or
utility from its components.
3.3 The origin of Goods and Services may be distinct from the
nationality of the Bidder.
ITB4. Cost of Bidding 4.1 The Bidder shall bear all costs associated with the preparation and
submission of its bid and the Procuring Agency will in no case be
responsible or liable for those costs, regardless of the conduct or
outcome of the bidding process.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 17 of 242
C: PREPARATION OF BIDS
ITB5.Contents of Bidding
Documents
5.1 In addition to Invitation for Bids, the Bidding Documents are
those stated below, and should be read in conjunction with any
Addendum issued in accordance with Sub-Clause ITB7.1.
5. Instructions to Bidders & Bidding Data
6. Schedules to Bid comprising the following:
Financial Schedule
ii) Schedule A to Bid: Schedule of Prices
Technical Schedule
x) Schedule B to Bid: Technical Proposal Form
xi) Schedule C to Bid: Company Profile
xii) Schedule D to Bid: General Experience
xiii) Schedule E to Bid: Relevant Experience
xiv) Schedule F to Bid: Human Resource
xv) Schedule G to Bid: Financial Situation
xvi) Schedule H to Bid: Relevant Machinery
xvii) Schedule I to Bid: Project Plans
xviii) Schedule J to Bid: Integrity Pact
Other Forms
iii) Form of Bid Security
iv) Form of Performance Guarantee
7. Form of Contract, General & Specific conditions
8. Scope of Work
ITB6. Clarification of
Bidding Documents 6.1 A prospective Bidder requiring any clarification(s) in respect of
the Bidding Documents may notify the Procuring Agency at the
Procuring Agency’saddress indicated in the BDS.
6.2 The Procuring Agency will respond to any request for clarification
within a day which it receives earlier than five (5) Days prior to the
deadline for the submission of Bids. Copies of the Procuring
Agency’s response will be forwarded to all prospective Bidders, at
least three (3) Days prior to dead line for submission of Bids, who
have received the Bidding Documents including a description of
the enquiry but without identifying its source.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 18 of 242
ITB7.Amendment of
Bidding Documents 7.1 At any time prior to the deadline for submission of Bids, the
Procuring Agency may, for any reason, whether at his own
initiative or in response to a clarification requested by a
prospective Bidder, modify the Bidding Documents by issuing
addendum.
7.2 Any addendum thus issued shall be part of the Bidding
Documents pursuant to Sub-Clause 7.1 hereof, and shall be
communicated in writing to all purchasers of the Bidding
Documents within 2 days of its approval. Prospective Bidders
shall acknowledge receipt of each addendum in writing to the
Procuring Agency.
7.3 To afford prospective Bidders reasonable time in which to take an
addendum into account in preparing their Bids, the Procuring
Agency may at its discretion extend the deadline for submission of
Bids.
ITB8. Language of Bid&
Notifications 8.1 The bid prepared by the Bidder and all correspondence and
documents relating to the Bid, exchanged between the Bidder and
the Procuring Agency shall be written in the English language.
Whereas, any printed literature furnished by the Bidder may be
written in another language so long as accompanied by an English
translation of its pertinent passages in which case, for purposes of
interpretation of the quotation, the English translation shall
govern.
8.2 Announcements and notifications shall be made through registered
mail or maybe delivered by hand against signature. The Procuring
Agency may make announcements through electronic mail or fax,
provided that the electronic mail addresses and fax number is
given on the form. Announcements with reference to proposal
letter made through this electronic address or fax numbers hall be
accepted.
8.3 For the notifications made through registered mail, the date of
notification shall be seventh day following the deposit of letter to
the postal service for local Applicants and fourteenth day for the
foreign Applicants. In case Applicants receive the notification
before such date, actual notification date shall be taken as basis.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 19 of 242
8.4 For the announcements made through electronic mail or fax, the
date of announcement shall be taken as the notification date.
Notification made in such away must be confirmed by the
Procuring Agency on the same day. Notifications which are not
confirmed on the same day shall be considered as not realized. In
order to ensure the confirmation as realized, it will be enough to
make the notification through registered mail. Notifications made
through electronic mail or fax will be documented in such a way
to contain the date of notification and its content.
8.5 Notifications through electronic mail will be made by using the
official electronic mail address of the Procuring Agency.
8.6 Notifications and announcements to the JV or Partnership will be
made to the Lead Partner or Pilot Partner or Coordinator associate.
ITB9. Documents
Comprising the Bid
9.1 The bid prepared by the Bidder shall comprise of the following
documents:
(g) Covering Letter
(h) Form of Bid duly filled, signed and sealed, in accordance with Sub-
Clause ITB15. (i) Schedules (A to J) to Bid duly filled and initialed, in accordance
with the instructions contained therein & in accordance with Sub-
Clause ITB15.
(j) Bid Security furnished in accordance with Clause ITB14.
(k) Documentary evidence in accordance with Clause ITB12.
(l) Documentary evidence in accordance with Clause ITB13.
ITB10. Sufficiency of Bid
10.1 Each Bidder shall satisfy himself before Bidding as to the
correctness and sufficiency of his Bid and of the rates and prices
entered in the Schedule of Prices, which rates and prices shall
except in so far as it is otherwise expressly provided in the
Contract, cover all his obligations under the Contract and all
matters and things necessary for the proper completion of the
Services stipulated in PART III: Scope of work, which is part and
parcel to this document.
10.2 The Bidder is advised to obtain for himself at his own cost and
responsibility all information that may be necessary for preparing
the bid and entering into an Contract for execution of the Services.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 20 of 242
ITB11. Bid Prices,
Currency of Bid and
Payment
11.1 The Bidder shall fill up the Schedule of Prices (Schedule A to
Bid) indicating the unit rates and prices of the Services to be
performed under the Contract. Prices in the Schedule shall be
entered keeping in view the instructions contained in the Preamble
to Schedule of Prices.
11.2 During the Bidder’s performance of the Contract, unless otherwise
stipulated in the Contract, prices quoted by the Bidder shall
remain fixed and not subject to variation on any account.
11.3 The unit rates and prices in the Schedule of Prices shall be quoted
by the Bidder in the currency as stipulated in Bidding Data.
ITB12. Documents
Establishing Bidder’s
Eligibility and
Qualification
12.1 Bidder/Manufacturer must possess capability and the experience
as stipulated in Bidding Data and the Qualification Criteria
stipulated in the Bidding Documents.
12.2 Pursuant to Clause ITB9 and 12.1, the Bidder shall furnish, as part
of its bid, documents establishing the Bidder’s eligibility to bid
and its qualifications to perform the Contract.
ITB13. Documents
Establishing Services’
Conformity to Bidding
Documents
13.1 The documentary evidence of the Services’ conformity to the
Bidding Documents may be in the form of literature, maps and
data and the Bidder shall furnish documentation as set out in
Bidding Data.
13.2 The Bidder shall note that standards for workmanship, material
and equipment, and references to brand names or catalogue
numbers, if any, designated by the Procuring Agency in the
Technical Proposal. Provisions are intended to be descriptive only
and not restrictive.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 21 of 242
ITB14. Bid Security
14.1 Each Bidder shall furnish, as part of his bid, a Bid Security
equivalent to the amount stipulated in Bidding Data either in the
form of Deposit at Call or a Bank Guarantee issued by a
Scheduled Bank in Pakistan in favor of the Procuring Agency,
valid for a period of One Hundred and Twenty (120) Days from
the last date for submission of bid. In case of the guarantee is
from a foreign bank, it shall be counter guaranteed by a scheduled
bank in Pakistan.
14.2 Any bid not accompanied by an acceptable Bid Security shall be
rejected by the Procuring Agency as non-responsive.
14.3 The Bid Security of unsuccessful Bidders will be returned upon
award of Contract to the successful Bidder or on the expiry of
validity of Bid Security whichever is earlier.
14.4 The Bid Security of the successful Bidder will be returned when
the Bidder has furnished the required Performance Security,
pursuant to Clause ITB22 and signed the Contract, pursuant to
Sub-Clauses ITB25.2 & 25.3.
14.5 The Bid Security may be forfeited under either of the following
circumstances:
(a) if a Bidder withdraws his bid during the period of bid
validity; or
(b) if a Bidder does not accept the correction of his Bid Price,
pursuant to Sub-Clause 19.2 here of; or
(c) in the case of a successful Bidder, if he fails to:
(i) furnish the required Performance Security in accordance
with Clause ITB26, or
(ii) sign the Contract, in accordance with Sub-Clauses ITB25.2
& 25.3
ITB15.Validity of Bids,
Format, Signing and
Submission of Bid
15.1 Bids shall remain valid for the period stipulated in the Bidding
Data after the date of bid opening.
15.2 All Schedules to Bid are to be properly filed, completed and
signed.
15.3 No alteration is allowed in the Form of Bid. Incase of any
alteration the bid shall be rejected.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 22 of 242
15.4 Each Bidder shall prepare Original and number of copies specified
in the Bidding Data of the documents comprising the bid as
described in Clause ITB5 and clearly mark them “ORIGINAL”
and “COPY” as appropriate. In the event of discrepancy between
them, the original shall prevail.
15.5 The original and all copies of the bid shall be typed or written in
indelible ink and shall be signed by a person or persons duly
authorized to sign (in the case of copies, photostats are also
acceptable). All pages of the bid documents shall be initialed by
the authorized person or persons along with the affixed official
seal.
15.6 The Bid shall be delivered in person or sent by registered mail at
the address as given in Bidding Data.
D. SUBMISSION OF BIDS
ITB16. Deadline for
Submission,
Modification &
Withdrawal of Bids
16.1 Sealed Bids must be received by the Procuring Agency at the
address provided in Bidding Data not later than the time and date
stipulated therein.
16.2 Bids submitted through telegraph, telex, fax or e-mail shall not be
considered.
16.3 Any bid received by the Procuring Agency after the deadline for
submission prescribed in Bidding Data will be returned unopened
to such Bidder.
16.4 Any Bidder may withdraw his bid after bid submission provided
that the modification or written notice of withdrawal is received
by the Procuring Agency prior to the deadline for submission of
bids.
16.5 Withdrawal of a bid during the interval between the deadline for
submission of bids and the expiration of the period of bid validity
specified in the Form of Bid may result in forfeiture of the Bid
Security pursuant to Sub-Clause ITB 26.3.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 23 of 242
E. BID OPENING AND EVALUATION
ITB17. Bid Opening
17.1 A committee consisting of nominated members by the Procuring
Agency will open the Bids (including withdrawals, substitution
and modifications made pursuant to Clause ITB16) in the
presence of Bidders’ representatives who choose to attend, at the
time, date and location stipulated in the Invitation for Bids.
Technical Bids will be opened first. At the end of the evaluation
of the Technical Bids, the Procuring Agency will invite
technically substantially responsive Bidders, eligible for award,
to attend opening of the Financial Bids.
The Bidders’ representatives who are present shall sign in a
register evidencing their attendance.
17.2 Envelopes marked “MODIFICATION”, “SUBSTITUTION” or
“WITHDRAWAL” shall be opened and read out first and the
name of the Bidder shall be read out. Bids for which an
acceptable notice of withdrawal has been submitted pursuant to
Clause ITB16 shall not be opened.
17.3 The Bidder’s name, Bid Prices, unit rates, any discount offered,
Bid modifications, substitutions and withdrawals, the presence or
absence of Bid Security, and such other details as the Procuring
Agency at its discretion may consider appropriate, will be
announced by the Procuring Agency at the Bid opening. The
Procuring Agency will record minutes of Bid opening.
Any Bid Price or discount which is not read out and recorded at
Bid opening will not be taken into account in the evaluation of
Bid.Any discount offered by the Bidder on its quoted prices, shall
only be considered if such discount is either shown on the duly
filled-in, signed & stamped Form of Bid/Letter of price bid or on
the Summary Page of the quoted amount for Lump sum
Contract/bill of quantities as applicable. In case of any
discrepancy or difference in the rate or amount of discount
mentioned in the Form of Bid/Letter of price bid (as duly filled-in
and signed), and on the Summary Page of the Schedule of Prices,
the discount shown on the Schedule of Price shall prevail.
Discount, if offered, through a separate letter of discount
submitted with the Bid, will not be entertained and shall be
considered null & void.
17.4 Discounts offered for lesser period than the Bid validity shall not
be considered in evaluation.
ITB18. Clarification of
Bids
18.1 To assist in the examination, evaluation and comparison of Bids,
the committee may, at its discretion, ask the Bidder for a
clarification of its Bid. The request for clarification and the
response shall be in writing and no change in the price or
substance of the Bid shall be sought, offered or permitted.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 24 of 242
ITB19.Preliminary
Examination &
Determination of
Responsiveness of
Bids
19.6 Prior to detailed evaluation pursuant to Clause ITB21, the
evaluation committee will determine the responsiveness of the
Bids in the following manner:
(b) the Committee will examine the Bids to determine
whether;
Technical areas
(i) The Bid is complete and does not deviate from the scope;
(ii) Completion period offered is within specified limits;
(iii) Bidder/Manufacturer meet the desired eligibility criteria
including the requisite experience;
(iv) Bid does not deviate from basic technical requirements;
(v) Bid is generally in order;
(vi) Required sureties have been furnished; and
(vii) Documents have been properly signed.
Financial areas
(i) Bid is valid till required period;
(ii) Bid prices are the same during currency of Contract if it
is a fixed price bid; and
(iii) No computational error has been made.
(iv) The rates quoted in the financial bid should be valid for
year 2016-17 & 2017-18 as per the requirement of frame
work contract
(v) The bid should be inclusive of all taxes
(b) the bid shall not to be considered, if:
(viii) It is unsigned;
(ix) Its validity is less than specified period;
(x) It is submitted for incomplete scope of work;
(xi) It indicates completion period later than specified;
(xii) It indicates that the works and services materials to be
supplied do not meet eligibility requirements;
(xiii) It indicates that Bid prices do not include the amount
of taxes;
(xiv) It indicates alteration in Form of Bid;
(vix) It is received after the deadline for submission of
Bids;
(xv) It is submitted through fax, telex, telegram or email;
(xvi) It indicates that prices quoted are not firm during
currency of the Contract whereas the Bidders are
required to quote fixed price(s);
(xvii) The Bidder refuses to accept arithmetic correction;
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 25 of 242
(xviii) It is materially and substantially different from the
Conditions/ Specifications of the Bidding Documents;
and
(xix) Submission of Conditional Bid.
After determining the responsiveness of Bids in the light of basis
stated in para 19.1, further action on technical evaluation will be
taken.
19.7 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and total price that
is obtained by multiplying the unit price and quantity, the unit
price shall prevail and the total price shall be corrected. If there is
a discrepancy between the words and figures the amount in words
shall prevail. If there is a discrepancy between the total Bid price
entered in Form of Price Bid and the total shown in Schedule of
Prices Summary, the amount stated in the Form of Price Bid will
be corrected by the evaluation committee in accordance with the
Corrected Schedule of Prices.
If the Bidder does not accept the corrected amount of Bid, his Bid
will be rejected and his Bid Security will be forfeited.
19.8 Prior to the detailed evaluation, pursuant to Clause ITB21 the
Evaluation Committee will determine the substantial
responsiveness of each Bid to the Bidding Documents. For
purpose of these Clauses, a substantially responsive Bid is one
which conforms to all the terms and conditions of the Bidding
Documents without material deviations.
A material deviation or reservation is one:
(iii) which affect in any substantial way, the scope, quality or
performance of the Works;
(iv) which limits in any substantial way, inconsistent with the
Bidding Documents, the Procuring Agency rights or the
Bidder’s obligations under the Contract; or
(iii) Whose rectification/adoption would affect unfairly the
competitive position of other Bidders presenting
substantially responsive Bids?
The Evaluation Committee’s determination of a Bid
responsiveness will be based on the contents of the Bid itself
without recourse to irrelevant evidence.
19.9 A Bid determined as substantially non-responsive will be rejected
and will not subsequently be made responsive by the Bidder by
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 26 of 242
correction.
19.10 Any minor informality or non-conformity or irregularity in a Bid
which does not constitute a material deviation may be waived by
Procuring Agency, as long as the waiver does not prejudice or
affect the relative ranking of any Bidder.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 27 of 242
ITB20. Conversion to
Single Currency 20.1 To facilitate evaluation and comparison, the Evaluation
Committee will convert all Bid Prices, expressed in the amounts
in various currencies in which bid Price is quoted, to Pak Rupees
at the telegraphic Transfer and Over Draft (TT&OD) composite
selling exchange rate published/authorized by the State Bank of
Pakistan and applicable to similar transaction, on the date of bid
opening.
ITB21. Detailed Evaluation
of Bids 21.1 Only the Bids previously determined to be substantially
responsive pursuant to Clause ITB19 will be evaluated and
compared in detail by the Procuring Agencies per the
requirements given hereunder:
21.2 Evaluation and Comparison of Bids
(a) Bids will be evaluated for complete scope of work.
(b) Basis of Price Comparison
The prices will be compared on the basis of the Lowest
Evaluated Bid Price.
(c) Technical Evaluation
It will be examined in detail whether the Services / Goods
offered by the Bidder comply with the Technical
Provisions of the Bidding Documents. For this purpose,
Personnel capabilities, equipment and services standards
offered by the Bidder will be reviewed for which the
Bidder’s data submitted with the Bid will be compared
with the technical features/criteria prescribed by the
Procuring Agency in Scope of Work PART III. Other
technical information submitted with the Bid regarding
the Scope of Work will also be reviewed including
importations, if any, required.
ITB22. Process to be
Confidential 22.1 Subject to Sub-Clause ITB19.1 heretofore, no Bidder shall
contact Procuring Agency on any matter relating to its Bid from
the time of the Bid opening to the time the bid evaluation result is
announced by the Procuring Agency. The evaluation result shall
be announced at least ten (10) Days prior to award of Contract.
The announcement to all Bidders will include table(s) comprising
read out prices, discounted prices, price adjustments made, final
evaluated prices and recommendations against all the bids
evaluated.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 28 of 242
22.2 Any effort by a Bidder to influence Procuring Agency in the Bid
evaluation, Bid comparison or Contract Award decisions may
result in the rejection of his Bid. Whereas, any Bidder feeling
aggrieved may lodge a written complaint not later than fifteen
(15) Days after the announcement of the bid evaluation result,
however, mere fact of lodging a complaint shall not warrant
suspension of procurement process.
F. AWARD OF CONTRACT
ITB23. Post Qualification
23.1 The Procuring Agency, at any stage of the bid evaluation, having
credible reasons for or prima facie evidence of any defect in
supplier’s or Supplier’s capacities, may require the suppliers or
Suppliers to provide information concerning their professional,
technical, financial, legal or managerial competence whether
already pre-qualified or not.
Provided that such qualification shall only be laid down after
recording reasons thereof in writing. They shall form part of the
records of that bid evaluation report.
23.2 The evaluation will take into account the Bidder’s financial and
technical capabilities. It will be based upon an examination of the
documentary evidence of the Bidders’ qualifications submitted
under Clause ITB12, as well as such other information required
in the Bidding Documents.
ITB24. Award Criteria
&Procuring Agency’s
Right
24.1 Subject to Sub-Clause ITB24.2, the Procuring Agency will award
the Contract to the Bidder whose bid has been determined to be
substantially responsive to the Bidding Documents and who has
offered the lowest evaluated Bid Price, provided that such Bidder
has been determined to be qualified to satisfactorily perform the
Contract in accordance with the provisions of Clause ITB 23.
24.2 Notwithstanding Sub-Clause ITB 24.1, the Procuring Agency
reserves the right to accept or reject any bid, and to annul the
bidding process and reject all bids, at any time prior to award of
Contract, without thereby incurring any liability to the affected
Bidders or any obligation to inform the affected Bidders of the
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 29 of 242
grounds for the Procuring Agency ’s action except that the
grounds for its rejection of all bids shall upon request be
communicated, to any Bidder who submitted a bid, without
justification of the grounds. Notice of the rejection of all the bids
shall be given promptly to all the Bidders.
ITB25. Notification of
Award & Signing of
Contract
25.1 Prior to expiration of the period of bid validity prescribed by the
Procuring Agency, the Procuring Agency will notify the
successful Bidder in writing (“Letter of Acceptance”) that his bid
has been accepted.
25.2 Within seven (7) Days from the date of furnishing of acceptable
Performance Security under the Contract, the Procuring Agency
will send the successful Bidder the Form of Contract provided in
the Bidding Documents, incorporating all Contracts between the
parties.
25.3 The formal Contract between the Procuring Agency and the
successful Bidder shall be executed within seven (7) Days of the
receipt of Form of Contract by the successful Bidder from the
Procuring Agency.
ITB26. Performance
Security 26.1 The successful Bidder shall furnish to the Procuring Agency
minimum 5% Performance Security of the Contract Price in the
form and the amount stipulated in the Contract within a period of
14 Days after the award of each work.
26.2 The performance security shall be in the form of Bank guarantee
issued by the scheduled Bank as per “State Bank of Pakistan” in
favor of Procuring Agency “Primary & Secondary Healthcare
Department. In case the performance security is from a Foreign
Bank, it shall be counter guaranteed by a scheduled bank of
Pakistan.
26.3 Failure of the successful Bidder to comply with the requirements
of Sub-Clauses ITB16.5, 24.1, 26. and 27.1shall constitute
sufficient grounds for the annulment of the award and forfeiture
of the Bid Security.
ITB 27. Continuing
Performance security 27.1 The successful bidder shall deposit the amount of Rs. 100,000/- in
the form of CDR, Bank Guarantee, Pay Order or Demand Draft
after initial acceptance from bidder
ITB28. Integrity Pact
28.1 The Bidder shall sign and stamp the Form of Integrity Pact
provided at Schedule-J to Bid in the Bidding Document for all
Federal/Provincial Government procurement contracts exceeding
Rupees ten (10) million. Failure to provide such Integrity Pact
shall make the bid non-responsive.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-20
Page 30 of 242
SECTION - III: BIDDING DATA SHEET
The following specific data for the goods to be procured shall complement, supplement, or amend the provisions in the ITB Section II. Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
B. General
ITB 1.1 Procuring Agency: Project Management Unit, Primary & Secondary Healthcare
Department.
ITB 1.2 The Procuring Agency has arranged the Funds from the Government of the
Punjab.
ITB 1.3
Name of Contract “Frame work contract of supplying and installation of sign
board for establishments of primary and secondary healthcare department
Punjab”.
ITB 1.4 The procurement shall be made under Punjab Procurement Rules 2014 “Single
Stage Two Envelop (SSTE) process”.
ITB 1.5
The Bid Security of Rs. 100,000/-shall be furnished in Deposit at Call / CDR /
Pay Order/ Bank Guarantee from the scheduled Bank as per “State Bank of
Pakistan” in favour of Procuring Agency “Project Director, Project Management
Unit, Primary & Secondary Healthcare Department”.
ITB 1.6
Bidder shall submit ORIGINAL & Two COPIES of “Technical
Proposal”,Original & one Copy of “Financial Proposal” and one soft copy in
CD/DVD/USB on the prescribed forms.
Bids to be delivered as per Punjab Procurement Rules 2014 for Single Stage Two
Envelope Procedure. Original Bid (Except Financial forms and schedule) along
with all copies shall be placed in a sealed, stamped and duly signed enveloped
marked “Technical Proposal”.
Similarly, the Financial Proposal (Form of Bid & Schedule of Prices) along with
copies shall be placed in a sealed, stamped and duly signed enveloped clearly
marked “Financial Proposal” followed by the name of assignment and with
warning “Do Not Open with the Technical Proposal”.
The envelope containing the Technical and Financial Proposals shall be properly
sealed, stamped and duly signed and shall be placed into an outer envelope and
marked as “Proposal for Supply and Installation of Signage in DHQ and THQ
Hospitals of Punjab”.
ITB 1.7
Bid validity period
The bid should remain valid for Ninety (90) Days from the last date for
submission of bid.
ITB 1.8 Deadline for submission of Bids is 3:00 pm on 24th January, 2019.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 31 of 242
ITB 1.8.1
Venue, Time and Date of Technical Bid Opening
Time: 03:30 pm on 24th January, 2019
Venue: Project Mangement Unit,Primary & Secondary Healthcare Department
31-E/1, Shahra-e-Imam Hussain, Gulberg-III,Lahore.
Phone No.: 042-99231208
Mob : +92 331 4427972
Email: [email protected]
The Financial Bids of the “technically responsive” Bidder(s) will be opened at a
date provided later on. The sealed financial bids of “technically non-responsive”
Bidders will be returned unopened.
ITB 1.9 Bid shall be quoted entirely in Pakistani Rupees only.
ITB 1.10
The Bidder shall submit Performance Security equivalent to 5% of the Contract
Price per contract in the form of CDR, Demand Draft and Bank Guarantee.
The performance security shall be in the form of Bank guarantee issued by the
scheduled Bank as per “State Bank of Pakistan” in favor of Procuring Agency
“Project Director, Project Management Unit, Primary & Secondary Healthcare
Department”. In case the performance security is from a Foreign Bank, it shall be
counter guaranteed by a scheduled bank of Pakistan.
ITB 1.11
The bidder shall submit continuing performance security as per the requirement of
framework contract amounting Rs. 100,000/- in the form of CDR, Demand Draft
and Bank Guarantee. The security shall be submitted within fourteen (14) days of
the advance acceptance of bid, and shall be retained during the currency of the
Contract, and shall be released after one month of the expiry of the Contract upon
satisfactory performance of work according to the Terms & Conditions of the
contract.
B. Preparation and Submission of Bids
ITB 19, 21
QUALIFICATION REQUIREMENTS
Evaluation and Comparison of Bids
(a) Bids will be evaluated for their responsiveness to the complete
scope of work.
(b) Basis of Price Comparison - The Bids shall be evaluated on the
basis of the qualified, responsive lowest Evaluated Bid.
(c) The bid prices shall be compared, after arithmetic correction, if any,
on the basis of quantities given in the Price Schedule. However, it may be noted that
the quantities given in the price schedule are only for evaluation purpose, and the
quantities of the framework contract have been mentioned below the Evaluation
Criteria.
(d) Technical Evaluation
Responsiveness (Knock-Down) Criteria:
• Registration documents as Company/Firm
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 32 of 242
• Client Satisfaction documents of Projects currently in hand or completed
projects (for past 2 years from the date of submitting bid)
(i) It will be examined in detail whether the Services / Goods offered
by the Bidder comply with the Technical Provisions of the Bidding
Documents. For this purpose, Personnel capabilities, equipment
and services standards offered by the Bidder will be reviewed for
which the Bidder’s data submitted with the Bid will be compared
with the technical features/criteria prescribed by the Procuring
Agency in Scope of work PART III. Other technical information
submitted with the Bid regarding the Scope of Work will also be
reviewed.
(ii) The criteria of proportionate marking will be used for technical
scoring, i.e. the firm shall be evaluated proportionately with
reference to each other on the basis of their inter-se credentials
(iii)The criteria for evaluation of technical bid shall be as per
following details:
Sr. No. Category Marks
A1 Company/firm Profile 5
A2
A3
General Experience
Relevant Experience
10
20
A4
A5
Human Resource
Sign Board manufacturing related machinery
10
10
A6 Financial Strength 25
A7 Working Methodology 20
Total
100
The breakup of the each of the category is given hereunder:
A1 Company Profile
A1 Company Profile Points
f) Status and Ownership of the Company/firm 20
g) Registration from the competent authority 20
h) Age of Company 20
i) Office Establishment 10
j) Company experience in Signage
Manufacturing
30
Total A1 100
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 33 of 242
A2 General Experience
A2 General Experience Points
c) Number of successfully completed
assignments
50
d) Average cost of successfully completed
projects
50
Total A2 100
A3 Relevant Experience
A3 Relevant Experience Points
c) Number of successfully completed
assignments
50
d) Average cost of successfully completed
projects
50
Total A3 100
A4 Human Resource
S. No.
Proposed Position Points
1 Number of operational Managers 40
2 Number of Skilled labor of sign board
installation 30
3 Number of Laborers 30
TOTAL A4 100
A5 Machinery related to sign board manufacturing
Sr. Proposed Position Points
No.
1 Number of Digital printing machines (UV
Printer, Vinyl Printing etc.) 35
2 Number of Cutting Machines (CNC, Water
Jet, Laser machines etc.) 35
3 Number of Welding Plants 30
TOTAL A5 100
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 34 of 242
A6 Financial Strength
A6 Financial Strength Points
d) Annual Turn Over 40
e) Current Ratio 30
f) Net Worth 30
Total A6 100
Financial Evaluation Criteria
Annual Turn Over Current Ratio Net Worth
40 30 30
Criteria, sub-criteria, and points system for the evaluation of Expression of Interest (EOIs) are as follows: Score = A1[05%] + A2[10%] + A3[20%] + A4[10%] + A5[10%] + A6[25%] + A7[20%]
The bids shall also be evaluated with reference to their responsiveness by the
above criteria:
Financial bids of only technically qualified (having minimum 65 marks) bidders shall be opened. Financial bids shall be compared on the basis of prices quoted against the BOQs mentioned against Annexure A
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 35 of 242
CRITERIA FOR EVALUATION OF BIDS
Description
It may be noted that all the quantities mentioned here are merely for the purpose of evaluation only,
and the quantities of the framework contract are mentioned below this table * All text should be written in Urdu and English Language Both Side by Side for all signage types **SS where used will be of 304 Grade ***The text mentioned underlined are instructions regarding changing size of signage component **** For each signage type installation charges should be separately mentioned keeping in the view that all signage will be installed in one single go by installation team
Supply Installation Sr No Signage Type Component Specifications Unit Rate Unit Rate Total Quantity Amount
F1
Internal Hanging
Signage -Fixed System
Signage Plate
4' (height) by 8' (width) Aluminum Composite Panel (ACP Aluminum coating not less than 0.3mm having PVDF Coating)) with thickness not less than 4 mm including bending on all sides (Double Sided). The face of ACP sheet
will be (7'101
2" x 3'10
1
2")
excluding bending (30.515 SFT) from both sides.
100
Frame of Signage
Should be made of 1.5" by 1.5" G.I square pipe having SWG 16, having total dimensions of
7'101
2" x 3'10
1
2" along with the
2 bracings of 1" by 1" square pipe of G.I having SWG 16 at center (one vertical & one horizontoal and welded connections).
Connection of Signage plate and
Frame
The ACP sheet should completely cover all the sides of frame and should be riveted to the frame with rivet diameter of 1/4" and having rivets at 1' intervals along length and 1' along height. The ACP sheet should have appropriate edge protection
Reflective Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection &colors from the
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 36 of 242
sheeting manufacturer. (For e.g. 3M)
Hanging Pipes
2 of these pipes of 1" diameter made of Stainless Steel SWG 14, having such length that clearance height of 8' from Finished Floor Level can be achieved. These should be attached with the GI square pipe and fixed with ceiling.
Hanging equipments
Hanging rods should be attached to the frame via G.I. socket with outer dia of 1.5" and length of 2" which will be welded to the frame via GI SWG 14 strip/plate of 6" length The rate will be divided by its area (i.e. 30.515 SFT), and will govern in any size ranging from (10 SFT to 40 SFT) Area of signage will be calculated by multiplying the total face width and height (excluding bending) of ACP sheet and bracing after 2 foot (in each direction) With minimum bracing of one horizontal and 2 vertical of GI Pipe of 1" x 1" having SWG 16
F1 (A)
Internal Hanging
Signage -Fixed System (A)
Signage Plate
4' (height) by 8' (width) Aluminum Composite Panel (ACP Aluminum coating not less than 0.3mm having PVDF Coating)) with thickness not less than 4 mm including bending on all sides (Double Sided). The face of ACP sheet
will be (7'101
2" x 3'10
1
2")
excluding bending (30.515 SFT) from both sides.
20
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 37 of 242
Frame of Signage
Should be made of 1.5" by 1.5" G.I square pipe having SWG 16, having total dimensions of
7'101
2" x 3'10
1
2" along with the
2 bracings of 1" by 1" square pipe of G.I having SWG 16 at center (one vertical & one horizontoal and welded connections).
Connection of Signage plate and
Frame
The ACP sheet should completely cover all the sides of frame and should be riveted to the frame with rivet diameter of 1/4" and having rivets at 1' intervals along length and 1' along height. The ACP sheet should have appropriate edge protection
Reflective Sheeting
Direct Digital Printing on Vinyl sheet of 3M 180-10 or equivalent & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection &colors from the sheeting manufacturer. (For e.g. 3M)
Hanging Pipes
2 of these pipes of 1" diameter made of Stainless Steel SWG 14, having such length that clearance height of 8' from Finished Floor Level can be achieved. These should be attached with the GI square pipe and fixed with ceiling.
Hanging equipments
Hanging rods should be attached to the frame via G.I. socket with outer dia of 1.5" and length of 2" which will be welded to the frame via GI SWG 14 strip/plate of 6" length The rate will be divided by its area (i.e. 30.515 SFT), and will govern in any size ranging from (10 SFT to 40 SFT) Area of signage will be calculated by multiplying the total face width and height (excluding bending) of ACP
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 38 of 242
sheet and bracing after 2 foot (in each direction) With minimum bracing of one horizontal and 2 vertical of GI Pipe of 1" x 1" having SWG 16
F2
Internal Hanging Signage - Slideable System
Signage Plate
1' (height) by 4' (width) High density Closed cell PVC Foam
board (Lite Board) with thickness not less than 5 mm. 8 plates are required in 32 SFT size signage on one side (Front
and Back)
10
Frame of Signage
Should be made of 1.5" by 1.5" G.I square pipe having SWG
16, having total width of 8' and height of 4' along with the 2 bracings of 1" by 1" square
pipe of G.I having SWG 16 at center (one vertical & one horizontoal and welded
connections)
Sliding plate
system
Anodized Aluminum sections of thickness 3mm of
appropriate and approved dimensions placed in such a
way so that sliding plate system can be implemented.
There should be two Aluminum sections around each foam board (top and
bottom). Riveted through the frame
Signage Texts
Direct Digital Printing on Lite board (closed cell PVC Foam
board) with UV Inks & scratch resistant sheet
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 39 of 242
Hanging Pipes
2 of these pipes of 1" diameter made of Stainless Steel SWG 14, having such length that clearance height of 8' from Finished Floor Level can be achieved. These should be attached with the GI square pipe and fixed with ceiling.
Hanging equipments
Hanging rods should be attached to the frame via G.I. socket with outer dia of 1.5"
and length of 2" which will be welded to the frame via GI SWG 14 strip/plate of 6"
length and fixed with ceiling per Square foot rate will
govern
H1
Specialist Name Plaques
and Room Name hanging
from wall
Name Plaques
Two SS sheet of high imported quality with Vinyl stenciling of translucent type (3630 series of 3M or equivalent). Sheet 1
size = 15"x7.5" & sheet 2 size=15"x4" thickness of both = 1.2 mm. (Double side writing)
170
Fixation
Mounted on wall via SS pipe with1" x 2" size and 1.2 mm
thick having length of 1' 2 Nos. of SS channels of same
length 1.5 mm thick and screwed with SS Pipe via 2
screws and signage plates to be screwed with SS Channels
via 3 fancy nuts and bolts
H1 (A)
Specialist Name Plaques
and Room Name hanging
from wall
Name Plaques
Two SS sheet of high imported quality with engraved colored text of approved color. Sheet 1
size = 15"x7.5" & sheet 2 size=15"x4" thickness of both = 1.2 mm. (Double side writing)
34
Fixation
Mounted on wall via SS pipe with1" x 2" size and 1.2 mm
thick having length of 1' 2 Nos. of SS channels of same
length 1.5 mm thick and screwed with SS Pipe via 2
screws and signage plates to be screwed with SS Channels
via 3 fancy nuts and bolts
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 40 of 242
J1 Room
Numbers - Stenciling
Room Name
SS sheet 8"x8" of 1 mm thickness with Vinyl stenciling of translucent type (3630 series of 3M or equivalent). 945
Fixation Fixed through wall with appropriate diameter and length of SS Spacer
J1 (A)
Room Numbers - Engraved
Room Name
SS sheet 8"x8" of 1 mm thickness with colored engraving of approved color and text 189
Fixation Fixed through wall with appropriate diameter and length of SS Spacer
K1
Room Name Plaques fixed
on wall - Stanciled
Room Name
SS sheet 15"x7.5" of 1.2 mm thickness with Vinyl stenciling of translucent type (3630 series of 3M or equivalent). 745
Fixation Fixed through wall with appropriate diameter and length of SS Spacer
K1 (A)
Room Name Plaques fixed
on wall - Engraved
Room Name
SS sheet 15"x7.5" of 1.2 mm thickness with colored engraving of approved color and text 149
Fixation Fixed through wall with appropriate diameter and length of SS Spacer
L1 Internal Wall
Signage
Signage Plate
36" x 9" Acrylic sheet with 6mm thickness
215
Reflective Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective Sheeting with UV
Inks & Over laminate Sheeting, including warranty letter of up
to 10 years in terms of reflection &colors from the sheeting manufacturer. (For
e.g. 3M)
Fixation
Attached to the wall with appropriate number of SS Spacers of appropriate diameter and length per Square foot rate will govern
Q1
Internal Departmental signage, Floor
map board and caution
Signage Plate
5' x 5' ACP Sheet with 4mm Thickness
(Aluminum coating not less than 0.3mm having PVDF
Coating)
255
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 41 of 242
signage with Reflective
Sheet Signage
Sheet and text
Direct Digital Printing on Diamond Grade or equivalent Reflective Sheeting with UV
Inks & Over laminate Sheeting, including warranty letter of up
to 10 years in terms of reflection &colors from the sheeting manufacturer. (For
e.g. 3M)
Fixation
Fixed on wall/door or where required with SS Spacers for
appropriate diameter and one and each edge with running at distance of 2.5' from all sides
Per Square foot rate will govern (The range may vary
from 5' x 5' to 6" x 6")
Q1 (A)
Internal Departmental signage, Floor
map board and caution signage with
Reflective Sheet
Signage Plate
5' x 5' ACP Sheet with 4mm Thickness (Aluminum coating not less than 0.3mm having
PVDF Coating)
51
Signage Sheet and
text
Direct Digital Printing on Vinyl Sheet (of 3M 180-10 or
equivalent) with UV Inks & Over laminate Sheeting,
including warranty letter of up to 10 years in terms of colors
from the sheeting manufacturer. (For e.g. 3M)
Fixation
Fixed on wall/door or where required with SS Spacers for
appropriate diameter and one and each edge with running at distance of 2.5' from all sides
Per Square foot rate will govern (The range may vary
from 5' x 5' to 6" x 6")
Q2
Caution Signage with
Photo luminous film
Signage Plate
24" x 24" ACP Sheet with 4mm Thickness (Aluminum coating not less than 0.3mm having
PVDF Coating)
170
Signage Sheet and
text
Direct Digital Printing on high quality Photo luminous film
with UV Inks with scratch resistant layer
Fixation
Fixed on wall/door or where required with SS Spacers for
appropriate diameter and one after each 12"
Per Square foot rate will
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 42 of 242
govern (The range may vary from 24" x 24" to 6" x 6")
Q3
Caution Signage with
Photo luminous film
Signage Plate
24" x 24" ACP Sheet with 4mm Thickness (Aluminum coating not less than 0.3mm having
PVDF Coating)
170
Signage Sheet and
text
Direct Digital Printing on high quality Photo luminous film
with UV Inks with scratch resistant layer
Fixation
Fixed through ceiling with SS chain with length enough to
maintain clear distance of 10' from wall
Per Square foot rate will govern (The range may vary
from 24" x 24" to 6" x 6")
Reflective
Sheet Reflective
Sheet
Reflective Sheet with Direct Digital Printing on Diamond
Grade or equivalent Reflective Sheeting with, UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection &colors from the sheeting
manufacturer. (For e.g. 3M) The price will be divided by
total area and per SFT rate will be governed for any size of
sheet 100 SFT
Vinyl Sheet Vinyl Sheet
Vinyl Sheet with Direct Digital Printing on Diamond Grade or equivalent Reflective Sheeting with, UV Inks & Over laminate Sheeting, including warranty
letter of up to 10 years in terms of colors from the
sheeting manufacturer. (For e.g. 3M)
The price will be divided by total area and per SFT rate will
be governed for any size of sheet 100 SFT
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 43 of 242
Quantities of Frame work
The framework quantities under this contract are given below. The quantities shall be valid for the Financial Years 2018-19 & 2019-20.
F1 Internal Hanging Signage -Fixed System 1000
F1 (A)
Internal Hanging Signage -Fixed System (A) 200
F2 Internal Hanging Signage - Slideable System 100
H1 Specialist Name Plaques and Room Name hanging from wall 1700
H1 (A)
Specialist Name Plaques and Room Name hanging from wall 340
J1 Room Numbers - Stenciled 9450
J1 (A)
Room Numbers - Engraved 1890
K1 Room Name Plaques fixed on wall - Stenciled 7450
K1 (A)
Room Name Plaques fixed on wall - Engraved 1490
L1 Internal Wall Signage 2150
Q1 Internal Departmental signage, Floor map board and caution signage with Reflective Sheet
2550
Q1 (A)
Internal Departmental signage, Floor map board and caution signage with Reflective Sheet
510
Q2 Caution Signage with Photo luminous film 1700
Q3 Caution Signage with Photo luminous film 1700
Reflective Sheet 10,000 SFT
Vinyl Sheet 10,000 SFT
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 44 of 242
SECTION - IV: BID FORM & SCHEDULES
A - FINANCIAL FORM& SCHEDULE
• Form of Bid
• Schedule A to Bid: Schedule of Prices
B - TECHNICAL FORMS
• Schedule B to Bid: Technical Proposal Submission Form
• Schedule C to Bid: Company Profile
• Schedule D to Bid: General Experience
• Schedule E to Bid: Relevant Experience
• Schedule F to Bid: Human Resource
• Schedule G to Bid: Net worth, Current Ratio and Annual Turn Over
• Schedule H to Bid: Relevant Machinery
• Schedule I to Bid: Project Related Plans
• Schedule J to Bid: Integrity Pact
C–STANDARD FORMS
• Form of Bid Security
• Form of Contract
• Form of Performance Guarantee
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 45 of 242
A - FINANCIAL FORM& SCHEDULE
FORM OF BID
(LETTER OF OFFER)
{Ref Number}
{Date}
To:
Azhar Hayat Khan
Procurement Specialist,
Primary & Secondary Healthcare Department
Subject: Bid Reference No. ___________________
“Supply and Installation of Sign Boards in Primary and Secondary Healthcare Establishments
of Punjab”
Dear Sir
1. We, the undersigned, offer to provide the “Framework Contract of Supplying and
Installation of Sign Boards for establishments of primary and secondary healthcare
department Punjab – Year 2018-19 & 2019-20” in accordance with your Invitation of Bids
dated (insert date) and our Technical Proposal. Our attached Financial Proposal is inclusive
of all taxes.
Our Financial Proposal shall be binding upon us subject to the modifications resulting from
Contract negotiations, up to expiration of the validity period of the Proposal, i.e. before the
date indicated in _______ of the Proposal Data Sheet.
We also declare that the Government of Pakistan/ Punjab has not declared us or any Sub-
Suppliers for any part of the Contract, ineligible on charges of engaging in corrupt,
fraudulent, collusive, or coercive practices. We furthermore, pledge not to indulge in such
practices in competing for or in executing the Contract, and are aware of the relevant
provisions of the Proposal Document.
We understand you are not bound to accept any Proposal you receive.
Dated this_______________Day of _____________, 20__
Signature ________________
in the capacity of _____________duly authorized to sign bid for and on behalf of
_______________________________
(Name of Bidder in Block Capitals)
(Seal)
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 46 of 242
Address
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
Witness:
(Signature)______________________________
Name: _______________________________________________________________
Address: _____________________________________________________
_____________________________________________________________________
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 47 of 242
SCHEDULE A TO BID - SCHEDULE OF PRICES
Sr. No. Page No.
3. Preamble to Schedule of Prices 26
4. Schedule of Prices for Central Zone (Package 1) 30
*(a) Summary of Bid Prices
* (b) Detailed Schedule of Prices
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 48 of 242
Guidelines for submission of SCHEDULE OF PRICES
1. General
1.1 The Schedule of Prices shall be read in conjunction with the Contract, together
with the Specifications and Maps, if any.
1.2 The Contract shall be for the whole of the Services as described in these
Bidding Documents. Bids must be for the complete scope of services.
2. Description
2.1 The general directions and descriptions of services and materials are not
necessarily repeated nor summarized in the Schedule of Prices. References to
the relevant sections of the Bidding Documents shall be made before entering
prices against each item in the Schedule of Prices.
3. Rates and Prices
3.1 Except as otherwise expressly provided under the Contract, the rates and
amounts entered in the Schedule of Prices shall be the rates at which the
Supplier shall be paid and shall be the full inclusive value of the services set
forth or implied in the Contract; except for the amounts reimbursable, if any to
the Supplier under the Contract.
3.2 Unless otherwise stipulated in the Contract, the rates and prices entered by the
Bidder shall not be subject to adjustment during the performance of the
Contract.
3.3 All duties, taxes and other levies payable by the Supplier shall be included in
the rates and prices.
3.4 The whole cost of complying with the provisions of the Contract shall be
included in the items provided in the Schedule of Prices, and where no items
are provided, the cost shall be deemed to be distributed among the rates and
prices entered for the related items of the Services and no separate payment
will be made for those items.
3.5 The rates, prices and amounts shall be entered against each item in the
Schedule of Prices. Any item against which no rate or price is entered by the
Bidder will not be paid for by the Procuring Agency when executed and shall
be deemed covered by the rates and prices for other items in the Schedule of
Prices.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 49 of 242
3.6 (a) The Bidder shall be deemed to have obtained all information as to and
all requirements related thereto which may affect the bid price.
(b) The Supplier shall be responsible to make complete arrangements for
the transportation of the Signage Materials, Machinery and Equipment
to the Site.
3.7 The Supplier shall provide for all parts of the Services to be completed in
every respect. Notwithstanding that any details, accessories, etc. required for
the complete installation and satisfactory operation of the services, are not
specifically mentioned in the scope of work, such details shall be considered
as included in the Contract Price.
4. Bid Prices
4.1 Break-up of Bid Prices
The various elements of Bid Prices shall be quoted as detailed by the
Procuring Agency in the format of Schedule of Prices.
The Bidder shall recognize such elements of the costs which he expects to
incur in the performance of the Services and shall include all such costs in the
rates and amounts entered in the Schedule of Prices.
4.2 Total Bid Price
The total of bid prices in the Schedule of Prices shall be entered in the
Summary of Bid Prices.
5. Provisional Sums
5.1 Provisional Sums included and so designated in the Schedule of Prices if any,
shall be expended in whole or in part at the direction and discretion of the
Procuring Agency. The Supplier will only receive payment in respect of
Provisional Sums if he has been instructed by the Procuring Agency to utilize
such sums.
6. -Invoicing & Payment
6.1 The Supplier shall be entitled to be paid the value of the Services executed
according to criteria devised in clause 6.8.1 of G.C.C. The Supplier shall
submit, to the Procuring Agency, an invoice showing the amounts to which he
considers himself entitled based on the schedule/criteria mentioned in 6.8.1 of
G.C.C.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 50 of 242
The monthly performance of the Supplier will be determined by the Procuring
Agency in accordance with the performance criteria determined in the
Contract. A progress payment report will be issued within one week by the
end of proceeding month. Based on this report an invoice shall be issued by
the Supplier and the payment shall be made within 30 days after the
submission of the invoice to the Procuring Agency.
7. Instruction for Financial Bids
The Supplier will follow the under mentioned instructions while filling the bid
documents:
(vii) The Contract will be “unit price contract” and made for the price in PKR the
sum of the amounts are calculated by means of multiplying the amount of each
work item as indicated in the list prepared by the Procuring Agency with the
unit price quoted by the Supplier for that work item. The payment for each
work performed shall be based on the unit price quoted by the Supplier in the
bid used for the determination of the Contract price.
(viii) The term of the Contract shall be for a period of two financial years (2018-19
& 2019-20) (including holidays and weekends) after the commencement date
of the start of work which will be initiated after work site will be delivered
upon signing of work site delivery note.
(ix) Minimum wage as notified by the Government of Punjab shall be applicable
for the period of Contract. The Minimum wage for Financial Year 2018-19 is
Rs. 15,000/- per worker per month as per Rules of Government of Punjab.
(x) Child Labor will not be employed under the Contract; the minimum age
as per the Pakistani law is 18 years.
(xi) All the labor laws including social security and EOBI etc. shall be
applicable in the Contract and shall be the responsibility of the Supplier.
(xii) Pursuant to the laws of Pakistan, all payable taxes and duties required to
be paid by the Supplier are included in the bid price including
withholding income tax, sales tax and custom duties etc. Change in
amount of taxes by the government shall be adjustable, accordingly.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 51 of 242
9. The numbers given in the bid price schedule are not the total number of sign
boards of this package. The maximum number of sign boards for this package are shown
in detail after the bid price schedule.
B- TECHNICAL FORMS
SCHEDULE - B TO BID - TECHNICAL PROPOSAL SUBMISSION FORM
{Ref Number}
{Date}
To:
Azhar Hayat Khan
Procurement Specialist,
Primary & Secondary Healthcare Department
Subject: Bid Reference No. ___________________
“Supply and Installation of Sign Boards in Primary & Secondary Healthcare Department
Establishments of Punjab”
Dear Sir
We, the undersigned, offer to provide the Framework Contract of Supplying and
Installation of Sign Boards – Year 2018-19 & 2019-20 for establishments of primary and
secondary healthcare department Punjab in accordance with your Request for Proposal
dated [Insert Date] and our Proposal. We are hereby submitting our Proposal, which
includes this Technical Proposal, and a Financial Proposal sealed under a separate envelope.
We hereby declare that all the information and statements made in this Proposal are
true and accept that any misinterpretation contained in it may lead to our disqualification.
If negotiations for contract finalization are held during the period of validity of the
Proposal, we undertake to negotiate on the basis of the proposed staff. Our Proposal is
binding upon us and subject to the modifications resulting from Contract finalization.
We undertake, if our Proposal is accepted, to initiate the consulting services related to
the assignment not later than the date given by the Procuring Agency.
We understand you are not bound to accept any Proposal you receive.
Dated this_______________Day of _____________, 20__
Signature ________________
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 52 of 242
in the capacity of _____________duly authorized to sign bid for and on behalf of
_______________________________
(Name of Bidder in Block Capitals)
(Seal)
Address
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
Witness:
(Signature)______________________________
Name: _______________________________________________________________
Address: _____________________________________________________
_____________________________________________________________________
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 53 of 242
SCHEDULE C TO BID – COMPANY PROFILE
f. Name and Ownership of the company: Describe the name of the company and
owners name of company. Briefly describe the details and number of partners
involved if any. Moreover, if company is associated with other company or any joint
venture for this specific project.
g. Registration from the competent authority: Provide the registration of company from
various authorities relevant to both business and signage supplying and installation.
Documentary proves should be attached.
h. Age of Company: Provide the document showing the date of registration of company
in order to asses the age of company. Please attach documentary proof of
incorporation or registration. In case of association or joint venture 50 % weightage
to age of each company will be taken into account.
i. Office Establishment: Provide the documentary proof of ownership of office setup.
In other cases attach the rental agreement or any other document in order to describe
the status of ownership of office setup. In case of association or joint venture 50 %
weightage to age of each company will be taken into account
j. Company experience in sign boards manufacturing: Mention the year from which
the company is in the business of sign boards. The experience will be calculated
from the year of first contract related to sign boards. Please provide details including
title of project, Procuring Agency name, project period. (Please limit page count to
no more than one page). In case of association or joint venture 50 % weightage to
age of each company will be taken into account.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 54 of 242
SCHEDULE D TO BID – GENERAL EXPERIENCE
Number of successfully completed assignments: Please provide list of successfully
completed assignments of general category to demonstrate general experience and ability to
provide the required services on a scale or scope comparable to the bidding document. Please
provide details including title of project, Procuring Agency name, project period, & value of
assignment. Client satisfaction certificates are essentially required. At most 10 projects can
be evaluated. (Please limit page count to no more than two pages)
Average cost of completed projects: Please provide list of completed projects average cost of
general category to demonstrate the volume of business in hand and volume of business
completed. Please provide details including title of project, Procuring Agency name and
value of assignment. (Please limit page count to no more than two pages)
TITLE PROCURING AGENCY NAME DURATION VALUE
Completed Projects:
SCHEDULE E TO BID – RELEVANT EXPERIENCE
Number of successfully completed assignments: Please provide list of on successfully
completed assignments of specific category to demonstrate specific experience and ability to
provide the required services on a scale or scope comparable to the bidding document. Please
provide details including title of project, Procuring Agency name, project period, & value of
assignment. Client satisfaction certificate is essentially required. At most 10 projects can be
taken into evaluation. (Please limit page count to no more than two pages)
Average cost of completed projects: Please provide list of completed projects average cost of
specific category to demonstrate the volume of business in hand and volume of business
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 55 of 242
completed. Please provide details including title of project, Procuring Agency name and
value of assignment. (Please limit page count to no more than two pages)
TITLE PROCURING AGENCY NAME DURATION VALUE
Completed Projects:
Sr.1
Assignment name:
Value of the contract (in current PKR)
Country:
Location within country:
Duration of assignment (months):
Name of Procuring Agency:
Total No of staff-months (by your firm) on the assignment:
Start date (month/year):
Completion date (month/year):
Value of services provided by your firm under the contract
(in current PKR ):
Name of associated Consultants, if any:
No of professional staff-months provided by associated
Consultants:
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 56 of 242
Name of senior professional staff of your firm involved and functions performed (indicate most significant
profiles such as Project Director/Coordinator, Team Leader):
Narrative description of Project:
Description of actual services provided by your staff within the assignment:
SCHEDULE F TO BID – HUMAN RESOURCE
a. Organization and Staffing: {Please describe the structure and composition of your
team, including the list of the Key Experts, Non-Key Experts and relevant technical and
administrative support staff.} The Execution Schedule and human resource allocation
including:
ii. Organizational structure at supervisory level and arrangements to handle
contractual obligations with Procuring Agency’s representatives
i.Role and Responsibility of Project Team i.e. JDs of the Core
ii.Curriculum vitae of CEO/Owner/Managing Partner, Operational Managers
Curriculum Vitae (CV)
12. Proposed Position [only one candidate shall be nominated for each position]:
13. Name of Firm [Insert name of firm proposing the staff]:
14. Name of Staff [Insert full name]:
15. Date of Birth: Nationality:
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 57 of 242
16. CNIC No (if Pakistani): or Passport No:
17. Education:
Degree Major/Minor Institution Date
(MM/YYYY)
18. Membership of Professional Associations:
19. Other Training [Indicate significant training since degrees under 6 – Education were
obtained]:
20. Languages [For each language indicate proficiency: good, fair, or poor in speaking,
reading, and writing]:
21. Employment Record [Starting with present position, list in reverse order every
employment held by staff member since graduation, giving for each employment (see
format here below): dates of employment, name of employing organization, positions
held.]:
Procuring Agency Position From
(MM/YYYY)
To (MM/YYYY)
22. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
[Among the assignments in which the staff has been involved, indicate the following
information for those assignments that best illustrate staff capability to handle the tasks
listed under point 11.]
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 58 of 242
1) Name of assignment or project:
Year:
Location:
Procuring Agency:
Main project features:
Positions held:
Activities performed:
2) Name of assignment or project:
Year:
Location:
Procuring Agency:
Main project features:
Positions held:
Activities performed:
3) Name of assignment or project:
Year:
Location:
Procuring Agency:
Main project features:
Positions held:
Activities performed:
[Unroll the project details group and continue numbering (4, 5, …) as many times as is
required]
12. Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV
correctly describes myself, my qualifications, and my experience. I understand that
any wilful misstatement described herein may lead to my disqualification or
dismissal, if engaged.
Date:
[Signature of staff member or authorized representative of the staff] Day/Month/Year
Full name of authorized representative:
Operational Managers:
Please provide the details of Operational Managers according to above details
(HR of Minimum Bachelors level will be considered of this category
(c) Skilled Labors for Sign boards Installation: Please provide the number of skilled labors
for sign boards installation. Mention the name of persons, CNIC Numbers and their
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 59 of 242
experience in a table and attach the copies of their CNIC cards.
(c) Laborer: Describe the number of laborers executing the site. Mention the name of
persons, CNIC Numbers and their experience in a table and attach the copies of their CNIC
cards.
SCHEDULE G TO BID – NETWORTH, CURRENT RATIO AND ANNUAL TURN OVER
Net worth, Current Ratio and Annual Turn Over: Please provide the two years income
statement and balance sheet in order to asses net worth, current ratio and annual turn over.
SCHEDULE H TO BID – MACHINERY RELATED TO SIGN BOARDS
MANUFACTURING
Digital Printing Machine:
Please provide the details of digital printing machines in a table showing the make, model
and capacity of machine. Attach the purchase or rental slips if any
Cutting Machines:
Please provide the details of cutting machines in a table showing the make, model and
capacity of machine. Attach the purchase or rental slips if any
Welding Plants:
Please provide the details of welding plants in a table showing the make, model and capacity
of machine. Attach the purchase or rental slips if any
SCHEDULE I TO BID –PROJECT RELATED PLANS
Please provide the working plans and methodology plans related to project in order to
express the strategy and project management related to signage supply and installation.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 60 of 242
SCHEDULE J TO BID - INTEGRITY PACT
DECLARATION OF FEES, COMMISSION AND BROKERAGE ETC.
PAYABLE BY THE SUPPLIERS OF GOODS, SERVICES & SERVICES IN
CONTRACTS WORTH RS. 10.00 MILLION OR MORE
Contract No.________________ Dated __________________
Contract Value: ________________
Contract Title: _________________
………………………………… [Name of Supplier] hereby declares that it has not obtained
or induced the procurement of any contract, right, interest, privilege or other obligation or
benefit from Government of Punjab (GoPb) or any administrative subdivision or agency
thereof or any other entity owned or controlled by GoPb through any corrupt business
practice.
Without limiting the generality of the foregoing, [name of Supplier] represents and warrants
that it has fully declared the brokerage, commission, fees etc. paid or payable to anyone and
not given or agreed to give and shall not give or agree to give to anyone within or outside
Pakistan either directly or indirectly through any natural or juridical person, including its
affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or
subsidiary, any commission, gratification, bribe, finder’s fee or kickback, whether described
as consultation fee or otherwise, with the object of obtaining or inducing the procurement of a
contract, right, interest, privilege or other obligation or benefit in whatsoever form from
GoPb, except that which has been expressly declared pursuant hereto.
[name of Supplier] certifies that it has made and will make full disclosure of all Contracts and
arrangements with all persons in respect of or related to the transaction with GoPb and has
not taken any action or will not take any action to circumvent the above declaration,
representation or warranty.
[name of Supplier] accepts full responsibility and strict liability for making any false
declaration, not making full disclosure, misrepresenting facts or taking any action likely to
defeat the purpose of this declaration, representation and warranty. It agrees that any contract,
right, interest, privilege or other obligation or benefit obtained or procured as aforesaid shall,
without prejudice to any other rights and remedies available to GoPb under any law, contract
or other instrument, be voidable at the option of GoPb.
Notwithstanding any rights and remedies exercised by GoPb in this regard, [name of
Supplier] agrees to indemnify GoPb for any loss or damage incurred by it on account of its
corrupt business practices and further pay compensation to GoPb in an amount equivalent to
ten time the sum of any commission, gratification, bribe, finder’s fee or kickback given by
[name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of
any contract, right, interest, privilege or other obligation or benefit in whatsoever form from
GoPb.
Name of Procuring Agency: ……………… Name of Supplier:
Signature: …………………… Signature: …………………………
[Seal] [Seal]
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 61 of 242
CRITERIA FOR EVALUATION OF BIDS
Description
It may be noted that all the quantities mentioned here are merely for the purpose of evaluation only,
and the quantities of the framework contract are mentioned below this table * All text should be written in Urdu and English Language Both Side by Side for all signage types **SS where used will be of 304 Grade ***The text mentioned underlined are instructions regarding changing size of signage component **** For each signage type installation charges should be separately mentioned keeping in the view that all signage will be installed in one single go by installation team
Supply Installation Sr No Signage Type Component Specifications Unit Rate Unit Rate Total Quantity Amount
F1
Internal Hanging
Signage -Fixed System
Signage Plate
4' (height) by 8' (width) Aluminum Composite Panel (ACP Aluminum coating not less than 0.3mm having PVDF Coating)) with thickness not less than 4 mm including bending on all sides (Double Sided). The face of ACP sheet
will be (7'101
2" x 3'10
1
2")
excluding bending (30.515 SFT) from both sides.
100 Frame of Signage
Should be made of 1.5" by 1.5" G.I square pipe having SWG 16, having total dimensions of
7'101
2" x 3'10
1
2" along with the
2 bracings of 1" by 1" square pipe of G.I having SWG 16 at center (one vertical & one horizontoal and welded connections).
Connection of Signage plate and
Frame
The ACP sheet should completely cover all the sides of frame and should be riveted to the frame with rivet diameter of 1/4" and having rivets at 1' intervals along length and 1' along height. The ACP sheet should have appropriate edge protection
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 62 of 242
Reflective Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective Sheeting with UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection &colors from the sheeting manufacturer. (For e.g. 3M)
Hanging Pipes
2 of these pipes of 1" diameter made of Stainless Steel SWG 14, having such length that clearance height of 8' from Finished Floor Level can be achieved. These should be attached with the GI square pipe and fixed with ceiling.
Hanging equipments
Hanging rods should be attached to the frame via G.I. socket with outer dia of 1.5" and length of 2" which will be welded to the frame via GI SWG 14 strip/plate of 6" length The rate will be divided by its area (i.e. 30.515 SFT), and will govern in any size ranging from (10 SFT to 40 SFT) Area of signage will be calculated by multiplying the total face width and height (excluding bending) of ACP sheet and bracing after 2 foot (in each direction) With minimum bracing of one horizontal and 2 vertical of GI Pipe of 1" x 1" having SWG 16
F1 (A)
Internal Hanging
Signage -Fixed System (A)
Signage Plate
4' (height) by 8' (width) Aluminum Composite Panel (ACP Aluminum coating not less than 0.3mm having PVDF Coating)) with thickness not less than 4 mm including bending on all sides (Double Sided). The face of ACP sheet
20
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 63 of 242
will be (7'101
2" x 3'10
1
2")
excluding bending (30.515 SFT) from both sides.
Frame of Signage
Should be made of 1.5" by 1.5" G.I square pipe having SWG 16, having total dimensions of
7'101
2" x 3'10
1
2" along with the
2 bracings of 1" by 1" square pipe of G.I having SWG 16 at center (one vertical & one horizontoal and welded connections).
Connection of Signage plate and
Frame
The ACP sheet should completely cover all the sides of frame and should be riveted to the frame with rivet diameter of 1/4" and having rivets at 1' intervals along length and 1' along height. The ACP sheet should have appropriate edge protection
Reflective Sheeting
Direct Digital Printing on Vinyl sheet of 3M 180-10 or equivalent & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection &colors from the sheeting manufacturer. (For e.g. 3M)
Hanging Pipes
2 of these pipes of 1" diameter made of Stainless Steel SWG 14, having such length that clearance height of 8' from Finished Floor Level can be achieved. These should be attached with the GI square pipe and fixed with ceiling.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 64 of 242
Hanging equipments
Hanging rods should be attached to the frame via G.I. socket with outer dia of 1.5" and length of 2" which will be welded to the frame via GI SWG 14 strip/plate of 6" length The rate will be divided by its area (i.e. 30.515 SFT), and will govern in any size ranging from (10 SFT to 40 SFT) Area of signage will be calculated by multiplying the total face width and height (excluding bending) of ACP sheet and bracing after 2 foot (in each direction) With minimum bracing of one horizontal and 2 vertical of GI Pipe of 1" x 1" having SWG 16
F2
Internal Hanging Signage - Slideable System
Signage Plate
1' (height) by 4' (width) High density Closed cell PVC Foam
board (Lite Board) with thickness not less than 5 mm. 8 plates are required in 32 SFT size signage on one side (Front
and Back)
10
Frame of Signage
Should be made of 1.5" by 1.5" G.I square pipe having SWG
16, having total width of 8' and height of 4' along with the 2 bracings of 1" by 1" square
pipe of G.I having SWG 16 at center (one vertical & one horizontoal and welded
connections)
Sliding plate
system
Anodized Aluminum sections of thickness 3mm of
appropriate and approved dimensions placed in such a
way so that sliding plate system can be implemented.
There should be two Aluminum sections around each foam board (top and
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 65 of 242
bottom). Riveted through the frame
Signage Texts
Direct Digital Printing on Lite board (closed cell PVC Foam
board) with UV Inks & scratch resistant sheet
Hanging Pipes
2 of these pipes of 1" diameter made of Stainless Steel SWG 14, having such length that clearance height of 8' from Finished Floor Level can be achieved. These should be attached with the GI square pipe and fixed with ceiling.
Hanging equipments
Hanging rods should be attached to the frame via G.I. socket with outer dia of 1.5"
and length of 2" which will be welded to the frame via GI SWG 14 strip/plate of 6"
length and fixed with ceiling per Square foot rate will
govern
H1
Specialist Name Plaques
and Room Name hanging
from wall
Name Plaques
Two SS sheet of high imported quality with Vinyl stenciling of translucent type (3630 series of 3M or equivalent). Sheet 1
size = 15"x7.5" & sheet 2 size=15"x4" thickness of both = 1.2 mm. (Double side writing)
170
Fixation
Mounted on wall via SS pipe with1" x 2" size and 1.2 mm
thick having length of 1' 2 Nos. of SS channels of same
length 1.5 mm thick and screwed with SS Pipe via 2
screws and signage plates to be screwed with SS Channels
via 3 fancy nuts and bolts
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 66 of 242
H1 (A)
Specialist Name Plaques
and Room Name hanging
from wall
Name Plaques
Two SS sheet of high imported quality with engraved colored text of approved color. Sheet 1
size = 15"x7.5" & sheet 2 size=15"x4" thickness of both = 1.2 mm. (Double side writing)
34
Fixation
Mounted on wall via SS pipe with1" x 2" size and 1.2 mm
thick having length of 1' 2 Nos. of SS channels of same
length 1.5 mm thick and screwed with SS Pipe via 2
screws and signage plates to be screwed with SS Channels
via 3 fancy nuts and bolts
J1 Room
Numbers - Stenciling
Room Name
SS sheet 8"x8" of 1 mm thickness with Vinyl stenciling of translucent type (3630 series of 3M or equivalent). 945
Fixation Fixed through wall with appropriate diameter and length of SS Spacer
J1 (A)
Room Numbers - Engraved
Room Name
SS sheet 8"x8" of 1 mm thickness with colored engraving of approved color and text 189
Fixation Fixed through wall with appropriate diameter and length of SS Spacer
K1
Room Name Plaques fixed
on wall - Stanciled
Room Name
SS sheet 15"x7.5" of 1.2 mm thickness with Vinyl stenciling of translucent type (3630 series of 3M or equivalent). 745
Fixation Fixed through wall with appropriate diameter and length of SS Spacer
K1 (A)
Room Name Plaques fixed
on wall - Engraved
Room Name
SS sheet 15"x7.5" of 1.2 mm thickness with colored engraving of approved color and text 149
Fixation Fixed through wall with appropriate diameter and length of SS Spacer
L1 Internal Wall
Signage Signage
Plate 36" x 9" Acrylic sheet with
6mm thickness 215
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 67 of 242
Reflective Sheeting
Direct Digital Printing on Diamond Grade or equivalent Reflective Sheeting with UV
Inks & Over laminate Sheeting, including warranty letter of up
to 10 years in terms of reflection &colors from the sheeting manufacturer. (For
e.g. 3M)
Fixation
Attached to the wall with appropriate number of SS Spacers of appropriate diameter and length per Square foot rate will govern
Q1
Internal Departmental signage, Floor
map board and caution signage with
Reflective Sheet
Signage Plate
5' x 5' ACP Sheet with 4mm Thickness
(Aluminum coating not less than 0.3mm having PVDF
Coating)
255
Signage Sheet and
text
Direct Digital Printing on Diamond Grade or equivalent Reflective Sheeting with UV
Inks & Over laminate Sheeting, including warranty letter of up
to 10 years in terms of reflection &colors from the sheeting manufacturer. (For
e.g. 3M)
Fixation
Fixed on wall/door or where required with SS Spacers for
appropriate diameter and one and each edge with running at distance of 2.5' from all sides
Per Square foot rate will govern (The range may vary
from 5' x 5' to 6" x 6")
Q1 (A)
Internal Departmental signage, Floor
map board and caution signage with
Reflective Sheet
Signage Plate
5' x 5' ACP Sheet with 4mm Thickness (Aluminum coating not less than 0.3mm having
PVDF Coating)
51 Signage
Sheet and text
Direct Digital Printing on Vinyl Sheet (of 3M 180-10 or
equivalent) with UV Inks & Over laminate Sheeting,
including warranty letter of up
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 68 of 242
to 10 years in terms of colors from the sheeting
manufacturer. (For e.g. 3M)
Fixation
Fixed on wall/door or where required with SS Spacers for
appropriate diameter and one and each edge with running at distance of 2.5' from all sides
Per Square foot rate will govern (The range may vary
from 5' x 5' to 6" x 6")
Q2
Caution Signage with
Photo luminous film
Signage Plate
24" x 24" ACP Sheet with 4mm Thickness (Aluminum coating not less than 0.3mm having
PVDF Coating)
170
Signage Sheet and
text
Direct Digital Printing on high quality Photo luminous film
with UV Inks with scratch resistant layer
Fixation
Fixed on wall/door or where required with SS Spacers for
appropriate diameter and one after each 12"
Per Square foot rate will govern (The range may vary
from 24" x 24" to 6" x 6")
Q3
Caution Signage with
Photo luminous film
Signage Plate
24" x 24" ACP Sheet with 4mm Thickness (Aluminum coating not less than 0.3mm having
PVDF Coating)
170
Signage Sheet and
text
Direct Digital Printing on high quality Photo luminous film
with UV Inks with scratch resistant layer
Fixation
Fixed through ceiling with SS chain with length enough to
maintain clear distance of 10' from wall
Per Square foot rate will govern (The range may vary
from 24" x 24" to 6" x 6")
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 69 of 242
Reflective
Sheet Reflective
Sheet
Reflective Sheet with Direct Digital Printing on Diamond
Grade or equivalent Reflective Sheeting with, UV Inks & Over laminate Sheeting, including warranty letter of up to 10 years in terms of reflection &colors from the sheeting
manufacturer. (For e.g. 3M) The price will be divided by
total area and per SFT rate will be governed for any size of
sheet 100 SFT
Vinyl Sheet Vinyl Sheet
Vinyl Sheet with Direct Digital Printing on Diamond Grade or equivalent Reflective Sheeting with, UV Inks & Over laminate Sheeting, including warranty
letter of up to 10 years in terms of colors from the
sheeting manufacturer. (For e.g. 3M)
The price will be divided by total area and per SFT rate will
be governed for any size of sheet 100 SFT
Total Cost of the Bid (For Evaluation purposes only)
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 70 of 242
C- STANDARDFORMS
FORM OF BID SECURITY
(Bank Guarantee)
Guarantee No._____________________
Executed on _____________________
Expiry date _____________________
(g) Guidelines for submission of schedule of prices
() Schedule of Prices
forthwith and without any reference to the Principal or any other person.
IN WITNESS WHEREOF, the above-bounden Guarantor has executed this Instrument under its
seal on the date indicated above, the name and corporate seal of the Guarantor being hereto
affixed and these presents duly signed by its undersigned representative, pursuant to authority of
its governing body.
_______________
Guarantor (Bank)
Witness:
1. _______________________ Signature _______________
_______________________ Name __________________
Corporate Secretary (Seal) Title ___________________
2. _______________________
_______________________ _______________________
Name, Title & Address Corporate Guarantor (Seal)
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 71 of 242
PART –II CONTRACT
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 72 of 242
FORM OF CONTRACT
This CONTRACT (hereinafter called the “Contract”) is made the [day] day of the month of
[month], [year], between, on the one hand, [name of Procuring Agency and related parties]
(hereinafter called the “Procuring Agency”) and administrative head of hospitals [name of
Hospital MS and related parties] , on the other hand, [name of Supplier] (hereinafter called
the “Supplier”).
[Note: In the text below text in brackets is optional; all notes should be deleted in final text.
If the Supplier consist of more than one entity, the above should be partially amended to read
as follows: “…(hereinafter called the “Procuring Agency”) and, on the other hand, a joint
venture consisting of the following entities, each of which will be jointly and severally liable
to the Procuring Agency for all the Supplier’s obligations under this Contract, namely, [name
of Supplier] and [name of Supplier] (hereinafter called the “Supplier”).]
WHEREAS
(a) the Procuring Agency has requested the Supplier to supply and install sign
boards as defined in the General Conditions of Contract attached to this
Contract (hereinafter called the “Services”);
(b) the Supplier, having represented to the Procuring Agency that they have the
required professional skills, and personnel and technical resources, have
agreed to provide the Services on the terms and conditions set forth in this
Contract for amount of……………………;
(c) the Procuring Agency has received budget from the Government of Punjab. It
intends to apply a portion of the proceeds of this budget to eligible payments,
if any, under the contract.
NOW THEREFORE the parties hereto hereby agree as follows:
1. The following documents shall be deemed to form and be read and construed as part of
this Contract, and the priority of the documents shall be as follows:
(a) the Letter of Acceptance;
(b) the Special Conditions of Contract;
(c) the General Conditions of Contract;
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 73 of 242
(d) the Scope of Services;
(e) Performance Specifications and Drawings;
(f) Annexures; and
(g) the Supplier’s Proposal.
2. The mutual rights and obligations of the Procuring Agency and the Supplier shall be as
set forth in the Contract, in particular:
(a) the Supplier shall carry out the Services in accordance with the provisions of
the Contract; and
(b) the Procuring Agency shall make payments, if any, to the Supplier in
accordance with the provisions of the Contract.
IN WITNESS, WHEREOF, the Parties hereto have caused this Contract to be signed in their
respective names as of the day and year first above written.
For and on behalf of [name of Procuring Agency]
[Authorized Representative]
For and on behalf of [name of Supplier]
[Authorized Representative]
[Note: If the Supplier consists of more than one entity, all these entities should appear as
signatories, e.g., in the following manner:]
For and on behalf of each of the Members of the Supplier
[name of member]
[Authorized Representative]
[name of member]
[Authorized Representative]
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 74 of 242
SECTION A: GENERAL CONDITIONS OF CONTRACT (GCC)
1. General Provisions
1.1 Definitions Unless the context otherwise requires, the following terms whenever
used in this Contract have the following meanings:
s) The Arbitrator is the person appointed jointly by the Procuring
Agency and the Supplier to resolve disputes in the first instance,
as provided for in Sub-Clause 8.2 hereunder.
t) “Contract” means the Contract signed by the Parties, to which
these General Conditions of Contract (GCC) are attached,
together with all the documents listed in Clause 1 of such signed
Contract;
u) “Contract Price” means the price to be paid for the performance
of the Services, in accordance with Clause 6;
v) “Day works” means varied work inputs subject to payment on a
time basis for the Supplier’s employees and equipment, in
addition to payments for associated materials and
administration.
w) “Defect” means an error or flaw in the process affecting
performance and potentially causing harm, a shortcoming that
may lead to damage or critically altering the construction of
goods, materials and rendering of services leading to their
obliteration.
x) “Procuring Agency” means Project Management Unit (PMU),
Primary & Secondary Healthcare Department, Government of
Punjab, 31 E 1 Gulberg III, Lahore.
y) “Foreign Currency” means any currency other than the currency
of the country of the Procuring Agency;
z) “GCC” means these General Conditions of Contract;
aa) “Government” means the Government of the Punjab;
bb) “Local Currency” means Pak Rupee (PKR);
cc) “Member,” in case the Supplier consist of a joint venture of
more than one entity, means any of these entities; “Members”
means all these entities, and “Member in Charge” means the
entity specified in the Special Conditions to act on their behalf
in exercising all the Supplier’ rights and obligations towards the
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 75 of 242
Procuring Agency under this Contract;
dd) “Party” means the Procuring Agency or the Supplier, as the case
may be, and “Parties” means both of them;
ee) “Personnel” means persons hired by the Supplier as employees
and assigned to the performance of the Services or any part
thereof;
ff) “Supplier” is a person or corporate body whose Proposal to
provide the Services has been accepted by the Procuring
Agency;
gg) “Supplier’s Proposal” means the completed Proposal document
submitted by the Supplier to the Procuring Agency
hh) “SCC” means the Special Conditions of Contract by which the
GCC may be amended or supplemented;
ii) “Specifications” means the specifications of the service included
in the Proposal document submitted by the Supplier to the
Procuring Agency
jj) “Services” means the work to be performed by the Supplier
pursuant to this Contract, as described in Section C – Scope of
services, Proposal document and attached Annexure.
1.2 Applicable Law The Contract shall be interpreted in accordance with the laws of
Islamic Republic of Pakistan.
1.3 Language This Contract has been executed in the language specified in the
SCC, which shall be the binding and controlling language for all
matters relating to the meaning or interpretation of this Contract.
1.4 Notices Any notice, request, or consent made pursuant to this Contract shall
be in writing and shall be deemed to have been made when delivered
in person to an authorized representative of the Party to whom the
communication is addressed, or when sent by registered mail, telex,
telegram, or facsimile to such Party at the address specified in the
SCC.
1.5 Location The Services shall be performed at such locations as are specified in
Section C – Scope of services and/or Appendix D, in the
specifications and, where the location of a particular task is not so
specified, at such locations, whether in the Government’s country or
elsewhere, as the Procuring Agency may approve.
1.6 Authorized
Representatives
Any action required or permitted to be taken, and any document
required or permitted to be executed, under this Contract by the
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 76 of 242
Procuring Agency or the Supplier may be taken or executed by the
officials specified in the SCC.
1.7 Inspection and
Audit by the
Procuring
Agency
The Supplier shall permit the Procuring Agency to inspect its
accounts and records relating to the performance of the Services and
to have them audited by auditors appointed by the Procuring
Agency, if so required.
1.8 Taxes and
Duties
1.9 Secrecy of
contract documents
and information
2.0 Action in
Absence of
Specification 2.Objects of
Antiquity
The Supplier and their Personnel shall pay such taxes, duties, fees,
and other impositions as may be levied under the Applicable Law.
The Supplier shall not, without the Procuring Agency's prior written
consent, disclose the Contract, or any provision thereof, or any
specification, plan, drawing, pattern, sample or information
furnished by or on behalf of the Procuring Agency in connection
therewith, to
any person other than a person employed by the Supplier in
performance of the Contract. Disclosure to any such employed
person shall be made in confidence and shall extend only so far, as
may be necessary for purposes of such performance.
The Supplier shall not, without the Procuring Agency's prior written
consent, make use of any document or information except for
purposes of performing the Contract.
Any document, other than the Contract itself, shall remain the
property of the Procuring Agency and shall be returned (in all
copies) to the Procuring Agency on completion of the Supplier's
performance under the Contract if so required by the Procuring
Agency.
In the case of any class of work for which there is no such
specification mentioned in the Contract, such work shall be carried
out in accordance with Engineer’s specifications, and in the event of
there being no such specifications, then the work shall be carried out
in all respects in accordance with the instructions and requirements
of the Engineer or other competent authority. All objects of value or antiquity found on the site shall remain the
property of the Procuring Agency or the Government of Pakistan as
per the Applicable Law, and such findings shall be immediately
reported to the Engineer/Procuring Agency.
2. Commencement, Completion, Modification, and Termination of Contract
2.1 Effectiveness of
Contract
This Contract shall come into effect on the date the Contract is
signed by both parties or such other later date as may be stated in
the SCC.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 77 of 242
2.2Commencement
of Services
2.2.1Work
Program
The Supplier shall submit a Schedule & Chart detailing the
scheduled program of works and schedule of procurement of
materials, as per the time frame specified in this tender, and
approved by the Procuring Agency/ Engineer/Architect. The said
Schedule & Chart shall be submitted subsequent to the acceptance
of the tender and within seven days of the final agreement made
between the Procuring Agency and the Supplier. The Schedule &
Chart shall be considered part of the final agreement, and shall be
binding upon the Supplier.
The Schedule shall be revised and brought up-to-date every month
and copies of the same shall be forwarded to the Engineer/Procuring
Agency. It is the Supplier's responsibility to see that these schedules
are adhered to. The Procuring Agency will not entertain any claim
by of the Supplier and Signage Suppliers on account of delay in
delivery of materials by the Procuring Agency.
2.2.2 Starting Date
2.2.3 Written Order
to Commence Work
The Supplier shall start carrying out the Services seven (07) days
after the date the Contract becomes effective, or at such other date
as may be specified in the SCC for each particular job.
After acceptance of the tender, the Engineer shall issue a written
order to the successful tenderer to commence the work, and the
Supplier shall supply and fix the items according the gestation
mentioned in the Work Order.
The Supplier shall enter upon or commence any portion of work
only with the written authority and instructions of the Engineer.
Without such instructions the Supplier shall have no claim to
demand for measurements of or payment for work done by him.
2.3 Intended
Completion Date
2.3.1 Grant of
Extension of Time
Unless terminated earlier pursuant to Sub-Clause 2.6, the Supplier
shall complete the activities by the Intended Completion Date, as is
specified in the SCC. If the Supplier does not complete the
activities by the Intended Completion Date, it shall be liable to pay
liquidated damage as per Sub-Clause 3.8. In this case, the
Completion Date will be the date of completion of all activities.
If the Supplier shall desire an extension of the time for completion
of the work on the ground of his having been unavoidably hindered
in its execution or on any other ground, he shall apply in writing to
the Engineer before the expiration of the period stipulated in the
tender or before the expiration of thirty days from the date on which
he was hindered as aforesaid or on which the cause for asking for
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 78 of 242
2.3.2 Certificate of
Completion
extension occurred, whichever is earlier; and the Engineer or other
competent authority may, if in his opinion there are reasonable
grounds for granting an extension, grant such extension as he thinks
necessary or proper. The decision of such competent authority in
this matter shall be final. The time limit for completion of the work shall be extended
commensurate with its increase in cost occasioned by alterations or
additions, and the certificate of the Engineer or other competent
authority as to such proportion shall be conclusive.
If the delay is attributable to reasons beyond the control of the
Supplier, requisite extension of time shall be granted by the
Engineer in after obtaining the approval of his higher authorities
wherever necessary.
On completion of the Entire Works, the Supplier shall report in
writing to the Engineer the completion of such work, and the
Engineer shall issue a certificate of Virtual Completion stating in
writing that the work has been so completed. The Maintenance
/Defects Liability Period shall commence from the date of such
certificate.
The works shall not be considered as completed until the
Engineer/Architect has certified in writing that they have been
virtually completed.
However, no such certificate shall be given nor shall the work be
considered to be complete until the Supplier shall have removed
from the premises on which the work shall have been executed all
surplus materials and rubbish, and shall have cleaned thoroughly all
finished surfaces, in or upon which the work has been executed, nor
until the works shall have been measured by the Engineer or other
competent authority, or where the measurements have been taken
by his subordinates until they have received the approval of the
Engineer or other competent authority, the said measurements being
binding and conclusive against the Supplier. If the Contractor shall
fail to comply with the requirements of this clause as to the removal
of scaffolding, surplus materials and rubbish, and cleaning the
premises, on or before the date fixed for the completion of the work,
the Engineer or other competent authority may, at the expense of
the Supplier, remove such surplus materials and rubbish and dispose
of the same as he thinks fit and clean off such dirt etc. as aforesaid;
and Supplier shall be liable to pay the amount of all expenses so
incurred, but shall have no claim in respect of any such surplus
materials as aforesaid except for any sum actually realized by the
sale thereof.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 79 of 242
2.3.3 Notice to be
given before work is
covered up
2.4 Modification
The Supplier shall give not less than five days notice in writing to
the Engineer before covering up or otherwise placing beyond the
reach of measurement any work, in order that the same may be
measured, and correct dimensions thereof taken before the same is
so covered up or placed beyond the reach of measurement; and shall
not cover up or place beyond the reach of measurement any work
without the consent in writing of the Engineer or other competent
authority or his subordinate in charge of work. If any work shall be
covered up or placed beyond the reach of measurement without
such notice having been given or consent obtained, the same shall
be uncovered at the Supplier’s expense, and in default thereof no
payment or allowance shall be made for such work or for the
materials with which the same was executed.
The Engineer, in concurrence with the Procuring Agency, may from
time to time issue further Drawings and/or written instructions,
details, directions and explanations, which are hereafter collectively
referred to as “instructions" in regard to: The variation or
modification of the design, quality or quantity of works or the
addition or omission or substitution of any work. Any discrepancy
in the Drawings or between the Schedule of quantities and/or
drawings and/or specification. The removal from the site of the
materials brought thereon by the Contractor and the substitution of
the other material thereof. The removal and/or re-execution of any
works executed by the Contractor.
The opening up for inspection of any work covered up. The
amending and making good of any work as executed. The
Contractor shall forthwith comply with and duly execute any work
comprised in such Engineer’s instructions, directions and
explanations, given to the Supplier or his representative upon the
works by the Engineer; which shall, if involving a variation, be
confirmed in writing by the Supplier within seven days, and if not
dissented from in writing within a further seven days by the
Engineer, such shall be deemed to be Engineer’s instructions within
the scope of the Contract. If compliance with the Engineer’s
instruction, as aforesaid, involves work and/or expense and loss
beyond that contemplated by the Contract, then, unless the same
were issued owing to some breach of this Contract by the Supplier,
the Procuring Agency shall pay to the Supplier at the
Engineer/Engineer’s Certificate the price of the said work (as an
extra to be valued as hereinafter provided and/or expense and/or
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 80 of 242
2.4.1 Orders for
variations to be in
writing
2.4.2 Variation not
to Vitiate Contract
2.4.3 Determination
of rates for
additional,
substituted or
altered items of
work
loss). Any alterations made to the work made based on technical;
/aesthetic values as per the instructions of the Engineer shall be
considered as part of the work undertaken by the Supplier under this
Contract, and shall be executed as such.
No such variations shall be made by the Supplier without an order
in writing of the Engineer. If for any reason the Engineer shall
consider it desirable to give any such order verbally, the Supplier
shall comply with such order and any confirmation in writing of
such verbal order given by the Engineer, whether before or after the
carrying out of the order, shall be deemed to be an order in writing
within the meaning of this clause; and if the Supplier shall within
seven days confirm the order in writing to the Engineer and if such
confirmation is not contradicted in writing within fourteen days by
the Engineer, it shall be deemed to be an order in writing by the
Engineer.
Any additional work which the Supplier may be directed to, in the
manner above specified, as part of the work, shall be carried out by
the Supplier on the same conditions in all respects on which he
agreed to do the main work and at the same rates as are specified in
the tender for the main work.
No alteration, omission, deletion or variation shall vitiate this
Contract, but in case the Engineer thinks proper at any time during
the progress of the works to make any alterations in or additions to
or omissions from the works or any alteration in the kind or quality
of the materials to be used therein, and shall give notice thereof in
writing under his hand to the Supplier, the Supplier shall alter, add
to or omit from, as the case may require, in accordance with such
notice, but the Supplier shall not do any work extra to or make any
deviation from any of the provisions of the Contract, stipulation,
specification or Contract drawings, without the previous consent in
writing of the Engineer; and the value of such extras, alterations,
additions or omissions shall in all cases be determined by the
Engineer and payment to be on sole discretion of the competent
authority.
If the additional, substituted or altered work includes any class of work for which no rate is specified in the Contract, then such work
shall be carried out at the rates specified for or derived from similar
item of work in the Contract. With regard to the question whether
the additional, substituted or altered item/items of work/works
is/are similar or not to that/those in the Schedule of Rates, the
decision of the Engineer shall be final and binding on the Supplier.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 81 of 242
2.4.4 Variations in
quantity
In the absence of similar items in Contract, the Supplier shall
within seven days of the date of receipt by him of the order to carry
out the work, inform the Engineer of the rates at which it is his
intention to charge for such class of work, supported by analysis of
the rate or rates claimed. The rate analysis submitted by the
Supplier shall be based on actual prevailing market rates of
materials, labor and any other incidental charges, plus 15% (fifteen
percent) overheads and profits, inclusive of all taxes. There upon
the Engineer shall determine the rates or rates on the basis of
observed data, and failing this, on the basis of prevailing market
rates. Under no circumstance shall the Supplier suspend the work
on the plea of non-settlement of rates for items falling under this
clause. In the event of any dispute regarding the rates for such
items the decision of the Engineer shall be final.
There may be large variations to the quantities mentioned in the
Bill of Quantities, and the Engineer reserves the right to decrease or
increase or delete any quantity of the item of work as required. The
Supplier should note that the rate quoted is per one unit; hence no
claims on escalation will be entertained due to variation in
quantities.
2.5 Force Majeure
Notwithstanding the provisions of the contract the Supplier shall not
be liable for forfeiture of its performance security, liquidated
damages or termination for default, if and to the extent that, its
delay in performance or other failure to perform its obligations
under the Contract is the result of an event of Force Majeure.
For purposes of this Clause, "Force Majeure" means an event
beyond the control of the Supplier and not involving the Supplier's
fault or negligence and not foreseeable. Such events may include,
but are not limited to, acts of the Procuring Agency either in its
sovereign or contractual capacity, wars or revolutions, fires, floods,
epidemics, quarantine restrictions and freight embargoes.
If a Force Majeure situation arises, the Supplier shall promptly
notify the Procuring Agency in writing of such conditions and the
cause thereof. Unless otherwise directed by the Procuring Agency
in writing, the Supplier shall continue to perform its obligations
under the Contract as far as is reasonably practical, and shall seek
all reasonable alternative means for performance not prevented by
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 82 of 242
the Force Majeure event.
2.6 Termination
2.6.1 By the
Procuring
Agency
2.6.1.1 If the Supplier, being an individual or a firm, commit any
“Act of Insolvency” or shall be adjudged as Insolvent or, being an
incorporated company, shall have an order for compulsory winding
up made against it, or pass an effective resolution for winding up
voluntarily or subject to the supervision of the court and of the
Official Assignee of the Liquidator in such acts of insolvency, or on
winding up shall be unable within seven days after notice to him
requiring him to do so, to show to the reasonable satisfaction of the
Engineer/Architect/Procuring Agency that he is able to carry out
and fulfill the Contract, and to give security therefore, if so
required by the Engineer/Architect or the Procuring Agency, or if
the Supplier (whether an individual, Firm or Incorporated
Company) shall suffer execution to be issued, or shall suffer any
payment under this Contract to be attached by or on behalf of any
of the creditors of the Supplier, or shall assign or sublet this
Contract without the consent in writing of the Architect first
obtained, or shall charge or encumber this Contract or any
payments due or which may become due to the Supplier there
under, or if the Engineer/Architect shall certify in writing to the
Procuring Agency that the Supplier:
2.6.1.2 Has abandoned the Contract, or
2.6.1.3 Has failed to commence the works, or has without any
lawful excuse under these conditions suspended the progress of the
works, or
2.6.1.4 Has failed to proceed with the works with such due
diligence and failed to make such due progress as would enable the
works to be completed within the time agreed upon, or
2.6.1.5 Has failed to remove rejected materials from the site or to
pull down and replace rejected work upon receiving from the
Engineer/Procuring Agency written notice that the said materials or
work were condemned and rejected by the Engineer/Procuring
Agency under these conditions, or
2.6.1.6 Has neglected or failed persistently to observe and perform
all or any of the acts, matters or things by this Contract to be
observed and performed by the Supplier, after written notice shall
have been given to the Supplier requiring the Supplier to observe or
perform the same, or
2.6.1.7 Has to the detriment of good workmanship, or in defiance of
the Engineer’s instructions to the contrary, sublet any part of the
Contract,
2.6.1.8 Then and in any of the said cases, the Procuring Agency
with the written recommendation of the Engineer may,
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 83 of 242
notwithstanding any previous waiver, after giving fifteen days’
notice in writing to the Supplier, terminate the Contract.
2.6.1.9 Further, the Procuring Agency or his agent or his servants,
may enter upon and take possession of the works and all signage,
tools, scaffoldings, sheds, machinery, and other power utensils and
materials lying upon the premises or the adjoining lands or roads,
and use the same as his own property or may employ the same by
means of his own servants and workmen in carrying out and
completing the works, or by employing any other Suppliers or
other person or persons to complete the works, and the Supplier
shall not in any way interrupt or do any act, matter or thing to
prevent or hinder such other Supplier or other person or persons
employed for completing and finishing or using the materials and
signage for the works. Upon completion, or as soon thereafter as
convenient, the Engineer/Procuring Agency shall give a notice in
writing to the Supplier to remove his surplus materials, and should
the Supplier fail to do so the Procuring Agency shall sell the same
by public auction, and shall give credit to the Supplier for the
amount realized.
2.6.2 By the
Supplier
The Supplier may terminate this Contract, by not less than thirty
(30) days’ written notice to the Procuring Agency, such notice to be
given after the occurrence of any of the events specified in
paragraphs (a) and (b) of this Sub-Clause 2.6.2:
(a) if the Procuring Agency fails to pay any monies due to the
Supplier within agreed timeline pursuant to this Contract, and
not subject to dispute pursuant to Clause 7, the Supplier shall
issue first notice that such payment is overdue. After forty-five
(45) days of giving written first-notice, if the Procuring
Agency still fails to pay, Supplier shall issue second written
notice. After fifteen days(15) of no response on second notice,
Supplier may give thirty (30) days termination notice; or
(b) if, as the result of Force Majeure, the Supplier is unable to
perform a material portion of the Services for a period of not
less than twenty-one (21) days with mutual consultation with
Procuring Agency.
2.6.3 Suspension
of Payment
2.7 Review of
Progress
If the Supplier has not received sums due to by the due date stated in
the SCC in accordance with Clause 6 the Supplier may issue a notice
as per sub-clause 2.6.2.
The progress of works shall be reviewed periodically by the
Procuring Agency/Engineer, as per the Schedule & Chart submitted
by the Supplier at the time of final agreement and revised
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 84 of 242
periodically.
3. Obligations of the Supplier
3.1 General
3.1.1 Framework Contract
The Supplier shall perform the Services in accordance with the
Specifications and Scope, and carry out its obligations with all due
diligence, efficiency, and economy, in accordance with generally
accepted professional techniques and practices, and shall observe
sound management practices, and employ appropriate advanced
technology and safe methods. The Supplier shall always act, in
respect of any matter relating to this Contract or to the Services, as
faithful adviser to the Procuring Agency, and shall at all times
support and safeguard the Procuring Agency’s legitimate interests
in any dealings with third parties.
During the total period of the contract, the Supplier shall be bound
by the Procuring Agency to provide the Sign Boards from time to
time on Framework Contract up to a quantity as specified in the
following schedule:
Quantities of Frame work
The framework quantities under this contract are given below. The quantities shall be valid for the Financial Years 2018-19 & 2019-20.
F1 Internal Hanging Signage -Fixed System 1000
F1 (A)
Internal Hanging Signage -Fixed System (A)
200
F2 Internal Hanging Signage - Slideable System
100
H1 Specialist Name Plaques and Room Name hanging from wall
1700
H1 (A)
Specialist Name Plaques and Room Name hanging from wall
340
J1 Room Numbers - Stenciled 9450
J1 Room Numbers - Engraved 1890
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 85 of 242
(A)
K1 Room Name Plaques fixed on wall - Stenciled
7450
K1 (A)
Room Name Plaques fixed on wall - Engraved
1490
L1 Internal Wall Signage 2150
Q1 Internal Departmental signage, Floor map board and caution signage with Reflective Sheet
2550
Q1 (A)
Internal Departmental signage, Floor map board and caution signage with Reflective Sheet
510
Q2 Caution Signage with Photo luminous film
1700
Q3 Caution Signage with Photo luminous film
1700
Reflective Sheet 10,000 SFT
Vinyl Sheet 10,000 SFT
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 86 of 242
3.2 Conflict of
Interests
3.2.1 Supplier
Not to
Benefit
from
Commissio
ns and
Discounts.
The remuneration of the Supplier pursuant to Clause 6 shall
constitute the Supplier’s sole remuneration in connection with this
Contract or the Services, and the Supplier shall not accept for their
own benefit any trade commission, discount, or similar payment in
connection with activities pursuant to this Contract or to the
Services or in the discharge of their obligations under the Contract,
and the Supplier shall use their best efforts to ensure that the
Personnel and agents of either of them similarly shall not receive
any such additional remuneration.
3.2.2 Supplier
and
Affiliates
Not to be
Otherwise
Interested
in Project
The Supplier agree that, during the term of this Contract and after
its termination, the Supplier and its affiliates, shall be disqualified
from providing goods, works, or Services (other than the Services
and any continuation thereof) for any project resulting from or
closely related to the Services.
3.2.3 Prohibition
of
Conflicting
Activities
Neither the Supplier nor the Personnel shall engage, either directly
or indirectly, in any of the following activities:
(a) during the term of this Contract, any business or professional
activities which would conflict with the activities assigned to
them under this Contract;
(b) during the term of this Contract, Supplier shall not hire such
public employees, in active duty or on any type of leave,
which would conflict with the activities assigned to Supplier
to perform any activity under this Contract;
(c) after the termination of this Contract, such other activities as
may be specified in the SCC.
3.3 Confidentiality The Supplier, and the Personnel of either of them shall not, either
during the term or within two (2) years after the expiration of this
Contract, disclose any proprietary or confidential information
relating to the Project, the Services, this Contract, or the Procuring
Agency’s business or operations without the prior written consent
of the Procuring Agency.
3.4 Supplier’s
Actions
Requiring
The Supplier shall obtain the Procuring Agency’s prior approval in
writing before taking any of the following actions:
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 87 of 242
Procuring
Agency’s Prior
Approval
(a) entering into a subcontract for the performance of any part of
the Services,
(b) appointing such members of the Personnel not listed by name
in Scope (“Key Personnel”),
(c) changing the Program of activities; and
(d) any other action that may be specified in the SCC.
3.5 Reporting
Obligations
The Supplier shall submit to the Procuring Agency the reports and
documents specified in Scope in the form, in the numbers, and
within the periods set forth in the said scope.
3.6 Documents
Prepared by the
Supplier to Be
the Property of
the Procuring
Agency
All plans, drawings, specifications, designs, reports, and other
documents and software submitted by the Supplier in accordance
with Sub-Clause 3.6 shall become and remain the property of the
Procuring Agency, and the Supplier shall, not later than upon
termination or expiration of this Contract, deliver all such
documents and software to the Procuring Agency, together with a
detailed inventory thereof. The Supplier may retain a copy of such
documents and software. Restrictions about the future use of these
documents, if any, shall be specified in the SCC.
3.8 Liquidated
Damages
3.7.1 Payments of
Liquidated
Damages
The Supplier shall pay liquidated damages to the Procuring Agency
at the rate per day stated in the SCC for each day that the
Completion Date is later than the Intended Completion Date. The
total amount of liquidated damages shall not exceed the amount
defined in the SCC. The Procuring Agency may deduct liquidated
damages from payments due to the Supplier. Payment of liquidated
damages shall not affect the Supplier’s liabilities.
3.7.2 Correction
for Over-
payment
If the Intended Completion Date is extended after liquidated
damages have been paid, the Procuring Agency shall correct any
overpayment of liquidated damages by the Supplier by adjusting
the next payment certificate. The Supplier shall be paid interest on
that sum, calculated from the date of payment to the date of
repayment, at the rates specified in Clause 6.
3.7.3 Lack of
performanc
e penalty
If the Supplier, after receipt of written notice from the
Engineer/Procuring Agency requiring compliance, fails to comply
with such further drawing and/or Engineer’s instructions, the
Procuring Agency, with the recommendation of the Engineer, may
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 88 of 242
employ and pay other persons to execute any such work whatsoever
that may be necessary to give effect thereto, and all costs incurred
in connection therewith shall be recoverable from the Supplier by
the Procuring Agency, on the Certificate of the Engineer, as a debt,
or may be deducted by him from any moneys due or to become due
to the Supplier
3.10 Perfor
mance Security
3.11 Execution of
Works
3.11 Bound by
Within 14 days after the Contractor’s receipt of each order, the
Contractor shall furnish Performance Security to the Procuring
Agency for an amount of 5% of the contract value, valid up to 60
days after the date of completion of contract obligations.
The proceeds of the performance security shall be payable to the
Procuring Agency as compensation for any loss resulting from the
Contractor's failure to complete its obligations under the Contract.
The Performance Security shall be Bank Guarantee in favor of the
Procuring Agency.
The performance security will be discharged by the Procuring
Agency and returned to the Contractor not later than 60 days
following the date of completion of the Contractor's performance
obligations.
In the event of any contract amendment, the Contractor shall,
within 7 days of receipt of such amendment, furnish the
amendment to the performance security, rendering the same valid
for the duration of the contract, as amended for further period of 60
days thereafter.
The Contractor shall execute the whole and every part of the work
in the most sound and substantial and workman-like manner, and
in strict accordance with the specifications both as regard to
materials and workmanship. The Contractor shall also conform
exactly, fully and faithfully to the designs, drawings and
instructions in writing relating to the work signed by the Engineer
or other competent authority and lodged in his office, and to which
the Supplier shall be entitled to have access, during office hours, at
such office or on the site of the work, for the purpose of inspection.
The Supplier shall, if he so requires, be entitled at his own expense
to obtain copies of the specifications and of all such designs,
drawings and instructions as aforesaid. The Supplier shall also be
responsible for the delivery of assigned job as per complete
satisfaction of the Engineer and the execution of the work strictly
in accordance with the specifications of work
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 89 of 242
Engineer Instructions
3.12 Defects Liability
Period/Maintenance
Period
3.13 Responsibility for
the Delay
The Supplier shall be bound to carry out the work in accordance
with any instructions in this connection which may be given to him
in writing signed by the Engineer, his authorized representative or
other competent authority.
Any instructions given verbally shall be noted in the Instruction
Book and got signed by the Engineer, or his authorized
representative, and deemed as instructions for the proper execution
of the work and, when considered necessary by the Engineer,
followed up in writing.
The whole of the work must be proceeded with in such sections and
at such times as directed by the Engineer.
If the Supplier or his workmen knowingly or unknowingly break,
damage, deface, injure or destroy any part of the fixed or part of
unfixed development in which they may be working, or any
building, road, fence, enclosure or grass land or cultivated ground
contiguous to the premises on which the work or any part thereof
is being executed, or if any damage shall be done to the work
while it is in progress, from any cause whatever, or if any damage
of any kind is done to the signge material incorporated in the work,
any imperfections become apparent in it within twelve months of
the grant of a Certificate of Completion, final or otherwise, by the
Engineer or other competent authority, the Supplier shall make
good the same at his own expense, or in default, the Engineer or
other competent authority may cause the same to be made good by
other workmen, and deduct the expenses (of which the certificate
of the Engineer or other competent authority shall be final) from
any sums that may be due or may thereafter become due to the
Supplier, or from his security deposit or the proceeds of sale
thereof, or of a sufficient portion thereof.
In case the progress achieved falls short by more than 25 percent of
the cumulative program, the reasons for such shortfall shall be
examined and a record made thereof apportioning the
responsibilities for the delay between the Supplier and the
Procuring Agency. This record should be signed in full and dated
both by the Engineer and the Supplier.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 90 of 242
3.14 Materials and
Workmanship
3.15 Samples of Work
3.17 Adherence to
Time Schedule
3.18 Setting out Work
3.19 Time Limits for
Unforseen Claims
All materials and workmanship shall, so far as procurable, be of the
respective kinds described in the schedule of quantities and/or
specification and in accordance with the Engineer/Engineer
instructions. The Supplier shall, upon the request of the
Engineer/Procuring Agency, furnish him with all invoices,
accounts, receipts, and other vouchers to prove that the materials
comply therewith.
All signage materials to be used on the work shall comply with the
requirements of the specifications in case of not confirming, shall
be established as the best available in the market by the Engineer
on due verification before approving the same to be installed on
site.
The Supplier shall be entirely responsible for the proper and
efficient carrying out of the work. The work shall be done in the
best and most workmen like manner. The samples of the best
available signage materials shall be provided by the Supplier at site
and shall be inspected by the Engineer or his designated staff
before being loaded for transport to the site.
The Supplier shall provide samples of all the signage materials at
site at his own cost before supply / installation at site.
The completion period, as stated in the Contract, shall be strictly
adhered to by the Supplier, and shall be reckoned from the date on
which the order to commence the work is issued to the Supplier in
writing by the Procuring Agency. It is the Supplier’s responsibility
to maintain the rate of progress as stipulated in the periodic
Schedule & charts.
The Supplier shall set out the works and shall be responsible for the
true and perfect setting out of the same and for the correctness of
the position, levels, dimensions and alignment of all parts thereof in
accordance with the drawing, if at any time any error in this respect
shall appear during the progress of the works, the Supplier shall, at
his own expense, rectify such error as required, to the satisfaction
of the Engineer.
The Supplier shall have to clear the site as directed before the work
is commenced, without any extra cost.
Under no circumstances whatever shall the Supplier be entitled to
any compensation from the Procuring Agency on any account
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 91 of 242
3.20 Suppliers Supervision of Works
3.21 Supplier Liable for Damages in Work Area
unless the Supplier shall have submitted a claim in writing to the
Engineer or other competent authority within thirty days of the
cause of such claim occurring.
The Supplier shall, at all times during the usual working hours, and
at all other times at which reasonable notice of the intention of the
Engineer or other competent authority or his subordinate to visit the
work shall have been given to the Supplier, either himself be
present to receive orders and instructions, or have a responsible
agent, duly accredited in writing, present for the purpose. Orders
given to the Supplier’s duly authorized agent shall be considered to
have the same force and effect as if they had been given to the
Supplier himself.
The Supplier shall protect from injury/damages from any cause
whatsoever all work and supply to any other requisite protection for
the whole work executed by him or special damage caused must be
made good by the Supplier at his own expense.
Should the work be suspended by reason of rain, strike, lockouts or
any other disturbing cause, the Supplier shall take all precautions
necessary for the protection of the work at his own expense, and
shall make good any damage arising from any of the causes.
Compensation for all damages done by Supplier or his men
whether in or beyond the limits of project shall be estimated by the
Engineer, and the estimate of the Engineer, subject to the decision
of the Engineer on appeal, shall be final. The Supplier shall be
bound to pay the amount of the assessed compensation on demand,
failing which the same will be recovered from the Supplier as
damages in the manner herein prescribed or deducted by the
Engineer or other competent authority from any sums that may be
due or become due from Procuring Agency, to the Supplier under
this Contract or otherwise.
The Supplier shall be responsible for all injury to persons, animals
or things, and damage to structural and decorative works and
damage to neighboring property, which may arise from the
operation or neglect of himself or of any nominated Signage
Suppliers or their employees, whether such injury or damage arise
from carelessness, accident or any other cause which is in any way
connected with the carrying out of this Contract. This clause shall
be held to include, inter alia, any damage to buildings and works
forming the subject of this Contract by frost or other inclemency of
weather. The Supplier shall indemnify the Procuring Agency and
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 92 of 242
3.22 Insurance in
Respect of Damages to
Persons and Property
hold him harmless in respect of all and any expense arising from
any such injury or damage to persons or property as aforesaid, and
also in respect of any claim made in respect of injury or damage
under any Act of Government or otherwise, and also in respect of
any award of compensation or damages consequent upon such
claim.
The Supplier shall reinstate all damage to property of every sort
mentioned in this clause, so as to deliver up the whole of the
contract works complete and perfect in every respect, and so as to
make good or otherwise satisfy all claims for damage to the
property of third parties.
The Supplier shall indemnify the Procuring Agency against all
claims which may be made against the Procuring Agency by any
member of the public or other third party, in respect of anything
which may arise in connection to the works or in consequence
thereof. The Supplier shall, at his own expense, arrange to effect
and maintain, until the virtual completion of the Contract, a policy
of Insurance against such risks, in the joint names of the Procuring
Agency and the Supplier, with an approved office; and deposit such
policy or policies with the Architect/Procuring Agency from time
to time during the currency of this Contract.
The Supplier shall similarly indemnify the Procuring Agency
against all claims which may be made upon the Procuring Agency,
whether under the Workmen's Compensation Act or any other
statute in force during the currency of this Contract, or at common
Law in respect of any employee of the Supplier or any Signage
Supplier and shall at his own expense effect and maintain until the
virtual completion of the Contract, with an approved office, a
policy of Insurance in the joint names of the Procuring Agency and
the Supplier against such risks, and deposit such policy or policies
with Architect/Procuring Agency from time to time during the
currency of the Contract.
The Supplier shall be responsible for anything which may be
excluded from the Insurance policies above referred to, and also for
all other damages to any property arising out of and incidental to
the negligent or defective carrying out of this Contract. He shall
also indemnify the Procuring Agency in respect of any costs,
charges or expenses arising out of any claim or proceeding, and
also in respect of any award of or compensation of damage arising
there from.
The Procuring Agency, with the concurrence of the Architect,
shall be at liberty and is hereby empowered to deduct the amount
of any damage, compensation, costs, charges and expense arising
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 93 of 242
3.24 Procuring
Agency’s Safety Policy
or accruing from or in respect of any such claims or damage, from
any sum or sums due or to become due to the Supplier.
The Supplier shall provide everything necessary for the proper
execution of the works according to the intent and meaning of the
Drawings, Schedule of Quantities and Specification taken together,
whether the same may or may not be particularly shown or
described therein, provided that the same can reasonably be
inferred there from.
The occupational safety, health and welfare of all employees
engaged in the construction of the project is of primary concern to
the Procuring Agency.
The Safety Policy is to manage the Project to ensure compliance
with all of the provisions of Government Standards and Procedures
and Project Environmental, Safety and Health Plan.
Throughout the execution of the work, Suppliers shall conform to
all lawful requirements, which in any way affect or are applicable
to the work and shall observe and comply with applicable safety
and health rules and regulations.
The Safety of the Workers employed by the Supplier will be the
exclusive responsibility of the Supplier and the Supplier will ensure
compliance with all Site Safety regulations in force on the site.
The Supplier will be responsible for the insurance as per the laws
of Pakistan, of his workers and employees employed or otherwise
present on the site and the Supplier indemnifies the Procuring
Agency against any claims or suits arising out of any adverse event
occurring in the execution of this contract
The safety provisions will include
The Supplier shall provide all persons working at site with
equipment, for ensuring safety from injury.
The Supplier, from the time of being placed in possession of the
site, shall provide safety & security for watching, lighting and
protecting the work, the site and surrounding property by day, by
night, on Sundays or other holidays, at no extra cost to the
Procuring Agency.
The Supplier shall provide any necessary temporary enclosures,
gates, entrances etc., for the protection of the work and materials,
and for altering and adopting same as may be required, and remove
the same at completion of the works and make good all works
disturbed.
The Supplier shall display all danger signs, contains notices at the
site to notify all about the safety aspects.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 94 of 242
3.3 Laboratory
Testing
The Supplier shall provide all necessary fencing and lights
required to protect the public from accident.
The Supplier shall be responsible for any damage occurred during
the installation of Sign Boards in hospital due to patients’
attendants’ invasion into the work area. Supplier must make liaison
with the security personnel to devise a plan to avoid any untoward
incident. Randomly 1 sample out of 100 sign boards will be tested in third
party laboratory. The approval and acceptance of all sign boards
will be subjected to the successful results of these tested samples.
To arrange these in all aspects will be obligation of the supplier.
However, the selection of samples will be from the client’s side.
4. Supplier’s Personnel
4.1 Description of
Personnel
The titles, agreed job descriptions, minimum qualifications, and
estimated periods of engagement in the carrying out of the Services
of the Supplier’s Key Personnel are described in Scope of services.
4.2 Removal and/or
Replacement of
Personnel
4.3
Measurement/Assess
ment of work
(a) If the Procuring Agency finds that any of the Personnel have
(i) committed serious misconduct or have been charged with
having committed a criminal action, or (ii) have reasonable
cause to be dissatisfied with the performance of any of the
Personnel, then the Supplier shall, at the Procuring Agency’s
written request specifying the grounds thereof, provide as a
replacement a person with qualifications and experience
acceptable to the Procuring Agency.
(b) The Supplier shall have no claim for additional costs arising
out of or incidental to any removal and/or replacement of
Personnel.
The Engineer may, from time to time, intimate to the Supplier that
he requires the works to be measured, and the Supplier shall
forthwith assist or send a qualified agent to assist the Engineer (or
their representative) in taking such measurements and calculations,
and to furnish all particulars or to give all assistance required by
either of them. The Supplier shall agree to all such measurements
recorded on the spot.
Before taking any measurements of the works, the Engineer shall
give minimum 24 hours notice to the Supplier and Supplier shall
make arrangement of manpower, measuring tools or if any either
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 95 of 242
required
Should the Supplier not attend or neglect or omit to send such Agent
within a week of the specified time period, the measurement taken
by the Engineer/Procuring Agency or approved by him shall be
taken to be the correct measurement of the works, and shall be
binding on the Supplier, and the Supplier shall have no right to
dispute the same.
5. Obligations of the Procuring Agency
5.1 Assistance and
Exemptions
The Procuring Agency shall use its best efforts to ensure that the
Government shall provide the Supplier such assistance and exemptions
as specified in the SCC.
5.2 Change in the
Applicable
Law
If, after the date of this Contract, there is any change in the Applicable
Law with respect to taxes and duties which increases or decreases the
cost of the Services rendered by the Supplier, then the remuneration
and reimbursable expenses otherwise payable to the Supplier under
this Contract shall be increased or decreased accordingly by Contract
between the Parties, and corresponding adjustments shall be made to
the amounts referred to in Sub-Clauses 6.2 (a) or (b), as the case may
be.
5.3 Services and
Facilities
The Procuring Agency shall make available to the Supplier the
Services and Facilities listed under Section – C, Scope of Services.
Provision of site free from all encumbrances for construction activity
shall be the responsibility of the Procuring Agency, failure to provide a
clear-site is a compensation event
6. Payments to the Supplier
6.1 Lump-Sum
Remuneration
The Supplier’s remuneration shall not exceed the Contract Price and
shall be a fixed lump-sum including all costs, and all other costs
incurred by the Supplier in carrying out the Services described in
Section C and scope of services of Proposal document. Except as
provided in Sub-Clause 5.2, the Contract Price may only be increased
above the amounts stated in Sub-Clause 6.2 if the Parties have agreed
to additional payments in accordance with Sub-Clauses 2.4 and 6.3.
6.2 Contract Price (a) The price payable in Pak Rupees (PKR) is set forth in SCC.
(b) The price payable in foreign currency is set forth in the SCC.
6.3 Payment for
Additional
Services
6.3.2 For the purpose of determining the price for additional Services
as may be agreed under Sub-Clause 2.4, a breakdown of the
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 96 of 242
6.4 No
Compensation for
Deletion of Work
6.5 Possession of
Site for Work 6.6 Retention
Money
6.7 Submission of
Bills
price is to be provided in Appendix C.
If at any time after the execution of the Contract documents, the
Engineer or other competent authority shall, for any reason
whatsoever, require the whole or any part of the work, as specified in
the tender, to be stopped for any period or require the whole or part of
the work (i) not to be carried out at all or (ii) not to be carried out by
the tendered Contractor, he shall give notice in writing of the fact to
the Contractor, who shall thereupon suspend or stop the work totally or
partially as the case may be. In any such case, the Contractor shall
have no claim to any payment of compensation whatsoever on account
of any profit or advantage which he might have derived from the
execution of the work in full but which he did not so derive in
consequence of the full amount of the work not having been carried
out, or on account of any loss that he may be put on account of
materials purchased or agreed to be purchased or for unemployment of
labor recruited by him. He shall also not have any claim for
compensation by reason of any alterations having been made in the
original specification, drawings, designs, and instructions which may
involve any curtailment of the work as originally contemplated.
Every endeavor shall be made to give clear possession of site in one
lot, and if it is not possible to do so, in more than one lot for which
delay, if any, no claim shall be entertained for the Contractor, but
extension of time of completion, if justified, may be granted, without
affecting the contract price.
An amount equivalent to 5% of price of contract amount shall be
retained till successful completion of Defects Liability Period /
Maintenance Period, which will be deducted 5% of the running bill
and will be released on successful completion of maintenance period.
All bills shall be prepared in the prescribed printed or typed form in
quadruplicate along with same indicated clearly on the copy of the
drawing for physical location details of the job work and handed over
to the Engineer in charge and acknowledgment obtained.
The charges to be made in the bills shall always be entered at the rates
specified in the tender, in full or in part as the case may be. In the case
of any extra work ordered in pursuance of these conditions, and not
mentioned or provided for in the tender, the charges in the bills shall
be entered at the rates herein provided for such work.
One copy of the passed bill shall be given to the Supplier without any
charge.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 97 of 242
6.8 Payment of
Bills
The details furnished by the Supplier in the bill should be completely
scrutinized and the said work should be checked to be in accordance
with the measurements recorded on the spot. The countersignature of
the Supplier or his agent in the Measurement Book and drawing shall
be sufficient proof as to the correctness of measurements, and shall be
binding on the Supplier in all respects.
Payment Terms based on the item rates for the quantum of the
certified virtual completion of the work shall be as follows;
6.8.1 Development works:
The bills for the payments shall be submitted separately for each
hospital of respective package based on execution work by the
following schedule/criteria: The format of IPC is annexed at B.
Sr.
NO.
Name and No.
of Package
Name of
Hospital
IPC
NO.
Amount of Bill
b. Sign Boards would be considered as per number of
boards as per specification provided in the
drawing/BOQ, and their rates would be measured
according to numbers or in square feet, as specified for
each case individually.
An amount equivalent to 5% of the billed amount will be retained till
the successful completion of the warranty period. Defects / Liability
Period / Maintenance Period. Which shall be one year
6.8.3 Payments shall be made promptly by the Procuring Agency but
in no case later than thirty (30) days after acceptance of item and
submission of the invoice or claim by the Supplier.
6.8.4 Payment shall be made in currency as indicated in the order.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 98 of 242
6.9 Taxes and
Duties
6.8.5 The Supplier shall be entitled to the payment of the Final
balance in accordance with the Final Certificate to be issued in
writing by the Engineer at the expiration of the maintenance period
referred to as “the Defects Liability Period” in the Appendix hereto,
or as soon after the expiration of such period as the works shall have
been finally completed and all defects made good according to the
true intent and meaning hereof, whichever shall last happen, provided
always that the issue by the Engineer of any Certificate during the
progress of the works or at or after their completion shall not relieve
the Supplier of his liability in cases of fraud, dishonesty, or fraudulent
concealment relating to the works or materials or to any matter dealt
with in the certificate, and in case of all defects and insufficiencies in
the works or materials which a reasonable examination would not
have disclosed.
6.8.6 No certificate of the Engineer shall of itself be conclusive
evidence that any work or materials to which it relates are in
accordance with the Contract.
6.8.7 The Engineer shall have power to withhold any certificate if the
works or any parts thereof are not being carried out to his satisfaction.
6.8.8 The Engineer may, by any certificate, make any correction in
any previous certificate which shall have been issued by him.
6.8.10 The final bill shall be submitted by the Supplier within one
month of the date of actual completion of the work in all respects.
Suppliers shall be entirely responsible for all taxes, duties, license
fees, octroi, road permits, etc., incurred until delivery and installation
of the contracted Goods to the Procuring Agency.
Being the purchases for Hospitals the customs/Excise duty Sales Tax
exemptions are applicable and these should be taken into account in
preparing the bids.
The Supplier and their employees shall be responsible for payment of
all their income tax, sales tax and other taxes on income arising out of
the Contract and the rates and prices stated in the Contract shall be
deemed to cover all such taxes, and the client will not deduct any such
taxes.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 99 of 242
7. Quality Control
7.1 Identifying
Defects
The principle and modalities of Inspection of the Services by the
Procuring Agency shall be as indicated in the SCC and scope of
services. The Procuring Agency shall check the Supplier’s
performance and notify him of any Defects that are found. Such
checking shall not affect the Supplier’s responsibilities. The
Procuring Agency may instruct the Supplier to search for a Defect
and to uncover and test any service that the Procuring Agency
considers may have a Defect. The building defects liability period is
12 months, starting from date mentioned on “Completion
Certificate”.
7.3 Correction of
Deficiencies,
and Non-
Performance
Penalty
7.3 Shortfall in
Progress made up
Subsequently 7.4 Penalty for
Delay
7.5 Sub-standard
(a) The Procuring Agency shall give notice to the Supplier of any
Defects before the end of the Contract. The Defects liability
period shall be extended for as long as Deficiencies remain to
be corrected.
(b) Every time notice of Deficiency is given, the Supplier shall
correct the notified Deficiency within the length of time
specified by the Procuring Agency’s notice.
(c) If the Supplier has not corrected a Deficiency within the time
specified in the Procuring Agency’s notice, the Procuring
Agency will assess the cost of having the Deficiency corrected,
the Supplier will pay this amount, and a Penalty for Non-
Performance calculated as described in Sub-Clause 3.8.
To the extent, the shortfall is assessed, as due to the delay on the part
of the Supplier, a notice shall be issued to him by the Engineer and
penalty shall be levied.
When the shortfall in the progress of work is determined to be due to
delay on the part of the Supplier, he shall be held to be responsible
for the same and shall be liable to pay penalty. In respect of the
shortfall in progress, assessed as due to the delay on part of the
Supplier the Supplier shall be liable to pay as penalty an amount of
0.1% of contract amount per day, up to a maximum amount of 10%
in contract sum, after which the Procuring Agency reserves the right
to terminate the Contract.
In the case of any failure by the Supplier to pay such penalty, the
Engineer or other competent authority may rectify or remove, and
re-execute the work or remove and replace the materials or articles
complained of, as the case may be, at the risk and expense in all
respects of the Supplier.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 100 of 242
Work
7.6 Acceptance of
Sub-standard Work
7.7 Work Open to
Inspection
If at any time before the security deposit is refunded to the Supplier,
it shall appear to the Engineer or other competent authority, that any
work has been executed with unsound, imperfect or unskillful
workmanship or with materials of inferior quality, or that any
materials or articles provided by the Supplier for the execution of the
work are unsound, or of a quality inferior to that contracted for or
are otherwise not in accordance with the Contract, it shall be lawful
for the Engineer or other competent authority to intimate this fact in
writing to the Supplier, who shall then be bound forthwith to rectify,
or remove and reconstruct the work so specified in whole or in part
as the case may require, or if so required, shall remove the materials
or articles at his own charge and cost, within such reasonable time as
may be specified in the order.
Should the Engineer or other competent authority for any valid
reasons consider that any such inferior work or materials as
described above is to be accepted or made use of, it shall be within
his discretion to accept the same at such reduced rates he may fix
thereof.
The decision of the Engineer, regarding the quantum of reduction as
well as justification thereof in respect of rates for sub-standard work
which may be decided to be accepted, will be final and would not be
open to arbitration.
The Engineer (and his representative) and the Procuring Agency
shall, at all reasonable times, have free access to the work and/or to
the workshops factories, or other places where materials are lying or
from which they are being obtained, and the Supplier shall give
every facility to the Engineer necessary for inspections and
examination and test of the materials and workmanship.
All works under or in course of execution or executed in pursuance
of the Contract shall at all times be open to the inspection and
supervision of the Engineer or other competent authority and his
subordinates.
8. Settlement of Disputes
8.1 Amicable
Settlement
The Parties shall use their best efforts to settle amicably all disputes
arising out of or in connection with this Contract or its interpretation
through negotiations in case of a dispute as a first step.Each Party shall
identify an officer who shall try to resolve the dispute for a period not
exceeding 10 days. In case of a failure, the matter shall be referred to
the arbitration.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 101 of 242
8.2 Dispute
Settlement
8.3 Arbitration
8.2.1 If any dispute or difference of any kind whatsoever were to arise
between the Engineer and the Supplier regarding the following
matters, namely:
8.2.2 The meaning of the specifications designs, drawings and
instructions herein before mentioned;
8.2.3 The quality of workmanship or materials used on the work; and
8.2.4 Any other question, claim, right, matter, thing whatsoever, in
any way arising out of or relating to the Contract, design, drawings,
specification estimates, instructions, or orders, or those conditions or
failure to execute the same whether arising during the progress of the
work, or after the complete termination or abandonment thereof,
8.2.5 The dispute shall be referred to the Engineer who has
jurisdiction over the work specified in the Contract. The Engineer
shall, within a period of thirty days from the date of being requested
by the Supplier to do so, give written notice of his decision to the
Supplier In case disputes are not resolved under provision of Clause, then the
dispute shall be settled in accordance with provision of Arbitration Act
1940, as amended from time to time.
The venue of the arbitration shall be Lahore, Pakistan.
Annexure - B
Sr.
NO.
Description Unit Total BOQ Since Previous Current Bill
Quantity Amount Quantity Amount Quantity Amount
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 102 of 242
SECTION B. SPECIAL CONDITIONS OF CONTRACT
Number of
GC Clause
Supplements to, Clauses in the General Conditions of Contract
1.1 The Arbitrator is: To be mutually decided in accordance with Arbitration
Act of 1940.
1.1 The contract name is: SUPPLY AND INSTALLATION OF SIGN
BOARDS IN PRIMARY & SECONDARY HEALTHCARE
DEPARTMENT ESTABLISHMENTS OF PUNJAB
1.1 The Procuring Agency is: Project Management Unit, Primary and
Secondary Healthcare Department, Government of Punjab
1.2 The Applicable Law is:Laws of Islamic Republic of Pakistan
1.3 The language is:English
1.4 The addresses are:
Procuring Agency:
Project Management Unit, Primary and Secondary Health Department,
Government of Punjab
31-E/1, Shahrah-e-Imam Hussain, Gulberg III, Lahore
Attention: Project Director, PMU
Tel: +924299231208
Mob:0331-4427972
Email: [email protected]
Supplier:
Attention:
Tel:
Email:
1.6 The Authorized Representatives are:
For the Procuring Agency:
Name:
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 103 of 242
Number of
GC Clause
Supplements to, Clauses in the General Conditions of Contract
Designation: Director Infrastructure, PMU
Tel:
Email:
For the Supplier:
Name:
Designation:
Tel:
Email:
2.1 The Contract shall come into force on such date as is mentioned in the work
order.
2.2.2 The Starting Date for the commencement of Services shall be such as
mentioned in the work order.
2.3 The Intended period of contract is:2 years from the date of
commencement; the execution must be completed within (45) forty-five
days from the date of commencement of each Contract.
3.8.1 The liquidated damages rate is 0.1% per day
The maximum amount of liquidated damages for the whole contract is
equivalent to 10%contract amount.
6, 6.2(a) The amount in Pak Rupees is:
6.5 Payment shall be made within 30 days of receipt of verified invoice, relevant
documents and successful completion of work.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 104 of 242
PART –III SCOPE OF WORK
Background
Primary & Secondary Healthcare Department (the Procuring Agency) invites bids from
Companies/Firms for the Supplying and Installation of Sign Boards in all the Primary &
Secondary Healthcare Facilities of Punjab.
The Procuring Agency delivers quality healthcare services to the community through an
efficient and effective service delivery system that is accessible, equitable, culturally
acceptable, affordable and sustainable. The Procuring Agency aims to improve the health and
quality of life of all, particularly women and children, through access to essential health
services and strives to reform and strengthen the critical aspects of the health systems and
enable it to:
• Provide and deliver a basic package of quality essential health care services
• Develop and manage competent and committed health care providers
• Generate reliable health information to manage and evaluate health services
• Adopt appropriate health technology to deliver quality services
• Finance the costs of providing basic health care to all
• Reform the health administration to make it accountable to the public
Procuring Agency is the key department entrusted by the people of Punjab with the
fundamental responsibility for the health of communities and the entire population. The
Procuring Agency is committed to deliver primitive, preventive as well as curative health
care services of Primary Health Care level to Secondary Health Care level.
Free of cost consultation, diagnostic facilities and medicines are provided to the patients
particularly focusing on the poor and marginalized segments of the society. The Procuring
Agency also provides different programs like:
• Hepatitis Control Program
• Aids Control Program
• Expanded Program for Immunization
• TB Control Program
• IRMNCH
• Malaria Control Program
• Infection Control Program
Besides measures to prevent, treat and control other communicable diseases and Epidemics /
Disasters, these vaccines are provided through Expanded Program on Immunization (EPI) for
children under 2 years and pregnant ladies. Health Department is producing its own trained
and qualified Human Resource keeping the HR development needs and requirements of
Health Care Infrastructure in mind.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 105 of 242
Scope of Work
All the works, pertaining to the Sign board works, will have to be done by the Supplier at the
allotted Health Facilities within a period of forty-five days from the date of award of each
individual contract as per the conditions of the contract. The signage works require dedicated
effort for ensuring durability and the sign boards materials requires appropriate level of
expertise and experiences in handling of the work. The installation shall be in stages,
primarily as per the availability of the site after completion of the Civil Works on the desired
stretch. The broad scope of work is mentioned as below while the detailed performance of
the Supplier shall be gauged based on the schedules as provided and the detailed
specifications and BOQ Items:
3. Speedy Work: Follow-up with the Civil Contractor for handing over of the site in
desired state for speedy signage works. Owner shall not be responsible for any delay
on account of the said reasons whatsoever.
4. Site Clearance: The sign board Supplier shall ensure the area of concern to be
cleared of all the unwanted materials like cement mix, aggregates, debris, and wastes
of any type or left over of the civil contractor before starting his work. The same
should be cleared off by the civil contractor and to be followed-up by the sign board
supplier. In-event of the same not being removed off the site by the civil contractors,
Signage Supplier shall be required to get the undesirable waste cleared off the site as
per instruction of the Engineer. The site clearance and preparation shall be at no
additional cost but part and parcel of the signage works. The site shall be signed off
for signage works only after sign-off by the Engineer on joint inspection with the
Signage Supplier.
GENERAL GUIDELINES FOR EXTERNAL SIGNAGE
Each sign board plate showing the name of facility should be in such a format that it should
display name of the facility in both URDU and ENGLISH languages with relevant symbol of
facility and its pointing arrow.
Each health facility should be given a specific intrinsic color (e.g. red for emergency) which
must be used for that facility signage plate in background for all signage types. The final
decision for each color lies with the Procuring Agency, and the color codes are conditional to
approval. Moreover, background color and text with symbol should be digitally printed on
one sheet.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 106 of 242
Type EG-1 to EG-8: Gantry Signage:
These signage are to be installed at the main gate of the hospital. The width of main gate vary
from hospital to hospital. Hence, the rate of horizontal structure pipe should be given
separately so that it can be added or subtracted from signage amount separately.
Type EL: Lettering:
This signage type is desired to install at façade or facia of hospitals building or in above
mentioned Gantry signage. This should be complete in all aspects including electrical wiring,
LED Modules etc.
Type A: External Platform/Road Signage:
These signage are to be installed on the shoulder of metaled asphalt road or any other
external platform for instance tough paver, P.C.C etc. The text on this sign board will be
giving information regarding road/traffic e.g. speed limit, or left/right turn symbols etc.
Type B: Main Directional Board:
This signage type should be installed on the main gate entrances inside the complex. The
purpose of this signage is to flash information regarding the location of major facilities of
hospital, and it shall serve as a monumental monolith structure.
Type C: Directional Board:
The directional board signage should be installed on the shoulder of the road/external
pathways as well as on junctions. They shall also be installed on the outside of each
department.
Type D: Departmental Signage on Building:
This signage type is required to be installed on the façade of block displaying the name of the
block
Type E: External Map Boards:
This signage type is required to be installed just few feet away from the main gate entrances.
This signage type should display layout plan (not to the scale) of hospital with necessary
directions, as well as building blocks highlighted in color codes.
Internal Signage
GENERAL INFORMATION REGARDING INTERNAL SIGNAGE:
Each signage plate showing the name of facility should be in such a format that it should
display name of the facility in both URDU and ENGLISH languages with relevant symbol of
facility and its pointing arrow. Moreover, background color and text with symbol should be
digitally printed on one sheet.
Type F: Internal Hanging Sign Boards:
This signage should be hanged with ceiling of building and is desired to be installed at the
main entrances as well as in corridors. This signage type should display the name of the main
health facilities ahead and above, and in adjoining corridors. The sizes shall vary according
to the space available.
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 107 of 242
Type H: Specialist name plaque fixed on wall:
These name plaques are desired to be fixed outsides the consultant/specialist rooms. The
name plaque should display the specialty of the doctor e.g. “Child Specialist” in URDU and
ENGLISH languages
Type J and K: Room Name Plaques and Numbers fixed on Wall:
This is a combination of two plaques combined into one. The first one, the room number,
shall be of Stainless steel, with approximately 1/3rd area used for text. The negative area shall
be used as a back drop from the second plate, which shall be of glass, and placed one inch
above the negative area on the SS. The glass plates shall be two in quantity for each room,
with text stenciled and pasted in between them.
Type L: Internal Wall Signage
These wall sign boards shall be on all corners and junctions, and shall act to further elaborate
the main Internal Hanging Sign Boards (Type F).
Type Q1: Internal Departmental, Floor map board, and Caution Signage
These signage are need to be installed at main entrance of departments of hospital building,
Floor map boards or any caution signage.
GENERAL INFORMATION REGARDING INTERNAL SIGNAGE:
Each signage plate showing the name of facility should be in such a format that it should
display name of the facility in both URDU and ENGLISH languages with relevant symbol of
facility and its pointing arrow. As for the final placement of each text, arrow, color code and
symbol, the Supplier shall obtain the details and approval from the Procurement Agency.
GENERAL INFORMATION
The Supplier shall be awarded contracts individually for each Health Facility according to the
availability of site, in which he shall be conveyed the actual total numbers of sign boards
required for each type. After each award of contract, the Supplier is expected to fabricate and
install them on site within 45 days. The final payments are conditional to the inspections of
the relevant committee(s) at site on time of installation or in warehouse before installation.
The content to be written on signage will be given by the department and service provider
has to produce the art work of that content and got it approved by the department.
The quantities mentioned in this Package 1 are for the Primary and Secondary Healthcare
Establishment in the following Districts of Rawalpindi and Gujranwala Division:
11. Attock
12. Chakwal
13. Jehlum
14. Rawalpinidi
15. Gujranwala
16. Gujrat
17. Hafizabad
18. Mandi Bahaud Din
Framework Contract of Supplying and Installation of Sign Boards –
Year 2018-19 & 2019-2020
Page 108 of 242
19. Narowal
20. Sialkot