pur 2013-07 miscellaneous architectural and engineering services rfp mandatory pre-proposal...
TRANSCRIPT
![Page 1: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/1.jpg)
PUR 2013-07 Miscellaneous Architectural and Engineering
Services RFPMandatory Pre-Proposal Conference
July 22, 2013
[ Sample Image: Place a 9.5” x 4.75” image here ]
![Page 2: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/2.jpg)
Agenda
• Welcome – E. Buddy Davis
• Brief Introductions
• RFP Overview– Deadlines– Scope of Requested Services– Tour of CBHC facility– Questions
![Page 3: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/3.jpg)
1.2 Timeline and Summary - RFP
• July 12, 2013 – RFP Packets & Instructions released.
• July 22, 2013 – Mandatory Pre-proposal Meeting
• July 23, 2013 – Deadlines for Written Questions
• July 26, 2013 – Answers to Questions released
• August 2, 2013 – 4:00 p.m. Proposal deadline
![Page 4: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/4.jpg)
1.2 Timeline and Summary – RFP, con’t.
• Week of August 5, 2013 – Evaluation Committee certifies firms and
evaluates proposals.
• Week of August 12, 2013 – Presentations of top 3 firms
• August 15, 2013 – – Evaluation committee recommend top 3
firms to Executive Director
![Page 5: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/5.jpg)
1.2 Timeline and Summary – RFP, con’t.
• August 22, 2013 – Executive Director recommends top 3 firms in rank
order to Board.– Board Approves list of firms and authorizes
negotiation with #1 ranked firm.
• August 23, 2013• Notice of Intent to Award issued.
• August 27 – September 5, 2013– Contract negotiations completed.
![Page 6: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/6.jpg)
Scope of Requested Services
• 1.4.1.1
• Project 1- Building Envelope Services– North and South Balcony leaks– 2nd Floor Window seal leaks– Roof Leaks
![Page 7: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/7.jpg)
North & South Balconies
North Entrance South Entrance
![Page 8: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/8.jpg)
2nd Floor Window Leaks
![Page 9: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/9.jpg)
Roof Leaks
ELC tenant space CBHC IT area
![Page 10: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/10.jpg)
Scope of Requested Services, con’t,
• 1.4.1.2 Project 2- Parking Lot – Remove tree roots and repair pavement– Sealcoat pavement– Re-stripe parking lines– Install traffic calming devices and speed limit signs– Add “No Parking Zones” in designated areas– Replace damaged car stops– Install new bike rack
![Page 11: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/11.jpg)
Parking Lot Repair & Improvements
![Page 12: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/12.jpg)
Repair, Sealcoat and Re-paint
![Page 13: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/13.jpg)
Improvements – Traffic calming
Parking Entrance Speed Reduction
![Page 14: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/14.jpg)
Improvements, con’t.
Landscape curbing Bike racks
![Page 15: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/15.jpg)
Scope of Requested Services, con’t,
• 1.4.2 Potential Projects – Tenant Space Re-design– Innovations Lab Reconfiguration– Audio/Visual Technology Upgrades– HVAC units repair or replacement
![Page 16: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/16.jpg)
Tenant Space Redesign
![Page 17: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/17.jpg)
Deadline Summary
• Deadline for Written Questions– 4:00 p.m. July 23, 2013– Emailed to [email protected]
• Answers to Written Questions– 4:00 p.m. July 26, 2013
• Posted on www.childrensboard.org and www.demandstar.com
• RFP deadline– 4:00 p.m. August 2, 2013 (CBHC clock)
• Delivered to CBHC office building• Emailed to [email protected]
![Page 18: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/18.jpg)
Deadlines, continued.
• Evaluation Committee Review (Week of August 5, 2013)– Certify all qualified firms.
• City and County qualified or based on statutory criteria in Section 287.055, Florida Statutes.
– Hear presentations from top 3 firms, based on their total scores received. (Week of August 12, 2013)
– Recommend top three ranked firms to CBHC Executive Director.
• Executive Director recommends top three ranked firms to Board for Approval – August 22, 2013
• Board approves list of firms in rank order and authorizes negotiations with #1 ranked firm – August 22, 2013
![Page 19: PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”](https://reader034.vdocument.in/reader034/viewer/2022051516/56649ce35503460f949af612/html5/thumbnails/19.jpg)
Thank You!
• Questions!
• The End.
• Contact information:– E. Buddy Davis, Purchasing & Facilities Director– Direct Line: 813-204-1770– Email – [email protected]