purpose driven, uncompromised professional construction. civils profile.pdf · purpose driven,...
TRANSCRIPT
Purpose driven, uncompromised professional construction.
CIVILSCORPORATE PROFILE
A uniquely different experience.
It’s the challenge and satisfaction that comes from the successful completion of every civils project that drives us forward.
Probuild Construction Group. Purpose driven, uncompromised professional
construction. A unique, different experience. Civils Projects, inspired to be
“
“
Based on a construction heritage that stretches back to 1989, Probuild directors Michael Simmonds, Nicholas and Phillip Buck have determined that achieving the highest standards of quality consistently requires a holistic, integrated approach backed by a strong corporate culture.
While providing the management team with the leeway to achieve, the directors follow a ‘hands on’ approach through daily involvement in the running of the business.
An ethos based on the highest ethical standards permeates our entire, purpose-driven business. With well trained and experienced team members being the most valuable asset of the business, the directors believe that utilising the most advanced technological systems to achieve corporate and client goals provides a significant advantage in a highly competitive marketplace.
The drive to provide our client base with an integrated solution delivering end-to-end quality led to the directors establishing a Civils Division in 2011 that operates seamlessly within the Probuild Group. In keeping with company culture, the division is managed by experienced and motivated professionals focused on delivering ‘best of breed’ service, and has attained a CIDB grading of 8CE.
SETTING A QUALITY BENCHMARK
mission“To create value for all our stakeholders by offering top quality, cost effective civils services.”
“To be recognised as a highly significant and competitive player in the civils projects industry in South Africa.”
WE ENSURE OURLONG TERM FUTURE BY:
Serving the best interests of our clients and exceeding their expectations
Continuing the employment of a transformation process
Creating a safe civils working environment
Excellence of delivery in our Civils Division is achieved by adherence to the principles of value-based management and the implementation of management controls of the highest calibre. Our IT-based management systems, operating procedures and process controls deliver measurable and actionable results, integrated process management and precise administration of every civils project
UNCOMPROMISEDSERVICE DELIVERY
SERVICESOFFERED
The Civils Division offers high quality turnkey solutions as well as specialist civils work that includes: Road construction
Infrastructure services for new townships
Construction of bridges Reservoirs and tanks, sewerage holding tanks, storm water drainage, retention dams
In choosing to contract with our Civils Division, clients have the assurance that they are dealing with a highly experienced team of civils experts backed by an integrated organisation committed to the delivery of excellence on brief, on time and on budget. Our leadership maintains an open door policy to advance interface with clients to ensure that our client base enjoys peace of mind throughout the course of a project.
CHOOSING QUALITY
THE VALUESTRONG LEADERSHIP
OF
Kobus van der Westhuizen (Bsc (Bldg) UOFS - 1994), Director of the Civils Division, joined Probuild in 2002 and brings more than 15 years of experience in the building and civils industries.
Under his leadership within the realm of an integrated management environment, the Civils Division delivers an unparalleled service offering of the highest quality – on time, to specification and on budget.
Delivering on that promise consistently is no mean feat in a highly competitive marketplace. The fact that the division has been able to consistently meet its commitments without compromise and to total client satisfaction speaks to the dedication of the civils team, backed by a supportive corporate group.
The sustained growth of our civils business in a short period is a strong indication that we deliver unwaveringly on our promise
SAFETYIN CIVILS
A fundamental requirement of the Probuild business model is adherence to
the highest standards of safety in the execution of contracts. A safety mindset is constantly reinforced among all team members in the workplace and beyond.
On all civils projects and throughout our operations we adhere to:
Strict compliance with the Occupational Health and Safety Act,
industry regulations and codes of practice in order to maintain the highest
possible standards of safety
Our quality control and adherence to product, service and safety
levels are non-negotiable. Exceptional standards are demanded and delivered
We are committed to protecting our workforce by ensuring total
compliance with occupational health and safety protocols
Our policy is designed to fit site and
situation specifics.
OUREXPERTISEYOURADVANTAGE
1. Client track record in delivering on your promise
2. Qualifications and experience
3. Use of advanced IT systems to manage and control projects
4. Excellence in application of management systems
5. Integrated business group philosophy that ensures the advantages of the group permeate the activities of all divisions
6. Implementation of the highest possible standards of safety
7. Support for small and medium business enterprises
8. Provision of employment opportunities and training for local communities
The Probuild Civils Division is committed to all these criteria which, when taken holistically, give our clients a competitive advantage second to none.
COMPLETEDSELECTED PROJECTS
CONTRACT SITE LOCATION DESCRIPTION CONTRACTDURATION / COMPLETION
Raceway Park Phase 2 Bloemfontein Construction of complete township infrastructure, construction of outfall sewer line and upgrade of intersection for the Manguang Municipality
Mar 2015
Raceway Park Phase 1 Bloemfontein Construction of complete township infrastructure, construction of outfall sewer line and upgrade of intersection for the Manguang Municipality
Nov 2012 – June 2013
N8 Intersection Bloemfontein Intersection and Traffic Calming – National Road Intersection upgrade, all relevant stormwater drainage, traffic control and signalisation
Nov 2014
Nicolway Bryanston Bulk Earthworks and Lateral support Sept 2014
Founders Hill Modderfontein 6 Storey Concrete Structure Jan 2014 – Dec 2014
Massbuild Midrand Concrete Hardstand for heavy duty traffic, with all related earthworks and stormwater drainage
Dec 2014
Bath Rosebank Bulk Earthworks and Platforms Jan 2015
Centenary Way Modderfontein Construction of new dual carriageway for JRA, construction of complete township infrastructure, construction of internal roads, construction of water retention structures and sewer pipe bridge
Aug 2015
Bulk Water Pipe Bloemfontein Medium Pressure Pipe Line – 700 diameter steel pipeline with all relevant chambers and connections
May 2015
Cedar Road Steyn City, Cnr William Nicol & Zeven Road, Riverglen/Dainfern
All intersection circle upgrades with special pattern paving and Road Overlays with all relevant roadmarking and signage
Feb 2015
Vantage Rosebank Bulk Earthworks and Lateral Support
Sept 2014
4 Stan Road Sandton Bulk Earthworks Oct 2014
Basa School Soweto Bulk Earthworks, parking areas, all relevant stormwater drainage and council road upgrade
Dec 2014
Steyn City - SewerPump Station
Steyn City. Cnr William Nicol & Zeven Road, Riverglen/Dainfern
Sewer pump station, holding tanks and ancillary works for Jhb Water
April 2013 - July 2013
Glenway Nooitgedacht, Mamelodi 6 km gravity and pumped outfall sewer line , construction of concrete pipeline bridge , sewer pump station and all associated works for Tswane Municipality
May 2012 - March 2013
Glenway - Internal Services
Nooitgedacht, Mamelodi Construction of complete township infrastructure, construction of sewer holding tank and pump station , construction of all internal roads for Tswane Municipality
Jan 2013 - Oct 2013
Salfin Phase 2 Carnival City Construction of complete township infrastructure, construction of outfall sewer line and pipe jacking to Rand Water Boards main water line Ekurhuleni Municipality
Oct 2014
Salfin Phase 1 Carnival City Construction of complete township infrastructure, construction of outfall sewer line and pipe jacking to Rand Water Boards main water line Ekurhuleni Municipality
Nov 2012 - May 2013
Pinelands Antwerp RoadModderfontein / Edenvale
Construction of roads and buried services for Heartland Properties
May 2013 - Aug 2013
Glenway - External Roads
Nooitgedacht, Mamelodi Ugrade of provincial road and new intersection for Gautrans Roads Department
Aug 2012 - March 2013
Westlake New K113 RoadModderfontein / Edenvale
Construction of new dual carriageway for JRA , construction of complete township infrastructure , construction of internal roads , construction of water retention structures and sewer pipe bridge
Aug 2012 - May 2013
Longlake Ext 12 Linbro Park Construction of new dual carriageway for JRA and township development, construction of water retention dams and bulk earthworks
Oct 2013
Longlake Ext 1 Linbro Park Construction of new dual carriageway for JRA and township development, construction of water retention dams and bulk earthworks
2012 - 2013
COMPLETEDSELECTED PROJECTS
CONTRACTDURATION / COMPLETION
CONTRACT SITE LOCATION DESCRIPTION
Steyn City - Reservoir Steyn City. Cnr William Nicol & Zeven Road, Riverglen/Dainfern
30 million litre concrete water reservoir and ancillary works for Jhb Water
Feb 2013 - Mar 2014
Devland Resevoir Cnr. Evette & Jan de Necker 15 million litre concrete water reservoir and ancillary works for Jhb Water
Nov 2012 - Dec 2013
Douglasdale Dairy Douglasdale Construction of 18 metre high dry milk powder bottling plant
2012
Niven Road Douglasdale Complete township infrastructure, upgrade of council road , construction of low level bridge and construction of access route and retaining walls for JRA , construction
2011
Valley Road Thornhill Construction of multi-directional road and traffic circle upgrade for
2012
Orion Park Randfontein Complete township infrastructure and construction of internal roads for the Randfontein Municipality
2011 - 2012
Morena Manor Mafikeng Complete township infrastructure, construction of internal roads for Mafikeng Municipality
2011 - 2012
The Boundary Lonehill Complete township infrastructure, upgrade of council road for Johannesburg Roads Agency (JRA), and construction of internal roads
2012
The Link Rivonia Upgrade of council roads and intersections for JRA , construction of internal roads and paving
2011
Greenwich Village Paulshof Upgrade of council road for JRA , bulk earthworks
2012 - 2013
Oasis Manor Randfontein Complete township infrastructure and construction of internal roads for the Randfontein Municipality
2011 - 2012
Sunset Manor Roodepan, Kimberley Complete township infrastructure, construction of internal roads and construction of sewer pump station and ancillary works for Sol Plaatje Municipality
2011 - 2012
Kensington Place Ferndale Complete township infrastructure, upgrade of council road for JRA and bulk earthworks
2011
COMPLETEDSELECTED PROJECTS
CONTRACTDURATION / COMPLETION
CONTRACT SITE LOCATION DESCRIPTION
COMMITMENTTO SMALL BUSINESSES
As the Civils Division, we extend our investment in people to local small and medium enterprises by ensuring that:We liaise with local authorities and civic organisations to identify potential employees Sub-contractors and labour used on our projects are drawn from local communities whenever possible on-site training is provided to all S.M.E’s who require upgrading of skills Local entrepreneurs and sub-contractors are earmarked Providing employment to new recruits who show
Our site management team ensures that quality construction standards are strictly adhered to by local S.M.E’s
CHOOSE THE BESTWe have developed an ethos, a structure, management and control methodologies aimed out ensuring our client base receives the highest standards of excellence end-to-end throughout our projects. Our primary objective is to achieve total client satisfaction while meeting the stringent standards set by the Probuild Group
We will maintain our passion to deliver exceptional quality, on time and on budget for every project in which we are involved
OUR PROMISE
PROBUILD CIVILS DIVISIONProbuild Commercial Park, Unit 4, 347 James CrescentHalfway House, Midrand
Tel: +27 11 805 6223
Fax: +27 11 805 6228
Email: [email protected]
Web: www.probuild.co.za
Probuild Civils Division is available to tender on civil construction projects. Talk to us if you’re looking for a committed contractor.