WENCO – GRP CONSTRUCTION QUALITY ASSURANCE & CONTROL INSPECTION CHECK LIST
CODE REF: PROC. REF: CHECK POINT DESCRIPTION CURRENT STATUS CORRRECTIVE ACTION TAKEN
Page 2 of 8
fire protection material shall be inspected to ensure
that the original packaging is not damaged.
For piping, fittings and flanges, are these items
lifted, moved and stored on site prior to use inaccordance with manufacturers specifications for
short and long term storage
Is there a control manifest or warehousing control
for receiving, issue and return of materials
Sect 5.3: System design
documentation
Supplied by client/s
Does WENCO provide red line / as-built mark-up’sfor inclusion in client design dossiers
Sect 5.4:
All pipe, fittings and relateditems shall be installed byqualified GRP pipe fittersand thereafter approved bya qualified GRP pipinginspector. GRP pipe fittersand GRP piping inspectorsshall be qualified accordingto the minimumrequirements detailed in Annex D.
Installer requirements Are all Bonders and Pipe Fitters:1. Verified as having the requisite years of
experience through reference checks prior
to mobilisation
2. Past training certification checked as valid
3. Qualified or re-qualified by a WENCO
trainer according to BS EN ISO 14692-4:2002 Annex D, Qualification of pipe
fitter, supervisor and inspector (asappropriate)
4. Are training records maintained and are
they auditable
5.
Do all Bonders and Pipe Fitters receive
identifying training cards / certificates
Are all tradesman Bonders and Pipe Fitters
adequately supervised and monitored by:
Site Manager
Qualified Trainer
Qualified Supervisor Qualified Foreman
Qualified QC Inspector
Sect 5.5:
Installation methods shallbe agreed between the
Installation methods Are there manufacturer or client specified
installation procedures specified and training
provided
All piping components shall as far as possible be
8/10/2019 Qa-qc Check List
http://slidepdf.com/reader/full/qa-qc-check-list 3/8
WENCO – GRP CONSTRUCTION QUALITY ASSURANCE & CONTROL INSPECTION CHECK LIST
CODE REF: PROC. REF: CHECK POINT DESCRIPTION CURRENT STATUS CORRRECTIVE ACTION TAKEN
Page 3 of 8
principal and themanufacturer. Copies ofinstallationmethods, procedures andquality plans shall beavailable on-site before
work commences.
installed so that they are stress-free; therefore:
a) bending of pipes to achieve changes in
direction, or forcing misaligned flangestogether by over-torquing bolts is not
permitted;
b) the manufacturer’s recommendations forbolt-torquing sequence, torque increments
and maximum bolt torque shall be followed.
Are there deviations to installation methods being
employed and are these recorded and traceable to
the installed equipment
Is there a Technical Query process that highlights
deviations and changes and does it provide client
instructions / responses
Sect 5.5.6.2: 5.5.6.2 Quality controlof adhesive and
laminated jointings
If so required by the principal, the followingrequirements shall be included for installation.
a) The frequency of testing shall be agreed
between the installer and the principal.b) The adhesive or resin used shall be in
accordance with the manufacturer's
recommendation and its degree of cure
shall be determined according to therequirements given in 6.8.2 of ISO 14692-
2:2002.
c) The adhesive or resin shall be applied at atemperature of at least 23 °C and a
relative humidity of less than 75 %.
For epoxy-based products, the glass transition
temperature T g of the cured adhesive or resin shall
not be less than 95 % of the minimum value
quoted by the manufacturer for the adhesive orresin system.
For polyester- and vinyl ester-based products, the
residual styrene monomer content for joints shall
be determined by measuring on a dummy jointmade up prior to starting the jointing work. The
8/10/2019 Qa-qc Check List
http://slidepdf.com/reader/full/qa-qc-check-list 4/8
WENCO – GRP CONSTRUCTION QUALITY ASSURANCE & CONTROL INSPECTION CHECK LIST
CODE REF: PROC. REF: CHECK POINT DESCRIPTION CURRENT STATUS CORRRECTIVE ACTION TAKEN
Page 4 of 8
styrene content shall be less than or equal to 2 %
(mass fraction) of the resin content.
The Barcol hardness shall be measured on all
laminated joints. It is recommended that a
minimum of ten readings be taken on each sample.The two highest and two lowest readings may be
discarded, with the remaining six to be used to
calculate an average reading which shall not be
less than 90% of the minimum value measured onthe baseline component. If an alternative method
has been used to determine the baseline for degree
of cure, then the acceptance criteria for qualitycontrol shall be agreed with the principal.
5.5.8 Quality programme for
installation
The contractor shall maintain a high level of
inspection to ensure compliance with all
requirements of this part
of ISO 14692, and shall have a quality managementsystem.
The contractor shall designate one individual,
experienced in all aspects of GRP piping field
fabrication, to be responsible for quality control
throughout the installation of the GRP pipingsystem. Quality control shall be based on the
implementation of:
records of adhesive and lamination
jointing procedure qualification,
requirements by the principal forinspection of all types of joints used,
inspection register for all types of jointsused,
inspection of finished fabricated
pipework for compliance with design
drawings, within tolerances as detailed in5.5.4.3.
8/10/2019 Qa-qc Check List
http://slidepdf.com/reader/full/qa-qc-check-list 5/8
WENCO – GRP CONSTRUCTION QUALITY ASSURANCE & CONTROL INSPECTION CHECK LIST
CODE REF: PROC. REF: CHECK POINT DESCRIPTION CURRENT STATUS CORRRECTIVE ACTION TAKEN
Page 5 of 8
For quality assurance and quality control during
the installation phase, the principal shall have the
right to inspect the ongoing work as well asinspect the contractor’s quality control routines.
Each connection shall be permanently marked for
identification purposes. A log book containing keyvalues relevant for the bonding process shall be
maintained.
The key values are the following:a) date;
b) temperature and relative humidity;
c) connection identification number;d)
electrical continuity and resistance to
earth if appropriate;
e)
curing temperature and time;
f)
signature of pipe fitter and inspector;
g)
bolt torque.Sect 5.6: System testing Does WECO have a Hydrostatic test procedure and
does it contain records for:
Pre-test inspection clearance
Flange and gasket handling and tensioning
Pressure recording
Temperature recording
Test result report including calibrationrecords
Qualifications and experience of
hydrostatic tester who conducted the test
Sect 5.7: Inspection Does WENCO have on site quality control
verification of compliance with:1.
The approved installation method
statements
2. Are there ITP’s in place covering
identified sections of the works:
a. On completion of the works are
the ITP’s signed off by the client
8/10/2019 Qa-qc Check List
http://slidepdf.com/reader/full/qa-qc-check-list 6/8
WENCO – GRP CONSTRUCTION QUALITY ASSURANCE & CONTROL INSPECTION CHECK LIST
CODE REF: PROC. REF: CHECK POINT DESCRIPTION CURRENT STATUS CORRRECTIVE ACTION TAKEN
Page 6 of 8
authorised representative (QC
Inspector or engineer):
b. Is there a register used to trackITP’s and their status
3. Are there routine and random QC
Inspections carried out, are theserecorded and reports issued to the sitemanager / supervisor
4. Are there internal and external QA audit
or QC Inspection NCR’s raised and closed
out within a reasonable time:a. Is there a register used to track
NCR’s and their status
b. Are there statistical meth used to
monitor and assess the types and
recurrence of NCR’s
Sect 5.8: Certification and
documentation
Are work packs compiled that include:
As-built ISO-Metric Diagrams’ Materials certification
Tradesman Bonders and Pipe Fitters
current qualification status records
Site survey reports
Signed off ITP/s
Sect 5.8.2: Pressure test
certificate
Upon completion of successful testing, a pressure
test certificate showing the limits of the test shall
be endorsed by the principal and incorporated into
the relevant test pack.
Sect 5.9: Repair after
installation
Are scopes of work well defined for application of
day rates for repairs that are:
WENCO caused defects
Caused by others
Sect 6: Operations
Sect 6.1: Operator's
documentation
Are as-built records provided by WENCO and
approved by clientAre there other types of operations manuals /
instructions provided
8/10/2019 Qa-qc Check List
http://slidepdf.com/reader/full/qa-qc-check-list 7/8
8/10/2019 Qa-qc Check List
http://slidepdf.com/reader/full/qa-qc-check-list 8/8
WENCO – GRP CONSTRUCTION QUALITY ASSURANCE & CONTROL INSPECTION CHECK LIST
CODE REF: PROC. REF: CHECK POINT DESCRIPTION CURRENT STATUS CORRRECTIVE ACTION TAKEN
Page 8 of 8
agreed change management process
Sect 6.5: Requirements for
testing and re-
certification
Does WENCO maintain a record of Tradesman
Bonders and Pipe Fitters training and re-
certification anniversary dates
Sect 6.6: Decommissioning Not included in WENCO scope of work N/A
Annex F (normative) Health and safety
Occupational Health
and Safety Act
Client HSE and
Contingency Planning
Does WENCO have a site Safety Management Plan
Does WENCO carry out JHA’s and are these posted
daily and signed off by all site personnel and
visitors
Is there a Site Contingency Plan and:
Are hazardous areas identified
Muster stations identified
Are personnel trained (induction)
regarding warning sounds, bunting,
vehicle use and placards, etc.