PROJECT : DUNG QUAT REFINERY (DQR)
QUALITY CONTROL FORM QCF 113 CLIENT : VIETNAM OIL AND GASCORPORATION ( PETROVIETNAM )
FIREPROOFING - CEMENTITIOUS 8474L
ITEM:___________________________________________________________
DRAWING No. _______________________________ REV. ______ SH__ OF __
UNIT / AREA _______________________________
ITEM INSPECTION ITEMS STATUS
ACCEPTABLE NOT ACCEPTABLE REMARKS
1 FORMWORKS CHECK :
- GEOMETRY / POSITION
- STABILITY / POSITION
- CLEARNESS
- OIL COATING
- CHAMFER
2 REINFORCEMENT CHECK :
- WIRE MESH SIZE / DIAMETER
- CONNECTORS
- HOOKS
- FASTENERS
- TACKWELD
- COATINGS
- CHAMFER
3 SPACER
- MIN. 50 MM THICK
4 SURVEY CHECK
5 TOP COATING
TEST RESULT:
APPROVED FOR CASTING YES NO
APPROVED FOR GUNITING YES
REMARKS:
SUBCONTRACTOR CONTRACTOR CLIENT NAME
SIGNATURE
DATE