qm lecture
TRANSCRIPT
-
8/13/2019 QM Lecture
1/96
-
8/13/2019 QM Lecture
2/96
Masters in Project Management from SZABIST, Islamabad
Masters in Business Administration ,Peshawar
Certified Project Manager from Project Management Institute (PMI)
Manager Disaster Preparedness and Emergency Response Unit (
Humanitarian Organization )
Zahid Shafiq, PMP
Z a h i d s h a f i q 7 @ G M A I L . C O M0 3 3 3 - 9 2 9 9 2 9 0
Facilitators Introduction
Facilitators Problems
Asks too many questions!
Observes punctuality
-
8/13/2019 QM Lecture
3/96
Name
Education
Professional background & experience
Expectations from this course
Participants Introduction
-
8/13/2019 QM Lecture
4/96
WHAT IS MEANT BY QUALITY?
Meeting customer requirements & satisfaction
Complying to best practices
Fitness for use
Freedom from defects Meeting Legal Requirements
WHAT IS MEANT BY MANAGEMENT?
Managementin all business and organizational activities is the act of
getting people together to accomplish desired goals and objectives
using available resources efficiently and effectively
Understanding Quality Concepts
-
8/13/2019 QM Lecture
5/96
DIFFERENCE B/W QUALITY & GRADE
Quality is fulfilling the customer requirements and grade is the
facilities or features in the product.
"You can choose a low grade product but not low quality
DIFFERENCE B/W PRECISION & ACCURACY
Accuracy is nearness to a target value for measurements or data
Precision is the repeatability of a measurement or data
Understanding Quality Concepts
-
8/13/2019 QM Lecture
6/96
Inspection Vs Audit
An inspection is an evaluation or assessment on products, itinvolves measurements or tests to conform the product to
meet the specified requirements and standard.
An Audit is an evaluation on organization, system, process,project or production line.
Checking thickness of a rod
Validating the shirt cutting methodology
Weighing the cement bag
Verifying cupboard dimensions
Review of on-line ticket purchasing
Interview and selection for IT job
-
8/13/2019 QM Lecture
7/96
Discipline Explanation of Quality
Airlines On-time, safety, comfortable, low-cost service
Health CareCorrect diagnosis, minimum wait time, lower cost,
security
Postal Services faster delivery, correct delivery, cost containment
AcademiaProper preparation for future, on-time knowledge
delivery
Consumer
ProductsProperly made, defect-free, cost effective
Communications Clearer, faster, accessible, cost effective
Quality Examples in Disciplines
-
8/13/2019 QM Lecture
8/96
Little q & Bigger Q
Product
Qualityq
Organizational
Quality
Q
Focus has been shifting from product quality to Assurance
From To
-
8/13/2019 QM Lecture
9/96
MaterialReceiving
Sorting Cutting Marking
FinalInspection
Galvanizing Washing AcidCleansing
q q q q
Q = q1 + q2 + q3 +. qn
q q q
Q
Changing Scope of Quality (q to Q)
-
8/13/2019 QM Lecture
10/96
PLANTHE WORK
DOACCORDING TO
PLAN
ACTAFTER PROBLEM
IDENTIFICATION
CHECKOUTCOME OF
WORK
PA
C D
(The Deming Wheel)
The PDCA Cycle
-
8/13/2019 QM Lecture
11/96
-
8/13/2019 QM Lecture
12/96
Cost of Good Quality
These are the costs required to ensure that product will meet the
requirements and it has got minimum defects (high acceptability)
Prevention Costs - Costs incurred to keep failure and appraisal costs
to a minimum
o Quality planningo Scheduled maintenance
o Trainings
Appraisal Costs - Costs incurred to determine the degree of
conformance to quality requirements.
o Checking & testing of purchased goods/ services
o Field testing
o Inspection
-
8/13/2019 QM Lecture
13/96
Cost of Poor Quality
These are the costs which are required to spend when there is a con-
conformity in product/ service
External Failure Costs
o Complaints
o Warranties
o Defect repair
o Sales reduction
Internal Failure Costs
o Delays
o Downtime
o Re-testingo Re-working
Cost of Quality = AC+PC+EFC+IFC
-
8/13/2019 QM Lecture
14/96
Cost of Quality
-
8/13/2019 QM Lecture
15/96
Consequences of Poor Quality
Low productivity
Increased inspections Cost overruns
Disturbed cash flows
Delays in product delivery
Bad market reputation
Disagreements over product acceptances
Loss of business
Reduction in expected sales numbers
-
8/13/2019 QM Lecture
16/96
Identify the activities studied in the topic on COST OF QUALITY under the
umbrella of Quality Assurance and Quality Control.
Exercise
Prototyping
Customer Complaints
Training Evaluation Quality Planning
Defect identification
Process validation
Warranties
Supplier evaluation
Field testing
Calibration of tools/ equipment
Following acceptance protocol
-
8/13/2019 QM Lecture
17/96
Cost-Benefit Analysis
CBA is a decision making technique which helps you to evaluate the
effectiveness of the planned action to take place
Trade-off between the decision to be taken and its value addition
After calculating the cost of quality, you come up with a better picture
as to what measures are required to be opted and what to leave
Time factor is also be given due importance while doing CBA
Return on investment
Payback period
-
8/13/2019 QM Lecture
18/96
QA ispart of the QMSthat aims to provide confidence that quality requirements
are being fulfilled and is targeted at predicting and preventing error before their
occurrence.
Diff. b/w Quality Assurance & Control
Characteristics of QA:
Process oriented Starts before projects commenceand continues till projects complete
Followspreventive approach
Interprets and strives to achieve customer requirements and project
specifications
FollowsPDCA cycle Complied through audits
-
8/13/2019 QM Lecture
19/96
QC is also a part of the QMS focused on fulfilling quality requirements by
evaluating and comparing actual performance and planned performance.
Diff. b/w Quality Assurance & Control
Characteristics of QC:
Product oriented
Helps QA to validate the customer requirements and project
specifications Done through inspections, testing and verifications
Starts after projects commences and continues till projects are handed
over
Follows corrective approach
What should be the sequence?
Which activities are performed in QA & QC?
How do they compliment each other?
-
8/13/2019 QM Lecture
20/96
-
8/13/2019 QM Lecture
21/96
Basic Steps to Solve Problems:
Quality Managing Tools
Define the problem and establish an improvement goal
Collect data
Analyze the problem
Generate potential solutions
Choose a solution
Implement the solution
Monitor the solution to see if it accomplishes the goal
-
8/13/2019 QM Lecture
22/96
There are 07Basic Tools of Qualityidentified as being most helpful
in troubleshooting quality issues. They are called basicbecause they
are suitable for people with little formal training in statistics. These
are :
Flow Chart
Cause & Effect Diagram
Check Sheet
Pareto Chart
Histogram
Scatter Plot
Control Chart
Quality Managing Tools
-
8/13/2019 QM Lecture
23/96
-
8/13/2019 QM Lecture
24/96
It visually represent relationships among the activities and tasks that
make up a process.
Flow Charts
A Flowchart may:
Have a logical start and an end.
Have Inputs and outputs.
Indicate resources involved in the
process.
Mention sequence of activities.
Show controlling points.
-
8/13/2019 QM Lecture
25/96
Following standard symbols are used to create process maps:
Symbols in Flowcharting
Process Step
Input/
Output
Terminal Decision
On-page
Connector
Page
Connector
Document/
Report
Existing
Process
Manual
OperationDelay Manual
Input
-
8/13/2019 QM Lecture
26/96
Three (03) types of flow diagrams can be used to describe a process,
depending upon the information to be shared. These are:
High-Level Flowchart
A first-level or top-down flowchart shows the major steps in a process. It
illustrates a "birds-eye view" of a process.
Types of Flow Charts
Types of Flow Charts
-
8/13/2019 QM Lecture
27/96
Detailed Flowchart
It maps all the steps and activities that occur in the process
including decision points, waiting periods, documents and
feedback loops etc.
Types of Flow Charts
-
8/13/2019 QM Lecture
28/96
Deployment or Matrix Flowchart
It maps out the process in terms of who is doing what and how in
a process. It is in the form of a matrix, showing the variousparticipants and the flow of steps among these participants.
Types of Flow Charts
-
8/13/2019 QM Lecture
29/96
Define the process steps by observing the process
Sort the steps into the order of their occurrence in the
process
Place the steps in appropriate flow chart symbols
Add the decision points & controlling points
Create the chart
Get it peer-reviewed
Modify if required
Creating a Flow Chart
-
8/13/2019 QM Lecture
30/96
Exercise:
Draw a process map showing the sequence, flow and interaction of
activities involved in the process of selection of a GD pilot for PakistanAir Force with the below mentioned activities:
Advertisement in newspaper
Applications receiving & scrutiny
Welcoming applicants at recruitment center Admission
Conducting preliminary test
Preliminary Test results announcement
Arrangements for ISSB tests
Conducting ISSB protocol
ISSB results declaration
Call for interview
Interview conduct
Selection formalities completion
Flow Charts
-
8/13/2019 QM Lecture
31/96
-
8/13/2019 QM Lecture
32/96
Also termed as Ishikawa, Fishbone and Cause & Effect Diagram.
It visually represents the causes of a problem or effect and help you
determine the ultimate source of the problem the root cause. It is used at the beginning of root cause analysis and planning.
Cause & Effect Diagram
CATEGORY
1
CATEGORY
2
CATEGORY
3
CATEGORY
4
CATEGORY
5
CATEGORY
6
EFFECT
-
8/13/2019 QM Lecture
33/96
Cause & Effect Diagram
Define
Problem
Draw SpineMark
Categories
Highlight
issues
-
8/13/2019 QM Lecture
34/96
Draw a fishbone diagram for investigating the reasons for higher turnover of
employees
Exercise
No
perks
-
8/13/2019 QM Lecture
35/96
Ch k Sh
-
8/13/2019 QM Lecture
36/96
It is a simple document that is used for collecting data in real-time and at the
location where the data is generated. This document is typically a blank form that is
designed for the quick, easy, and efficient recording of the desired information
Check Sheet
ProblemFrequenc
yTotal
Hard to drive
toIIII 4
Officelocation
IIIII 6
Low Salary IIIIIIIIIIIIII 13
Lesser
PerksIIIIIIIIIII 9
Salariesgetting
higher
IIIIIIIIIIIIIII 15
High market
demandIIIII 6
Flexibility in
managemen
t
III 3
-
8/13/2019 QM Lecture
37/96
P t Ch t
-
8/13/2019 QM Lecture
38/96
It is a simple bar graph that ranks problems in order of magnitude to determine the
priorities for improvement activities. Often called the 80-20 rule, the Paretos Principle
is a way of separating the vital few from the trivial many.
Pareto Chart
-
8/13/2019 QM Lecture
39/96
S tt Pl t
-
8/13/2019 QM Lecture
40/96
A scatter plot is a classic statistical diagram that lets you visualize the relationship
between numeric variables. For instance, if you have a table of data on cities, you
could use a scatter plot to see if there is a relationship between population and
crime levels.
Scatter Plot
If the points cluster in a band running from lower left to upper right, there is a
positive correlation (if x increases, y increases).
If the points cluster in a band from upper left to lower right, there is a negativecorrelation (if x increases, y decreases).
-
8/13/2019 QM Lecture
41/96
-
8/13/2019 QM Lecture
42/96
-
8/13/2019 QM Lecture
43/96
-
8/13/2019 QM Lecture
44/96
Statistical
-
8/13/2019 QM Lecture
45/96
Standard Deviation
Square of variance; formula is:
X = mean of values of distribution
n = No. of values used to calculate standard deviation
xi = value of x for each item in distribution
( )2
n
xxi=
Statistical
Concepts
Standard
-
8/13/2019 QM Lecture
46/96
Standard
Deviation Shows amount of variation or "dispersion" from the average
(mean, or expected value).
A low standard deviation indicates that the data points tend
to be very close to the mean, whereas:
High standard deviation indicates that the data points are
spread out over a large range of values.
http://upload.wikimedia.org/wikipedia/commons/8/8c/Standard_deviation_diagram.svg -
8/13/2019 QM Lecture
47/96
-
8/13/2019 QM Lecture
48/96
Control Charts
Control charts present the results of a process over time
They are used to determine if the process is under control Can be used to monitor:
Cost and Schedule variances
Errors in process
Control Chart- a typical
-
8/13/2019 QM Lecture
49/96
Control Chart a typical
illustartion
-
8/13/2019 QM Lecture
50/96
Out of Control Process
The process is out ofstatistical control under oneof two circunstances:
A point is out of the control limits
boundaries or there are; Non random points that are within
the upper and lower limits, asstated by the rule of seven.
Think of out of control as alack of consistency andpredictability in the process.
-
8/13/2019 QM Lecture
51/96
Out of Control Process
f S C C
http://sixsigmaindonesia.com/blog/?attachment_id=69 -
8/13/2019 QM Lecture
52/96
The Rule of Seven in Control Charts
Refers to non randompoints grouped in a
series, totalizing seven,all of them on one side
of the mean.
The rule states that,even though none of
these points is out of the
control limits, they arenot random and so theprocess is out of control.
O t f C t l P R l f S
-
8/13/2019 QM Lecture
53/96
Out of Control Process Rule of Seven
-
8/13/2019 QM Lecture
54/96
Histogram
-
8/13/2019 QM Lecture
55/96
A histogram is a type of bar graph for showing frequency distribution, or how
often individual data points occur across the range of the data from low to high.
It represents frequency distribution by means of rectangles whose widthsrepresent class intervals and whose areas are proportional to the corresponding
frequencies
Histogram
How to draw a histogram
-
8/13/2019 QM Lecture
56/96
SELECTthe measures to be examined. For example, you need to study things
like time, weight, dimensions and speed etc.
COLLECTthe data (use a check sheet)
PREPAREthe frequency table in a sequential form
DESIGNthe histogram (class interval and class width finalization)
DRAWthe histogram in a graphical display (using bar graph)
INTERPRETthe data and draw your observations
How to draw a histogram
Interpretation of Histogram
-
8/13/2019 QM Lecture
57/96
Interpretation of Histogram
Interpretation of Histogram
-
8/13/2019 QM Lecture
58/96
Interpretation of Histogram
-
8/13/2019 QM Lecture
59/96
Customer Satisfaction
-
8/13/2019 QM Lecture
60/96
Customer Requirements & Satisfaction
C
U
ST
O
M
E
R
S
C
U
ST
O
M
E
R
S
Product & QMS
Product
Continual Improvement of the
Quality Management System
R
e
qu
i
r
e
m
e
nt
s
S
a
t
i
s
f
a
c
t
io
nInput
Output
-
8/13/2019 QM Lecture
61/96
Customer Satisfaction
Customer is the one who uses our products by spending his
money that is actually the lifeline of your business.
CUSTOMER IS THE KING and it is inevitable to satisfy him and
keep him retained.
Customer satisfaction must be the prime goal of an organization.
-
8/13/2019 QM Lecture
62/96
Types of Customers
Internal Customers and External Customers > Both must be
satisfied
Internal customers are the company employees, people in the
process and each department is a customer to another one.
External customers are your product users and the ones who
influence the sales of products
Customers change their needs and must be tapped periodically
-
8/13/2019 QM Lecture
63/96
Customer Feedback
Comment Card
Customer Questionnaire
Toll Free Telephone Numbers
Customer Visits
Internet & Computer
Employee Feedback
Customer Complaints
-
8/13/2019 QM Lecture
64/96
PQM Approach
ProjectQuality
Management
Perform
Quality
Assurance
Plan
Quality
Perform
Quality
Control
-
8/13/2019 QM Lecture
65/96
Definitions
Plan Quality
Identifying which quality standards are relevant to the
project and determining how to satisfy them.
Perform Quality Assurance
Evaluating overall project performance on a regular basis to
provide confidence that project is meeting and satisfying
the relevant quality standards.
Perform Quality Control
Monitoring specific project results to determine if they
comply with relevant quality standards and identifying ways
to eliminate causes of unsatisfactory performance.
Understanding Project Quality
-
8/13/2019 QM Lecture
66/96
Understanding Project Quality
Quality in the real world
-
8/13/2019 QM Lecture
67/96
Quality in the real world To begin:
The customer determines their requirements.
The project team clarifies the requirements. The project team determines what is to be done to meet requirements
Quality Starts:
The PM determines available existing standards, policies, plans and
procedures.
Project planning and execution gets underway.
QC department measures the performance from the start of planning till
project end against standards, policies, plans and procedures. This initiates
changes, corrective & preventive actions and defect repairs.
QA department conducts audits periodically. This department issueschange requests and highlight areas needing corrective and preventive
actions.
The change control board reviews the changes as part of integrated
change control.
The project is completed, quality targets are approved and customer is
-
8/13/2019 QM Lecture
68/96
PLAN QUALITY
-
8/13/2019 QM Lecture
69/96
Plan Quality
It is the process of:
Identification of quality requirements and standards.
Documenting how to demonstrate the compliance
Quality planning is done in parallel with other project planning
-
8/13/2019 QM Lecture
70/96
Plan Quality
-
8/13/2019 QM Lecture
71/96
T l & T h i f PLAN QUALITY
-
8/13/2019 QM Lecture
72/96
Tools & Techniques for PLAN QUALITY Flow Charting
What actions would add the value in achieving quality results
Cost of Quality
Good and poor quality costs estimations
Control Charts
Setting different thresholds for various processes
Benchmarking
Comparing planned practices with alike projects
Design of Experiments
Exploring different options to achieve quality objectives
Statistical Sampling
Sample frequency and sizes to be determined
-
8/13/2019 QM Lecture
73/96
O t t f PLAN QUALITY
-
8/13/2019 QM Lecture
74/96
Outputs from PLAN QUALITY
Quality Management Plan
How quality would be managed throughout project lifecycle
Quality Metrics
A definition that describes clearly how QC will measure it
Quality Checklists
Component specific tool used to verify requirements
Process Improvement Plan
How processes can be improved by analyzing the improvement areas
Project Document Updates
Stakeholder register and Responsibility Assignment Matrix
Q lit M t Pl
-
8/13/2019 QM Lecture
75/96
Scope
Assemble a team
Systematically plan
Write the Plan
Submit the Plan for review and approval
Once approved, distribute the plan
Start work, following the plan
Revise when needed, get approval and then re-distribute the plan
Quality Management Plan
Constituents of Quality Management Plan
-
8/13/2019 QM Lecture
76/96
Quality Requirements & Expectations
What to achieve, Project Scope, Constraints, Stakeholders, Procurement,
Outsourcing, Deliverables & Acceptance Criteria etc.
Quality Management and Organization
Framework, Standards, Documentation , Quality Metrics and Quality
Responsible, HSE Requirements, Change Management & Responsibility
Assignment Matrix
QA Processes
Process Evaluation, Validations, Audits, Root cause Analysis, Supplier
Management, Trainings and Corrective & Preventive Actions
QC Processes
Inspections, Verifications, Variances, Tools & Defect Repairs
Constituents of Quality Management Plan
Understanding Project Quality
-
8/13/2019 QM Lecture
77/96
Understanding Project Quality
Differences in Approach
-
8/13/2019 QM Lecture
78/96
Differences in Approach
Quality Assurance Testing (Quality Control)
A mind set that focuses on doing
everything as well as possible.
An activity that looks for where things
were not done as well as they could be
done.
QA requires high levels of interactionand focusses the needs of multiple
people, groups, and stakeholders to
make effective decisions on balance.
Test requires high levels of technical
skill to execute procedures for
validation.
Are the business requirements an
accurate reflection of the customer's
needs? (Doing the right thing.)
Does the product satisfy the
requirements, as written? (Doing things
right.)
Definition:
-
8/13/2019 QM Lecture
79/96
Definition:
Assuranceis
The act of giving confidence
The state of being certain
The act of making certain
Quality assuranceis the planned and systematic activity implemented in a QMS
so that the requirements for a product/ service are met
In QA, we establish whether we are following/ using the standards captured in
Plan Quality or otherwise and exploit options for improvement
Audit Triggering
-
8/13/2019 QM Lecture
80/96
Audit Triggering
Audits can be triggered in two scenarios:
Routine audits conduct as spelt out in QMP
*After having QC results
* Once you have the problematic QC results, you need to:
Revisit your processes, especially the area needing attention
Revisit your auditing process
Revisit your auditing techniques
Importance of QA:
-
8/13/2019 QM Lecture
81/96
Importance of QA:
Compliance of standards and best practices Overseeing the processes
Prevention from defects -foreseeing issues before hand
Reduces costs Reworking costs are controlled
Analytical approach to defects handling Root-cause analysis
Change Management- Tracking of all changes
Process Improvement Identification of any process improvements
Reporting
Audit is the most reliable tool to ascertain QA plan
It can be done internally or externally
PERFORM QUALITY ASSURANCE
-
8/13/2019 QM Lecture
82/96
PERFORM QUALITY ASSURANCE
Inputs to PERFORM QUALITY ASSURANCE
-
8/13/2019 QM Lecture
83/96
Inputs to PERFORM QUALITY ASSURANCE
Project Management Plan
Quality Management Plan covering QA activities and Process Improvement
Plan
Quality Metrics
A definition that describes clearly how QA & QC will measure it
Work Performance Information
Technical Performance measures
Project Deliverables Status
Schedule Progress &
Cost Incurred
Quality Control Measurements
Results obtained from QC activities like inspections and testing
Tools & Techniques for PERFORM QUALITY ASSURANCE
-
8/13/2019 QM Lecture
84/96
Tools & Techniques for PERFORM QUALITY ASSURANCE
Plan Quality and Perform QC Tools & Techniques
Quality Audits
To identify good practices
To identify gaps and improvement areas
To confirm the implementation of approved change requests
Process Analysis
Used for repetitive activities in the project
To identify problems, constraints and non-value added activities
Root cause analysis is part of process analysis
Outputs from PERFORM QUALITY ASSURANCE
-
8/13/2019 QM Lecture
85/96
Outputs from PERFORM QUALITY ASSURANCE
Organizational Process Updates
Checklists, pro-formas and standards updates
Lessons Learnt documents
Process modifications
Change Requests
Suggested improvements and corrective actions to be proposed through
integrated change control
Project Management Plan Updates
Relevant plans like QMP, time, cost & communication management plan
Project Documents Updates
Process Documents
What is Quality Control
-
8/13/2019 QM Lecture
86/96
What is Quality Control
QC is checking the actual product parameters against the standard/
requirements
It is done through inspections and testing
It can be performed on deliverables or on the product as a whole
It takes time but sampling may help---can mislead too!!!
It needs appreciable set of skills
Acceptance and rejection criterion along with tolerances & thresholds
information
QC process needs to be revisited periodically
YOU MUST HAVE; WHAT YOU NEED
Understanding Project Quality
-
8/13/2019 QM Lecture
87/96
g j Q y
Importance of Quality Control
-
8/13/2019 QM Lecture
88/96
p Q y
It provides measurement data to help perform RCA
It validates the achievement of what is written in standards & requirements
It keeps mistakes out of hands of customer
Prevention and inspection
Inspection & Testing
-
8/13/2019 QM Lecture
89/96
Inspection & Testing
INSPECTION:
Checking the physical characteristics of product
Checking the completeness of product/ deliverable
Inspection in phases reduces:
Cost and time for final inspection
Re-working and error rate
TESTING:
Checking performance of product
It may be destructive or non-destructive
PERFORM QUALITY CONTROL
-
8/13/2019 QM Lecture
90/96
PERFORM QUALITY CONTROL
Quality Control Plan
-
8/13/2019 QM Lecture
91/96
Q y
Objectives definition
Organizational setup for QC
Inspection methodologies
Documentation requirements and archiving
Communication requirements
Reviews
Inputs to PERFORM QUALITY CONTROL
-
8/13/2019 QM Lecture
92/96
Inputs to PERFORM QUALITY CONTROL
Project Management Plan
Quality Management Plan covering QC activities
Quality Metrics
A definition that describes clearly how QC will measure it
Quality Checklists
Component specific tool used to verify requirements
Work Performance Measurements
Planned vs Actual Technical Performance
Planned vs Actual Schedule Performance
Planned vs Actual Cost Performance
Inputs to PERFORM QUALITY CONTROL
-
8/13/2019 QM Lecture
93/96
Inputs to PERFORM QUALITY CONTROL
Approved Change Requests
Defect Repairs, Revised methodologies and revised schedule
Deliverables
Tangible and phase-gate products
Organizational Process Assets
Quality Standards and Policies
Standard Work Guidelines
Issue and Defect Reporting Procedures & Communication Policies
Tools & Techniques for PERFORM QUALITY
-
8/13/2019 QM Lecture
94/96
CONTROL C& E Diagram
Pareto Chart
Histogram
Flow Chart
Control Chart
Run Chart
Scatter Plot
Statistical Sampling
Inspection
Approves Change Requests Review
Requests review for implementation as approved
-
8/13/2019 QM Lecture
95/96
Outputs from PERFORM QUALITY CONTROL
-
8/13/2019 QM Lecture
96/96
Outputs from PERFORM QUALITY CONTROL
Change Requests
Changes arising out of defects, corrective and preventive actions
Project Management Plan Updates
Quality Management Plan &
Process Improvement Plan
Project Documents Updates
Quality Standards