    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)1

    1.0) General:

    The Quality Trophy is an ANNUAL APPRAISAL on the performance towards excellent

    performance in Product quality, cost, timely completion, Safe working practices and Progress

    achieved through Quality Management System made towards business excellence.

    The applicant shall Study the criteria and make a self-assessment in the original copy either with

    a tick mark against "YES" or "No" providing with an objective evidence for "YES" at the time of

    assessing.

    This trophy intends to increase Quality awareness and motivate all towards

    1.1) Product Quality as an increasingly important element for competitiveness.

    1.2) Adoption of successful quality strategies and benefits derived from implementation of

    Quality Management Systems.

    1.3) Effective implementation of Quality Management System at sites.

    1.4) Effectiveness of corrective and preventive measures initiated at site.

    1.5) Safe working practices implementation

    2.0) Scope:

    The awards will be given to one project in each BU for Electrical construction (Domestic)

    Substation Business Unit

    Industrial Electrification Business Unit

    Transmission Line Business Unit

    Railway Construction Business Unit

    Transmission Line Factories

    The original self-assessed booklet shall be submitted to QMS - HQ in hard and soft copies.

    Applicants are requested to ensure the availability of all the objective evidences at the time

    of assessment.

    Non-availability of objective evidence / continuity breakdown in the workflow will lead to

    counting of "NO during the assessment.

    LLAARRSSEENN && TTOOUUBBRROO LLIIMMIITTEEDDELECTRICAL CONSTRUCTION (DOMESTIC)

    QUALITY TROPHY APPLICATION

    APRIL 2009 TO MARCH 2010

  • 8/3/2019 Qt Application for Sites-2009-10

    2/16

    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)2

    The awards will be distributed to winning job sites during New Year address of President -

    Construction. The awardees list would be published in internal magazines. The site team

    members of the winning project will be awarded a Trophy along with Certificate of Merit.

    3.0) Application submission associated Processes and key dates:

    EVP- Electrical Construction (Domestic) releases forms in Portal / e mail

    Site would submit the filled up application to QMS - HQ

    Evaluation of application and finalization of list of sites in consultation

    with BU Head

    Completion of Evaluation

    Submission of recommendation along with assessment report to

    HQ Committee for Winner selection

    Declaration of Winner

    Distribution of Trophy to Winners

    27thOctober10

    January11

    10th November1

    15th December10

    20th December10

    27th December10

    5th November10

  • 8/3/2019 Qt Application for Sites-2009-10

    3/16

    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)3

    4.0) Eligibility:

    50% or more Sales on erection achieved as of 31st March10, of the total contract value

    and should have achieved / exceeded 90% of the budgeted/MTR Sales, GM for the

    Assessment Year.

    Sites closing early are to be informed to QMS HQ along with Project completion reports

    for immediate assessment.

    Site Photos, site-in-charge Photo and list of salient Features of the site shall be handed

    over to assessor during the Initial assessment itself.

    5.0) Assessment areas and scores:

    Max.Score

    1. PROJECT MANAGEMENT AND PLANNING - 30

    2. SITE EXECUITON - 25

    3. QUALITY MANAGEMENT SYSTEM - 104. QA / QC - 10

    5. STORES MANAGEMENT - 10

    6. EHS - 15

    ---------

    Max. Total: 100

    ---------

    6.0) Incomplete applications are liable to be rejected.

    7.0) Site assessment will be carried out by HQ-QMS plus External.

  • 8/3/2019 Qt Application for Sites-2009-10

    4/16

    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)4

    APPLICATION FOR QUALITY TROPHY 2009-10

    (To be submitted in electronic form as well as hard copy booklet)

    1. Name of Project : __________________________________________

    Job No :___________________________________________

    Address : ___________________________________________

    ___________________________________________

    Telephone: ____________________Fax: _________________________

    Email : __________________________________________________

    2. Highest ranking official in the Project:

    Name________________________________________ PS No.___________

    Address _______________________________________

    _______________________________________

    Tel. No.: Office _________________Home _____________Cell Ph. ______________

    3. Category: Tick () as applicable

    Substation Business Industrial Electrification Business

    Transmissionline Business Transmissionline Factories

    Railway Construction Business

    4. No. of employees at peak ________________________

    5. No. of workmen at peak__________________________

    6. Project Value (original) __________________________________

    7. Project Value (Actual / Expected) __________________________________

    8. Date of project commencement (as per contract)____________________

    Passport

    Size of

    project

    manager to

    be pasted

  • 8/3/2019 Qt Application for Sites-2009-10

    5/16

    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)5

    9. Date of project commencement (actual )____________________

    10. Date of completion (as per contract)_______________________

    11. Date of completion (Expected)___________________

    12. Staff List for the Project as on 1st April09 to 31st March10 please attach the list

    of staff showing the name, PS Number and duration of the team member in the

    project for issuing of the certificate of merit.

    13. Site In-charges critical review on strengths and opportunities for improvement

    with respect to Quality (Min. 3 areas) Mandatory

  • 8/3/2019 Qt Application for Sites-2009-10

    6/16

    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)6

    ASSESSMENT FOR PROJECT MANAGEMENT AND PLANNING

    NAME OF THE PROJECT:

    PROJECT MANAGEMENT AND PLANNING APPLICANTASSESSMENTBY QMS - HQ OBJECTIVE

    EVIDENCESSLNO FUNCTIONS REF DOCUMENTS YES NO YES NO

    1Receipt and availabilityof the contractdocuments

    Tender documents

    Technical Specifications

    Techno commercial offers

    LOI / LOA / Letter of agreements

    Vendor offers / correspondences

    Approved L2 Schedules

    2

    Review of the contract

    documents and itsevidences

    Kick Off Meeting (KOM) Date

    KOM attended as per procedure

    KOM Minutes

    Contract Variation

    PV Clause

    Approved BOQ

    Approved Drawings

    3ACE Preparation andsubmission & approval

    ACE Submission on

    ACE Approved by

    ACE Approved on

    4Availability of ApprovedL2 Schedule

    Submission on

    Approved on

    5MPCS duly approvedwithin a month from thedate of LOI

    S0 to S10 Preparation

    LOI date

    S0 to S10 submission

    S0 to S10 Approved

    6S1- Schedule ofInvoicing

    Regular updation

    Review

    Variation identification

    Root cause analysis

    Corrective action in line to the aboveto eliminate the root cause

    Effectiveness of the corrective action

    7S5-Schedule of Labourrequirement

    Regular updation

    Review

    Variation identification

    Root cause analysis

    Corrective action in line to the aboveto eliminate the root cause

    Effectiveness of the corrective action

  • 8/3/2019 Qt Application for Sites-2009-10

    7/16

    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)7

    PROJECT MANAGEMENT AND PLANNING APPLICANTASSESSMENTBY QMS - HQ OBJECTIVE

    EVIDENCESSLNO FUNCTIONS REF DOCUMENTS YES NO YES NO

    8S6-Schedule of Materialrequirement & status

    Regular updation

    Review

    Variation identification

    Root cause analysis

    Corrective action in line to the aboveto eliminate the root cause

    Effectiveness of the corrective action

    9S8-Schedule of Directcost

    Regular updation

    Review

    Variation identification

    Root cause analysis

    Corrective action in line to the aboveto eliminate the root cause

    Effectiveness of the corrective action

    10S9-Schedule of Indirectcost

    Regular updation

    Review

    Variation identification

    Root cause analysis

    Corrective action in line to the aboveto eliminate the root cause

    Effectiveness of the corrective action

    11 Job Cost Report

    Regular updation

    Review

    Variation identification

    Root cause analysis

    Corrective action in line to the aboveto eliminate the root cause

    Effectiveness of the corrective action

    12 Daily progress

    Preparation

    Review

    Decision / Direction

    Action

    Effectiveness

    13 Weekly progress

    Preparation

    Review

    Decision / Direction

    Action

    Effectiveness

    14 Monthly progress

    Preparation

    Review

    Root cause analysis & correctiveaction

    Effectiveness of corrective action

  • 8/3/2019 Qt Application for Sites-2009-10

    8/16

    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)8

    PROJECT MANAGEMENT AND PLANNING APPLICANTASSESSMENTBY QMS - HQ OBJECTIVE

    EVIDENCESSLNO FUNCTIONS REF DOCUMENTS YES NO YES NO

    15Review of objectives &targets in terms ofquality , cost & time

    objectives for Planning

    Monitoring of performance

    Action plan on adverse performance

    16Statutory & regulatoryrequirements

    list of Statutory & regulatoryrequirements

    Compliances to the requirements

    17 Invoicing

    Validation to period for invoicingrequired vs invoicing actual

    Validation to Submission

    Validation to Collection

    Effectiveness of the cycle time

    18Winding up & Projectcompletion

    Timely winding up meeting

    Monitoring as per the Demobilizationplan

    Final bill clearances from clients

    Project completion certificates fromclient

    Project completion report submissionto HQ

    19Sub-contractorManagement

    No of Sub Contractors engaged at Site

    Sub-contractor evaluation beforeinduction

    Screening of subcontractor workmen

    Rating of subcontractor

    Objective Remarks:

  • 8/3/2019 Qt Application for Sites-2009-10

    9/16

    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)9

    ASSESSMENT FOR SITE EXECUTION

    NAME OF THE PROJECT:

    SITE EXECUTION APPLICANTASSESSMENTBY QMS - HQ OBJECTIVE

    EVIDENCESSLNO FUNCTIONS REF DOCUMENTS YES NO YES NO

    1 Process identification

    Sequence of Processes identification

    List of processes and sub processavailability

    Approved Work Instructions /Procedures

    Weekly & daily planning for executingthe activities

    Record of Approved Drawings

    2 Drawings /Deliverables

    Receipt and updation of the approveddrawings; issue & control on themovement of the drawings

    Preparation or coordination for as builtdrawings

    Control of Clients data/Drawings

    List of codes & standards for referencewith regular updation to requirements

    Coordination for obtaining customerapprovals for materials, drawings orany deliverables in time from theclients

    3 Input verification

    Validation of materials to therequirements before considering asinput

    Competency of People

    Condition of Machines

    4 Process verification

    Control parameters identified forexecuting the activities effectively

    Monitoring and controlling of theprocess established

    Effectiveness of control

    Verification on in process authorization/clearance for erection process

    Acceptance criteria specification in theQAP

    Verification of output in line with QAP

    Authorization or clearance validation

    Acceptance by client

    5Final verification andApprovals

    Final inspection as per approved FQP

    Final inspection reports

    Client acceptance on final product

    client submission

    Objective Remarks:

  • 8/3/2019 Qt Application for Sites-2009-10

    10/16

    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)10

    ASSESSMENT FOR QUALITY MANAGEMENT SYSTEMS

    NAME OF THE PROJECT:

    QUALITY MANAGEMENT SYSTEMS APPLICANTASSESSMENTBY QMS - HQ OBJECTIVE

    EVIDENCESSLNO FUNCTIONS REF DOCUMENTS YES NO YES NO

    1 Documentation

    Receipt of QMS documents

    Issue of QMS Documents

    Control of the QMS documents

    2 Implementation

    Verification of QMS Implementationthough Audits

    Audit plan -Plan Vs Actual

    Audit Notification

    Audit checklist

    Audit summary report

    Observations /NCR's

    Timely compliances on auditobservation points

    3 QMS Orientation

    QMS orientation ensured to all newstaff at site

    Effectiveness of the Orientation

    4 Quality Objectives

    Quality objectives for the Project site

    Review and analysis on achievementof Quality objectives at regularintervals

    Implementing the corrective measuresfor adverse performance

    5 Trainings

    Availability of Training plan

    Training conducted as per plan

    Availability of Training records

    Effectiveness of Training

    6CAPA / MonthlyReview Meetings

    Conducting regular CAPA/Monthlyreview meetings

    Decision / Direction

    Effectiveness

    7Control of Nonconformities (NCR)

    Identification of NCR's through audits,daily inspections etc

    identification of root causes

    Implementation of Corrective action

    Review of effectiveness of Correctiveaction

    Initiating the actions to prevent theoccurrences

  • 8/3/2019 Qt Application for Sites-2009-10

    11/16

    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)11

    QUALITY MANAGEMENT SYSTEMS APPLICANTASSESSMENTBY QMS - HQ OBJECTIVE

    EVIDENCES

    SLNO FUNCTIONS REF DOCUMENTS YES NO YES NO

    8

    Customer complaints

    & feedbackMechanism

    Customer Compliant Receipt

    Method of updation

    Response to the client

    Correction initiated

    Root cause analysis & CorrectiveAction implementation

    Effectiveness of Corrective action

    9Customer satisfactionReports (CSR)

    Receipt of CSR

    Review and Feedback analysis of theCSR

    Corrective actions on Customerfeedback on improvements

    Feedback to clients on Action taken by

    the site for improvements

    10 Improvements

    Identify area for Improvement

    Analyze the process for improvements

    identify the Preventive action foreliminating potential non conformity

    Objective Remarks:

  • 8/3/2019 Qt Application for Sites-2009-10

    12/16

    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)12

    ASSESSMENT FOR QUALITY ASSURANCE / QUALITY CONTROL

    NAME OF THE PROJECT:

    QUALITY ASSURANCE / QUALITY CONTROL APPLICANTASSESSMENTBY QMS - HQ OBJECTIVE

    EVIDENCES

    SLNO FUNCTIONS REF DOCUMENTS YES NO YES NO

    1 QA/QC functions

    Approved work Procedures / Qualityassurance plans / checklists

    Work done as per the stated methodstatement and checked at differentstages.

    In process inspection as per approvedprocedure

    Inspection reports/records forinspection

    Updation of Checklists

    2 Calibration

    List of Measuring equipment

    Calibration plan

    Calibration schedule

    Calibration status-Required vs actual

    Issue of calibration certificates

    3Control of process andproduct nonconformities

    Non conformities identified during theprocess or product verification andvalidation

    Correction

    Root cause analysis

    Corrective action implemented

    Effectiveness of Corrective action

    4 Best PracticesNumber of best practices identified andimplemented

    5 Benefits

    Cost

    Quality

    Time

    Implemented in QMS

    Objective Remarks:

  • 8/3/2019 Qt Application for Sites-2009-10

    13/16

    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)13

    ASSESSMENT FOR STORES MANAGEMENT

    NAME OF THE PROJECT:

    STORES MANAGEMENT APPLICANTASSESSMENTBY QMS - HQ OBJECTIVE

    EVIDENCESSLNO FUNCTIONS REF DOCUMENTS YES NO YES NO

    1Storage area as per layout drawing

    Semi covered

    Closed area

    Open yard

    2Receipt of thematerials

    Storage procedure & Loading andunloading instructions

    Designated area for receipt

    Purchase order(PO)/LR/DC

    Source inspection clearance report

    Manufacturer's TC

    3Inspection of thematerial at the storeyard

    Physical verification for damages

    Inward material inspection report

    Designated area for accepted &rejected materials

    Reporting against shortage or damageof the materials

    Action on the damaged materials

    Non acceptance report for rejectedmaterials

    Inspection clearance by site and client

    Regular updation for material receiptnote

    4Storage of theMaterials

    Storage as per designated areas

    All the materials are identified andreadily traceable

    5 Issue of the Materials

    Indent place by the user shallnecessarily cover cost code, materialcode, Quantity and description

    Signature of Authorized person as perauthorization list

    Updating of Record/Bin cards

    6 Monitoring & Control

    Follow of FIFO

    Monthly stock statement

    list of materials (Own)

    List of client supplied materials

    Periodic physical verification againststock

    updation of Materials/consumablesissued to Sub contractors (free)

    updation of Materials/consumablesissued to Sub contractors (Chargeable)

    Verification of Shelf life materials

    Daily stock position of critical items

    Objective Remarks:

  • 8/3/2019 Qt Application for Sites-2009-10

    14/16

    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)14

    ASSESSMENT FOR ENVIRONMENT, HEALTH & SAFETY

    NAME OF THE PROJECT:

    ENVIRONMENT, HEALTH & SAFETY APPLICANTASSESSMENTBY QMS - HQ OBJECTIVE

    EVIDENCES

    SLNO FUNCTIONS REF DOCUMENTS YES NO YES NO

    1 EHS Plan

    Availability of EHS plan

    Implementation of EHS procedures

    Awareness of EHS practices in all thestaff & workman

    2 EHS Audits

    EHS audits complying with plannedrequirements

    Compliances to EHS requirements

    3 Emergency Evacuationplan

    Availability of Emergency Evacuationplan

    Emergency preparedness andresponse time testing

    4EHS Educationprogram

    Pep talk before the start of erectionactivities

    EHS awareness initiatives

    5Awards won by site forEHS

    Award certificate

    Objective Remarks:

  • 8/3/2019 Qt Application for Sites-2009-10

    15/16

    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)15

    ASSESSMENT FOR FINANCIAL PERFORMANCE

    (Assessment Financial Year: 2009-2010)

    NAME OF THE PROJECT:

    FINANCIAL PERFORMANCEBUDGETED

    (ACE)ACTUAL

    POSITIVE VARIANCE

    OBJECTIVEVIDENCEAPPLICANT

    ASSESSMENTBY QMS - HQ

    SLNO FUNCTIONS REF DOCUMENTS YES NO YES NO

    1Project Financialparameters -Budget Vs Actual

    Sales

    Gross Margin

    PBIT

    PBIT % of sales

    Average Workingcapital (AWC)

    Average Net fixedassets (ANFA)

    EVA

    ROCE (%)

    Staff Man Months

    ROTE (PBIT/StaffMan Months)

    2 InvoicingSubmission of Clientinvoice as percontract

    3CollectionTargets

    More than Sixmonths

    Less than six months

    Deduction of LD

    Objective Remarks:

  • 8/3/2019 Qt Application for Sites-2009-10

    16/16

    QUALITY TROPHY APPLICATION 2009 10 ELECTRICAL CONSTRUCTION (DOMESTIC)

    MAIN ASSESSMENT SHEET

    (For use by Applicant and QMS)

    NAME OF THE PROJECT & REGION / TFL: PROJECT MANAGER NAME:

    JOB CODE OF THE PROJECT: DATE:

    SLNO

    FUNCTION/ACTIVITYASSESSMENT

    POINTSCOMPLIANCE

    FOR "YES"COMPLIANCE

    FOR "NO"% WEIGHTAGE

    FOR " YES "

    WEIGHTAGE OBTAINEDFOR " YES "

    APPLICANT QMS - HQ

    1PROJECT MANAGEMENTAND PLANNING

    90 30%

    2 SITE EXECUITON 25 25%

    3QUALITY MANAGEMENTSYSTEM

    40 10%

    4QUALITY ASSURANCE /QUALITY CONTROL

    20 10%

    5 STORES MANAGEMENT 30 10%

    6ENVIRONMENT, HEALTH &SAFETY

    10 15%

    GRAND TOTAL 100%

    APPLICANT NAME: ASSESSOR NAME:

    SIGNATURE: SIGNATURE:

    DATE: DATE:

    Recommendation:

    HQ Committee evaluated the above parameters. After review, the site is recommended / not

    recommended for Quality Trophy Winners 2009-10.

    Reasons for Rejection:

    Signature