quadrogen gas clean-up technology for fuel cell applications · presentation on quadrogen gas...

16
Presentation to: Quadrogen Gas Clean-up Technology for Fuel Cell Applications Presented by: Alakh Prasad, President & CEO 7 March 2014 Quadrogen Power Systems, Inc.

Upload: others

Post on 16-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

Presentation to

Quadrogen Gas Clean-up Technology for Fuel Cell Applications

Presented by Alakh Prasad President amp CEO

7 March 2014

Quadrogen Power Systems Inc

Quadrogen Overview

Developed proprietary gas clean-up technology for fuel cell applications

First demonstration unit using biogas in operation for more than 2 frac12 years

Second unit using biogas operational by Q32014

Third unit using landfill gas operational by Q12015

Working on associated gas applications

7 March 2014 2

The Problem

Biogas Associated Petroleum Gas (APG)

50 - 60 Methane 35 - 40 Carbon Dioxide 0-11 Nitrogen

Contaminants Siloxanes Sulfur Species Halogen Species Volatile Organic Compounds Water Oxygen

50 - 80 Methane 20 ndash 50 Higher hydrocarbons 20 - 40 Carbon Dioxide 0 - 5 Nitrogen

Contaminants Sulfur Species Volatile Organic Compounds Water

High maintenance reduced revenues reduced possibilities

7 March 2014 3

or APG

C3P Technology

Capture

Known species adsorbed on unique high-capacity media

Biogas Ultra-Clean gas

Condensing

Water and contaminants separated via cooling - uses no adsorption media

Conversion Polishing

Organic sulfur and Final chemisorption other species step polishes converted to known contaminants to set of compounds trace levels

(lt 30 ppbv)

7 March 2014 4

Quadrogen System at Orange County WWTP California

Quadrogen Gas Clean‐up System Installed

Orange County Sanitation District

(OCSD) 7 March 2014 5

Biogas Clean-up system at OCSD WWTP in California

6

The Air Products and FuelCell Energy team selected C3P technology through a competitive bidding process and the installed unit is in operation since June 2011

7 March 2014

Biogas Clean-up System Performance at OCSD WWTP

Volume basis siloxane species analyzed D4 D5 D6 L2 and L3 to 100 ppbv detection limit

ppbv level clean-up Longer life

Reliable ultra-clean and lower OampM cost 7 March 2014 7

Siloxane Removal after 15000+ hours of operation

7 March 2014 8

Halogen Removal after 15000+ hours of operation

7 March 2014 9

VOC Removal after 15000+ hours of operation

7 March 2014 10

Sulfur Removal after 15000+ hours of operation

Chart courtesy of Fred Jahnke Sr Manager Hydrogen Programs FuelCell Energy Inc

Highly Reliable No breakthrough yet and no maintenance required 7 March 2014 11

Quad-generation Demo Project in Delta BC

7 March 2014 12

Quadrogen Technologies for Quad-generation Demo Project

7 March 2014 13

Quad-generation Demonstration Project in BC Canada

Demonstration Project Site

All Village Farms Greenhouses gt 100 acres

Landfill

7 March 2014 14

Conclusion

Biogas system cost reduction System simplification Fuel flexible design and development

Demonstrate technology for APG applications Performance validation Lifetime evaluation Validate design for ease of deployment

7 March 2014 15

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16

Page 2: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

Quadrogen Overview

Developed proprietary gas clean-up technology for fuel cell applications

First demonstration unit using biogas in operation for more than 2 frac12 years

Second unit using biogas operational by Q32014

Third unit using landfill gas operational by Q12015

Working on associated gas applications

7 March 2014 2

The Problem

Biogas Associated Petroleum Gas (APG)

50 - 60 Methane 35 - 40 Carbon Dioxide 0-11 Nitrogen

Contaminants Siloxanes Sulfur Species Halogen Species Volatile Organic Compounds Water Oxygen

50 - 80 Methane 20 ndash 50 Higher hydrocarbons 20 - 40 Carbon Dioxide 0 - 5 Nitrogen

Contaminants Sulfur Species Volatile Organic Compounds Water

High maintenance reduced revenues reduced possibilities

7 March 2014 3

or APG

C3P Technology

Capture

Known species adsorbed on unique high-capacity media

Biogas Ultra-Clean gas

Condensing

Water and contaminants separated via cooling - uses no adsorption media

Conversion Polishing

Organic sulfur and Final chemisorption other species step polishes converted to known contaminants to set of compounds trace levels

(lt 30 ppbv)

7 March 2014 4

Quadrogen System at Orange County WWTP California

Quadrogen Gas Clean‐up System Installed

Orange County Sanitation District

(OCSD) 7 March 2014 5

Biogas Clean-up system at OCSD WWTP in California

6

The Air Products and FuelCell Energy team selected C3P technology through a competitive bidding process and the installed unit is in operation since June 2011

7 March 2014

Biogas Clean-up System Performance at OCSD WWTP

Volume basis siloxane species analyzed D4 D5 D6 L2 and L3 to 100 ppbv detection limit

ppbv level clean-up Longer life

Reliable ultra-clean and lower OampM cost 7 March 2014 7

Siloxane Removal after 15000+ hours of operation

7 March 2014 8

Halogen Removal after 15000+ hours of operation

7 March 2014 9

VOC Removal after 15000+ hours of operation

7 March 2014 10

Sulfur Removal after 15000+ hours of operation

Chart courtesy of Fred Jahnke Sr Manager Hydrogen Programs FuelCell Energy Inc

Highly Reliable No breakthrough yet and no maintenance required 7 March 2014 11

Quad-generation Demo Project in Delta BC

7 March 2014 12

Quadrogen Technologies for Quad-generation Demo Project

7 March 2014 13

Quad-generation Demonstration Project in BC Canada

Demonstration Project Site

All Village Farms Greenhouses gt 100 acres

Landfill

7 March 2014 14

Conclusion

Biogas system cost reduction System simplification Fuel flexible design and development

Demonstrate technology for APG applications Performance validation Lifetime evaluation Validate design for ease of deployment

7 March 2014 15

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16

Page 3: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

The Problem

Biogas Associated Petroleum Gas (APG)

50 - 60 Methane 35 - 40 Carbon Dioxide 0-11 Nitrogen

Contaminants Siloxanes Sulfur Species Halogen Species Volatile Organic Compounds Water Oxygen

50 - 80 Methane 20 ndash 50 Higher hydrocarbons 20 - 40 Carbon Dioxide 0 - 5 Nitrogen

Contaminants Sulfur Species Volatile Organic Compounds Water

High maintenance reduced revenues reduced possibilities

7 March 2014 3

or APG

C3P Technology

Capture

Known species adsorbed on unique high-capacity media

Biogas Ultra-Clean gas

Condensing

Water and contaminants separated via cooling - uses no adsorption media

Conversion Polishing

Organic sulfur and Final chemisorption other species step polishes converted to known contaminants to set of compounds trace levels

(lt 30 ppbv)

7 March 2014 4

Quadrogen System at Orange County WWTP California

Quadrogen Gas Clean‐up System Installed

Orange County Sanitation District

(OCSD) 7 March 2014 5

Biogas Clean-up system at OCSD WWTP in California

6

The Air Products and FuelCell Energy team selected C3P technology through a competitive bidding process and the installed unit is in operation since June 2011

7 March 2014

Biogas Clean-up System Performance at OCSD WWTP

Volume basis siloxane species analyzed D4 D5 D6 L2 and L3 to 100 ppbv detection limit

ppbv level clean-up Longer life

Reliable ultra-clean and lower OampM cost 7 March 2014 7

Siloxane Removal after 15000+ hours of operation

7 March 2014 8

Halogen Removal after 15000+ hours of operation

7 March 2014 9

VOC Removal after 15000+ hours of operation

7 March 2014 10

Sulfur Removal after 15000+ hours of operation

Chart courtesy of Fred Jahnke Sr Manager Hydrogen Programs FuelCell Energy Inc

Highly Reliable No breakthrough yet and no maintenance required 7 March 2014 11

Quad-generation Demo Project in Delta BC

7 March 2014 12

Quadrogen Technologies for Quad-generation Demo Project

7 March 2014 13

Quad-generation Demonstration Project in BC Canada

Demonstration Project Site

All Village Farms Greenhouses gt 100 acres

Landfill

7 March 2014 14

Conclusion

Biogas system cost reduction System simplification Fuel flexible design and development

Demonstrate technology for APG applications Performance validation Lifetime evaluation Validate design for ease of deployment

7 March 2014 15

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16

Page 4: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

or APG

C3P Technology

Capture

Known species adsorbed on unique high-capacity media

Biogas Ultra-Clean gas

Condensing

Water and contaminants separated via cooling - uses no adsorption media

Conversion Polishing

Organic sulfur and Final chemisorption other species step polishes converted to known contaminants to set of compounds trace levels

(lt 30 ppbv)

7 March 2014 4

Quadrogen System at Orange County WWTP California

Quadrogen Gas Clean‐up System Installed

Orange County Sanitation District

(OCSD) 7 March 2014 5

Biogas Clean-up system at OCSD WWTP in California

6

The Air Products and FuelCell Energy team selected C3P technology through a competitive bidding process and the installed unit is in operation since June 2011

7 March 2014

Biogas Clean-up System Performance at OCSD WWTP

Volume basis siloxane species analyzed D4 D5 D6 L2 and L3 to 100 ppbv detection limit

ppbv level clean-up Longer life

Reliable ultra-clean and lower OampM cost 7 March 2014 7

Siloxane Removal after 15000+ hours of operation

7 March 2014 8

Halogen Removal after 15000+ hours of operation

7 March 2014 9

VOC Removal after 15000+ hours of operation

7 March 2014 10

Sulfur Removal after 15000+ hours of operation

Chart courtesy of Fred Jahnke Sr Manager Hydrogen Programs FuelCell Energy Inc

Highly Reliable No breakthrough yet and no maintenance required 7 March 2014 11

Quad-generation Demo Project in Delta BC

7 March 2014 12

Quadrogen Technologies for Quad-generation Demo Project

7 March 2014 13

Quad-generation Demonstration Project in BC Canada

Demonstration Project Site

All Village Farms Greenhouses gt 100 acres

Landfill

7 March 2014 14

Conclusion

Biogas system cost reduction System simplification Fuel flexible design and development

Demonstrate technology for APG applications Performance validation Lifetime evaluation Validate design for ease of deployment

7 March 2014 15

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16

Page 5: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

Quadrogen System at Orange County WWTP California

Quadrogen Gas Clean‐up System Installed

Orange County Sanitation District

(OCSD) 7 March 2014 5

Biogas Clean-up system at OCSD WWTP in California

6

The Air Products and FuelCell Energy team selected C3P technology through a competitive bidding process and the installed unit is in operation since June 2011

7 March 2014

Biogas Clean-up System Performance at OCSD WWTP

Volume basis siloxane species analyzed D4 D5 D6 L2 and L3 to 100 ppbv detection limit

ppbv level clean-up Longer life

Reliable ultra-clean and lower OampM cost 7 March 2014 7

Siloxane Removal after 15000+ hours of operation

7 March 2014 8

Halogen Removal after 15000+ hours of operation

7 March 2014 9

VOC Removal after 15000+ hours of operation

7 March 2014 10

Sulfur Removal after 15000+ hours of operation

Chart courtesy of Fred Jahnke Sr Manager Hydrogen Programs FuelCell Energy Inc

Highly Reliable No breakthrough yet and no maintenance required 7 March 2014 11

Quad-generation Demo Project in Delta BC

7 March 2014 12

Quadrogen Technologies for Quad-generation Demo Project

7 March 2014 13

Quad-generation Demonstration Project in BC Canada

Demonstration Project Site

All Village Farms Greenhouses gt 100 acres

Landfill

7 March 2014 14

Conclusion

Biogas system cost reduction System simplification Fuel flexible design and development

Demonstrate technology for APG applications Performance validation Lifetime evaluation Validate design for ease of deployment

7 March 2014 15

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16

Page 6: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

Biogas Clean-up system at OCSD WWTP in California

6

The Air Products and FuelCell Energy team selected C3P technology through a competitive bidding process and the installed unit is in operation since June 2011

7 March 2014

Biogas Clean-up System Performance at OCSD WWTP

Volume basis siloxane species analyzed D4 D5 D6 L2 and L3 to 100 ppbv detection limit

ppbv level clean-up Longer life

Reliable ultra-clean and lower OampM cost 7 March 2014 7

Siloxane Removal after 15000+ hours of operation

7 March 2014 8

Halogen Removal after 15000+ hours of operation

7 March 2014 9

VOC Removal after 15000+ hours of operation

7 March 2014 10

Sulfur Removal after 15000+ hours of operation

Chart courtesy of Fred Jahnke Sr Manager Hydrogen Programs FuelCell Energy Inc

Highly Reliable No breakthrough yet and no maintenance required 7 March 2014 11

Quad-generation Demo Project in Delta BC

7 March 2014 12

Quadrogen Technologies for Quad-generation Demo Project

7 March 2014 13

Quad-generation Demonstration Project in BC Canada

Demonstration Project Site

All Village Farms Greenhouses gt 100 acres

Landfill

7 March 2014 14

Conclusion

Biogas system cost reduction System simplification Fuel flexible design and development

Demonstrate technology for APG applications Performance validation Lifetime evaluation Validate design for ease of deployment

7 March 2014 15

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16

Page 7: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

Biogas Clean-up System Performance at OCSD WWTP

Volume basis siloxane species analyzed D4 D5 D6 L2 and L3 to 100 ppbv detection limit

ppbv level clean-up Longer life

Reliable ultra-clean and lower OampM cost 7 March 2014 7

Siloxane Removal after 15000+ hours of operation

7 March 2014 8

Halogen Removal after 15000+ hours of operation

7 March 2014 9

VOC Removal after 15000+ hours of operation

7 March 2014 10

Sulfur Removal after 15000+ hours of operation

Chart courtesy of Fred Jahnke Sr Manager Hydrogen Programs FuelCell Energy Inc

Highly Reliable No breakthrough yet and no maintenance required 7 March 2014 11

Quad-generation Demo Project in Delta BC

7 March 2014 12

Quadrogen Technologies for Quad-generation Demo Project

7 March 2014 13

Quad-generation Demonstration Project in BC Canada

Demonstration Project Site

All Village Farms Greenhouses gt 100 acres

Landfill

7 March 2014 14

Conclusion

Biogas system cost reduction System simplification Fuel flexible design and development

Demonstrate technology for APG applications Performance validation Lifetime evaluation Validate design for ease of deployment

7 March 2014 15

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16

Page 8: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

Siloxane Removal after 15000+ hours of operation

7 March 2014 8

Halogen Removal after 15000+ hours of operation

7 March 2014 9

VOC Removal after 15000+ hours of operation

7 March 2014 10

Sulfur Removal after 15000+ hours of operation

Chart courtesy of Fred Jahnke Sr Manager Hydrogen Programs FuelCell Energy Inc

Highly Reliable No breakthrough yet and no maintenance required 7 March 2014 11

Quad-generation Demo Project in Delta BC

7 March 2014 12

Quadrogen Technologies for Quad-generation Demo Project

7 March 2014 13

Quad-generation Demonstration Project in BC Canada

Demonstration Project Site

All Village Farms Greenhouses gt 100 acres

Landfill

7 March 2014 14

Conclusion

Biogas system cost reduction System simplification Fuel flexible design and development

Demonstrate technology for APG applications Performance validation Lifetime evaluation Validate design for ease of deployment

7 March 2014 15

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16

Page 9: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

Halogen Removal after 15000+ hours of operation

7 March 2014 9

VOC Removal after 15000+ hours of operation

7 March 2014 10

Sulfur Removal after 15000+ hours of operation

Chart courtesy of Fred Jahnke Sr Manager Hydrogen Programs FuelCell Energy Inc

Highly Reliable No breakthrough yet and no maintenance required 7 March 2014 11

Quad-generation Demo Project in Delta BC

7 March 2014 12

Quadrogen Technologies for Quad-generation Demo Project

7 March 2014 13

Quad-generation Demonstration Project in BC Canada

Demonstration Project Site

All Village Farms Greenhouses gt 100 acres

Landfill

7 March 2014 14

Conclusion

Biogas system cost reduction System simplification Fuel flexible design and development

Demonstrate technology for APG applications Performance validation Lifetime evaluation Validate design for ease of deployment

7 March 2014 15

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16

Page 10: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

VOC Removal after 15000+ hours of operation

7 March 2014 10

Sulfur Removal after 15000+ hours of operation

Chart courtesy of Fred Jahnke Sr Manager Hydrogen Programs FuelCell Energy Inc

Highly Reliable No breakthrough yet and no maintenance required 7 March 2014 11

Quad-generation Demo Project in Delta BC

7 March 2014 12

Quadrogen Technologies for Quad-generation Demo Project

7 March 2014 13

Quad-generation Demonstration Project in BC Canada

Demonstration Project Site

All Village Farms Greenhouses gt 100 acres

Landfill

7 March 2014 14

Conclusion

Biogas system cost reduction System simplification Fuel flexible design and development

Demonstrate technology for APG applications Performance validation Lifetime evaluation Validate design for ease of deployment

7 March 2014 15

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16

Page 11: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

Sulfur Removal after 15000+ hours of operation

Chart courtesy of Fred Jahnke Sr Manager Hydrogen Programs FuelCell Energy Inc

Highly Reliable No breakthrough yet and no maintenance required 7 March 2014 11

Quad-generation Demo Project in Delta BC

7 March 2014 12

Quadrogen Technologies for Quad-generation Demo Project

7 March 2014 13

Quad-generation Demonstration Project in BC Canada

Demonstration Project Site

All Village Farms Greenhouses gt 100 acres

Landfill

7 March 2014 14

Conclusion

Biogas system cost reduction System simplification Fuel flexible design and development

Demonstrate technology for APG applications Performance validation Lifetime evaluation Validate design for ease of deployment

7 March 2014 15

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16

Page 12: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

Quad-generation Demo Project in Delta BC

7 March 2014 12

Quadrogen Technologies for Quad-generation Demo Project

7 March 2014 13

Quad-generation Demonstration Project in BC Canada

Demonstration Project Site

All Village Farms Greenhouses gt 100 acres

Landfill

7 March 2014 14

Conclusion

Biogas system cost reduction System simplification Fuel flexible design and development

Demonstrate technology for APG applications Performance validation Lifetime evaluation Validate design for ease of deployment

7 March 2014 15

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16

Page 13: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

Quadrogen Technologies for Quad-generation Demo Project

7 March 2014 13

Quad-generation Demonstration Project in BC Canada

Demonstration Project Site

All Village Farms Greenhouses gt 100 acres

Landfill

7 March 2014 14

Conclusion

Biogas system cost reduction System simplification Fuel flexible design and development

Demonstrate technology for APG applications Performance validation Lifetime evaluation Validate design for ease of deployment

7 March 2014 15

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16

Page 14: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

Quad-generation Demonstration Project in BC Canada

Demonstration Project Site

All Village Farms Greenhouses gt 100 acres

Landfill

7 March 2014 14

Conclusion

Biogas system cost reduction System simplification Fuel flexible design and development

Demonstrate technology for APG applications Performance validation Lifetime evaluation Validate design for ease of deployment

7 March 2014 15

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16

Page 15: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

Conclusion

Biogas system cost reduction System simplification Fuel flexible design and development

Demonstrate technology for APG applications Performance validation Lifetime evaluation Validate design for ease of deployment

7 March 2014 15

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16

Page 16: Quadrogen Gas Clean-Up Technology for Fuel Cell Applications · Presentation on Quadrogen gas clean-up technology for fuel cell applications by Alakh Prasad, Quadrogen Power Systems,

Follow up Questions

THANK YOU

Quadrogen Power Systems Inc wwwquadrogencom Phone (604) 221 7170

7 March 2014 16