quality assurance essentials · b. process control tests conducted during the manufacturing of the...

27
Quality Assurance Essentials Emulsion Task Force Meeting By: Colin A. Franco, P.E. Associate Chief Engineer RIDOT Denver - May 21 - 22, 2017

Upload: others

Post on 22-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

Quality Assurance Essentials

Emulsion Task Force Meeting

By: Colin A. Franco, P.E.Associate Chief Engineer

RIDOT

Denver - May 21-22, 2017

Page 2: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

Quality Assurance - Definition

AASHTO R10 & TRB Circular E-C173

Quality Assurance – All those planned and

systematic actions necessary to provide

confidence that a product or facility will perform

satisfactorily in service …

Page 3: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

• Applies to projects on the NHS

• State administered and locally administered

• Including Design-Build - 23CFR637.207(b)

“All provisions of 637.207(a) are applicable to Design-Build projects and other alternative contracting methods.”

• Non-NHS projects

• Many States apply same QA procedures as NHS

Applicability of 23 CFR 637

Page 4: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

QA Program

Agency Acceptance

Dispute Resolution

Independent Assurance

Contractor QC

Lab Qualification

Personnel Qualification

Core Elements of a

Quality Assurance Program

Page 5: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

Core Elements of a QA Program

Quality Assurance

QualityControl

AgencyAcceptance

Independent AssuranceDispute Resolution

LaboratoriesPersonnel

Page 6: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

• All acceptance activities must be carried out by the Agency or their “Designated Agent”

• Agency independently performs: Acceptance (Verification) Testing

Agency Acceptance

Page 7: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

Acceptance Program• Acceptance program. All factors that

comprise the Agency determination of

the quality of the product as specified in

the contract requirements. These

factors include:

• verification sampling,

• testing,

• inspection

Page 8: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

Acceptance Function

• Acceptance is not focused on directing the methods used to achieve conformance

• The primary objectives of agency acceptance are:

• Measure the Quality of all materials produced

and placed by the contractor

• Determine the corresponding payment

the contractor should receive

Page 9: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

Acceptance Function

• Quality measurement is achieved through three general acceptance activities:

• Monitoring the adequacy of contractor QC activity

• Performing acceptance inspection to identify visually deficient work

• Performing Acceptance sampling and testing for key quality characteristics

• Agency is obtaining information to confirm that all products meet the specified

quality level

Page 10: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

Independent Assurance - “Activities that are an unbiased and

independent evaluation of all the sampling and testing

procedures used in the Quality Assurance Program”

Independent Assurance - IA

Page 11: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

• Provide an assessment of

personnel proficiency and

equipment for both

agency and contractor

Independent Assurance activities:

Scope of IA Activities

Page 12: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

• Performed by Agency or Designated Agent personnel who are not

directly responsible for project Acceptance sampling and testing

• Provides periodic independent evaluation of QC and Acceptance

personnel and their equipment

• Not used to make a determination of work quality or

acceptability

Independent Assurance – IA (cont.)

Page 13: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

Quality Control - QC - “The system used by a Contractor

party to monitor, assess and adjust their production or

placement processes to ensure that the final product will

meet the specified level of quality.”

Definition

Contractor Quality Control

Page 14: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

• QC is the responsibility of the Contractor

• The party producing or placing the product is in the best position to exercise Quality Control

Contractor Responsibility for Quality Control

Page 15: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

Scope of Quality Control Activities

• Contractor’s QC system should address:

• Materials production processes

• Materials transportation and handling

• Field placement procedures

• Calibration and maintenance of equipment

• Activities (sampling, testing and inspection) to maintain each process in control

• Means to make timely adjustments and corrections

Page 16: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

Contractor QC Operating Documents

• Quality Control Plan - A project specific document prepared by the contractor

which identifies QC personnel and procedures that will be used to maintain

production and placement processes in control and meet the

agency specification requirements.

Page 17: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

• Central Laboratories

• Consultant Labs used for Independent Assurance (IA)

• Consultant Labs used for Dispute Resolution

Requirements for Laboratory Accreditation

Page 18: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

“Laboratories that are

capable as defined by

appropriate programs

established by each

Agency.”

Qualified Laboratories

Page 19: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

• Laboratory Qualification

Program

• All other Labs performing

sampling and testing that is

utilized in the Agency’s

acceptance decision

Laboratory Qualification

Page 20: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

Qualified Personnel - “Personnel who are capable as

defined by appropriate programs established or

recognized by each Agency.”

Definition

Qualified Personnel

Page 21: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

Personnel who are recognized by a formal certifying

body as qualified to perform specific procedures.

Definition

Certified Personnel

Page 22: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

• Formal training

• On-the-job training

• Specified re-

qualification intervals

• Proficiency demonstration

• A written exam

• A process for disqualification or decertification

A complete personnel qualification/certification

program should include, at minimum:

Requirement for Personnel

Qualification / Certification

Page 23: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

• Dispute Resolution - The procedure used

to resolve discrepancies between the

Agency’s Acceptance and Contractor’s QC

testing results that could impact

payment.

• Dispute Resolution system required when

QC results used in Acceptance decision.

Materials Testing Dispute Resolution

Page 24: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

• Can be performed within the DOT

• Use of accredited third party

laboratory can be used.

Responsibility for Dispute Resolution

Page 25: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

WA

TE

R

CO

NT

EN

T

RE

SID

UE

AN

D

OIL

DIS

TIL

LA

TE

RE

SID

UE

BY

EV

AP

OR

AT

ION

PA

RT

ICL

E

CH

AR

GE

OF

CA

TIO

NIC

RE

SID

UE

BY

EV

AP

OR

AT

ION

VIS

CO

SIT

Y

(SA

YB

OL

T

FU

RO

L)

DE

MU

LS

IBIL

ITY

SE

TT

LE

ME

NT

CE

ME

NT

MIX

ING

SIE

VE

TE

ST

CO

AT

ING

MIS

CIB

ILIT

Y

WIT

H W

AT

ER

FR

EE

ZIN

G

CO

AT

ING

AB

ILIT

Y A

ND

WA

TE

R

RE

SIS

TA

NC

E

ST

OR

AG

E

ST

AB

ILIT

Y

EX

AM

INA

TIO

N

OF

RE

SID

UE

ID O

F C

AT

ION

IC

SL

OW

SE

T

EM

UL

SIO

NS

WE

IGH

T P

ER

GA

LL

ON

RE

SID

UE

BY

LO

W-

TE

MP

ER

AT

UR

E

VA

CC

UU

M

DIS

TIL

LA

TIO

N

SAMPLE

CR

S-2

, C

MS

-2,

RS

-2,

HF

MS

-2 W

LA

TE

X

AS

TM

D244,

P

AS

TM

D244,

P

AS

TM

D244,

P

AS

TM

D244,

P

AS

TM

D244,

P

AS

TM

D244,

P,

PE

, A

, IA

AS

TM

D244,

P

AS

TM

D244,

P

AS

TM

D244,

P

AS

TM

D244,

P

AS

TM

D244,

P,

PE

AS

TM

D244,

P

AS

TM

D244,

P

AS

TM

D244,

P,

PE

, A

, IA

AS

TM

D244,

P

AS

TM

D244,

P

AS

TM

D244,

P

AS

TM

D244,

P,

PE

, A

AS

TM

D244,

P

AS

TM

D244,

P,

PE

, A

PE

, A

D 6

930,

EN

12847

AS

TM

D244,

EN

13075-1

, N

F T

66-

019

AS

TM

D244,

D7276

PA

TT

I A

dh

esio

n

Test,

PE

, A

, IA

AS

TM

D244

A A A A A A A A A A

SK

ID T

ES

TE

R -

A A A

D 7

000

A A A

VIRGIN

RECYCLED

CIR

5. Tests performed during the construction of the

emulsified application process

6. Tests associated with post construction/in-

service performance

P - Process Control performed by the contractor/vendor over all production operations. This will entail

the constant monitoring of equipment, materials, and production activity to insure that the materials

meet all applicable requirements and are produced within specifications

PE - Product evaluation is based on compatibility with established standards and

specifications, tested properties, performance history and suitablity to specific

applications performed by the puchasing agency or independent laboratory.

IA - Independent assurance are activities that are an unbiased and independent

evaluation of all the sampling and testing (or inspection) used in the QA program

SECTION DESCRIPTION

A - Acceptance testing performed by the agency, or its designated agent, to evaluate acceptability of

the final product. Also called verification sampling and testing when specifically used to validate the

contractor's data

C. Material conformance testing

4. Tests and processess to establish the design and construction criteria utilizing specific materials and resources

B. Process control tests conducted during the

manufacturing of the emulsion liquid

2.

AS

PH

AL

T

EM

UL

SIO

N G

RA

DE

S

SCRUB

TACK COAT

1. List of various applications for bitumen emulsions

2. List of the all grades of bitumen emulsions that can be used for

each application

3. Describes the various tests associated with the

manufacturing of bitumen emulsions

PERFORMANCE TESTS

TH

ER

MA

L C

RA

CK

ING

RE

SIS

TA

NC

E

C.

GENERAL

A. Lists test performed when designing the emulsion

liquid to be manufactured

3.

MANUFACTURING OF LIQUID BITUMEN EMULSION

5.

CONSTRUCTION

SAND SEAL

MIX

ES

1.

EM

UL

SIO

N A

PP

LIC

AT

ION

S

NOVA

6.

IN-SERVICE PERFORMANCE REQUIREMENTS FUNCTION

AND DURABILITY

4. DESIGN/

PRECONSTRUCTION

ENGINEERING

SH

OV

ING

RA

VE

LIN

G

CO

MP

AC

TA

BIL

ITY

B.

MATERIAL MANUFACTURING

(STABILITY/CONSISTENCY)

ST

AB

ILIT

Y

FA

TIG

UE

CR

AC

KIN

G

SK

ID

BR

EA

KIN

G R

AT

E

SLURRY SEAL

MICROSURFACING

FOG SEAL

SW

EE

P T

ES

T

AP

PL

ICA

TIO

N M

IX D

ES

IGN

WE

TT

ING

OF

ST

ON

ES

PL

AC

EM

EN

T

A.

MATERIAL ENGINEERING

AND DESIGN

FIE

LD

CO

AT

ING

TE

ST

DR

AIN

OU

T/

SP

RA

YA

BIL

ITY

AD

HE

SIO

N T

O S

UB

ST

RA

TE

AD

HE

SIO

N T

O S

UB

ST

RA

TE

RU

TT

ING

WO

RK

AB

ILIT

Y

AD

HE

SIO

N T

O A

GG

RE

GA

TE

Quality Assurance Testing

UV

OX

IDA

TIO

N

FT

FA

TT

INE

SS

RE

SIS

TA

NC

E-E

AR

LY

AG

GR

EG

AT

E L

OS

S

LO

NG

TE

RM

RA

VE

LL

ING

RE

SIS

TA

NC

E

FOAM ASPHALT

CHIP SEAL

Page 26: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

SAMPLE

CR

S-2

, C

MS

-2,

RS

-2,

HF

MS

-2 W

LA

TE

X

AS

TM

D244,

P,

PE

, A

PE

, A

D 6

930,

EN

12847

AS

TM

D244,

EN

13075-1

, N

F T

66-

019

AS

TM

D244,

D7276

PA

TT

I A

dh

esio

n

Test,

PE

, A

, IA

AS

TM

D244

A A A A A A A A A A

SK

ID T

ES

TE

R -

A A A

D 7

000

A A A

VIRGIN

RECYCLED

CIR

5. Tests performed during the construction of

the emulsified application process

6. Tests associated with post construction/in-

service performance

P - Process Control performed by the contractor/vendor over all production operations. This will entail

the constant monitoring of equipment, materials, and production activity to insure that the materials

meet all applicable requirements and are produced within specifications

PE - Product evaluation is based on compatibility with established standards and

specifications, tested properties, performance history and suitablity to specific

applications performed by the puchasing agency or independent laboratory.

IA - Independent assurance are activities that are an unbiased and independent

evaluation of all the sampling and testing (or inspection) used in the QA program

SECTION

DESCRIPTION

A - Acceptance testing performed by the agency, or its designated agent, to evaluate acceptability of

the final product. Also called verification sampling and testing when specifically used to validate the

contractor's data

C. Material conformance testing

4. Tests and processess to establish the design and construction criteria

utilizing specific materials and resources

B. Process control tests conducted during the

manufacturing of the emulsion liquid

2.

AS

PH

AL

T

EM

UL

SIO

N G

RA

DE

S

SCRUB

TACK COAT

1. List of various applications for bitumen

emulsions

2. List of the all grades of bitumen emulsions that can

be used for each application

3. Describes the various tests associated with

the manufacturing of bitumen emulsions

PERFORMANCE TESTS

TH

ER

MA

L C

RA

CK

ING

RE

SIS

TA

NC

E

A. Lists test performed when designing the

emulsion liquid to be manufactured

5.

CONSTRUCTION

SAND SEAL

MIX

ES

1.

EM

UL

SIO

N A

PP

LIC

AT

ION

S

NOVA

6.

IN-SERVICE PERFORMANCE REQUIREMENTS FUNCTION

AND DURABILITY

4. DESIGN/

PRECONSTRUCTION

ENGINEERING

SH

OV

ING

RA

VE

LIN

G

CO

MP

AC

TA

BIL

ITY

ST

AB

ILIT

Y

FA

TIG

UE

CR

AC

KIN

G

SK

ID

BR

EA

KIN

G R

AT

E

SLURRY SEAL

MICROSURFACING

FOG SEAL

SW

EE

P T

ES

T

AP

PL

ICA

TIO

N M

IX D

ES

IGN

WE

TT

ING

OF

ST

ON

ES

PL

AC

EM

EN

T

FIE

LD

CO

AT

ING

TE

ST

DR

AIN

OU

T/

SP

RA

YA

BIL

ITY

AD

HE

SIO

N T

O S

UB

ST

RA

TE

AD

HE

SIO

N T

O S

UB

ST

RA

TE

RU

TT

ING

WO

RK

AB

ILIT

Y

AD

HE

SIO

N T

O A

GG

RE

GA

TE

Quality Assurance Testing

UV

OX

IDA

TIO

N

FT

FA

TT

INE

SS

RE

SIS

TA

NC

E-E

AR

LY

AG

GR

EG

AT

E L

OS

S

LO

NG

TE

RM

RA

VE

LL

ING

RE

SIS

TA

NC

E

FOAM ASPHALT

CHIP SEAL

Page 27: Quality Assurance Essentials · B. Process control tests conducted during the manufacturing of the emulsion liquid SCRUB TACK COAT 1. List of various applications for bitumen emulsions

Questions

?