  • 7/31/2019 Quality Checks During Overhaul

    1/29

    24 May 2012 PMI Revision 00 1

    QUALITY

    CHECKS DURINGO/H

  • 7/31/2019 Quality Checks During Overhaul

    2/29

    24 May 2012 PMI Revision 00 2

    Boiler Pass 1&2

    Ducts

    Rotary parts

    ESP

    Turbine auxilaries

    Generator

  • 7/31/2019 Quality Checks During Overhaul

    3/29

    24 May 2012 PMI Revision 00 3

  • 7/31/2019 Quality Checks During Overhaul

    4/29

    24 May 2012 PMI Revision 00 4

    ROLE OF QUALITY ASSURANCE DEPT. AT

    SITE:

    TO PREPARE QUALITY PLAN BEFORE OVERHAUL.

    TO PREPARE QA CHECK LISTS.

    TO INVOLVE IN CRITICAL CHECKS DURING OVERHAUL. TO INVOLVE IN DAY TO DAY MAINTENANCE.

    TO CARRYOUT NON DESTRUCTIVE TESTING.

  • 7/31/2019 Quality Checks During Overhaul

    5/29

    24 May 2012 PMI Revision 00 5

    Boiler pass 1 & 2

    (Tube Failure Mechanisms)

    Erosion

    Corrosion

    Mechanical wear

    Material mix-up

    Weld failures i.e Dissimilar & attachment weldfailures

  • 7/31/2019 Quality Checks During Overhaul

    6/29

    24 May 2012 PMI Revision 00 6

    Preventive measures during O/H

    100% visual inspection in all the identified areas

    Deploying IBR qualified welders & use of

    approved electrodes Extensive Tube Thickness survey

    NDT of welds( DPT, RT, UT &MPI)

  • 7/31/2019 Quality Checks During Overhaul

    7/29

    24 May 2012 PMI Revision 00 7

    QA methodology in different

    areas

    Goose neck region:DPT, Visualinspection and TTS

    RH girdling loops:Visual inspection for

    dents and distortion of binding loops

    Economisers & LTSH:TTS for top, bottom, extreme coils both

    Sides 1 to 5 tubes and visual inspectionfor alignment and erosion.

  • 7/31/2019 Quality Checks During Overhaul

    8/29

    24 May 2012 PMI Revision 00 8

    LTSH bifurcation tubes:Visual inspection for refractory damage and erosion & TTS

    RH : Visual inspection for overheating ,cleat rubbing (half reheater)and

    TTS & DPT

    Header stub joints: Visual inspection and DPTScreen tubes:

    TTS and visual inspection

    Raiser tubes:

    MPI / RT of bends and weldments

    QA methodology in different

    areas

  • 7/31/2019 Quality Checks During Overhaul

    9/29

    24 May 2012 PMI Revision 00 9

  • 7/31/2019 Quality Checks During Overhaul

    10/29

  • 7/31/2019 Quality Checks During Overhaul

    11/29

  • 7/31/2019 Quality Checks During Overhaul

    12/29

    24 May 2012 PMI Revision 00 12

    FANS AND ESP

    II PAFan, FD Fan:

    Blade alignment and clearances, motor & fanalignment and blades DPT

    III ID Fan:1. Bearing surface Visual & DPT

    2. Shaft visual inspection for pitting3. Welding joints and shaft- MPI&DPT

    ESP:Erosion of emitting electrodes, hammer

    Rings, bending of shock bar and cracking ofsuspension frame hooks of collecting electrodes.

  • 7/31/2019 Quality Checks During Overhaul

    13/29

    24 May 2012 PMI Revision 00 13PENETRANT APPLICATION READY FOR INSPECTION

  • 7/31/2019 Quality Checks During Overhaul

    14/29

    24 May 2012 PMI Revision 00 14

    TURBINE

    Main turbine (HP,IP and LP) checks

    NDT checks on turbine and auxilaries

    Generator checks

    NDT on generator

    Other checks in different areas

  • 7/31/2019 Quality Checks During Overhaul

    15/29

    24 May 2012 PMI Revision 00 15

    Radial alignment

    Axial alignment

    Clearances measurement

    Coupling run out

  • 7/31/2019 Quality Checks During Overhaul

    16/29

    24 May 2012 PMI Revision 00 16

    Visual inspection

    Blue matching of valves

    DPT & MPI of components

    UT of bearings

  • 7/31/2019 Quality Checks During Overhaul

    17/29

    24 May 2012 PMI Revision 00 17

    Turbine blades, De aerator perforated sheets, rotoralumina blast cleaning

    Shafts of CEP,BFP and vacuum pumps

    HRH & MS strainers

    Valves seating area

  • 7/31/2019 Quality Checks During Overhaul

    18/29

    24 May 2012 PMI Revision 00 18

    Line contact to be ensured

  • 7/31/2019 Quality Checks During Overhaul

    19/29

    24 May 2012 PMI Revision 00 19

    Shafts of CEP,BFP and Vacuum pumps MS & HRH strainer line weld joints, control fluid

    oil line weld joints, impulse line weld joints

    TDBFP gear coupling , bearings babbit metalarea.

    Stop valves & control valves components

    MPI of rotor & blades

  • 7/31/2019 Quality Checks During Overhaul

    20/29

  • 7/31/2019 Quality Checks During Overhaul

    21/29

    24 May 2012 PMI Revision 00 21

    UT of bearings

    To assess the de-bonding of babbitting

    Reference Standard: ASTM A 435 Acceptance norms: No multiple backwall echos

    UNIT 4 BrgThrust pads-36 Nos

  • 7/31/2019 Quality Checks During Overhaul

    22/29

  • 7/31/2019 Quality Checks During Overhaul

    23/29

    24 May 2012 PMI Revision 00 23

    After rotor threading out-rotor N2 pressure test(leakage - Not morethan 0.5

    kg/sg.cm for 6 hrs)

    IR value of rotor

    RSO test of rotor( sinusoidal wave form)

    Winding resistance

  • 7/31/2019 Quality Checks During Overhaul

    24/29

    24 May 2012 PMI Revision 00 24

    Stator

    Visual inspection of stator

    IR value of stator

    Wedge tightness , ELCID test and tan

    Winding resistance

  • 7/31/2019 Quality Checks During Overhaul

    25/29

  • 7/31/2019 Quality Checks During Overhaul

    26/29

    24 May 2012 PMI Revision 00 26

    DPT of compressor blades

  • 7/31/2019 Quality Checks During Overhaul

    27/29

  • 7/31/2019 Quality Checks During Overhaul

    28/29

    24 May 2012 PMI Revision 00 28

    Other areas

    DPT of expansion bellows

    DPT of HP heaters parting plane welds

    Condenser cleaning

    Deaerator visual inspection

  • 7/31/2019 Quality Checks During Overhaul

    29/29

    24 May 2012 PMI Revision 00 29