quality checks during overhaul
TRANSCRIPT
-
7/31/2019 Quality Checks During Overhaul
1/29
24 May 2012 PMI Revision 00 1
QUALITY
CHECKS DURINGO/H
-
7/31/2019 Quality Checks During Overhaul
2/29
24 May 2012 PMI Revision 00 2
Boiler Pass 1&2
Ducts
Rotary parts
ESP
Turbine auxilaries
Generator
-
7/31/2019 Quality Checks During Overhaul
3/29
24 May 2012 PMI Revision 00 3
-
7/31/2019 Quality Checks During Overhaul
4/29
24 May 2012 PMI Revision 00 4
ROLE OF QUALITY ASSURANCE DEPT. AT
SITE:
TO PREPARE QUALITY PLAN BEFORE OVERHAUL.
TO PREPARE QA CHECK LISTS.
TO INVOLVE IN CRITICAL CHECKS DURING OVERHAUL. TO INVOLVE IN DAY TO DAY MAINTENANCE.
TO CARRYOUT NON DESTRUCTIVE TESTING.
-
7/31/2019 Quality Checks During Overhaul
5/29
24 May 2012 PMI Revision 00 5
Boiler pass 1 & 2
(Tube Failure Mechanisms)
Erosion
Corrosion
Mechanical wear
Material mix-up
Weld failures i.e Dissimilar & attachment weldfailures
-
7/31/2019 Quality Checks During Overhaul
6/29
24 May 2012 PMI Revision 00 6
Preventive measures during O/H
100% visual inspection in all the identified areas
Deploying IBR qualified welders & use of
approved electrodes Extensive Tube Thickness survey
NDT of welds( DPT, RT, UT &MPI)
-
7/31/2019 Quality Checks During Overhaul
7/29
24 May 2012 PMI Revision 00 7
QA methodology in different
areas
Goose neck region:DPT, Visualinspection and TTS
RH girdling loops:Visual inspection for
dents and distortion of binding loops
Economisers & LTSH:TTS for top, bottom, extreme coils both
Sides 1 to 5 tubes and visual inspectionfor alignment and erosion.
-
7/31/2019 Quality Checks During Overhaul
8/29
24 May 2012 PMI Revision 00 8
LTSH bifurcation tubes:Visual inspection for refractory damage and erosion & TTS
RH : Visual inspection for overheating ,cleat rubbing (half reheater)and
TTS & DPT
Header stub joints: Visual inspection and DPTScreen tubes:
TTS and visual inspection
Raiser tubes:
MPI / RT of bends and weldments
QA methodology in different
areas
-
7/31/2019 Quality Checks During Overhaul
9/29
24 May 2012 PMI Revision 00 9
-
7/31/2019 Quality Checks During Overhaul
10/29
-
7/31/2019 Quality Checks During Overhaul
11/29
-
7/31/2019 Quality Checks During Overhaul
12/29
24 May 2012 PMI Revision 00 12
FANS AND ESP
II PAFan, FD Fan:
Blade alignment and clearances, motor & fanalignment and blades DPT
III ID Fan:1. Bearing surface Visual & DPT
2. Shaft visual inspection for pitting3. Welding joints and shaft- MPI&DPT
ESP:Erosion of emitting electrodes, hammer
Rings, bending of shock bar and cracking ofsuspension frame hooks of collecting electrodes.
-
7/31/2019 Quality Checks During Overhaul
13/29
24 May 2012 PMI Revision 00 13PENETRANT APPLICATION READY FOR INSPECTION
-
7/31/2019 Quality Checks During Overhaul
14/29
24 May 2012 PMI Revision 00 14
TURBINE
Main turbine (HP,IP and LP) checks
NDT checks on turbine and auxilaries
Generator checks
NDT on generator
Other checks in different areas
-
7/31/2019 Quality Checks During Overhaul
15/29
24 May 2012 PMI Revision 00 15
Radial alignment
Axial alignment
Clearances measurement
Coupling run out
-
7/31/2019 Quality Checks During Overhaul
16/29
24 May 2012 PMI Revision 00 16
Visual inspection
Blue matching of valves
DPT & MPI of components
UT of bearings
-
7/31/2019 Quality Checks During Overhaul
17/29
24 May 2012 PMI Revision 00 17
Turbine blades, De aerator perforated sheets, rotoralumina blast cleaning
Shafts of CEP,BFP and vacuum pumps
HRH & MS strainers
Valves seating area
-
7/31/2019 Quality Checks During Overhaul
18/29
24 May 2012 PMI Revision 00 18
Line contact to be ensured
-
7/31/2019 Quality Checks During Overhaul
19/29
24 May 2012 PMI Revision 00 19
Shafts of CEP,BFP and Vacuum pumps MS & HRH strainer line weld joints, control fluid
oil line weld joints, impulse line weld joints
TDBFP gear coupling , bearings babbit metalarea.
Stop valves & control valves components
MPI of rotor & blades
-
7/31/2019 Quality Checks During Overhaul
20/29
-
7/31/2019 Quality Checks During Overhaul
21/29
24 May 2012 PMI Revision 00 21
UT of bearings
To assess the de-bonding of babbitting
Reference Standard: ASTM A 435 Acceptance norms: No multiple backwall echos
UNIT 4 BrgThrust pads-36 Nos
-
7/31/2019 Quality Checks During Overhaul
22/29
-
7/31/2019 Quality Checks During Overhaul
23/29
24 May 2012 PMI Revision 00 23
After rotor threading out-rotor N2 pressure test(leakage - Not morethan 0.5
kg/sg.cm for 6 hrs)
IR value of rotor
RSO test of rotor( sinusoidal wave form)
Winding resistance
-
7/31/2019 Quality Checks During Overhaul
24/29
24 May 2012 PMI Revision 00 24
Stator
Visual inspection of stator
IR value of stator
Wedge tightness , ELCID test and tan
Winding resistance
-
7/31/2019 Quality Checks During Overhaul
25/29
-
7/31/2019 Quality Checks During Overhaul
26/29
24 May 2012 PMI Revision 00 26
DPT of compressor blades
-
7/31/2019 Quality Checks During Overhaul
27/29
-
7/31/2019 Quality Checks During Overhaul
28/29
24 May 2012 PMI Revision 00 28
Other areas
DPT of expansion bellows
DPT of HP heaters parting plane welds
Condenser cleaning
Deaerator visual inspection
-
7/31/2019 Quality Checks During Overhaul
29/29
24 May 2012 PMI Revision 00 29