Quality Control of Ship Repair
Tripartite Meeting
Beijing
1 November 2005
![Page 2: Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005](https://reader036.vdocument.in/reader036/viewer/2022062519/5697bfbc1a28abf838ca17cd/html5/thumbnails/2.jpg)
Abstract
• Two types of repair:
1) Planned in connection with Special Surveys, which always includes coating work and machinery overhaul, but may also include steel replacement.
2) In connection with accidents.
![Page 3: Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005](https://reader036.vdocument.in/reader036/viewer/2022062519/5697bfbc1a28abf838ca17cd/html5/thumbnails/3.jpg)
Quality Control
• Many repair yards are ISO certified.
• On some repair yards the ISO certificate is not worth the paper it is printed on.
• Use references for Q.C.
• Long term contracts – larger owners
![Page 4: Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005](https://reader036.vdocument.in/reader036/viewer/2022062519/5697bfbc1a28abf838ca17cd/html5/thumbnails/4.jpg)
Repair Contract
• When setting up the contract, Owners may want to include certain clauses.
• There is no guarantee, however, that the yard will accept the clauses.
![Page 5: Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005](https://reader036.vdocument.in/reader036/viewer/2022062519/5697bfbc1a28abf838ca17cd/html5/thumbnails/5.jpg)
![Page 6: Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005](https://reader036.vdocument.in/reader036/viewer/2022062519/5697bfbc1a28abf838ca17cd/html5/thumbnails/6.jpg)
Repair Contract
![Page 7: Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005](https://reader036.vdocument.in/reader036/viewer/2022062519/5697bfbc1a28abf838ca17cd/html5/thumbnails/7.jpg)
![Page 8: Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005](https://reader036.vdocument.in/reader036/viewer/2022062519/5697bfbc1a28abf838ca17cd/html5/thumbnails/8.jpg)
Quality Control
• Quality of repairs is to some degree dependent on geography.
• So is the price of repairs!
![Page 9: Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005](https://reader036.vdocument.in/reader036/viewer/2022062519/5697bfbc1a28abf838ca17cd/html5/thumbnails/9.jpg)
Quality Control - Coating
• Owner should have a coating inspector on-site
• Make sure also coating supplier representative is available.
![Page 10: Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005](https://reader036.vdocument.in/reader036/viewer/2022062519/5697bfbc1a28abf838ca17cd/html5/thumbnails/10.jpg)
Quality Control - Machinery
• Enrol specialists for specialized jobs – repair of turbochargers e.g. should not be left to the yard alone.
![Page 11: Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005](https://reader036.vdocument.in/reader036/viewer/2022062519/5697bfbc1a28abf838ca17cd/html5/thumbnails/11.jpg)
Quality Control - Steel
• Steel for replacement/repair should as far as practically be cut in a workshop, not on-site.
• Class should ensure that the right steel quality is used.
![Page 12: Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005](https://reader036.vdocument.in/reader036/viewer/2022062519/5697bfbc1a28abf838ca17cd/html5/thumbnails/12.jpg)
Quality Control
• Yards are entitled to delegate work to subcontractors.
• Yards cannot delegate the liability!
![Page 13: Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005](https://reader036.vdocument.in/reader036/viewer/2022062519/5697bfbc1a28abf838ca17cd/html5/thumbnails/13.jpg)
Quality Control
• Yards are responsible for carrying out the work.
• The Owner is responsible for obtaining class approval of the work!
![Page 14: Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005](https://reader036.vdocument.in/reader036/viewer/2022062519/5697bfbc1a28abf838ca17cd/html5/thumbnails/14.jpg)
Repair Contract
• Example of a clause:
• Steel replacement shall be carried out in accordance with IACS Recommendation 47 ”Shipbuilding and Repair Quality Standards” – Part B.
![Page 15: Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005](https://reader036.vdocument.in/reader036/viewer/2022062519/5697bfbc1a28abf838ca17cd/html5/thumbnails/15.jpg)
Prudent Approach
• ”You don’t get what you EXPECT!”
• ”You only get what you INSPECT!”