quang ninh port's presentation

29
Company LOGO Quang ninh port No. 1 Cai Lan Road – Ha Long City– Quang Ninh Province - Vietnam

Upload: nguyen-huu-thanh

Post on 20-May-2015

547 views

Category:

Business


4 download

TRANSCRIPT

Page 1: Quang ninh port's presentation

Company

LOGO

Quang ninh port

No. 1 Cai Lan Road – Ha Long City– Quang Ninh Province - Vietnam

Page 2: Quang ninh port's presentation

Vietnam national shipping linesQuang Ninh Port

Tel : 033.625889; 033. 825603 ; 033.825627

Fax : 033.826118Pilot boarding station : 200 43’ 04’’ N

1070 10’ 33’’ EMain gate to Cai Lan Port

Page 3: Quang ninh port's presentation

General introductionGeneral introduction

1. Introduction on Cai Lan Port and its transportation network1. Introduction on Cai Lan Port and its transportation network

2. Introduction on Cai Lan Port’s facilities 2. Introduction on Cai Lan Port’s facilities

3. A number of preferential policies offered by Quang Ninh Port 3. A number of preferential policies offered by Quang Ninh Port

Page 4: Quang ninh port's presentation

1. Technical information and transportation networks

.A. .A. Access channelAccess channel

Total length: 18 nautical miles

Passage from Buoy No. 0 to Hon Mot is 11.8 Nautical miles, 300 m wide, -13 m deep against the port datum.

Passage from Hon Mot to Cua Luc is 4.2 Nautical miles, 80m wide, -8,1m deep against the port datum.

Passage from Cua Lục to Cai Lan Port is 2 Nautical miles, 130m wide, -10m deep against the port datum.

On 24 Sept. 2004, The Prime Minister has approved the project to upgrade and dredged the passage from Hon Mot to Cua Luc up to the depth of -10m, 130m wide which is capable of receiving vessels up to 40.000 – 45.000 DWT. The dredging works is expected to commence from Sept.2005 and taken for 5 months.

Page 5: Quang ninh port's presentation

Transportation system to Cai Lan Port

Transportation system to Cai Lan Port

RoadRoad WaterwayWaterway RailwayRailway

Connected tothe port through the National Road No. 18 (the permitted load capacity is 10 tons/vehicle axe

Suitable for the large volume of cargo transport to the Northern provinces rendered with the waterways systems

At present connected to Ha Long railway Station. It is expected to connect to Cai Lan Port by 2007

Page 6: Quang ninh port's presentation

The map of the north of Vietnam which generally overview the The map of the north of Vietnam which generally overview the locations and the transport systems to Cai Lan Port from other areas.locations and the transport systems to Cai Lan Port from other areas.

Page 7: Quang ninh port's presentation

- By 2005 to construct the railway which connect Bac Ninh Province to Pha Lai.

(The detour of Kep - Bac Giang station is over and the distance is reduced 60km).

- It is expected that the railway to Cai Lan Port to be commenced from May 2005 and complete by 2007. This railway is built with two gauges 1.435m and 1.05m nationally and internationally.

- It is expected that during 2010-2015 the Highway Noi Bai-Ha Long to be complete.

The development plan of transportation systems to Cai Lan Port in coming years

Page 8: Quang ninh port's presentation

-Berth No.1: 166 m long, wall height +5m, front depth –9m which is capable of receiving vessels up to 25.000 DWT. -Temporary berth: 80m long, wall height +5m, front depth –5m, which is capable of receiving vessels up to1.000 DWT.

-Turning basin : 350 m in diameters.

3.1 Existing berths: 5 berths : Berths No 1, 5, 6, 7 and the temporary berth

Page 9: Quang ninh port's presentation

Berth No. 5, 6, 7: Total length 680m, wall height +5mfront water depth: -12m which is capable of receiving vessels up to40.000 DWT and 45.000 DWT

Handling works at berth No. 6

Page 10: Quang ninh port's presentation

The master plan of Cai lan Port to the year 2010The master plan of Cai lan Port to the year 2010

Up to 2010 Cai Lan port will comprise of total 09 berths

Page 11: Quang ninh port's presentation

Machinery vessel at berth No. 5

Page 12: Quang ninh port's presentation

Passenger ship at berth No. 6

Page 13: Quang ninh port's presentation

Berth No. 7

Page 14: Quang ninh port's presentation

3.2 Warehousing & yards3.2 Warehousing & yards

Total area of the warehouse (05 units) Total area of the warehouse (05 units) 12.700 12.700 mm22 of whichof which: : CFS: CFS: 4.600 4.600 mm22

Other warehousesOther warehouses::

Berth No. 5: Berth No. 5: 5.400 m5.400 m22

Berth No.1 : Berth No.1 : 2.700 2.700 mm22

Kho 2.700 m2

B·i: 15.000 m2

Page 15: Quang ninh port's presentation

Total yard area of 5 berths: 162,000 m2

Among those: Container yard at berth No. 7: 49,000 m2

Others (including container):

Berth No 6: 52.000 m2

Berth No. 5: 26.000 m2 Berth No. 1 35.000 m2

General layout of the yards for the berths No. 6, 7 and some parts of berth No. 5

Page 16: Quang ninh port's presentation

Cai Lan Port’s facilities & equipment

Item Quantity Description

Quayside Gantry Crane 2 40 ton under spreader (20, 40, 45 ft container, outreach: 37m, Hoist height: 31m

Rubber-tyred gantry crane (RTG) 4 7 rows / 4 tiers (7 + 1 wide, 1 over 4 high)

Mobile Harbour Crane 1 Load on rope 64 ton at 20 m radius. With 40 ft container spreader and grab. Liebherr.

Rail mounted crane 2 Lifting capacity 5 - 25 tons; 32 radius

CTMS (Container Terminal Management System)

1 For vessel schedule, container receiving/delivery, yard control, vessel loading/discharging, on-line inquiry, reporting, and billing system.

Tractor/Chassis 13 Max 45 ft container box. Command 50 + TC56K0C2E

Forklift 2.5 t 20 Stripping/stuffing container, unloading/loading trailers

Forklift 5 t 2 Stripping/stuffing container, unloading/loading trailers.

Forklift 10 t 5 Stripping/stuffing container, unloading/loading trailers.

Truck crane 5 Lifting capacity 14,5 - 25ton

Yard Crane 1 Max. 50 ton x 30m -KR-500 - Kato Works

Wheel Loader 2 Operrating capacity 830 kg, Bucket capacity 0.4 m3

Weight bridge 4 Weighing load up to 80 tons

Tugboat 3 1.200 -1.500 PS

Page 17: Quang ninh port's presentation

Mobile harbor crane Liebherr 64 Mt handling the fertilizer using the hydraulic grab of 8 m3 at Berth N. 5

Page 18: Quang ninh port's presentation

Two gantry cranes of 60 MT handling at berth No. 6

Page 19: Quang ninh port's presentation

Rubber tired gantry crane handling frozen container at the yard of Berth No. 7

Page 20: Quang ninh port's presentation

The Bien Dong floating crane of 400 MT capacity unloading the heavy loads at the berth No. 5

Page 21: Quang ninh port's presentation

Empty container forklift at berth No. 6

Page 22: Quang ninh port's presentation

The belt conveyor is loading the wood chips at the Berth No. 6

Page 23: Quang ninh port's presentation

Informatics Room with the Computer terminal Management System -CTMS

Page 24: Quang ninh port's presentation

0

500

1.000

1.500

2.000

2.500

3.000

3.500

4.000

4.500

2000 2001 2002 2003 2004

Turnover (10Million)

Output(thousand ofton)

Business results from

2000 to 2004

Page 25: Quang ninh port's presentation

0

2.000

4.000

6.000

8.000

10.000

12.000

14.000

16.000

2005 2006 2007 2008 2009 2010

Turnover (10Million)

Output(Thousand ofton)

Development plan to 2010

Page 26: Quang ninh port's presentation

Part IIIPart III:: A number of the priority policies offered by Quang A number of the priority policies offered by Quang Ninh Port to the customers for the initial years of Ninh Port to the customers for the initial years of operationoperation

1. Quang Ninh Port will provide the assistance policies on handling and storage charges for the customers for the initial operation year. The specific assistances depend on the kind of goods and the throughput of each kind of cargo.

2. Accepting the container handling operation as follows: vessels (or barge) – truck then go straight or vice versa including the transhipment by barge to alongside the vessel at the berth for handling.

At present two Tariffs have been applied:

+ Foreign Tariff. + Domestic Tariff.

Page 27: Quang ninh port's presentation

3. Providing and assisting partly of the tallying, freight forwarding, lashing, unlashing charges for the first two years operation.

4. The yard and warehousing charges on the necessary cargo kept in the warehouses and yards for vanning to the container will be considered for reduction.

5. 60 days of yard storage charge is exempted for empty container which is waiting for export vanning at Cai Lan Port.

6. 30 days of yard storage charge is exempted for custom clearance container for export.

7. 15 days of yard storage charge is exempted for import custom clearance container.

8. The imported container doing the custom procedures at Cai Lan Port is considered to be reduced by 10% of loading, unloading and custom inspection charges as per the Port’s tariff.

Page 28: Quang ninh port's presentation

9. The loading, unloading, vanning/devanning services are provided 24/24 hr as registered at least in advanced 6 hours by the customers.

10. Propose to the Government for permission of opening the bonded warehouse and container transit services.

11. Assistance in dealing with the legal formalities such as: port authority, security border gate, quarantine, custom procedure as required from the customers.

12. Assistance in dealing with the legal formalities relating to the opening of the Container routes through Cai Lan Port, assistance in setting up the branches, representative offices as required from the customers

Page 29: Quang ninh port's presentation

Tel: 033.625889, 033.825627Fax: 033.826118, 033.825600 Email: [email protected]

Quang Ninh POrt

No. 1 Cai Lan Road

Ha Long City - Quang Ninh Province

Thank you !

For the sustainable development of Quang ninh Port, We always hope to receive the attention and co-operations from the customers. For further information on our Port, please

contact the following address and telephones.