Page 1: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

1Shahab D. Mohaghegh, WVU, ISI

Quantifying Uncertainties Associated with Reservoir Simulation Studies UsingSurrogate Reservoir Models

Shahab D. MohagheghWest Virginia University &Intelligent Solutions, Inc.

SPE 102492

Page 2: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

2Shahab D. Mohaghegh, WVU, ISI SPE 102492

Outline

Reservoir Simulation & UncertaintySurrogate Reservoir ModelsCase Study: A Giant Oil Field In the Middle East.Quantifying Uncertainty, Using Surrogate Reservoir Model

Page 3: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

3Shahab D. Mohaghegh, WVU, ISI SPE 102492

Sources of Uncertainty

Geological InterpretationsLog interpretationsCore measurements & AnalysisSCALRock TypingSeismic measurements and interpretations

THE EARTH MODEL

Page 4: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

4Shahab D. Mohaghegh, WVU, ISI SPE 102492

Quantifying Uncertainty

Conventional Approach:Geo-StatisticsMultiple Realizations

Hundreds & sometimes thousands of simulation runsResponse Surface

New ApproachSurrogate Reservoir Model, SRM

Page 5: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

5Shahab D. Mohaghegh, WVU, ISI SPE 102492

SRM Development

Main tolls for the development of Surrogate Reservoir models: Intelligent Systems

Artificial Neural NetworksGenetic AlgorithmsFuzzy Logic

Page 6: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

6Shahab D. Mohaghegh, WVU, ISI SPE 102492

Surrogate Reservoir Models

A subset of a more general set of models called Surrogate Intelligent Models

Real-Time OptimizationReal-Time Decision MakingAnalysis of Uncertainty

An absolute essential tool for smart fields (i-fields)

Page 7: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

7Shahab D. Mohaghegh, WVU, ISI SPE 102492

SRM an Engineering Tool

Are Surrogate Reservoir Models the same as “Response Surface” techniques?

NO. Unlike purely statistical techniques, SRMs are designed to be engineering tools.SRM is defined within the System Theory while Response Surface is a geostatisticalmethod.

INPUT OUTPUTSYSTEM

Page 8: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

8Shahab D. Mohaghegh, WVU, ISI SPE 102492

SRM an Engineering Tool

Depending on the project objectives, SRMs are developed to preserve and respond to the physics of the problem.Honoring the physics is an important validation step in the development process of SRMs and their distinguishing feature from other (geostatistical) techniques.

SEE A DEMONSTRATION

Page 9: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

9Shahab D. Mohaghegh, WVU, ISI SPE 102492

“Monte Carlo Simulations entails generating a large number of equally likely random realizations of the reservoir fields with parameter statistics derived from sampling, solving deterministic flow equations for each realization, and post-processing the results over all realizations to obtain sample moments of the solution. This approach has the advantages of applying to a broad range of both linear and nonlinear flow problems, but has a number of potential drawbacks … the computation effort for each realization is usually large, especially for large-scale reservoirs. As a result, a detailed assessment of the uncertainty associated with flow performance predictions is rarely performed.”

“Accurate, Efficient Quantification of Uncertainty for Flow in Heterogeneous Reservoirs Using the KLME Approach.” Z. Lu, Los Alamos Natl. Laboratory; D. Zhang, U. of Oklahoma. SPE 93452, SPE Reservoir Simulation Symposium, 31 January-2 February, The Woodlands, Texas.

Page 10: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

10Shahab D. Mohaghegh, WVU, ISI SPE 102492

Objective

Quantify uncertainties associated with reservoir simulation studies, using Monte Carlo Simulation method.Develop a Surrogate Reservoir Model (SRM) based on a Full Field Model (FFM) for a giant oil field in the Middle East for Analysis of uncertainty.

Page 11: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

11Shahab D. Mohaghegh, WVU, ISI SPE 102492

Methodology

Develop an SRM based on the Full Field model.Calibrate and validate the SRM.Select KPIs for uncertainty analysis.Assign PDF to each KPI.Perform Monte Carlo Simulation.

Page 12: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

12Shahab D. Mohaghegh, WVU, ISI SPE 102492

FFM Characteristics

Full Field Model Characteristics:Underlying Complex Geological Model.ECLIPSETM

165 Horizontal Wells.Approximately 1,000,000 grid blocks.Single Run = 10 Hours on 12 CPUs.Water Injection for Pressure Maintenance.

Page 13: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

13Shahab D. Mohaghegh, WVU, ISI SPE 102492

SRM Characteristics

Accurate replication of Full Field Model Results (for every well in the field):

Instantaneous Water CutCumulative Oil ProductionCumulative Water Production

Ability to run in real-time.Remove the bottleneck.

Page 14: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

14Shahab D. Mohaghegh, WVU, ISI SPE 102492

Very Complex Geology

Page 15: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

15Shahab D. Mohaghegh, WVU, ISI SPE 102492

Very Complex Geology

Reservoirs represented in the FFM.

Page 16: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

16Shahab D. Mohaghegh, WVU, ISI SPE 102492

Curse of Dimensionality

Source of dimensionality:STATIC: Representation of reservoir properties associated with each well.DYNAMIC: Simulation runs to demonstrate well productivity.

Page 17: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

17Shahab D. Mohaghegh, WVU, ISI SPE 102492

Curse of Dimensionality

Representing reservoir properties for horizontal wells.

Page 18: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

18Shahab D. Mohaghegh, WVU, ISI SPE 102492

Curse of Dimensionality, Static

Potential list of parameters that can be collected on a “per-grid block” basis.

IMPORTANT NOTE: Specific objective of the surrogate model must be identified in advance.

Mid Depth Thickness

Relative Rock Ttype Porosity

Initial Water Saturations Stylolite Intensity

Horizontal Permeabil ity Vertical Permeabil ity

Sw @ Reference Point So @ Reference Point

Capil lary Pressure/Saturation Function Pressure @ Reference Point

Parameters Used on a per segment basis

Page 19: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

19Shahab D. Mohaghegh, WVU, ISI SPE 102492

Curse of Dimensionality, StaticPotential list of parameters that can be collected on a “per-well” basis.

IMPORTANT NOTE: Specific objective of the surrogate model must be identified in advance.

Latitude Longitude

Deviation Azimuth

Horizontal Well Length Productivity Index

Distance to Free Water Level Water Cut @ Reference Point

Flowing BHP @ Reference Point Oil Prod. Rate @ Reference Point

Cum. Oil Prod. @ Reference Point Cum. Water Prod. @ Reference Point

Distance to Nearest Producer Distance to Nearest Injector

Distance to Major Fault Distance to Minor Fault

Parameters Used on a per well basis

Page 20: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

20Shahab D. Mohaghegh, WVU, ISI SPE 102492

Curse of Dimensionality, Static

Total number of parameters that need representation during the modeling process:

12 parameters x 40 grid block/well = 480

16 parameter per well

Total of 496 parameter per well

Building a model with 496 parameters per well is not realistic, THE CURSE OF DIMENSIONALITY

Dimensionality Reduction becomes a vital task.

Page 21: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

21Shahab D. Mohaghegh, WVU, ISI SPE 102492

Curse of Dimensionality, Dynamic

Well productivity is identified through following simulation runs:

All wells producing at 1500, 2500, 3500, & 4500 bpd (nominal rates)

Cap the field productivityNo cap on field productivity

Page 22: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

22Shahab D. Mohaghegh, WVU, ISI SPE 102492

Curse of Dimensionality, Dynamic

Well productivity through following simulation runs:

Step up the rates for all wellsCap the field productivityNo cap on field productivity

Page 23: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

23Shahab D. Mohaghegh, WVU, ISI SPE 102492

Curse of Dimensionality

In order to address the “Curse of Dimensionality” one must understand the behavior and contribution of each of the parameters to the process being modeled.Not a simple and straight forward task. !!!

Page 24: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

24Shahab D. Mohaghegh, WVU, ISI SPE 102492

Curse of Dimensionality

To address this issue, we use Fuzzy Pattern Recognition technology, based on Fuzzy Cluster Analysis.

Page 25: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

25Shahab D. Mohaghegh, WVU, ISI SPE 102492

Parameter: Pressure @ Reference

Key Performance Indicator

Page 26: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

26Shahab D. Mohaghegh, WVU, ISI SPE 102492

Key Performance Indicator

Page 27: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

27Shahab D. Mohaghegh, WVU, ISI SPE 102492

Please Note: The lower the bar, the higher the influence.

Key Performance Indicators

Page 28: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

28Shahab D. Mohaghegh, WVU, ISI SPE 102492

Surrogate Modeling

40% of data was set aside as blind (verification) data.

Page 29: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

29Shahab D. Mohaghegh, WVU, ISI SPE 102492

Surrogate Modeling

40% of data was set aside as blind (verification) data.

Page 30: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

30Shahab D. Mohaghegh, WVU, ISI SPE 102492

Optimal Production Strategy

Well Ranked No. 1

IMPORTANT NOTE: This is NOT a Response Surface – SRM was run hundreds of times to generate these figures.

Page 31: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

31Shahab D. Mohaghegh, WVU, ISI SPE 102492

Optimal Production Strategy

Well Ranked No. 100

IMPORTANT NOTE: This is NOT a Response Surface – SRM was run hundreds of times to generate these figures.

Page 32: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

32Shahab D. Mohaghegh, WVU, ISI SPE 102492

Following are the steps involved:1. Identify a set of key performance indicators that

are most vulnerable to uncertainty.2. Define probability distribution function for each of

the performance indicators.a. Uniform distributionb. Normal (Gaussian) distributionc. Triangular distributiond. Discrete distribution

Analysis of Uncertainty

Page 33: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

33Shahab D. Mohaghegh, WVU, ISI SPE 102492

Following are steps involved:3. Run the neural network model hundreds or

thousands of times using the defined probability distribution functions for the identified reservoir parameters. Performing this analysis using the actual Full Field Model is impractical.

4. Produce a probability distribution function for cumulative oil production and the water cut at different time and liquid rate cap.

Analysis of Uncertainty

Page 34: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

34Shahab D. Mohaghegh, WVU, ISI SPE 102492

I-12

P-16

Page 35: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

35Shahab D. Mohaghegh, WVU, ISI SPE 102492

Key Performance Indicators

40 producing layers.

One million grid blocks.

This is the distribution of the parameter being studied in the geologic model.

Page 36: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

36Shahab D. Mohaghegh, WVU, ISI SPE 102492

Page 37: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

37Shahab D. Mohaghegh, WVU, ISI SPE 102492

Cumulative Oil ProductionUniform Distribution was assigned to the top 5 KPIs.

Gaussian Distribution was assigned to the top 5 KPIs.

Page 38: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

38Shahab D. Mohaghegh, WVU, ISI SPE 102492

Instantaneous Water CutUniform Distribution was assigned to the top 5 KPIs.

Gaussian Distribution was assigned to the top 5 KPIs.

Page 39: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

39Shahab D. Mohaghegh, WVU, ISI SPE 102492

B-91

Page 40: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

40Shahab D. Mohaghegh, WVU, ISI SPE 102492

Cumulative Oil Production

Influence of uncertainties associated with top and low ranking KPIs on the well

output.

Page 41: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

41Shahab D. Mohaghegh, WVU, ISI SPE 102492

Instantaneous Water Cut

Influence of uncertainties associated with top and low ranking KPIs on the well

output.

Page 42: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

42Shahab D. Mohaghegh, WVU, ISI SPE 102492

Page 43: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

43Shahab D. Mohaghegh, WVU, ISI SPE 102492

CONCLUSIONS

A successful surrogate reservoir model was developed for a giant oil field in the Middle East.The surrogate model was able to accurately mimic the behavior of the actual full field flow model.

Page 44: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

44Shahab D. Mohaghegh, WVU, ISI SPE 102492

CONCLUSIONS

The surrogate reservoir model would provide results in real time.The surrogate model was used to analyze uncertainties associated with the full field flow model.

Page 45: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

45Shahab D. Mohaghegh, WVU, ISI SPE 102492

CONCLUSIONS

Development of successful surrogate reservoir model is an important and essential step toward development of next generation of reservoir management tools that would address the needs of smart fields.

Page 46: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

46Shahab D. Mohaghegh, WVU, ISI SPE 102492

Page 47: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

47Shahab D. Mohaghegh, WVU, ISI SPE 102492

Page 48: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

48Shahab D. Mohaghegh, WVU, ISI SPE 102492

Page 49: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

49Shahab D. Mohaghegh, WVU, ISI SPE 102492

Page 50: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

50Shahab D. Mohaghegh, WVU, ISI SPE 102492

Page 51: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

51Shahab D. Mohaghegh, WVU, ISI SPE 102492

Page 52: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

52Shahab D. Mohaghegh, WVU, ISI SPE 102492

Page 53: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

53Shahab D. Mohaghegh, WVU, ISI SPE 102492

Page 54: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

54Shahab D. Mohaghegh, WVU, ISI SPE 102492

Analysis of Uncertainty

Page 55: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

55Shahab D. Mohaghegh, WVU, ISI SPE 102492

Analysis of Uncertainty

Page 56: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

56Shahab D. Mohaghegh, WVU, ISI SPE 102492

Average Sw @ Reference point in Top Layer II

Value in the model = 8%Lets use a minimum of 4% and a maximum of 15% with a triangular distribution

4 8 15

Analysis of Uncertainty

Page 57: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

57Shahab D. Mohaghegh, WVU, ISI SPE 102492

Average Capillary Pressure @ Reference point in Top Layer III

Value in the model = 79 psiLets use a minimum of 60 psi and a maximum of 100 psi with a triangular distribution

60 80 100

Analysis of Uncertainty

Page 58: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

58Shahab D. Mohaghegh, WVU, ISI SPE 102492

PDF for HB001 Cumulative Oil and Cumulative Water production at the rate of 3,000 blpd cap after 20 years.

Analysis of Uncertainty

Page 59: Quantifying Uncertainties Associated with Reservoir ...Shahab D. Mohaghegh, WVU, ISISPE 102492. Objective. Quantify uncertainties associated with reservoir simulation studies, using

59Shahab D. Mohaghegh, WVU, ISI SPE 102492

Such analysis can be performed for all wells at any rate and any number of years.There is a higher probability of acceptance of the ideas for rate increase by the management, if we show that:

We are aware of the uncertainties associated with our analysis.Uncertainties are being accounted for in our decision making process.

Analysis of Uncertainty