Quarterly Progress Report:4th Quarter of 2011-12 (MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above) SLN Name of work and Location Estimate d Cost (`Lakhs) Tendered Cost (`Lakhs) %age above/ below Est. Agreement No. & Date / Order No.& Date Agency Date of start Time of completio n Physical progres s (%) Engineer Incharge, Department Remarks 46 Scrap&LD Slag handling at VSP for the Period 2008‐ 2011 5389.12 5389.12 0.00 VSP/WC/SSD/583150/N/2009‐ 2010/8090000272 18‐MAY‐09 FERRO SCRAP NIGAM LTD 01‐07‐08 30‐06‐11 95.03 AGM(SSD), SSD Job Completed 50 STEEL / IRON SCRAP PROCESSING AND EMERGENCY CONTAINER MANAGEMENT. 1214.55 2623.43 116.00 VSP/WC/SSD/583880/OT/2009‐ 2010/8090000274 18‐MAY‐09 NEHA CONSTRN (P) LTD 16‐05‐09 15‐05‐12 53.16 AGM (SSD), SSD Work in Progress 49 Recovery of steel scrap, iron scrap, iron / steel muck and fines and used/ rejected refractories from the Central dump &Processing Yard, transportation of Slag & debris. 981.02 2217.11 126.00 VSP/WC/SSD/583870/OT/2009‐ 2010/8090000273 18‐MAY‐09 NEHA CONSTRN (P) LTD 16‐05‐09 15‐05‐12 56.80 AGM (SSD), SSD Work in Progress 12 RUNNING AND PLANNED REPAIR JOBS (REFRACTORY AND MECHANICAL) IN COCCP BATTERIES FOR THE YEAR 2008‐2011 1597.72 1700.00 6.40 VSP/WC/CRG/5805 8 ‐ 0/OT/2008‐ 2009/8080000166 19‐NOV‐08 ROSY ENTERPRISES 01‐10‐08 30‐09‐11 24.64 DGM CRG, COCCP Extended up to 30/09/12 55 STRAPPING OF MILL PRODUCT IN WIRE ROD MILL 1091.95 1275.00 16.76 VSP/WC/WRM/584 95‐0/OT/2009‐ 10/8090000359 12‐ SEP‐09 MIDFIELD INDUSTRIES LTD 16‐08‐09 15‐08‐11 95.59 AGM(O)/W RM, WRM Job Completed 6 Technological Assistance in Batteries of CO&CCP which involves cleaning of Standpipes, Valve boxes, Oven doors, Oven door windows, Hatches etc in A,B,C &G shifts in smoky, dusty & hot environment. 388.79 379.90 ‐2.29 VSP/WC/CO&CCP/7 1407‐0/OT/2011‐ 12/8110000940 03‐ DEC‐11 MULTI‐TECH CONSTRUCTIONS 01‐12‐11 30‐11‐12 DGM(O)‐CO, COCCP Work in Progress 16 Strapping of steel products (LMMM and MMSM) for Unitization purpose of open end wagons. 320.95 337.58 5.18 VSP/WC/LMMM/71 220‐0/OT/2011‐ 2012/8120000983 10‐JAN‐12 MIDFIELD INDUSTRIES LTD 25‐12‐11 24‐12‐13 AGM (O), LMMM, LMMM Work in Progress Compiled from WCMS data given by IT departmemt Page 1 of 22

Upload: others

Post on 01-Apr-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

46 Scrap&LD Slag handling at VSP for the Period 2008‐2011

5389.12 5389.12 0.00 VSP/WC/SSD/58315‐0/N/2009‐2010/8090000272 18‐MAY‐09

FERRO SCRAP NIGAM LTD

01‐07‐08 30‐06‐11 95.03 AGM(SSD), SSD

Job Completed

50 STEEL / IRON SCRAP PROCESSING AND EMERGENCY CONTAINER MANAGEMENT.

1214.55 2623.43 116.00 VSP/WC/SSD/58388‐0/OT/2009‐2010/8090000274 18‐MAY‐09

NEHA CONSTRN (P) LTD

16‐05‐09 15‐05‐12 53.16 AGM (SSD), SSD

Work in Progress

49 Recovery of steel scrap, iron scrap, iron / steel muck and fines and used/ rejected refractories from the Central dump &Processing Yard, transportation of Slag  & debris.

981.02 2217.11 126.00 VSP/WC/SSD/58387‐0/OT/2009‐2010/8090000273 18‐MAY‐09

NEHA CONSTRN (P) LTD

16‐05‐09 15‐05‐12 56.80 AGM (SSD), SSD

Work in Progress

12 RUNNING AND PLANNED REPAIR JOBS (REFRACTORY AND MECHANICAL) IN COCCP BATTERIES FOR THE YEAR 2008‐2011

1597.72 1700.00 6.40 VSP/WC/CRG/58058 ‐ 0/OT/2008‐2009/8080000166 19‐NOV‐08

ROSY ENTERPRISES

01‐10‐08 30‐09‐11 24.64 DGM CRG, COCCP

Extended up to 30/09/12

55 STRAPPING OF MILL PRODUCT IN WIRE ROD MILL

1091.95 1275.00 16.76 VSP/WC/WRM/58495‐0/OT/2009‐10/8090000359 12‐SEP‐09

MIDFIELD INDUSTRIES LTD

16‐08‐09 15‐08‐11 95.59 AGM(O)/WRM, WRM

Job Completed

6

Technological Assistance in Batteries of CO&CCP which involves cleaning of Standpipes, Valve boxes, Oven doors, Oven door windows, Hatches etc in A,B,C &G shifts in smoky, dusty & hot environment.

388.79 379.90 ‐2.29 VSP/WC/CO&CCP/71407‐0/OT/2011‐12/8110000940 03‐DEC‐11

MULTI‐TECH CONSTRUCTIONS

01‐12‐11 30‐11‐12 ‐ DGM(O)‐CO, COCCP

Work in Progress

16

Strapping of steel products (LMMM and MMSM) for Unitization purpose of open end wagons.

320.95 337.58 5.18 VSP/WC/LMMM/71220‐0/OT/2011‐2012/8120000983 10‐JAN‐12

MIDFIELD INDUSTRIES LTD

25‐12‐11 24‐12‐13 ‐ AGM (O), LMMM, LMMM

Work in Progress

Compiled from WCMS data given by IT departmemt Page 1 of 22

Page 2: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

51 Lifting, Shifting,Transportation and dumping of slag boulders,muck and debris from DF Bay of SMS and collection,Transportation  and Delivery of Bloom End Cutting Scrap to SMS Scrap Pit

320.06 320.06 0.00 VSP/WC/SSD/58510‐0/N/2009‐2010/8090000395 05‐NOV‐09

HINDUSTAN STEELWORKS CONSTRUCTIONS LTD

01‐08‐09 31‐07‐12 33.60 MGR(SSD), SSD

Work in Progress

8

Cold Vulcanising Of Conveyor Belts and Conveyor Belts Changing

280.15 280.15 0.00 VSP/WC/CMM/71460‐0/OT/2011‐12/8120001002. 08‐FEB‐12

THEJO ENGINEERING LTD

01‐02‐12 31‐01‐15 ‐ AGM(M)/CMM, CMM

2

SHIFTING OF EXCESS BF GRANULATED SLAG

243.81 228.58 ‐6.25 VSP/WC/BF/71206‐ 0/OT/2011‐2012/8110000803 07‐JUL‐11

SAI LAKSHMI ENTERPRISES

08‐07‐11 07‐07‐12 ‐ AGM(O), BF Work in Progress

62

Periodic Overhauling (POH) of  Two nos. of VSP Locomotives. consisting of the following jobs , a) Complete dismantling of all sub‐assemblies., b) Overhauling/ Reconditioning/ replacement  as necessary, c) Reassembly of the same, d) Modifications/ Upgradations/  as desired by VSP, e)Special repairs

220.00 220.00 0.00 VSP/WC/TRAFFIC/71590‐0/N/2011‐12/8120001004 11‐FEB‐12

SOUTHERN RAILWAY‐ CENTRAL WORKSHOP

29‐02‐12 28‐02‐13 ‐ AGM(MAINT.), TRAFFIC

Work in Progress

Compiled from WCMS data given by IT departmemt Page 2 of 22

Page 3: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

57

Capital Repairs,Tube leakage Repairs, HP Welding in CDCP1,2,3&4 Boilers,Replacement of Economiser & Evaporator Tube bundles in CDCP Boilers, and Misc jobs in Auxilliary units of Thermal Power Plant

186.24 204.83 9.98 VSP/WC/TPP/71319‐0/OT/2011‐12/8110000921 24‐NOV‐11

V&S CONSTRUCTIONS

01‐01‐12 31‐12‐13 ‐ DGM(O)/TPP, TPP

Work in Progress

59

CAPITAL REPAIR OF  BOILER PRESSURE PARTS

155.64 195.00 25.29 WC/VSP/70509‐O/O/2011‐12/8110000799 01‐JUL‐11

V&S CONSTRUCTIONS

16‐07‐11 15‐07‐13 ‐ DGM(M), TPP

Work in Progress

65

Evacuation  &  transportation of metallurgical waste  and  opr & Maint of Metallurgicl pond pump house

159.74 167.32 4.75 VSP/WC/WMD/71279‐0/OT/2011‐12/8110000949 14‐DEC‐11

SAI LAKSHMI ENTERPRISES

15‐12‐11 14‐12‐12 ‐ AGM (T)//WMD, WMD

Work in Progress

47 Digging, loosening, Removal and Shifting of old and accumulated metallic jam, muck & debris up to `zero' meter level (as defined in para 2 & 3 of clause 2 of Scope of Work) from area below CCM‐2, CCM‐3, CCM‐4, CCM‐5 & CCM‐6 in DF Bay of SMS at the specified place of work.

115.75 158.76 37.16 VSP/WC/SSD/70367‐0/OT/2011‐12/8110000760 04‐MAY‐11

METAL TRADERS & PROCESSING CO.

11‐05‐11 10‐03‐12 93.32 MANAGER (SSD), SSD

Work in Progress

20

STRAPPING OF MILL PRODUCTS IN MMSM.

110.59 158.00 42.86 VSP/WC/MMSM/71219‐0/OT/2011‐2012/8120000982 10‐JAN‐12

MIDFIELD INDUSTRIES LTD

01‐01‐12 31‐12‐13 ‐ AGM (O), MMSM

Work in Progress

Compiled from WCMS data given by IT departmemt Page 3 of 22

Page 4: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

10 Cold Vulcanising Of Conveyor Belts and Conveyor Belts Changing

144.90 153.00 5.59 VSP/WCD/CMM/57418‐0/O/2007‐08/13059 24‐MAR‐08

THEJO ENGG SERVICES PVT LTD

01‐04‐08 31‐03‐11 94.25 AGM(M)/CMM, CMM

Job Completed

45 HANDLING AND PROCESSING OF NON‐ROLLABLE BLOOMS IN BSY OF SMS AREA

144.36 144.36 0.00 VSP/WC/SMS/58496‐0/N/2008‐09/8090000269 11‐MAY‐09

HINDUSTAN STEELWORKS CONSTRUCTIONS LTD

01‐06‐09 31‐05‐12 57.57 AGM ‐ BSY/ SMS, SMS

Work in Progress

63 Periodic Overhauling (POH) of  VSP Locomotive Nos. VSP‐03 & VSP‐04. consisting of the following jobs , a) Complete dismantling of all sub‐assemblies., b) Overhauling/ Reconditioning/ replacement  as necessary, c) Reassembly of the same, d) Modifications/ Upgradations/  as desired by VSP,  e)Special

140.00 140.00 0.00 VSP/WC/TRAFFIC/70285‐0/N/2010‐11/8110000695 24‐FEB‐11

SOUTHERN RAILWAY‐ CENTRAL WORKSHOP

01‐03‐11 29‐02‐12 64.35 AGM(MAINT.), TRAFFIC

Work in Progress

26 MAINTENANCE & UPKEEP OF 42 NOS. LIFTS IN VSP FOR 3 YEARS PERIOD

128.23 135.00 5.28 VSP/WC/LUB&HYD/70319‐0/OT/2010‐11/8100000638 11‐NOV‐10

BECO ELEVATOR ENGINEERING

01‐11‐10 31‐10‐13 9.07 AGM(MECH), Lub & Hyd

Work in Progress

25

Refractory lining jobs of SMS ‐I & II, Rolling Mills and allied units.

116.87 128.22 9.72 VSP/WC/RED/70638‐0/OT/2011‐2012/8110000841 23‐AUG‐11

KRISHNA CONSTRUCTIONS

06‐08‐11 05‐08‐13 ‐ AGM, RED Work in Progress

18

Repair of DE Systems 2011‐12

128.28 125.00 ‐2.55 VSP/WC/ENMD/71300‐0/OT/2011‐12/8110000891 29‐OCT‐11

DURGA SRI RAGHAVENDRA ENGG SERVICES

01‐11‐11 31‐10‐12 ‐ MANAGER(ENMD), EnMD

Work in Progress

Compiled from WCMS data given by IT departmemt Page 4 of 22

Page 5: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

3 Maintenance Contract of On‐Line Stack Monitoring Systems and their associated equipment installed in VSP

123.00 123.00 0.00 VSP/WC/INSTN/70425‐0/N/2010‐11/8100000123 27‐OCT‐10

NEVCO ENGINEERS PVT LTD

21‐12‐10 20‐12‐13 4.46 J.N. MURTHY, AGM (INST), INSTMN

Work in Progress

48 SUPERVISION OF THE WORK OF " STEEL AND IRON SCRAP PROCESSING INCLUDING EMERGENCY CONTAINER MANAGEMENT IN VSP(INSIDE PLANT)" FOR THE PERIOD 2009‐12

118.05 118.05 0.00 VSP/WC/SSD/58509‐0/N/2009‐2010/8090000392 02‐NOV‐09

HINDUSTAN STEELWORKS CONSTRUCTIONS LTD

16‐05‐09 15‐05‐12 57.37 MGR (SSD), SSD

Work in Progress

26

Up keep of Wagon Tipplers and conveyor galleries of stacking streamin RMHP ( Ore & Flux ) Part ‐I

114.12 117.54 3.00 VSP/WC/RMHP/71417‐0/OT/2011‐2012/8110000947 13‐DEC‐11

CLT ENGINEERING ENTERPRISES (Partnership)

01‐01‐12 31‐12‐12 ‐ S.GOPALA KRISHNA, DGM(O)I/C, RMHP

Work in Progress

11 Mechanised Handling , Stacking and Loading of Ammonium Sulphate bags and HP Naphthalene at Coal Chemicals Plant at CO&CCP.

108.09 117.28 8.50 VSP/WC/CO&CCP/58483‐0/OT/2009‐10/8090000320 05‐AUG‐09

MANASA ENTERPRISES

01‐09‐09 31‐08‐12 40.39 AGM(O)/CCP, COCCP

Work in Progress

11 Rubber Lagging Of Conveyor Pulleys (For the Years 2008‐11)

105.09 111.40 6.00 VSP/WC/CMM/58011‐0/OT/2008‐09/8080000062 18‐AUG‐08

THEJO ENGG SERVICES PVT LTD

18‐08‐08 17‐08‐11 75.71 AGM(M)/CMM, CMM

Job Completed

1

OPERATION AND MAINTENANCE OF ADMINISTRATION BUILDING & OUTSIDE PERIPHERY AC PLANTS

103.16 102.49 ‐0.65 VSP/WC/ACS/71492‐0/OT/2011‐12/8120001018 23‐FEB‐12

VIJAYA ENGG WORKS

01‐03‐12 28‐02‐13 ‐ AGM(ACS), ACS

Work yet to be started

40 Technological assistance in Bloom storage yard‐1

95.97 99.81 4.00 VSP/WC/SMS/70456‐0/OT/2010‐11/8110000736 06‐APR‐11

SRI LAKSHMI ENGG WORKS

01‐05‐11 01‐04‐13 ‐ AGM‐ELECT, SMS

Work in Progress

Compiled from WCMS data given by IT departmemt Page 5 of 22

Page 6: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

64

Comprehensive operation, housekeeping and mechanical maintenance jobs in treatment plants of BF Pump houses of Water   Management Department  on 24 hrs. x 365 days basis.

101.25 96.03 ‐5.15 VSP/WC/WMD/70592‐0/OT/2011‐12/8110000961 22‐DEC‐11

SKI Engineering 09‐01‐12 08‐01‐13 ‐ AGM(T)/WMD, WMD

Work in Progress

3

OPERATION AND MAINTENANCE OF UKKU HOUSE AND VSGH AC PLANTS

92.91 90.00 ‐3.13 VSP/WC/ACS/71507‐0/OT/2011‐12/8120000995 30‐JAN‐12

SIRI CONSTRUCTIONS ‐CHAITANYA NAGAR  GAJUWAKA

01‐02‐12 31‐01‐15 ‐ AGM  (ACS), ACS

Work in Progress

17

Technological Assistance for operational works in finishing and shipping areas fo LMMM, Part‐3

82.86 84.00 1.37 VSP/WC/LMMM/71277‐0/OT/2011‐2012/8110000933 28‐NOV‐11

RISHITA ASSOCIATES

16‐12‐11 15‐11‐13 ‐ AGM(O), LMMM

Work in Progress

1 MISCELLANEOUS CIVIL JOBS IN SMS  AND ES&F ZONE/AREAS(Part‐1)

119.76 80.21 ‐33.03 VSP/WC/CED/71526‐1/OT/2011‐12/8120001027 03‐MAR‐12

CH BANGARAIAH & CO

09‐03‐12 08‐03‐13 ‐ MANAGER(C)‐CED, CED

Work yet to be started

4

Repair of 7.5 MW Generator Rotor

76.13 76.13 0.00 VSP/WC/71593‐N/NOM/8120001001. 08‐FEB‐12

BHEL ‐ VISAKHAPATNAM SITE OFFICE

13‐02‐12 12‐05‐12 ‐ AGM(E), TPP

Work in Progress

60

CAPITAL REPAIR OF BOWL MILLS OF TPP BOILERS

58.76 74.76 27.24 VSP/WC/TPP/70495‐O/O/2011‐12/8110000801 07‐JUL‐11

HI‐TECH SERVICES

08‐07‐11 07‐07‐13 ‐ DGM(M), TPP

Work in Progress

9 REFRACTORY MAINTENANCE OF CDCP , CCP OF CCCD

74.11 73.90 ‐0.29 VSP/WC/CRG/58438‐0/OT/2009‐2010/8090000264 28‐APR‐09

MULTI‐TECH CONSTRUCTIONS

01‐06‐09 31‐05‐11 92.92 AGM(CRG), COCCP

Job Completed

Compiled from WCMS data given by IT departmemt Page 6 of 22

Page 7: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

36

Technological assistance in Bloom storage yard‐2

71.48 73.73 3.15 VSP/WC/SMS/71374‐0/OT/2011‐12/8110000942 08‐DEC‐11

SRI VENKATA RAMA ENTERPRISES

01‐01‐12 31‐12‐14 ‐ AGM(O)/BSY, SMS

Work in Progress

25 Hiring of Mini trucks of 2.5/3t  capacity.

48.25 69.97 45.02 VSP/WC/FMD/59050‐0/1/OT/2010‐11/ 21‐APR‐10

MAJJI GOWRI MINI TRANSPORT

01‐05‐10 30‐04‐13 25.43 AGM(FMD), FMD

Work in Progress

2 MAINTENANCE OF PERSONAL COMPUTERS AND ITS RELATED EQUIPMENT IN VSP

99.59 68.70 ‐31.02 VSP/WC/IT/70385‐0/O/2011‐12/8110000751 26‐APR‐11

ACS TECHNOLOGIES LTD

01‐05‐11 30‐04‐13 ‐ AGM(IT), I T

Work in Progress

22 Cleaning Works in MMSM 73.45 68.61 ‐6.60 VSP/WC/MMSM/70484‐0/OT/2010‐2011/8110000686 07‐FEB‐11

SWATHI ENGG WORKS

20‐02‐11 19‐02‐13 ‐ AGM(O)/MMSM, MMSM

Work in Progress

22 RETREADING / REPAIRS OF HEAVY DUTY TYRES (OTR) OF EARTH MOVING EQUIPMENTS OF FMD

47.61 66.38 39.43 VSP/WC/FMD/59019‐0/OT/2009‐10/ 10OCT‐09

SURYA TYRE TECH

12‐12‐09 11‐12‐11 45.36 AGM(FMD), FMD

Extended up to 11/04/12

29

CLEANING OF RECLAIMING CONVEYOR & ROTARY DRYER STREAM IN RMHP (PART II B)

65.78 65.78 0.00 VSP/WC/RMHP/71383‐0/OT/2011‐2012/8110000881 20‐OCT‐11

P APPALA NAIDU 21‐10‐11 20‐10‐12 ‐ MSV KRISHNAIAH, DGM (O), RMHP

Work in Progress

5 OPERATION AND MAINTENANCE OF ADMINISTRATION BUILDING & OUTSIDE PERIPHERY AC PLANTS

64.37 65.66 2.00 VSP/WC/ACS/58237‐0/OT/2008‐09/ 29‐OCT‐08

VIJAYA ENGG WORKS

01‐11‐08 31‐10‐11 97.83 SR. MANAGER(ACS), ACS

Job Completed

6 OPERATION AND MAINTENANCE OF UKKU HOUSE AND VSGH AC PLANTS

68.36 64.20 ‐6.08 VSP/WC/ACS/58267‐0/OT/2008‐09/ 14‐NOV‐08

SIRI CONSTRUCTIONS ‐CHAITANYA NAGAR  GAJUWAKA

01‐12‐08 30‐11‐11 97.52 SR. MANAGER (ACS), ACS

Job Completed

Compiled from WCMS data given by IT departmemt Page 7 of 22

Page 8: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

23 Hiring of Mini trucks of 2.5/3t  capacity.

42.89 62.19 45.02 VSP/WC/FMD/59050‐0/2/OT/2010‐11/ 21‐APR‐10

K VASANTA RAO 01‐05‐10 30‐04‐13 27.27 AGM(FMD), FMD

Work in Progress

24 Hiring of Mini trucks of 2.5/3t  capacity.

42.89 62.19 45.02 VSP/WC/FMD/59050‐0/3/OT/2010‐11/ 21‐APR‐10

A V LAKSHMANA RAO

01‐05‐10 30‐04‐13 26.98 AGM(FMD), FMD

Work in Progress

33

Repainting of various structures including EMD pipelines in TPP zone, ASP zone& PCM in BF zone

65.96 62.13 ‐5.82 VSP/WC/STED/70608‐0/OT/2011‐12/8110000789 02‐JUN‐11

COROMONDAL PAINTS LTD

02‐06‐11 01‐06‐12 ‐ MANAGER, StED

Work in Progress

54 Structural repair work for buildings and technological structures including Roof Sheeting and side cladding works in various units of Converter shop, Slag Yard, LP Bay, Mixer and other Auxiliary Units in SMS Area (Part‐2)(Group‐B)

59.38 59.38 0.00 VSP/WC/StED/59375‐2/OT/2010‐11/8100000567 15‐JUL‐10

JYOTHI ERECTORS

23‐07‐10 22‐07‐11 85.58 AGM, StED Job Completed

52 Structural repair work for buildings and technological structures including Roof Sheeting and side cladding works in various units of Blast Furnace (Part‐3)

58.95 58.95 0.00 VSP/WC/StED/59375‐3/OT/2010‐11/8100000568 15‐JUL‐10

FRANCO INDIA 23‐07‐10 22‐07‐11 86.47 AGM, StED Job Completed

34

Repainting of Various structures including ODPL structures and pipelines in BF area

56.94 58.05 1.95 VSP/WC/STED/70622‐0/OT/2011‐12/8110000790 02‐JUN‐11

COROMONDAL PAINTS LTD

02‐06‐11 01‐06‐12 ‐ SR MANAGER, StED

Work in Progress

Compiled from WCMS data given by IT departmemt Page 8 of 22

Page 9: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

27 DEVELOPMENT OF MANUFACTURING DRAWINGS FOR SPARE PARTS USING LDS MACHINE AND CAD WORK STATION AND SUPPLY OF CAD BACK UP FILES IN CD'S.

53.45 56.66 6.00 VSP/WC/PD/58219‐0/OT/2008‐09/8080000184 22‐DEC‐08

ESQUIRE ENGINEERING SOLUTIONS LTD,

29‐12‐08 28‐12‐11 57.38 AGM(MECH), PD DEPT

Extended up to 28/04/12

35

Repainting of Various structures including ODPL structures in Battery side & FLTs at COCCP area and FLTs & WTs along boundary wall.

66.27 56.27 ‐15.09 VSP/WC/STED/70561‐0/OT/2011‐12/8110000788 02‐JUN‐11

SHIVA CHEMICALS

02‐06‐11 01‐06‐12 ‐ MANAGER, StED

Work in Progress

10 Technological Assistance & Upkeep of Coal Chemical Plant (Part‐2)

55.69 55.68 ‐0.02 VSP/WC/CO&CCP/70491‐0/OT/2010‐2011/810000710 09‐MAR‐11

REDDY ENTERPRISES (LRK)

01‐04‐11 31‐03‐12 46.73 AGM(O)CCP, COCCP

Work in Progress

24

Refractory works of Blast Furnaces, CRMP, Sinter Plant and T.P.P

52.35 55.65 6.30 VSP/WC/RED/71282‐0/OT/2011‐2012/8110000871 29‐SEP‐11

MULTI‐TECH CONSTRUCTIONS

05‐10‐11 04‐10‐13 ‐ AGM(RED), RED

Work in Progress

51 Structural repair work for buildings and technological structures including Roof Sheeting and side cladding works in various units of Sinter Plant area  (Part‐4)

55.40 55.40 0.00 VSP/WC/StED/59375‐4/OT/2010‐11/8100000569 15‐JUL‐10

ANIL ENGINEERING WORKS

23‐07‐10 22‐07‐11 88.10 AGM, StED Job Completed

8

Peripheral Cleaning works of CO&CCP Batteries

58.29 55.26 ‐5.20 VSP/WC/CO&CCP/71243‐0/OT/2011‐12/8110000839 19‐AUG‐11

R KONDAYYA 01‐09‐11 31‐08‐12 ‐ DGM(O), COCCP

Work in Progress

Compiled from WCMS data given by IT departmemt Page 9 of 22

Page 10: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

14 HANDLING AND POISITIONING OF RAW MATERIALS, HOUSE KEEPING AND MACHINE CLEANING AT FOUNDRY FOR THE YEAR 2010 ‐ 12

58.72 55.13 ‐6.11 VSP/WC/ES&F/70411‐0/OT/2010‐11/8100000667 16‐DEC‐10

BABA ENGG WORKS

16‐01‐11 15‐01‐13 9.60 S.K.PANDEY, AGM(FOUNDRY), ES&F

Work in Progress

53 Structural repair work for buildings and technological structures including Roof Sheeting and side cladding works in various units of WRM, LMMM, MMSM & other units of Mills including lighting towers and watch towers along Boundary wall (Part‐5)

54.53 54.53 0.00 VSP/WC/StED/59375‐5/OT/2010‐11/8100000570 15‐JUL‐10

RK CONSTRUCTION

23‐07‐10 22‐07‐11 85.95 AGM, StED Job Completed

32 Technological upkeep of Converter shop floors and equipments in SMS.

61.35 53.62 ‐12.60 VSP/WC/SMS/71568‐0/OT/2011‐12/8120001042 10‐MAR‐12

PAHAL SWAYAM SEVI SANSTHA

01‐04‐12 31‐03‐13 ‐ AGM(O), SMS

Work yet to be started

18 CLEANING WORKS IN BAR MILL AREAS OF LMMM.

51.51 52.90 2.69 VSP/WC/LMMM/70397‐0/OT/2010‐11/8110000733 04‐APR‐11

M SOMULU 08‐04‐11 07‐04‐13 ‐ AGM(O), LMMM

Work in Progress

36

Repainting of various units in Rolling Mills area and Conveyor galleries in C& CCD area

59.28 52.75 ‐11.01 VP/WC/STED/70447‐0/OT/2011‐12/8110000787 02‐JUN‐11

MK GOLD PAINTS PVT LTD

02‐06‐11 01‐06‐12 ‐ MANAGER, StED

Work in Progress

28

TECHNOLOGICAL ASSISTANCE IN LOSP & LOCP IN RMHP ZONE

52.46 52.46 0.00 VSP/WC/RMHP/71384‐0/OT/2011‐2012/8110000886 25‐OCT‐11

K CHINNA RAO 01‐11‐11 31‐10‐12 ‐ AK DHAWAN, AGM (O), RMHP

Work in Progress

Compiled from WCMS data given by IT departmemt Page 10 of 22

Page 11: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

39 Repainting of Various structures in CO&CCP area including EMD Pipelines

49.24 52.19 6.00 VSP/WC/STED/70602‐0/OT/2011‐12/8110000778 24‐MAY‐11

TRITON PAINTS 24‐05‐11 23‐05‐12 ‐ SR MANAGER, StED

Work in Progress

21 Technologial Assistance  in  CMS  of  Engg. Shops & Fdy.

53.73 50.34 ‐6.30 VSP/WC/ES&F/70445‐0/OT/2010‐11/8100000668 16‐DEC‐10

SREE SAI RAMA CONSTRUCTIONS

15‐01‐11 14‐01‐13 8.05 SENIOR MANAGER(CMS)/ES&F, ES&F

Work in Progress

2 MISCELLANEOUS CIVIL JOBS IN  ROLLING MILLS  ZONE/AREAS(Part‐2).

75.15 50.33 ‐33.03 VSP/WC/CED/71526‐2/OT/2011‐12/8120001028 03‐MAR‐12

S SATISHKUMAR & CO

09‐03‐12 08‐03‐13 ‐ MANAGER(C)‐CED, CED

Work yet to be started

1

REPAIR OF 220KV TRANSMISSION LINES AND SWITCH YARD EQUIPMENTS FOR DNW DEPT.

45.26 48.40 6.93 VSP/WC/DNW/71353‐0/OT/2011‐12/8120000994 27‐JAN‐12

PG POWER SYSTEMS PVT LTD

30‐01‐12 29‐01‐15 ‐ DCM/DNW, DNW

Work in Progress

17 THERMAL INSULATION AND CLADDING WORKS IN VISAKHAPATNAM STEEL PLANT

48.36 48.30 ‐0.13 VSP/WC/EMD/70328‐1/OT/2010‐2011/8100000608 30‐SEP‐10

SWAMY CONSTRUCTIONS

08‐10‐10 07‐10‐11 7.23 AGM ‐ EMD ( ODPL), EMD

Extended up to 07/04/12

40 Repainting of Various structures at COCCP area

47.97 48.25 0.58 VSP/WC/STED/70562‐0/OT/2011‐12/8110000776 24‐MAY‐11

COLOUR INDIA PAINTS INDUSTRIES

24‐05‐11 23‐05‐12 ‐ MANAGER, StED

Work in Progress

43 Technological upkeep of Converter shop floors and equipments in SMS.

49.59 48.00 ‐3.21 VSP/WC/SMS/70522‐0/OT/2010‐11/8110000728 23‐MAR‐11

SREE NOOKAMBIKA BUILDERS

01‐04‐11 31‐03‐12 87.92 AGM(O), SMS

Work in Progress

27

CLEANING OF STOCKYARD BEDS, YARD CONVEYORS & EQUIPMENT STREAM IN RMHP (PART II A)

47.78 47.78 0.00 VSP/WC/RMHP/71385‐0/OT/2011‐2012/8110000883 24‐OCT‐11

K GANGA RAJU 12‐11‐11 11‐11‐12 ‐ PK CHARI, AGM (O), RMHP

Work in Progress

Compiled from WCMS data given by IT departmemt Page 11 of 22

Page 12: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

37 Repainting of various units of SMS area

52.61 47.20 ‐10.29 VSP/WC/STED/70429‐0/OT/2011‐12/8110000785 31‐MAY‐11

MK GOLD PAINTS PVT LTD

31‐05‐11 30‐05‐12 ‐ MANAGER, StED

Work in Progress

13 Pipe line replacement in Coal Chemicals Plant

53.97 46.80 ‐13.29 VSP/WC/CO&CCP/59339‐0/OT/2010‐11/8100000493 05‐APR‐10

SWAMY CONSTRUCTIONS

12‐04‐10 11‐04‐11 36.99 AGM(M)/CO&CCP, COCCP

Extended up to 11/04/12

7

CUTTING , BAGGING & LOADING OF SOLID PITCH IN COAL CHEMICAL PLANT

45.98 46.74 1.65 VSP/WC/CO&CCP/71213‐0/OT/2011‐12/8110000875 04‐OCT‐11

P DHANUNJAYA REDDY

01‐11‐11 31‐10‐12 ‐ AGM(O), COCCP

Work in Progress

41 Repainting of various structures in SMS including ODPL structures.

53.24 46.58 ‐12.50 VSP/WC/STED/70607‐0/OT/2011‐12/8110000777 24‐MAY‐11

AMBUJA PAINTS LTD.

24‐05‐11 23‐05‐12 ‐  MANAGER / STED, StED

Work in Progress

9

Technological repairs and structural modifications in various units of the plant under CMM

60.28 46.50 ‐22.86 VSP/WC/CMM/71209‐0/O/2011‐12/8110000826 06‐AUG‐11

MANI ENGG. WORKS

11‐08‐11 10‐08‐12 ‐ AGM(M)/CMM), CMM

Work in Progress

52 Cleaning works in TPP and its auxiliaries.

51.57 46.41 ‐10.00 VSP/WC/TPP/70485‐0/OT/2010‐11/ 07FEB‐11

A SURYANARAYANA VARMA

01‐03‐11 29‐02‐12 85.91 DGM(O)/TPP(W), TPP

Extended up to 30/06/12

53 Cleaning works in TPP and its auxiliaries.

51.57 46.41 ‐10.00 VSP/WC/TPP/70485‐0/OT/2010‐11/ 07FEB‐11

A SURYANARAYANA VARMA

01‐03‐11 29‐02‐12 4.74 DGM(O)/TPP(W), TPP

Extended up to 30/06/12

41 Technological assistance for online jam lancing of blowing lance, misc. lancing jobs, bagging for special steels and purging while tapping in SMS.

45.41 45.90 1.08 VSP/WC/SMS70515‐0/OT/2010‐11/8110000722 18‐MAR‐11

SURYA TEJ ENGG WORKS

01‐04‐11 31‐03‐12 ‐ AGM(O)‐LD, SMS

Extended up to 31/05/12

Compiled from WCMS data given by IT departmemt Page 12 of 22

Page 13: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

44 Technological assistance for online jam lancing of blowing lance, misc. lancing jobs, bagging for special steels and purging while tapping in SMS.

45.41 45.90 1.08 VSP/WC/SMS70515‐0/OT/2010‐11/8110000722 18‐MAR‐11

SURYA TEJ ENGG WORKS

01‐04‐11 31‐03‐12 78.36 AGM(O)‐LD, SMS

Extended up to 31/05/12

3 MISCELLANEOUS CIVIL JOBS IN  BF & ASP ZONE/AREAS(Part‐3).

68.26 45.71 ‐33.03 VSP/WC/CED/71526‐3/OT/2011‐12/8120001029 03‐MAR‐12

M SOMULU 09‐03‐12 08‐03‐13 ‐ MANAGER(C)‐CED, CED

Work yet to be started

38 Repainting of various structures including conveyor deck plates & stringer posts in SMS area

54.05 45.12 ‐16.52 VSP/WC/STED/70428‐0/OT/2011‐12/8110000786 31‐MAY‐11

COLOUR INDIA PAINTS INDUSTRIES

31‐05‐11 30‐05‐12 ‐ MANAGER, StED

Work in Progress

7 Repair of critical AC units inside the plant

43.90 45.00 2.50 VSP/WC/ACS/70469‐0/OT/2010‐11/8110000704 25‐FEB‐11

SIRI CONSTRUCTIONS ‐CHAITANYA NAGAR  GAJUWAKA

01‐03‐11 29‐02‐12 71.67 AGM(E)/ACS, ACS

Job Completed

15 ONLINE JACKETING OF DAMAGED GAS PIPE LINE

48.22 43.90 ‐8.97 VSP/WC/EMD/70313‐0/OT/2010‐2011/8100000618 14‐OCT‐10

RAO WELDING WORKS

20‐10‐10 19‐10‐11 46.67 AGM (MECH), EMD

Extended up to 18/04/12

43 Repainting of Various structures and conveyor Galleries including Flood light towers in Sinter Plant  area

44.59 43.68 ‐2.04 VSP/WC/STED/70443‐0/OT/2011‐12/8110000766 12‐MAY‐11

COLOUR INDIA PAINTS INDUSTRIES

12‐05‐11 11‐05‐12 ‐ MANAGER, StED

Work in Progress

44 Repainting of Various structures and chimney shells in  ESF, Stores and Traffic areas.

44.87 43.50 ‐3.04 VSP/WC/STED/70541‐0/OT/2011‐12/8110000767 12‐MAY‐11

COLOUR INDIA PAINTS INDUSTRIES

12‐05‐11 11‐05‐12 ‐ SR MANAGER, StED

Work in Progress

Compiled from WCMS data given by IT departmemt Page 13 of 22

Page 14: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

45 Repainting of Various structures and conveyor Galleries including ODPL structures in Sinter Plant  area

44.82 42.56 ‐5.04 VSP/WC/STED/70442‐0/OT/2011‐12/8110000765 12‐MAY‐11

MK GOLD PAINTS PVT LTD

12‐05‐11 11‐05‐12 ‐ MANAGER, StED

Work in Progress

58

REPLACEMENT OF TUBULAR AIR PRE‐HEATER IN BOILER

41.13 42.45 3.20 VSP/WC/TPP/71208‐0/OT/2011‐12/8110000834 12‐AUG‐11

V&S CONSTRUCTIONS

20‐08‐11 19‐08‐12 ‐ AGM(M), TPP

Work in Progress

46 Re‐Painting of various Structures including conveyor deck plates and Flood Light Towers in BF Zone

48.17 42.38 ‐12.02 VSP/WC/STED/70430‐0/OT/2011‐12/8110000762 12‐MAY‐11

COLOUR INDIA PAINTS INDUSTRIES

12‐05‐11 11‐05‐12 ‐ MANAGER, StED

Work in Progress

55 Structural repair work for buildings and technological structures including Roof Sheeting and side cladding works in various units of TPP & ASP including PCM‐1 to 4 Area (Part‐6)

42.22 42.22 0.00 VSP/WC/StED/59375‐6/OT/2010‐11/8100000571 15‐JUL‐10

JS ENGG. WORKS 23‐07‐10 22‐07‐11 82.42 AGM, StED Job Completed

13 FETTLING OF CASTINGS PRODUCED IN FOUNDRY

40.83 42.17 3.28 VSP/WC/ES&F/59031‐0/OT/2009‐10/ 08‐SEP‐09

LAXMI & COMPANY

13‐10‐09 12‐10‐11 84.01 DCM(FOUNDRY), ES&F

Job Completed

28

Assistance for shift Mechanical Maintenance of RMHP (2011‐12)

54.99 42.00 ‐23.62 VSP/WC/RMHP/71398‐0/OT/2011‐2012/8110000900 09‐NOV‐11

SRI RAJ MOHAN ENTERPRISES

11‐11‐11 10‐11‐12 ‐ AJEET KUMAR ‐ AGM(M), RMHP

Work in Progress

61

CAPITAL  REPAIR  OF ESPs OF TPP BOILERS

40.61 42.00 3.42 VSP/WC/TPP/70600‐0/OT/2011‐12/ 24MAY‐11

FRIENDS ENTERPRISES

11‐06‐11 10‐06‐13 ‐ DGM(M), TPP

Work in Progress

Compiled from WCMS data given by IT departmemt Page 14 of 22

Page 15: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

2

Maintenance of Air‐conditioning equipments in SMS‐II ,ASU‐IV & WMD building for SMS‐II of expansion area

40.85 41.77 2.25 VSP/WC/ACS/70640‐0/OT/2011‐12/8120000992 23‐JAN‐12

BHARATH REFREGERATION COMPANY

01‐02‐12 31‐01‐13 ‐ AGM, ACS Work in Progress

56 Structural repair work for buildings and technological structures including Roof Sheeting and side cladding works in various units of Battery No‐01 to 04 and other Aux. Units in C & CCD Area (Group‐A) (Part‐7)

41.75 41.75 0.00 VSP/WC/StED/59375‐7/OT/2010‐11/8100000572 15‐JUL‐10

MAHALAXMI CONSTRUCTIONS

23‐07‐10 22‐07‐11 74.22 AGM, StED Job Completed

1

CLEANING WORKS IN PCM,PSY & SSY AREAS OF BF

41.02 40.87 ‐0.36 VSP/WC/BF/71430‐0/OT/2011‐12/8110000932 28‐NOV‐11

CHAKRADHARA ENTERPRISES

19‐01‐12 18‐01‐13 ‐ AGM(O), BF Work in Progress

4

REPAIR OF AIR CONDITIONERS, WATER COOLERS ETC.

40.08 40.08 0.00 VSP/WC/ACS/71244‐0/OT/2011‐12/8110000843 25‐AUG‐11

BHARATHI REFRIGERATIONS

01‐09‐11 31‐08‐13 ‐ AGM / ACS, ACS

Work in Progress

4 MISCELLANEOUS CIVIL JOBS IN  C&CCD  ZONE/AREAS(Part‐4).

57.78 38.69 ‐33.03 VSP/WC/CED/71526‐4/OT/2011‐12/8120001030 03‐MAR‐12

BABA ENGG WORKS

09‐03‐12 08‐03‐13 ‐ MANAGER(C)‐CED, CED

Work yet to be started

19

"Assistance in Preparatory Jobs for Rolling and Assembly,Repair & Revisioning of Operational Spares for MMSM"

37.94 38.44 1.32 VSP/WC/MMSM/71217‐0/OT/2011‐2012/8120000976 02‐JAN‐12

ROSHNI TECHNOLOGIES

22‐01‐12 21‐01‐13 ‐ AGM(OPRN)/MMSM, MMSM

Work in Progress

42 Re‐Painting of various Structures including conveyor deck plates and tensioning devices in BF Zone

48.00 38.40 ‐20.00 VSP/WC/STED/70441‐0/OT/2011‐12/8110000775 24‐MAY‐11

SHIVA CHEMICALS

24‐05‐11 23‐05‐12 ‐ MANAGER, StED

Work in Progress

Compiled from WCMS data given by IT departmemt Page 15 of 22

Page 16: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

50 Structural repair work for buildings and technological structures including Roof Sheeting and side cladding works in various units of  Engineering Shops, Foundry, FMD, Traffic, Stores and Miscellaneous Buildings/Units (Part‐8)

38.02 38.02 0.00 VSP/WC/StED/59375‐8/OT/2010‐11/8100000573 15‐JUL‐10

TIJO CONSTRUCTIONS

23‐07‐10 22‐07‐11 88.36 AGM, StED Job Completed

19

TECHNOLOGICAL ASSISTANCE & REPAIR OF SLUDGE TREATMENT PLANT/CCCD:2011‐12

39.65 38.01 ‐4.13 VSP/WC/EnMD/71363‐0/OT/2011‐12/8110000890 29‐OCT‐11

CHANDAN ENTERPRISES

01‐11‐11 31‐10‐12 ‐ MANAGER(ENMD), EnMD

Work in Progress

47 Repainting of Various structures  including Flood light towers and steel chimneys in RMHP  (Coal)  area

39.97 37.90 ‐5.18 VSP/WC/STED/70440‐0/OT/2011‐12/8110000764 12‐MAY‐11

MK GOLD PAINTS PVT LTD

12‐05‐11 11‐05‐12 ‐ MANAGER, StED

Work in Progress

30 Up Keep and on line mechanical repair works and cleaning of  Wagon Tippler and conveyor gallaries of stacking stream  in RMHP(CHP) ‐ PART‐I

28.63 37.80 32.03 VSP/WC/RMHP/OT/70337/8110000715 11‐MAR‐11

CLT ENGINEERING ENTERPRISES (Partnership)

12‐03‐11 11‐03‐12 ‐ DGM(O), RMHP

Extended up to 11/06/12

31 Up Keep and on line mechanical repair works and cleaning of  Wagon Tippler and conveyor gallaries of stacking stream  in RMHP(CHP) ‐ PART‐I

28.63 37.80 32.03 VSP/WC/RMHP/OT/70337/8110000715 11‐MAR‐11

CLT ENGINEERING ENTERPRISES (Partnership)

12‐03‐11 11‐03‐12 76.22 DGM(O), RMHP

Extended up to 11/06/12

Compiled from WCMS data given by IT departmemt Page 16 of 22

Page 17: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

37

TECHONOLOGICAL ASSISTANCE FOR SHIFTING AND ADDING OF LADLE COVERING COMPOUND(GRANULES/POWDER/FLAKES), PETROCOKE, FERROALLOYS ETC. INTO STEEL LADLES AT ARS‐1, IRUT, ARS‐3 & LF.

29.93 37.25 24.45 VSP/WC/SMS/71337‐0/OT/2011‐12/8110000939 02‐DEC‐11

KUSHEL ENTERPRISES

10‐12‐11 09‐12‐12 ‐ AGM(O)/CCD, SMS

Work in Progress

29

Servicing of CNC Roll Turning Lathes at RS&RS

37.00 37.00 VSP/WC/RS&RS/71388‐0/N/2011‐12/8110000850 31‐AUG‐11

DEUSCHE MASCHINEN INDIA PVT. LTD

01‐10‐11 30‐09‐12 ‐ SR.MANAGER(MECH), RSRS

Work in Progress

5 MISCELLANEOUS CIVIL JOBS IN SP&TPP ZONE/AREAS.(Part‐5)

55.00 36.83 ‐33.03 VSP/WC/CED/71526‐5/OT/2011‐12/8120001031 03‐MAR‐12

VA NAIDU 09‐03‐12 08‐03‐13 ‐ MANAGER(C)‐CED, CED

Work yet to be started

30

Repair and maintenance of DF cranes etc. in SMS

36.21 36.51 0.83 VSP/WC/SMS/71311‐0/OT/2011‐12/8110000956 21‐DEC‐11

BHAVANI INDUSTRIAL ENGG SERVICES

01‐03‐12 28‐02‐13 ‐ AGM(M), SMS

Work yet to be started

49 Structural repair work for buildings and technological structures including Roof Sheeting and side cladding works in various units of RMHP & CRMP Area (Part‐9)

36.32 36.32 0.00 VSP/WC/StED/59375‐9/OT/2010‐11/8100000574 15‐JUL‐10

SURYA TEJ ENGG WORKS

23‐07‐10 22‐07‐11 89.13 AGM, StED Job Completed

48 Repainting of Various structures including Flood light towers in RMHP (ore area)

40.61 35.70 ‐12.10 VSP/WC/STED/70434‐0/OT/2011‐12/8110000763 12‐MAY‐11

COLOUR INDIA PAINTS INDUSTRIES

12‐05‐11 11‐05‐12 ‐ MANAGER, StED

Work in Progress

Compiled from WCMS data given by IT departmemt Page 17 of 22

Page 18: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

3 TECHNOLOGICAL ASSISTANCE FOR TLC JAM UP‐KEEPING, BC,TC, CHANGING, BLOW PIPES AND ELBOWS CHANGING, LOADING AND UNLOADING OF BOULDERS, JAM REMOVAL FROM CAST HOUSE AND OTHER AREAS OF BF

36.04 35.50 ‐1.50 VSP/WC/BF/70526‐0/OT/2010‐ 2011/8110000745 11‐APR‐11

GOPI CONSTRUCTIONS

01‐05‐11 30‐04‐12 ‐ AGM(O), BF Work in Progress

5

CLEANING WORKS OF CSP UNITS IN CO&CCP

36.81 35.10 ‐4.65 VSP/WC/CO&CCP/71420‐0/OT/2011‐12/8110000925 26‐NOV‐11

M. RAMA RAJU & CO.

13‐01‐12 12‐01‐13 ‐ AGM(O), COCCP

Work in Progress

4 CLEANING WORKS IN PCM,PSY & SSY AREAS OF BF

33.93 34.73 2.36 VSP/WC/BF/70403‐0/OT/2010‐11/8100000679 03‐JAN‐11

CHAKRADHARA ENTERPRISES

19‐01‐11 18‐01‐12 99.30 AGM(O), BF

14

Rejuvenation of Structure & Pipelines of EMD, Capital Repair of BFGCP etc. for the year 2011‐2012

34.11 34.00 ‐0.33 VSP/WC/EMD/71203‐0/OT/2011‐12/8110000820 01‐AUG‐11

SANTHI FABRICATORS

08‐08‐11 07‐08‐12 ‐ AGM (MECH), EMD

Work in Progress

33 Collection and disposal of sludge and scale in GCM of SMS

35.37 34.00 ‐3.89 VSP/WC/SMS/71528‐0/OT/2011‐12/8120000989 19‐JAN‐12

SVL ENTERPRISES

08‐03‐12 07‐03‐13 ‐ AGM(O), SMS

Work yet to be started

34

Technological assistance by deployement of helpers and semi‐skilled manpower in CCD of SMS

32.97 33.92 2.88 VAP/WC/SMS/71274‐0/OT/2011‐12/8110000878 13‐OCT‐11

CHAKRADHARA ENTERPRISES

18‐02‐12 17‐02‐13 ‐ AGM (O) CCD, SMS

Work in Progress

66 Common Shutdown Capital Repair Jobs in SMS Pipeline Tunnel/Pump House Area.

32.75 33.50 2.28 VSP/WC/WMD/70594‐0/OT/2011‐12/8110000753 27‐APR‐11

RESHMA ENTERPRISES

02‐05‐11 01‐05‐12 ‐ AGM(T)/WMD, WMD

Work in Progress

Compiled from WCMS data given by IT departmemt Page 18 of 22

Page 19: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

23 "Assistance in Preparatory Jobs for Rolling and Assembly,Repair & Revisioning of Operational Spares for MMSM"

33.10 33.39 0.87 VSP/WC/MMSM/70271‐0/OT/2010‐2011/8100000554 03‐JUL‐10

MECH‐WELD ENGG WORKS

22‐09‐10 21‐09‐11 98.25 AGM(OPRN)/MMSM, MMSM

Job Completed

6 MISCELLANEOUS CIVIL JOBS IN  RMHP ZONE/AREAS.(Part‐6)

49.85 33.39 ‐33.03 VSP/WC/CED/71526‐6/OT/2011‐12/8120001032 03‐MAR‐12

VISAKHA CONSTRUCTIONS

09‐03‐12 08‐03‐13 ‐ MANAGER(C)‐CED, CED

Work yet to be started

15

Cleaning works in Billet Mill & Shipping areas of LMMM.

34.70 32.70 ‐5.76 VSP/WC/LMMM/71456‐0/OT/2011‐2012/8110000955 19‐DEC‐11

SRI RAJ MOHAN ENTERPRISES

28‐12‐11 27‐12‐12 ‐ AGM(O), LMMM

Work in Progress

20

Repair/Fabrication of 'RECUPERATORS'

34.34 32.63 ‐4.99 VSP/WC/ES&F/71256‐0/O/2011‐12/8110000845 26‐AUG‐11

DYNAMIC CONSTRUCTIONS

01‐09‐11 31‐08‐12 ‐ AGM (ESF), ES&F

Work in Progress

16 THERMAL INSULATION AND CLADDING WORKS IN VISAKHAPATNAM STEEL PLANT

32.24 32.20 ‐0.13 VSP/WC/EMD/70328‐2/OT/2010‐2011/8100000609 30‐SEP‐10

BEARDSELL LIMITED

08‐10‐10 07‐10‐11 43.42 AGM ‐ EMD ( ODPL), EMD

Job Completed

21 On Line Gas Cutting of MMSM Products

34.79 32.00 ‐8.01 VSP/WC/MMSM/70523‐0/OT/2010‐2011/8110000714 10‐MAR‐11

UNITED FREIGHT CARRYING CORPORATION

08‐04‐11 07‐04‐12 ‐ AGM (O) ‐ MMSM, MMSM

Work in Progress

35

TECHNOGICAL ASSISTANCE IN TUNDISH NOZZLE FIXING, MONOBLOCK STOPPERS SETTING, ETC. IN TPBAY OF SMS

29.74 31.83 7.00 VSP/WC/SMS/71336‐0/OT/2011‐12/8120000980 05‐JAN‐12

MGM ENTERPRISES

07‐01‐12 06‐01‐13 ‐ AGM(O)/TP BAY, SMS

Work in Progress

38

Technological assistance for shroud fixing in CCD of SMS

33.03 31.77 ‐3.81 VSP/WC/SMS/71211‐0/OT/2011‐12/8110000798 01‐JUL‐11

HARSHA ENTERPRISES

01‐08‐11 31‐07‐12 ‐ AGM (O) CCD, SMS

Work in Progress

Compiled from WCMS data given by IT departmemt Page 19 of 22

Page 20: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

31

Repair/replacement of hood,stack and skirt tubes of GCP in  SMS.

31.61 31.40 ‐0.66 VSP/WC/SMS/71483‐0/OT/2011‐12/8110000963 26‐DEC‐11

P NARASIMHA RAO & CO

01‐01‐12 31‐12‐12 ‐ AGM(MECH), SMS

Work in Progress

54 Replacement of unserviceable damaged wooden/steel sleepers with PSC sleepers, through packing, spreading of slag etc., in various yards of Traffic department (part‐1) 

30.19 31.27 3.58 VSP/WC/TRAFFIC/70512‐1/OT/2010‐11/8110000724 21‐MAR‐11

PARAMESWARI ENGG WORKS

01‐04‐11 31‐01‐12 90.49 AGM (M)‐ P.WAY& F/S, TRAFFIC

Job Completed

32 Repair and maintenance of DF cranes etc. in SMS

31.83 31.19 ‐2.00 VSP/WC/SMS/70297‐0/OT/2010‐11/8100000611 04‐OCT‐10

BHAVANI INDUSTRIAL ENGG SERVICES

01‐11‐10 31‐10‐11 85.27 AGM(M), SMS

Job Completed

12

Repair & Replacement Jobs of CCP Equipments at CO&CCP (Part‐II)

31.48 31.17 ‐1.00 VSP/WC/CO&CCP/70571‐0/OT/2011‐2012/8110000748 18‐APR‐11

JOY MA KALI CONSTRUCTION CO.

02‐09‐11 01‐09‐12 ‐ AGM(M)/CO&CCP, COCCP

Work in Progress

39

Cleaning works in CCD area of SMS

34.70 30.78 ‐11.29 VSP/WC/SMS/71201‐0/OT/2011/12/8110000802 07‐JUL‐11

HARSHA ENTERPRISES

16‐07‐11 15‐07‐12 ‐ AGM (O) CCD, SMS

Work in Progress

42 Collection and disposal of sludge and scale in GCM of SMS

30.35 30.00 ‐1.15 VSP/WC/SMS/70521‐0/OT/2010‐11/8100000707 03‐MAR‐11

MGM ENTERPRISES

08‐03‐11 07‐03‐12 98.00 AGM(O), SMS

Work in Progress

7 MISCELLANEOUS CIVIL JOBS IN CRMP,FMD & TRAFFIC ZONE/AREAS.(Part‐7)

43.48 29.12 ‐33.03 VSP/WC/CED/71526‐7/OT/2011‐12/8120001033 03‐MAR‐12

VENU CONSTRUCTIONS

09‐03‐12 08‐03‐13 ‐ MANAGER(C)‐CED, CED

Work yet to be started

Compiled from WCMS data given by IT departmemt Page 20 of 22

Page 21: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

8

CLEANING JOBS IN CED AND ED(W) Bldg. AREAS(PART‐1)

29.79 27.74 ‐6.90 VSP/WC/CED/71447‐1/OT/2011‐12/8110000965 30‐DEC‐11

SRI SAI RAGHAVENDRA ENGINEERS & CONTRACTORS

15‐01‐12 14‐01‐13 ‐ MANAGER(C)‐CED, CED

Work in Progress

9

CLEANING JOBS IN RMHP  AREAS(PART‐2)

28.75 26.77 ‐6.90 VSP/WC/CED/71447‐2/OT/2011‐12/8110000966 30‐DEC‐11

SENSIITIVE iNSTRUMENTATION & ELECTRICAL WORKS

15‐01‐12 14‐01‐13 ‐ MANAGER(C)‐CED, CED

Work in Progress

10

CLEANING JOBS IN C&CCD,CRG,ETL,QATD,INSTRUMENTATION & TELECOM AREAS.(PART‐4)

28.75 26.77 ‐6.90 VSP/WC/CED/71447‐4/OT/2011‐12/8110000968 30‐DEC‐11

KEERTHI CONSTRUCATIONS

15‐01‐12 14‐01‐13 ‐ MANAGER(C)‐CED, CED

Work in Progress

11 CLEANING JOBS IN BF & SP AREAS(PART‐3).

28.75 26.77 ‐6.90 VSP/WC/CED/71447‐3/OT/2011‐12/8110000967 30‐DEC‐11

RKV ENGG WORKS

15‐01‐12 14‐01‐13 10.24 MANAGER(C)‐CED, CED

Work in Progress

12 CLEANING JOBS IN SMS,CRMP,RED & SSD AREAS(PART‐5)

27.71 25.79 ‐6.90 VSP/WC/CED/71447‐5/OT/2011‐12/8110000969 30‐DEC‐11

S.R.INDUSTRIES 15‐01‐12 14‐01‐13 9.85 MANAGER(C)‐CED, CED

Work in Progress

16 CLEANING JOBS IN ESF,SPC,ERS,WCC,StED,CMM&CME AREAS(PART‐6).

27.71 25.79 ‐6.90 VSP/WC/CED/71447‐6/OT/2011‐12/970 30‐DEC‐11

SUNITHA PADMASRI ENTERPRISES

15‐01‐12 14‐01‐13 7.75 MANAGER(C)‐CED, CED

Work in Progress

2 ENVIRONMENTAL PROTECTION WORKS,BEAUTIFICATION AND HORTICULTURE DEVELOPMENT INSIDE THE PLANT OF VSP PACKAGE‐1

19.60 24.89 27.00 VSP/WC/CED/71370‐1/OT/2011‐12/8110000907 17‐NOV‐11

P DHANUNJAYA REDDY

17‐11‐11 16‐11‐12 28.72 MANAGER(C)‐CED, CED

Work in Progress

15 CLEANING JOBS IN LMMM,WRM,MMSM AND RS&RS AREAS(PART‐7)

26.66 24.82 ‐6.90 VSP/WC/CED/71447‐7/OT/2011‐12/8110000971 30‐DEC‐11

SURYA TEJ ENGG WORKS

15‐01‐12 14‐01‐13 7.78 MANAGER(C)‐CED, CED

Work in Progress

Compiled from WCMS data given by IT departmemt Page 21 of 22

Page 22: Quarterly Progress Report:4th Quarter of 2011-12 · 46Scrap&LD Slag handling at ... 01‐07‐08 30‐06‐11 95.03AGM(SSD), SSD Job Completed 50STEEL / IRON SCRAP PROCESSING AND

Quarterly Progress Report:4th Quarter of 2011-12(MONEYTORY LIMIT: MECH./ OPR./ELEC.- Rs.30Lakhs above, CIVIL- Rs.1.00 Cr.above/ 2 Largest Value, HORTICULTURE-Rs.2Lakhs above)

SLN Name of  work and Location

Estimated Cost    (`Lakhs)

Tendered Cost        

(`Lakhs)

%age    above/  below Est.

Agreement No. & Date / Order No.& 

Date

Agency Date of start     

Time of completio

Physical progress (%)

Engineer Incharge, Department

Remarks

3 ENVIRONMENTAL PROTECTION WORKS,BEAUTIFICATION AND HORTICULTURE DEVELOPMENT INSIDE THE PLANT OF  VSP PACKAGE‐2

17.89 22.73 27.00 VSP/WC/CED/71370‐2/OT/2011‐12/8110000908 17‐NOV‐11

SURYA TEJ ENGG WORKS

17‐11‐11 16‐11‐12 22.35 MANAGER(C)‐CED, CED

Work in Progress

1 ENVIRONMENTAL PROTECTION WORKS, BEAUTIFICATION AND HORTICULTURE DEVELOPMENT INSIDE THE PLANT OF VSP PACKAGE‐3

17.83 22.65 27.00 VSP/WC/CED/71370‐3/OT/2011‐12/8110000909 17‐NOV‐11

MD JAHANGEER 17‐11‐11 16‐11‐12 34.53 MANAGER(C)‐CED, CED

Work in Progress

13 CLEANING JOBS IN TRAFFIC AREAS(PART‐8)

24.29 22.61 ‐6.90 VSP/WC/CED/71447‐8/OT/2011‐12/8110000972 30‐DEC‐11

PRAGADA PAPAYYA

15‐01‐12 14‐01‐13 9.55 MANAGER(C)‐CED, CED

Work in Progress

4 ENVIRONMENTAL PROTECTION WORKS, BEAUTIFICATION AND HORTICULTURE DEVELOPMENT INSIDE THE PLANT OF VSP PACKAGE‐4

17.76 22.55 27.00 VSP/WC/CED/71370‐4/OT/2011‐12/8110000910 17‐NOV‐11

K POTTENNA 17‐11‐11 16‐11‐12 20.35 MANAGER(C)‐CED, CED

Work in Progress

14 CLEANING JOBS IN WMD,UTILITIES,EMD,EnMD,ACVS,MMS & TS AREAS(PART‐9)

22.49 20.94 ‐6.90 VSP/WC/CED/71447‐9/OT/2011‐12/8110000972 30‐DEC‐11

G MOHAN RAO 15‐01‐12 14‐01‐13 8.12 MANAGER(C)‐CED, CED

Work in Progress

Compiled from WCMS data given by IT departmemt Page 22 of 22