questions on aci 318 appendix d, anchoring to concrete

2
68 MAY 2005 / Concrete international  Questions in this column were asked by users of ACI documents and have been answered by ACI staff or by a member or members of ACI technical committees. The answers do not represent the ofcial position of an ACI committee. Only a published committee document represents the formal consensus of the committee and the Institute. We invite comment on any of the questions and answers published in this column. Write to the Editor, Concrete International, 38800 Country Club Drive, Farmington Hills, MI 48331; contact us by fax at (248) 848-3701; or e-mail [email protected]. Q.  What values should be used for effective embedment depth and effective edge distance in calculating the  projected concrete failure areas for an anchor group influenced by three or four edges?  A. For tension loads, the effective embedment depth h ef  to be used in calculating the projected concrete failure area in tension A  Nc  is defined in 318-0 5 provision D.5.2.3 in terms of the maximum distance from the center of an anchor shaft to the edge of the concrete c a,max , and the maximum spacing between the anchors: “Where anchors are located less than 1.5h ef  from three or more edges, the value of h ef  used in Eq. (D-4) through (D-11) shall be the greater of c a,max  /1.5 and one-third of the maximum spacing between anchors within the group.” Comment ary Fig. RD.5.2.3 provides an example calculation of A  Nc , using the term h ef  to distinguish the effective Questions on  ACI 318 Appendix D,  Anchoring to Concrete When compared with previous editions, ACI 318-05 provides significant clarification as well as more consistent nomenclature. To highlight a small portion of the revisions, the following questions, commonl y asked in reference to ACI 318-02 Appendix D, are repeated here. embedment depth from the actual embedment depth. For shear loads, the edge distance c a1  (the distance from the center of an anchor shaft to the edge of the concrete in the direction of the applied shear) to be used in calculating the projected concrete failure area in shear  A Vc  is defined in D.6.2.4 in terms of the edge distance in the direction perpendicular to the applied shear c a2 , the thickness of the member h a , and the maximum spacing between the anchors: “Where anchors are influenced by three or more edges, the value of c a1  used in Eq. (D-23) through (D-28) shall not exceed the greatest of: c a2 /1.5 in either direction, h a /1.5; and one-third of the maximum spacing between anchors within the group.” Commentary Fig. RD.6.2.4 provides an example calculation of A Vc , using the term c a1  to distinguish the effective edge distance from the actual edge distance. Q.   How is pryout shear calculated for a connection with multiple anchors?  A. As in the previous edition of 318, 318-05 provision D6.3.1 defines the coefficient for pryout strength k cp  as a function of h ef . In 318-05, however, k cp  is applied to the nominal concrete breakout strength in tension for either a single anchor N cb  per Eq. (D-4) or a group of anchors N cbg  per Eq. (D-5). For a group of anchors, for example, the nominal pryout strength V cpg  is given by Eq. (D-30) as V cpg  = k cp  N cbg .

Upload: alvaro-sanchez-guzman

Post on 01-Jun-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Questions on ACI 318 Appendix D, Anchoring to Concrete

8/9/2019 Questions on ACI 318 Appendix D, Anchoring to Concrete

http://slidepdf.com/reader/full/questions-on-aci-318-appendix-d-anchoring-to-concrete 1/1

68 MAY 2005 / Concrete international

Questions in this column were asked by users of ACI documentsand have been answered by ACI staff or by a member or membersof ACI technical committees. The answers do not represent theofcial position of an ACI committee. Only a published committeedocument represents the formal consensus of the committee andthe Institute.

We invite comment on any of the questions and answerspublished in this column. Write to the Editor, Concrete International,38800 Country Club Drive, Farmington Hills, MI 48331; contact usby fax at (248) 848-3701; or [email protected].

Q. What values should be used for effective embedmentdepth and effective edge distance in calculating the

projected concrete failure areas for an anchor groupinfluenced by three or four edges?

A. For tension loads, the effective embedment depthhef to be used in calculating the projected concrete

failure area in tension A Nc is defined in 318-05 provisionD.5.2.3 in terms of the maximum distance from the centerof an anchor shaft to the edge of the concrete ca,max , andthe maximum spacing between the anchors:

“Where anchors are located less than 1.5 hef from threeor more edges, the value of hef used in Eq. (D-4) through(D-11) shall be the greater of ca,max /1.5 and one-third of themaximum spacing between anchors within the group.”

Commentary Fig. RD.5.2.3 provides an example calculation

of A Nc, using the term h′

ef to distinguish the effective

Questions on ACI 318 Appendix D, Anchoring to Concrete

When compared with previous editions, ACI 318-05 provides significant clarification as well as more consistentnomenclature. To highlight a small portion of the revisions, the following questions, commonly asked in reference toACI 318-02 Appendix D, are repeated here.

embedment depth from the actual embedment depth.For shear loads, the edge distance ca 1 (the distance

from the center of an anchor shaft to the edge of theconcrete in the direction of the applied shear) to be usedin calculating the projected concrete failure area in shear

AVc is defined in D.6.2.4 in terms of the edge distance inthe direction perpendicular to the applied shear ca 2, thethickness of the member ha , and the maximum spacingbetween the anchors:

“Where anchors are influenced by three or moreedges, the value of ca1 used in Eq. (D-23) through (D-28)shall not exceed the greatest of: ca 2/1.5 in either direction,ha /1.5; and one-third of the maximum spacing betweenanchors within the group.”

Commentary Fig. RD.6.2.4 provides an examplecalculation of AVc, using the term c

a 1 to distinguish theeffective edge distance from the actual edge distance.

Q. How is pryout shear calculated for a connection withmultiple anchors?

A. As in the previous edition of 318, 318-05 provisionD6.3.1 defines the coefficient for pryout strength kcp

as a function of hef . In 318-05, however, kcp is applied tothe nominal concrete breakout strength in tension foreither a single anchor N cb per Eq. (D-4) or a group ofanchors N cbg per Eq. (D-5). For a group of anchors, forexample, the nominal pryout strength V cpg is given by

Eq. (D-30) as V cpg = kcp N cbg .