QUIMICA. CEPSA QUIMICA PALOS DE LA FRONTERA IPPC DEVELOPMENT. Palos de la Frontera Jul 12 th , 2012. IPPC DEVELOPMENT: KEY DATES. Quality, Safety and Environment Certifications. QUALITY. ISO 9001. 1992. ISO 14001. ENVIRONMENT. 1999. 2010. ENVIRONMENT. EMAS. OHSAS 18001. 2004. - PowerPoint PPT PresentationTRANSCRIPT
Pagina 1 de 3CEPSA Química
QUIMICA
Palos de la Frontera Jul 12th, 2012
CEPSA QUIMICAPALOS DE LA FRONTERA
IPPC DEVELOPMENT
Pagina 1 de 3CEPSA Química
IPPC DEVELOPMENT: KEY DATES
YEAR PUBLICATION/ACTION
1996/09 Council Directive 96/61/EC of 24th September 1996 concerning integrated pollution prevention and control ("IPPC Directive")
2002/07 Transposition to Spanish legislation: Law 16/2002 (IPPC)
2003/02 Publication of Reference Document on Best Available Techniques in the Large Volume Organic Chemical Industry (LVOC BREF)
2004/01 Presented documentation to Andalusia Environment Government
2005/04 Obtained “Integrated Environmental Authorization (AAI)”
2007/10 2007/10/30 Final date for “Integrated Environmental Authorization (AAI) ”
Pagina 1 de 3CEPSA Química
Quality, Safety and Environment Certifications
ISO 9001
ISO 14001
OHSAS 18001
RESPONSIBLE CARE
QUALITY
ENVIRONMENT
RISKS PREVENTION
EMASENVIRONMENT
DOÑANA 21SUSTAINABILITY
SUSTAINABILITY
2010
1999
1992
2004
2007
1993
At start of IPPC legislation CEPSA Química had established operational procedures to control and minimize pollution
Pagina 1 de 3CEPSA Química
QUIMICA
IPPC DEVELOPMENT
What’s needed to obtain IPPC permit?:BREF Documents relevant to petrochemical industry:
“Large Volume Organic Chemical Industry”, 2003/02.“Cooling Systems”, 2001/12.“Common Waste Water and Waste Gas Treatment and Management Systems in the Chemical Sector”, 2003/02.“Emission from storage of bulk or dangerous materials”, 2003/07.“Monitoring Systems”, 2003/07.“Large Combustion Plants”, 2003/03
Did not exist specific BREF of phenol production (today: first draft in study).
Methylamine: BREF LVOC summary of system established in CEPSA Química: BAT.
PHENOL/ACETONE: Process via cumene oxidation formed by alkylation: BAT
Pagina 1 de 3CEPSA Química
Control of Air Pollution Emissions
QUIMICA
IPPC DEVELOPMENT: requirements
Fuel: Priority utilization of natural gas. Minimization of Fuel-oil (Voluntary objective)
High reduction in SOx and Nox emissios
2004: Only one furnace used FO and NG simultaneously: B-401.
New plant that started at 2007: furnace designed only for natural gas.
2008: stopped use of FO.
2009: New furnace B-401N to substitute old B-401.
New furnaces: Low NOx burners. B-401 NOx emissions below limits.
Pagina 1 de 3CEPSA Química
IPPC DEVELOPMENT: requirements
Pagina 1 de 3CEPSA Química
QUIMICA
IPPC DEVELOPMENT: requirementsControl of Air Pollution Emissions
Continuous emissions Monitoring system for furnaces > 50 Mw:
(B-401/ B-401N) and cogeneration plant.Adaptation of platform and ladder in furnace B-401’s stack for air emission measurements.Design of stacks to optimize dispersion of pollutant.
Pagina 1 de 3CEPSA Química
QUIMICA
IPPC DEVELOPMENT: requirementsControl of Air Pollution Emissions
Minimization of Volatile Organic Compound emissions (VOC’s) (Voluntary objective)
Optimization of activated charcoal chambers system to reduce VOC in air from oxidation reactors. New vents absorber of Methylamine plant.Reduction of atmospheric vents from trucks and drums loading.Change of open samplings systems to closed-loops.Pump Seals: Substitution of water systems to gas closed circuits.Establishment of a Leak Detection and repair (LDAR) program.
Pagina 1 de 3CEPSA Química
QUIMICACEPSA Química has a Cogeneration plant that has an independent IPPC Permit.
Reduction of limit to NOx: 500 to 75 mg/Nm3.
Change to a gas generator with Dry Low Emissions technology .
Investment 8 MM €.
IPPC DEVELOPMENT: requirements
Control of Air Pollution Emissions
Pagina 1 de 3CEPSA Química
Control of Waste Water Emissions
QUIMICA
IPPC DEVELOPMENT: requirements Process water waste is sent to a primary treatment and then goes to the treatment plant where the contaminants are eliminated through a biological cleaning process: Emission point #1
IPPC permit established authorized waste water limits and how they must be controlled.
CQ have made Investments to optimize effluent plant in order to improve the quality of the waste water even better than limits:
Design and implementation of new system of waste water treatment from new plant thatstarted operation at 2007.
Optimization of control elements to lower contamination of waste water.
New filter system for sludge excess
Pagina 1 de 3CEPSA Química
Control of Waste Water Emissions
QUIMICA
IPPC DEVELOPMENT: requirements
The rainfall water has an independent circuit: Emission point #2
IPPC permit established that water could only be sent at this emission point when it's raining and must be free of contaminants.
CEPSA Química had made Investments to take residual water out of rainfall circuit.
Implementation of Continuous Flow equipment thatallows us to control that rainfall circuit only operateswhen it’s raining.
Pagina 1 de 3CEPSA Química
Control of Wastes
QUIMICA
IPPC DEVELOPMENT: requirements
IPPC permit established authorized Hazardous waste and regulations about its management.
CQ has established techniques and operational controls to minimize wastes.
New temporary warehouses has been built to gather the residues.
Selective gathering of residues has been improved.
Pagina 1 de 3CEPSA Química
Control of soil and groundwater
QUIMICA
IPPC DEVELOPMENT: requirements
CQ has established techniques and operational controls to avoid this contamination.
Special attention to storage: leak proofing of storage tanks, built over pedestal with leaks detectors, bunds,…. .
Protection of land of Operational areas by use of waterproof concrete.
Pagina 1 de 3CEPSA Química
Other requirements stipulated in the permit
QUIMICA
IPPC DEVELOPMENT: requirements
Internal and external measurements, control and report of air emissions, waste water, wastes…(many of these are indicated on environmental legislation).
Audits of compliance of requirements from IPPC permit by administration (each 2 years, measurements including).
Establish obligation of Communication: environmental incidents/accidents, changes in process, productive stops….
Realization of annual report of “European Regulation on Pollutant Release and Transfer Registers (E-PRTR)”.
Pagina 1 de 3CEPSA Química
Environment-related operational costs and investments (MM €)
YEAR 2005 2006 2007 2008 2009 2010 2011
INVESTMENTS 0,184 0,776 0,501 0,544 5,281 1,438 10,024
OPERATIONAL COSTS 4,963 6,350 7,867 8,640 4,942 5,572 6,274
Not including technical changes operational and security that have relation with environment.Not including Cogeneration Plant.
Pagina 1 de 3CEPSA Química
Consumption of water, calorific energy, electricity
Pagina 1 de 3CEPSA Química
And now?
QUIMICA
IPPC DEVELOPMENT: requirements
Validity period of permit is 8 years (will expire in 2013):The documentation for renewal was presented in May, 2012
Requirements of new BREF and new legislation will be included (for example Industrial Emissions Directive)
Will establish new BAT and emission levels associated (BAT-AELs): new investments.
Will include references to raw materials and energy consumption.
Pagina 1 de 3CEPSA Química