Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

Upload: ira-walters

Post on 01-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

Quintette Project UpdateNorth East Coal Forum

Jeff Butcher

Processing Superintendent October 10, 2013

Page 2: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

A Leader in Sustainable Mining

• Growth – growing to maximize the value of our resources

• Productivity – continuously improving our efficiency

• Sustainability – responsibly mining for the long term

Page 3: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

A Leader in Sustainable Mining

• Growth – growing to maximize the value of our resources

• Productivity – continuously improving our efficiency

• Sustainability – responsibly mining for the long term

Page 4: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

Coal Business Unit

Page 5: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

A Leading Global, High Quality Steelmaking Coal Producer

Over 4,400 employees across six steelmaking coal operations

# 1 Producer of steelmaking coal in N. America

# 2 Exporter of steelmaking coal in world

80% of Canadian steelmaking coal production

Page 6: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

6 Source: Teck Resources Limited

Our Coal Resources are Sufficient for Over 100 Years of Production

• Approximately 35 years of reserves

• Significant resources to support existing reserve base

• More than 95% of our reserves and resources are hard coking coal

Long-Life Quality Coal Reserves and Resources

Reserves

Measured &Indicated Resources

Inferred Resources

1.02 billion clean tonnes

3.66 billion in situ tonnes

2.22 billion in situ tonnes

Page 7: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

7

Our Operations Have a Robust Supply Chain

LegendCN Rail

CP Rail

Quintette

Page 8: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

8

Source: Teck Resources Limited

We are a Leading Supplier to Steel Producers Around the World

NorthAmerica

~5%Europe~15%

SouthAmerica

~5%

China~30%

Teck Coal – high quality, consistency, reliability, long-term supply

Asia ex.China~45%

Page 9: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

Quintette Background

Page 10: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

Growing Coal ProductionQuintette Restart Update

10

Page 11: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

Quintette History

11

• Located in the Peace River Coal Field of northeast B.C.

• Previous operations took place from 1982 to August 2000

• Area of interest is the former Windy Pit (mined from 1997 to closure) and the Window Pit

• The previously mined Mesa, Wolverine and Shikano Pits are considered exhausted

Page 12: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

Growing Coal ProductionQuintette Restart Update

• Targeting 2015 production at 3 Mtpa growing to 4 Mtpa

• Major permit (Mines Act Permit Amendment) obtained

• Impact Benefit Agreements with First Nations progressing well

• Substantial infrastructure (plant, electricity) already exists and refurbishing has begun

• Geology simple; coal quality known and valued in the market

12

Page 13: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

The Path Forward

• Acquisition of Effluent Permit

• Finalization of First Nations agreements

• We are continuing to proceed with detailed engineering work

• If a decision is made in early 2014 to proceed, the operation could be in commercial production in mid-2015

13

Page 14: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

Summary

• Growth – well advanced in growing from 24Mt to +30Mt, with successful Quintette permitting

• Productivity – significant movement down the cost curve

• Sustainability – continuous improvement in safety, responsible environmental management with ongoing benefits for communities

Page 15: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

Plant Dewatering – Dry Coal without Drying

Coal dewatering comprised of 3 stages

• Drain & Rinse

• Mechanical Dewatering

• Thermal Dewatering

15

Page 16: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

Thermal Dewatering

Traditionally most flexible and easiest, but most energy intensive

• Requires heating of large volume of air, energy inefficient.

16

Page 17: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

Drain & Rinse

Coarse Coal Drain and Rinse • Magnetite recovery and

proper moisture

Fine Coal Drain and Rinse • Ash separation and

moisture reduction

17

Page 18: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

Mechanical Dewatering

• Mechanical dewatering through centrifugal force, air pressure or vacuum

• Opportunity to add as much energy to minimize the requirement for thermal drying

18

Page 19: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

Summary

• Growth – well advanced in growing from 24Mt to +30Mt, with successful Quintette permitting

• Productivity – significant movement down the cost curve

• Sustainability – continuous improvement in safety, responsible environmental management with ongoing benefits for communities

Page 20: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

Coal Processor’s Guide Stone

20

Page 21: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

Coal Processor’s Guide Stone

21

Page 22: Quintette Project Update North East Coal Forum Jeff Butcher Processing Superintendent October 10, 2013

22

Thank You

Questions?