r & e grant application project #: 15-17 biennium 15-053 · 2016-03-17 · r & e grant...

35
R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #: 15-053 R&E Project Request: Total Project: 8/8/2016 Start Date: 6/30/2017 End Date: ODFW - Gold Beach Field Office Organization: Applicant Information Todd Confer Name: PO Box 642 Address: 29907 Airport Way Gold Beach, OR 97444 541-247-7605 Telephone: 541-247-2321 Fax: [email protected] Email: Past Recommended or Completed Projects Number Name Status 07-056 Elk R. Chinook Freshwater Harvest and Escapement Completed 09-046 Elk R Chinook Freshwater Harvest and Escapement-09 Completed 09-232 South Coast Fall Chinook Spawning Surveys Completed $116,262 $139,300 Project #: 15-053 Elk River Hatchery Maintenance Page 1 of 9 Last Modified/Revised: 2/26/2016 8:07:35 AM

Upload: others

Post on 15-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:

R & E Grant Application15-17 Biennium

Project Information

Elk River Hatchery Maintenance

Project #:15-053

R&E Project Request:

Total Project:

8/8/2016Start Date:

6/30/2017End Date:

ODFW - Gold Beach Field OfficeOrganization:

Applicant Information

Todd ConferName:

PO Box 642Address:

29907 Airport Way

Gold Beach, OR 97444

541-247-7605 Telephone:

541-247-2321Fax:

[email protected]:

Past Recommended or Completed Projects

Number Name Status

07-056Elk R. Chinook Freshwater Harvest and Escapement

Completed

09-046Elk R Chinook Freshwater Harvest and Escapement-09

Completed

09-232 South Coast Fall Chinook Spawning Surveys Completed

$116,262

$139,300

Project #: 15-053Elk River Hatchery Maintenance

Page 1 of 9Last Modified/Revised: 2/26/2016 8:07:35 AM

Page 2: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:

Location Information

Where is it?

The project will occur on public land owned or managed by the applicant

Site Description

Street Address, nearest intersection, or other descriptive location.Elk River Hatchery95163 Elk River RoadPort Orford, OR 97465541-332-7025

Directions to the site from the nearest highway junction.Elk River Road, 8 miles east of Hwy 101 intersection.

Following project completion, public anglers will be allowed the following level of access to the project site:

Limited access

Please describe what leases, easements, agreements are in place to ensure angler access to the project site, and what is the length of each agreement.

State owned. ODFW maintains boat and bank access on the 13 acre Elk River Hatchery parcel.

Dominant Land Use Type:Fish culture - Elk River Hatchery

Project Location

General Project Location.CURRYCounty:

RogueODFW Dist:

Elk RiverStream/Lake/Estuary Name:

17100306Sub-basin:

Specific Project Location.Latitude Longitude

42.73858 -124.40359

Project Summary

Project Summary

Please provide a couple sentence summary of the proposal.Repair/maintain infrastructure at Elk River Hatchery to ensure a reliable water supply for rearing salmon/steelhead, conduct chemical treatments as necessary to maintain fish health, and maintain a safe and efficient working environment for hatchery personnel. This proposal wraps 9 individual maintenance projects into one overall application for Elk River Hatchery.

Overall Project Goals

Describe the primary goals or outcomes of the entire project, including elements not requesting

Project #: 15-053Elk River Hatchery Maintenance

Page 2 of 9Last Modified/Revised: 2/26/2016 8:07:35 AM

Page 3: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:

funding from R&E.Priority #1. Maintain a reliable water supply for rearing fall Chinook, winter steelhead, and rainbow trout.

Priority #2. Improve our ability to do chemical treatments as necessary to maintain fish health.

Priority #3. Improve the safety and efficiency of hatchery operations.

Primary objectives of R&E funding

Please describe the measurable objectives for the R&E portion of the funding request.Priority #1. - Project #15-062. Install shut-off valves on both the north and south lateral water supply lines. Installing valves will allow maintenance of each lateral supply line without a complete shutdown of the hatchery.

Priority #1. - Project #16-006. Replace the roof on the electrical building. Maintaining the integrity of the electrical building is necessary to ensure an uninterrupted electrical supply to the main intake pumps.

Priority #1. - Project #16-004. Replace the roof, siding, and insulation on the emergency generator building. Maintaining a properly functioning generator is critical in the event of a loss of electrical power.

Priority #2. - Project #15-007. Re-route effluent from the steelhead brood facility through the main discharge. Re-routing (and diluting) the effluent is necessary to meet water quality requirements in order to treat with formalin or H2O2.

Priority #2. - Project #16-008. Install new 1" supply water line between north and south banks of raceways. Installing a new water supply line will facilitate formalin/H2O2 treatments in raceways.

Priority #2. - Project #16-003. Construct 2 chemical storage sheds. Chemicals are currently stored outside in an unsecured area. Storage sheds will provide safe and secure storage for formalin and H2O2.

Priority #3. - Project #16-009. Remove well casings. Six abandoned well casings located near the shop are safety hazards and should be removed to below grade and filled.

Priority #3. - Project #16-007. Repair host site. The domestic water line and septic system at the host site have failed and the site currently cannot be used. The site may also be used for temporary staff housing.

Priority #3. - Project #16-005. Construct 24'X30' equipment storage shed. There currently is no covered storage for the hatchery tractor or boats/equipment used by District and Corvallis Research personnel for monitoring projects.

Current Situation/Justification

Please describe the current situation and explain why this funding is needed.Elk River Hatchery produces 475K fall Chinook smolts for release in the Chetco and Elk rivers, 50K winter steelhead smolts for release in the Chetco river, and 9K legal rainbow trout for local lake fisheries. Unmet maintenance needs currently put those rearing programs at risk. The south lateral water supply line is leaking but can't be repaired until shut-off valves are installed. The poor condition of the electrical and generator buildings put the intake pumps at risk of failure due to electrical disruptions. Chetco steelhead brood cannot currently be treated with either

Project #: 15-053Elk River Hatchery Maintenance

Page 3 of 9Last Modified/Revised: 2/26/2016 8:07:35 AM

Page 4: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:

formalin or H2O2, due to the inability to dilute effluent, and has contributed to prespawning mortality and difficulty meeting production goals. Treatment chemicals are not stored securely due to a lack of storage space. Equipment, such as an R&E funded tractor, have inadequate covered storage which contributes to increased maintenance. A hatchery host could provide assistance to hatchery staff, but due to lack of maintenance the host site is currently unusable.

Recreation and Commercial Benefit

This project will provide benefits to:Recreational fisheriesCommercial fisheries

Explain how this project will contribute to current (and/or potential) fishing opportunities, access, or fisheries management.

Elk River Hatchery produces fall Chinook that contribute to recreational and commercial fisheries. The average harvest on the Chetco River is 600 fall Chinook and 1700 winter steelhead. Approx. 30% of the fall Chinook and 40% of the winter steelhead caught are hatchery-origin fish produced at Elk River Hatchery. The average harvest on Elk River is 1800 fall Chinook. Approx. 70% of the harvest is hatchery-origin fall Chinook. Harvest in the Chetco ocean terminal area fisheries averages 700 fall Chinook in the recreational fishery and 500 in the commercial fishery, approx. 20% are of hatchery origin. Harvest in the Elk ocean terminal area fisheries averages 900 fall Chinook in the commercial fishery, approx. 50% are of hatchery origin. The Chetco and Elk fall Chinook programs also contribute to the general ocean fisheries managed by the Pacific Fishery Management Council and Pacific Salmon Commission.

Is this project part of an approved Salmon-Trout Enhancement Program (STEP) activity?No

This project has been identified as a priority for:Basin/regional

Identify any plan or other document that identifies this priority.Several of these projects are identified in the Propagation Program's list of Maintenance and Capital improvements projects (attached). Other projects have been identified since the Propagation Program's list was developed.

This project is intended to benefit the following species:Fall Chinook SalmonWinter SteelheadRainbow Trout

This project will benefit anglers or fishery by providing:Hatcheries/Propagation/Liberation

Hatcheries/Propagation/Liberation

Hatchery Name:Elk River Hatchery

This is a:State hatchery

As a result of this request hatchery production will:Maintain

Project #: 15-053Elk River Hatchery Maintenance

Page 4 of 9Last Modified/Revised: 2/26/2016 8:07:35 AM

Page 5: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:

This project will:Address a need identified on the ODFW Hatchery Maintenance Priority listRestore, rehabilitate, modify, or replace existing production/acclimation facilitiesImprove safety of hatchery operationsImprove staff efficiency of hatchery operationsImprove effectiveness of hatchery operations (i.e. improve survival or return to angler)

Fish produced at this facility are for:Sport harvestCommercial harvest

Project Description

ScheduleActivity Date RE Funding

Complete design and engineering of maintenance projects (ODFW Engineering staff) 05/2016 NoProject #16-006. Purchase material and replace roof on electrical building (hatchery + district staff) 08/2016 YesProject #16-004. Purchase material and replace roof, siding, insulation on emergency generator building (hatchery + district staff)

08/2016 Yes

Project #16-003. Purchase building material and build formalin and H2O2 storage sheds (hatchery + district staff)

09/2016 Yes

Project #16-009. Cut off abandoned well casings below grade and in-fill (hire local contractor) 09/2016 YesProject #16-005. Purchase and construct 24'X30' pole building kit, including leveling site and pouring concrete pad (hatchery + district staff as per ODFW Engineering guidance)

10/2016 Yes

Project #15-062. Install shut-off valves on north and south lateral water supply lines, including cutting and removing asphalt + fill to access buried water lines (as per ODFW Engineering design)

06/2017 Yes

Project #15-077. Install drain line to re-route steelhead brood effluent, including cutting and removing asphalt + fill to install new effluent line across hatchery grounds (as per ODFW Engineering design)

06/2017 Yes

Project #16-008. Install 1" water supply line, including cutting and removing asphalt + fill to lay new water line across hatchery grounds (as per ODFW Engineering design)

06/2017 Yes

Project #16-007. Obtain permits and hire certified installer to repair host site septic system. Trench and install new domestic water line to host site (as per ODFW Engineering design)

06/2017 Yes

PermitsPermit Secured? Date Expected

Permits are required for repair of the host site septic system (Curry County Planning Clearance Form, DEQ Application for On-Site Sewage Treatment System)

No 09/2016

Project Design and Description

Please describe in detail the methods or approach that will be used to achieve the project objectives.Work orders have been submitted to ODFW Engineering for each of the 9 individual projects included in this application (Attached). Project objectives will be completed consistent with design/guidance provided by ODFW Engineering staff.

Engineering

Does the project involve capital improvement, engineering, site grading or other construction?YesOn ODFW land or managed by ODFW staff

Project Management and Maintenance

What is the life expectancy of R&E funded construction, structures, equipment, supplies, data or fishery?

Expected life span of new construction and water lines is 20+ years.

Project #: 15-053Elk River Hatchery Maintenance

Page 5 of 9Last Modified/Revised: 2/26/2016 8:07:35 AM

Page 6: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:

Who is responsible for long term management, maintenance, and oversight of the project beyond what is funded by R&E.

ODFW Fish Propagation Program/Elk River hatchery staff will be responsible for long-term maintenance and oversight of the project.

Will the project require ongoing maintenance?YesStandard hatchery procedures will be followed to maintain new construction.

Is there a plan to collect baseline data and to conduct monitoring efforts to measure the effectiveness of the project?

No

Project Funding

Funding

Have you applied for OWEB funding for this project?No

Other Funding Source Type Secured Dollar Value CommentsProject Manager (ODFW Rogue Watershed District)

In-Kind Secured 3922 Estimated 106 hours at $37/hr

Personnel - replace roofs & siding, build chemical sheds & equipment storage building, replace domestic water line to host site (ODFW hatchery & district staff)

In-Kind Secured 19116 Estimated 708 hours at $27/hr

Total 23038

Project #: 15-053Elk River Hatchery Maintenance

Page 6 of 9Last Modified/Revised: 2/26/2016 8:07:35 AM

Page 7: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:

Budget

Item Unit Number Unit Cost In-kind or non-cash

contributions

Funding fromother sources

R&E Funds Total Costs

PROJECT MANAGEMENT

Goal 1. Elk River Hatchery Manager 27 37 999 0 0 999Goal 2. Elk River Hatchery Manager 21 37 777 0 0 777Goal 3. Elk River Hatchery Manager 58 37 2146 0 0 2146

SUBTOTAL(1) 3922 0 0 3922IN-HOUSE PERSONNEL

Goal 1. Hatchery + District Staff 184 27 4968 0 0 4968Goal 2. Hatchery + District Staff 140 27 3780 0 0 3780Goal 3. Hatchery + District Staff 384 27 10368 0 0 10368

SUBTOTAL(2) 19116 0 0 19116CONTRACTED SERVICES

Goal 1. Install 3 valves (main, N & S laterals)

0 0 0 0 30800 30800

Goal 2. Install effluent line, 1" water line 0 0 0 0 43600 43600Goal 3. Remove well casings, replace septic+drain field

0 0 0 0 15906 15906

SUBTOTAL(3) 0 0 90306 90306TRAVEL

0 0 0 0 0 0SUBTOTAL(4) 0 0 0 0

SUPPLIES/MATERIALS

Goal 1. Roofing, Siding, Insulation 0 0 0 0 4816 4816Goal 2. Framing, Roofing, Siding, Doors 0 0 0 0 6600 6600Goal 3. Pole Barn, Concrete, Water Line, Fill

0 0 0 0 14540 14540

SUBTOTAL(5) 0 0 25956 25956EDUCATION/OUTREACH

0 0 0 0 0 0SUBTOTAL(6) 0 0 0 0

EQUIPMENT

0 0 0 0 0 0SUBTOTAL(7) 0 0 0 0

FISCAL ADMINISTRATION

0 0 0 0 0 0SUBTOTAL(8) 0 0 0 0

BUDGET TOTAL

23038 0 116262 139300

Project #: 15-053Elk River Hatchery Maintenance

Page 7 of 9Last Modified/Revised: 2/26/2016 8:07:35 AM

Page 8: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:

Project Map

Project #: 15-053Elk River Hatchery Maintenance

Page 8 of 9Last Modified/Revised: 2/26/2016 8:07:35 AM

Page 9: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:

Additional Files

Click a link to view that particular file.

Cost Estimates

Elk River Hatchery Photo

ERH Work Orders

Signature Page

Water Leak

Project #: 15-053Elk River Hatchery Maintenance

Page 9 of 9Last Modified/Revised: 2/26/2016 8:07:35 AM

Page 10: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 11: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 12: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 13: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 14: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 15: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 16: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 17: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 18: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 19: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 20: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 21: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 22: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 23: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 24: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 25: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 26: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 27: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 28: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 29: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 30: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 31: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 32: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 33: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 34: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #:
Page 35: R & E Grant Application Project #: 15-17 Biennium 15-053 · 2016-03-17 · R & E Grant Application 15-17 Biennium Project Information Elk River Hatchery Maintenance Project #: