Backflow Preventer System
For CTS®/ IBO® Hollow Bars
CTS®
The CTS® Preventer is used to install micropiles and tie-back anchors in areas
where water ingress is a distinct possibly, for example in existing or new
basements and underground structures.
By using the Preventer system, dewatering is often not required.
Features and benefits• Allows the installation of micropiles and tie back
anchors without the need for dewatering
• Safe, controlled and efficient installation• Economical installation, when compared to
dewatering
• Simple operating procedures
Typical applications
• Tension micropiles to resist uplift
• Tie-back anchors for secant piled walls,
diaphragm walls and sheet piled walls
• Compression micropiles
Description
The Preventer system is essentially a valve system that is connected to a compressor via an airline. The
system is operated by opening and closed the rubber insert, by applying air pressure to inflate and deflate the rubber insert. When the rubber insert is in the “closed” (inflated) position, it restricts the ingress of water, whilst pressing tight against the micropile/anchor, allowing the installation and grouting to be completed,
The Preventer is fixed securely to the structure prior to commencing the installation. It is removed once the grout has completely cured, exposing the top of the micropile/anchor ready for the head detail to be constructed.
- 2 -
ID
OD
Bar Size
CTS® IBO®
Up to T52
T73 & T103
Type
DN150
DN250
ID
mm
145
250
OD
mm
285
395
L
mm
420
610
Tk
mm
240
350
P max
bar
6
3
Weight
kg
17.5
55
Max Drill bit
mm
130
220
Product Specification
- 3 -
Securing of an Excavation in Vancouver, BC
CTS® Preventer System for Tie-back Anchors
- 4 -
Typical Excavation Support
Closed Preventer Valve
Geotechnical seminar „Installation & Design“ – 10.+ 11.02.2016
Excavation dimensions:
100 x 16 x 26 m
Picture from week 12, 2015
(13 m depth)
Bored pile wall
Tie-backing approx. 7 m
below ground water table
Installation of IBO® T52/26
incl. Preventer System
Piles length is between 14 – 22 m
Approx. 3000 lm
Soil conditions:
Sand and gravel + weathered rock
Geotechnical seminar „Installation & Design“ – 10.+ 11.02.2016
CTS®
Step 1: Core drilling Ø 200 mm
Step 2: Insert flange tube, Tension and pressure resistant, leak proof!
flange tube (with head plate) tube Ø 168,3 mm flange Ø 285 mm
Cement Grout
Geotechnical seminar „Installation & Design“ – 10.+ 11.02.2016
Step 3: Mount preventer
8 x Bolt M20x80 per flange connection
for additional safety eventually use of second preventer
Compressed air max. 6 bar
open closed
Preventer flange: Ø 285 mm inner diameter: 145 mm (special rubber sleeve)
1 x Flange seal DN 150
- 5 -
CTS® Preventer System Installation Steps
Geotechnical seminar „Installation & Design“ – 10.+ 11.02.2016
CTS®
Step 4: Drill down the complete micropile IBO® T52/26 Drill with sufficient drill bit through the concrete, afterwards change Drill bit (to e.g. clay bit) if required Open and close the preventer for flushing
Advice: Do not bear the drill rig against the preventer!
Preventer-pressure should be chosen that to allow some backflow to disappear; approx. 0,5 bar above pressure of ground water
Geotechnical seminar „Installation & Design“ – 10.+ 11.02.2016
CTS®
Step 5: Drilling down the micropile IBO® T52/26 to final depth by using a recoverable extension (CTS® hollow bar with coupling). Loosen the CTS® hollow bar which is inside the preventer and flush with water to clean the preventer. Grease the last section of the CTS® hollow bar which is available for the pile head before installation.
grease
last section
- 6 -
CTS® Preventer System Installation Steps
Geotechnical seminar „Installation & Design“ – 10.+ 11.02.2016
Step 6: Close the preventer with a blind flange Ø285 mm. After curing of the cement, the compressed air of the preventer can be released. Or use our patented rubber stop for immediatere-use of the preventer.
8 x Bolt M20x80 per flange connection
1 x Flange seal DN 150
Blank flange DN 150
Geotechnical seminar „Installation & Design“ – 10.+ 11.02.2016
Step 7: The head construction can be fixed after the cement suspension is fully cured.
Head plate
Spherical collar nut
Geotechnical seminar „Installation & Design“ – 10.+ 11.02.2016
1.) Application – Information: Insert flange tube, tension and pressure resistant, leak proof!
Cement Grout
Prohibited: Leaky inserted flange pipe or incomplete seat of the flange head plate
2.) Application - Information: If there is doubt whether the flange tube is inserted tightly? So a leak test must be carried out!
8 x Bolt M20x80 per flange connection
1 x Flange seal DN 150
1 x Blank flange DN 150 with hose connection
- 7 -
CTS® Preventer System Important Information
Geotechnical seminar „Installation & Design“ – 10.+ 11.02.2016
3.) Application - Information: Preventer Valve
The hand lever valve is connected by a pneumatic hose onto the preventer valve. The preventer valve is supplied
with air pressure of max. 6 bar. Connection plug Quick-release valve
Air pressure
Control: To adjust the pressure
Hand lever valve, 2 positions: Open / Close
Pressure gauge: Show preventer pressure
Geotechnical seminar „Installation & Design“ – 10.+ 11.02.2016
4.) Application – Information: Use fully functioning preventer valves only. The use of inoperable preventer valves is prohibited!
The special rubber sleeve will wear during his use (19 mm wall thickness), if more than half is worn
or if it is damaged or cracked, it must be replaced!
Spare rubber seal is available.
- 8 -
CTS® Preventer System Important Information
Geotechnical seminar „Installation & Design“ – 10.+ 11.02.2016
5.) Application - Saftey indication: Do not reach into the preventer!
6.) Setting for drilling: The preventer pressure has to be setted. A light reflux has to be available. During the drilling the preventer has to be opened and closed for flushing.
Control: To adjust the pressure
- 9 -
CTS® Preventer System Important Information
7.) Setting for drilling: The preventer pressure has to be setted.A light reflux has to be available. Replace spilled ground through thickflushing suspension. Cement
Cement
8.) Setting for drilling: If the Preventer pressure is too high, the rubber sleeve will wear before maturity!
- 10 -
CTS® Preventer System Important Information
9.) Setting during drilling: If the preventer pressure is too low, material will flush out and it comes to soil erosion.
This must be avoided at all costs!
10.) Error: In case of failure, such as if the preventer can not be controlled anymore and material will flow out uncontrolled, the outflow is to stop immediately by mounting a blank flange. Or install the patented rubber stop.The preventer can now be removed and serviced.
8 x Bolt M20 x 80 per flange connection
1 x Flange seal DN 150
Blank flange DN 150
- 11 -
CTS® Preventer System Important Information
Geotechnical seminar „Installation & Design“ – 10.+ 11.02.2016
Protection against uplift TITAN 73 + 103 by using TITAN Preventer System
-
!/ �! IBO® T73 IBO® T103
- 12 -
Micropiles against uplift CTS® / IBO® T73+T103
Excavation pit
concrete slab t = 0,50m (0,75 m)
0.5
0 m
~ 1:10
0.6
0 m
Step 1: Core drilling Ø 200 mm approx. 0,40 m deep
Step 2: Insert flange tube, Tension and pressure resistant, leak proof!
Flange tube (with head plate) tube Ø 273 mm flange Ø 395 mm length: 600 mm
Cement Grout
Preventer Flange: Ø 395 mm Inside: Ø 250 mm
(Special Rubber Sleeve)
12x Bolt M20 Each Flange Connection
1x Flange Seal DN 250 Each Flange Connection
Flange Tube (with Head Plate) Tube: Ø 273 mm
Flange: Ø 395 mm Height: 600 mm
0.5
0 m
~ 1:10
Step 3: Mount preventer
Cement Grout
- 13 -
CTS®/ IBO® T73 + T103 Installation Steps
Slide 26
0.5
0 m
~ 1:10
Step 4: Drill down the complete micropile. Drill with sufficient drill bit through the concrete, afterwards change Drill bit (to e.g. clay bit) if required. Open and close the preventer for
flushing
Advice: Do not bear the drill rig against the preventer!
0.5
0 m
~ 1:10
Step 5: Drilling down the micropile to final depth by using a recoverable extension (CTS® hollow bar with coupling). Loosen the CTS® hollow bar which is inside the preventer and flush with water to clean the preventer. Grease the last section of the CTS® hollow bar which is available for the pile head before installation.
- 14 -
CTS®/ IBO® T73 + T103 Installation Steps
0.5
0 m
~ 1:10
Step 6: Close the preventer with a blind flange. After curing of the cement, the compressed air of the preventer can be released. Or install the patented rubber stop for immediate re-use of the preventer.
0.5
0 m
~ 1:10
Head plate Ø 395x50 mm
Spherical Collar Nut
Step 7: The head construction can be fixed after the cement suspension is fully cured.
- 15 -
TITAN IBO® T73 + T103 Installation Steps
Version: May 2019
CON-TECH HEAD OFFICE
DELTA, BC CANADA
Sept 8
Memberships:
Head Office: Sales & Production:• 8150 River Road,
Delta, B.C., Canada, V4G 1B5Tel: 604-946-5571
Toll Free: 1-888-818-4826Email: [email protected]
Eastern Locations: Sales & Production: • Brockville, ON, Canada
Tel: 613-342-0041• Charlotte, NC, USA Tel:
Tel: 704-494-3989
Toll Free: 1-888-818-4826Email: [email protected]
Western Locations: Sales & Production Plant:• 3736 South Tacoma Way,
Tacoma, WA, 98409, USATel: 253-237-9008
Toll Free: 1-888-818-4826Email: [email protected]