r. v. apshankar [email protected] energy systech pune case studies on furnace insulation

12
R. V. APSHANKAR [email protected] ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION

Upload: bernadette-powell

Post on 24-Dec-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION

R. V. [email protected]

ENERGY SYSTECHPUNE

CASE STUDIES ON FURNACE INSULATION

Page 2: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION

INTRODUCTION TO

ENERGY SYSTECH

• MELTING & HOLDING FURNACES – ELECTRICAL AND FUEL-FIRED

• HEAT TREATMENT FURNACES FOR ALUMINIUM CASTINGS (DROP QUENCH SOLUTION ANNEALING)

• DEGASSING MACHINES FOR ALUMINIUM MELT• DENSITY TESTING MACHINES FOR GAS

DETERMINATION

SERVICE TO THE ALUMINIUM CASTING INDUSTRY

Page 3: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION

CASE STUDY ON ALUMINIUM HOLDING

FURNACE• ALUMINIUM HOLDING FURNACE IN A

LEADING FOUNDRY IN PUNE• CRUCIBLE-TYPE: CAPACITY 300 kg AL• PREVIOUS INSULATION: INSULATION

BRICK• PREVIOUS CONSUMPTION: 350 kWh /

DAY• NEW INSULATION: CERAMIC FIBRE

BOARD• NEW CONSUMPTION: 240 kWh / DAY• ANNUAL SAVING : RS 1,60,000 (YEAR

1999-2000)

• PAYBACK PERIOD: LESS THAN 6 MONTHS

• 22 FURNACES!!

Page 4: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION

BENEFITS

• LOWER ENERGY BILLS• LOWER AMBIENT TEMPERATURES ->

BETTER WORK ENVIRONMENT• BETTER TEMPERATURE CONTROL• LOWER CONNECTED LOAD (MAX

DEMAND CHARGES)• POSSIBILITY OF CAPACITY EXPANSION• LONG LIFE OF INSULATION

Page 5: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION

DESIGN ASPECTS

• INSULATION MOUNTING - ANCHORING, ETC

• SEALING OF THE FURNACE• MECHANICAL WARPING-PROOF

DESIGN• LOAD SUPPORT (BOTTOM BRICKS)• MOUNTING OF HEATERS• LIMITATIONS ON FUEL-FIRING

CERAMIC FIBRE BLANKETS & BOARDS

Page 6: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION

ELECTRICALLY-HEATED CRUCIBLE FURNACE

Page 7: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION

RESISTANCE HEATED

INDUCTION

ENERGY SOURCES

SOLID LIQUID GAS

ELECTRICAL FUEL-FIRED

Page 8: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION

EFFICIENCY OF FURNACES RELATED TO

LOSSES

Heat Balance of a Furnace

Page 9: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION

LIGHT OIL FIRED CRUCIBLE FURNACE

Page 10: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION

DIESEL-FIRED ALUMINIUM MELTING-CUM-HOLDING

FURNACE

• HEAT RECUPERATION FROM FLUE GASES• AUTOMATIC BURNER => ON-OFF TEMP.

CONTROL• LOW THERMAL MASS => QUICK START UP• ADVTGS OF INGOT PREHEATING

Page 11: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION