r. v. apshankar [email protected] energy systech pune case studies on furnace insulation
TRANSCRIPT
![Page 2: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION](https://reader036.vdocument.in/reader036/viewer/2022082505/56649dc55503460f94ab8c8d/html5/thumbnails/2.jpg)
INTRODUCTION TO
ENERGY SYSTECH
• MELTING & HOLDING FURNACES – ELECTRICAL AND FUEL-FIRED
• HEAT TREATMENT FURNACES FOR ALUMINIUM CASTINGS (DROP QUENCH SOLUTION ANNEALING)
• DEGASSING MACHINES FOR ALUMINIUM MELT• DENSITY TESTING MACHINES FOR GAS
DETERMINATION
SERVICE TO THE ALUMINIUM CASTING INDUSTRY
![Page 3: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION](https://reader036.vdocument.in/reader036/viewer/2022082505/56649dc55503460f94ab8c8d/html5/thumbnails/3.jpg)
CASE STUDY ON ALUMINIUM HOLDING
FURNACE• ALUMINIUM HOLDING FURNACE IN A
LEADING FOUNDRY IN PUNE• CRUCIBLE-TYPE: CAPACITY 300 kg AL• PREVIOUS INSULATION: INSULATION
BRICK• PREVIOUS CONSUMPTION: 350 kWh /
DAY• NEW INSULATION: CERAMIC FIBRE
BOARD• NEW CONSUMPTION: 240 kWh / DAY• ANNUAL SAVING : RS 1,60,000 (YEAR
1999-2000)
• PAYBACK PERIOD: LESS THAN 6 MONTHS
• 22 FURNACES!!
![Page 4: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION](https://reader036.vdocument.in/reader036/viewer/2022082505/56649dc55503460f94ab8c8d/html5/thumbnails/4.jpg)
BENEFITS
• LOWER ENERGY BILLS• LOWER AMBIENT TEMPERATURES ->
BETTER WORK ENVIRONMENT• BETTER TEMPERATURE CONTROL• LOWER CONNECTED LOAD (MAX
DEMAND CHARGES)• POSSIBILITY OF CAPACITY EXPANSION• LONG LIFE OF INSULATION
![Page 5: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION](https://reader036.vdocument.in/reader036/viewer/2022082505/56649dc55503460f94ab8c8d/html5/thumbnails/5.jpg)
DESIGN ASPECTS
• INSULATION MOUNTING - ANCHORING, ETC
• SEALING OF THE FURNACE• MECHANICAL WARPING-PROOF
DESIGN• LOAD SUPPORT (BOTTOM BRICKS)• MOUNTING OF HEATERS• LIMITATIONS ON FUEL-FIRING
CERAMIC FIBRE BLANKETS & BOARDS
![Page 6: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION](https://reader036.vdocument.in/reader036/viewer/2022082505/56649dc55503460f94ab8c8d/html5/thumbnails/6.jpg)
ELECTRICALLY-HEATED CRUCIBLE FURNACE
![Page 7: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION](https://reader036.vdocument.in/reader036/viewer/2022082505/56649dc55503460f94ab8c8d/html5/thumbnails/7.jpg)
RESISTANCE HEATED
INDUCTION
ENERGY SOURCES
SOLID LIQUID GAS
ELECTRICAL FUEL-FIRED
![Page 8: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION](https://reader036.vdocument.in/reader036/viewer/2022082505/56649dc55503460f94ab8c8d/html5/thumbnails/8.jpg)
EFFICIENCY OF FURNACES RELATED TO
LOSSES
Heat Balance of a Furnace
![Page 9: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION](https://reader036.vdocument.in/reader036/viewer/2022082505/56649dc55503460f94ab8c8d/html5/thumbnails/9.jpg)
LIGHT OIL FIRED CRUCIBLE FURNACE
![Page 10: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION](https://reader036.vdocument.in/reader036/viewer/2022082505/56649dc55503460f94ab8c8d/html5/thumbnails/10.jpg)
DIESEL-FIRED ALUMINIUM MELTING-CUM-HOLDING
FURNACE
• HEAT RECUPERATION FROM FLUE GASES• AUTOMATIC BURNER => ON-OFF TEMP.
CONTROL• LOW THERMAL MASS => QUICK START UP• ADVTGS OF INGOT PREHEATING
![Page 11: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION](https://reader036.vdocument.in/reader036/viewer/2022082505/56649dc55503460f94ab8c8d/html5/thumbnails/11.jpg)
THANKYOU
![Page 12: R. V. APSHANKAR info@energysystech.com ENERGY SYSTECH PUNE CASE STUDIES ON FURNACE INSULATION](https://reader036.vdocument.in/reader036/viewer/2022082505/56649dc55503460f94ab8c8d/html5/thumbnails/12.jpg)