r v f q o Ö w f ' f ü n ]4½ Ó1 É.3 w c. o ¨&³ t -Р· kawa kayan thongwa thanlyin kyauktan...

113
㪡㪩 ၮ⋚ 㪈㪌㪄㪇㪉㪋 ࡑࡦࡖࡒࡦࡗ㒽᳓ㆇᣉ⸳ ᡷ⺞ᩏ ᐔᚑ ᐕ ⁛┙ⴕᴺ ࿖㓙දജᯏ᭴ ,+%# ৻⥸⽷࿅ᴺ ࿖㓙⥃ᶏ㐿⊒⎇ⓥ࠲ࡦ ࡑࡦࡖࡒ࿖ㆇャ⋭ ࡑࡦࡖࡒ ḧ␠ 㒽᳓ㆇ␠ ᦨ⚳ႎ๔

Upload: others

Post on 05-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Gulf of Mottama(also: Gulf of Martaban)

    Sat ThwarDoe Tan

    Plyin Ma KhonGwa

    Da Ni

    Thar Paung Lay

    Hpan Khar Pin

    Myaung Hmaw

    Ah Nan Kone

    Thabaung

    Zin Pyun KoneBei Ga Yet Gyi

    Tha Yet Kone

    Ywar Thit Paik Tan

    Ah Gat

    Sat Hltone

    Sin Tar

    Kyee Chaung

    Ka Nyin Kone (S/N)

    Myin Ka Seik

    Hlwa Zin Kone

    Kan Gyi

    Ta Zin

    Kun Thee Taw

    Ta Zine Kone

    Taung Ka Lay Htone Bo

    Kyaung Su

    Da Yei Bauk

    Leik Ka Bar

    Hpa Yar Gyi Su

    Sar Hpyu Su

    Kyar Chaung

    Ma Yan Kone

    Pyaung Pyan

    San GyiMa Gyi Pin

    Nga Pye Ma (U/L)

    Hpa Yar Hla (N/S)

    Thet KeiThaung

    Oke Kan

    Thin Gan gyi

    Sa Lu Seik

    Seik Gyi

    Kone Gyi

    Bi Tut

    Thin Gan Kone

    Bo Kone

    Da None

    Kyet Shar

    Htaung Paing

    Ma YanSeik Ma

    Myo Kone

    La Mu Gyi

    Ah Wa Myei

    Kyon Ka Dun

    Ah Hpaung

    Taw Chaik

    Ah Lel

    Twa Chaung

    Kawhmu

    Hpa Yar Gyi

    Kha Yan Gyi

    Ga Lone

    War Taw

    Ah Lel ChaungWei Daunt

    Inn Ma

    Ah Kwi

    Shwe Pan Kone

    Ah Hltaung

    Ka Ni Su

    Jone Jone Kya

    Aing ZaukAh Lel Su

    Aung Sa Kwin

    Lemyethna

    Gyo Kone

    IngapuKha Mon Seik

    Thar Ra Waw

    Daunt Gyi

    Da Nu Bay Ywar Ma

    Hle Lan Ku

    Dawei

    Zaung Tu

    Baw Ni

    Kyaik Sa Kaw (E)

    Moke Shit Wa

    Taw Sun

    Auk Ta Kei

    Ah Du

    Taw GyiLay Ein Su

    Nyaung Kone

    Ah Laing Ni

    Gwayt tan Shey

    Hltone Gyi

    Aye

    Day Zat

    Thu Htay Kwin

    Ah Lun Zoke

    Kan PyaungKyauktan

    Mee PyaShan Chaung

    Ah Se

    Ka Dat Pa Na

    Thongwa

    Daunt Gyi

    Aung Thar

    Yae Kyaw

    Tha Ma Seik Ta

    Ma Har MeikThar Ga Ya

    Oke Kan Ywar Ma

    Min Hla Wa

    Inn Kan

    Inn Tan

    Daunt Gyi

    Kyauk Taing

    Ta Pe Ka Lar

    Kin Pa Ti

    Dan Mi

    Daw Tha Yaw

    Ah Nauk Chin Kwin

    Aing Ma

    Hnget Gyi Taung

    Thea Kone Tan

    Ah Se

    Kyone Ma Ngay

    Po Laung

    Pyin Kha YaingWar Kone

    Lel Taw

    Zee Chaing

    Sa Par Kyi

    Kyar Ni Kan

    Wet Gyi Kwin

    Gway Kone

    Ah Pin Hnit Se

    Gon Hnyin Tan

    Twan Tay

    Kyaik Kaw

    Daik-U

    Hpaung Taw Thi

    Thaik Tu Kone

    Hpa Yar Gyi

    Thanatpin

    Ka Mar Sei

    Ohn Hne

    Thet Ka La

    Kayan

    Thanlyin

    Mingaladon

    Dar Pein (S)

    Sat Thwar Taw

    Hmawbi Hlegu

    Taikkyi

    Thayarwady

    Letpadan

    Danubyu

    Nyaungdon

    Pantanaw

    Dedaye

    Kangyidaunt

    Kyaunggon

    Ah Thoke

    Pyaw Bwe Gyi

    Waw

    Kanbet

    Maubin

    BAGO

    GWAGWAGWA

    INGAPUINGAPUINGAPU

    HINTHADAHINTHADAHINTHADA

    ZALUNZALUNZALUNTAIKKYITAIKKYITAIKKYI

    DAIK-UDAIK-UDAIK-U

    BAGOBAGOBAGO WAWWAWWAW

    THANATPINTHANATPINTHANATPIN

    HLEGUHLEGUHLEGUHMAWBIHMAWBIHMAWBI

    HTANTABINHTANTABINHTANTABIN

    TWANTAYTWANTAYTWANTAY

    KAWHMUKAWHMUKAWHMU

    KUNGYANGONKUNGYANGONKUNGYANGON

    KAWAKAWAKAWA

    KAYANKAYANKAYAN

    THONGWATHONGWATHONGWA

    THANLYINTHANLYINTHANLYIN

    KYAUKTANKYAUKTANKYAUKTAN

    LETPADANLETPADANLETPADAN

    THAYARWADYTHAYARWADYTHAYARWADY

    LEMYETHNALEMYETHNALEMYETHNA

    YEGYIYEGYIYEGYI

    THABAUNGTHABAUNGTHABAUNG

    KYAUNGGONKYAUNGGONKYAUNGGON

    EINMEEINMEEINMEPATHEINPATHEINPATHEIN

    NGAPUDAWNGAPUDAWNGAPUDAW MYAUNGMYAMYAUNGMYAMYAUNGMYA

    WAKEMAWAKEMAWAKEMA

    MAWLAMYINEGYUNMAWLAMYINEGYUNMAWLAMYINEGYUN

    LABUTTALABUTTALABUTTA

    KYONPYAWKYONPYAWKYONPYAW

    DANUBYUDANUBYUDANUBYU

    NYAUNGDONNYAUNGDONNYAUNGDONPANTANAWPANTANAWPANTANAW

    MAUBINMAUBINMAUBIN

    KYAIKLATKYAIKLATKYAIKLAT

    DEDAYEDEDAYEDEDAYE

    PYAPONPYAPONPYAPONBOGALEBOGALEBOGALE

    RAKHINESTATE

    RAKHINESTATE

    RAKHINESTATE BAGO WEST

    DIVISIONBAGO WEST

    DIVISIONBAGO WEST

    DIVISION

    BAGO EASTDIVISION

    BAGO EASTDIVISION

    BAGO EASTDIVISIONYANGON

    DIVISIONYANGONDIVISIONYANGONDIVISION

    AYEYARWADY

    DIVISION

    AYEYARWADY

    DIVISION

    AYEYARWADY

    DIVISION

    Pyapon

    Hinthada

    Ngathaingchaung

    Kyaiklat

    Bogale

    Mawlamyinegyun

    PATHEIN

    Myaungmya

    Labutta

    Hainggyikyun

    Kyarkan

    Wakema

    Kyon Ma Ngay

    Einme

    Shwe Laung

    YANGON

    94°30'0''E

    17°3

    0'0'

    'N17

    °0'0

    ''N16

    °30'

    0''N

    16°0

    '0''N

    17°3

    0'0'

    'N17

    °0'0

    ''N16

    °30'

    0''N

    16°0

    '0''N

    95°0'0''E 95°30'0''E 96°0'0''E 96°30'0''E

    94°30'0''E 95°0'0''E 95°30'0''E 96°0'0''E 96°30'0''E

    Major Landing Stations of IWT

    State\Division Capital

    Main Town

    Other Town

    International Airport

    Domestic Airport

    International Port

    State/Region Boundary

    Township Boundary

    Railway

    Road

    Main Inland Waterway Route

    Legend

    Scale10 20 30 40 50 km0

    N

    China

    Thailand

    Laos

    Vietnam

    Cambodia

    Bangladesh

    Bhutan

    Malaysia

    Maypyidaw

    Yangon

    MYANMARMYANMAR

    調査対象地域の

    内陸水運主要港

    および

    航路位置図

  • BM 59007

    BM

    BM

    BM

    BM

    BM

    BM

    BM

    BM

    1011

    1213

    12

    34

    56

    78

    9

    22232425

    2627

    2829

    3031

    3233

    34353637

    1415161718192021

    YangonInternational

    Airport

    YangonInternational

    Airport

    Geodetic station

    Dock yard

    Survey Dept.

    Yangon Central RS

    IBC

    YIT

    MPF

    GTC

    Estate

    MRTV

    NationalStadium No.1

    Mingalardon

    DALLA

    MITT

    Shwepyithar

    Mayangon

    Hlaing

    Sanchaung

    Kamayut

    Bahan

    Dagon

    Lanmadaw

    AhlonePabedan

    Latha

    Kyauktada

    Seikkan

    Pazundaung

    Botataung

    Thaketa

    Dawbon

    Thingangyun

    South Okkalapa

    Dagonmyothit(North)

    Yankin

    Seikkyikanaungdo

    Kyimyindaing

    Hlaingtharyar

    North Okkalapa

    Insein

    Mingalataungnyunt

    Tarmway

    Dagonmyothit(East)

    Dagonmyothit(South)

    Dagonmyothit(Seikkan)

    Kyimyindaing

    Dagonmyothit(East)

    Dagonmyothit(Seikkan)

    Dagonmyothit(South)

    Taw kyaik

    Ma yan

    Myauk su

    Taw paung sein

    Kyun bin

    Ale kyun

    Taw pa lweKya dan

    Oak aw lan

    Byu gyaung

    Htan daw

    Shan gan

    Toe kwin

    Bo te gon

    Khon hnet ein dan

    INYA LAKE

    KAN DAW GYI LAKE

    Tama t

    a kaw

    C

    Lat that Y

    To gya

    ung ga

    lay C

    Kyaik ka san C

    Bogyok C

    Ko po C

    Ta gu gyan C

    Ata

    ik y

    o C

    U pe yo

    Da

    niyo

    C

    In k

    yan

    C

    Kun

    ta C

    Letpan

    binC

    Tam

    an

    gyiC

    Tadagki Y

    Yab aukkyi C

    Nga moe ye

    ik C

    TWA NTE C A

    NA

    L

    PAZUNDAUNG C

    Ka naung do

    Creek

    S hwe lin bam C

    HLAING

    RIVER

    Ky it

    an Y

    Phyat lan Y

    Sin pon C

    Alat C

    Wela C

    Let p

    an gw

    a C

    Htone

    C

    Min ga iun C

    Nyaung C

    Su la kan C

    Pa ya C

    BalaC

    Pet inn C

    Ht

    ainhn

    api

    nC

    Yewe

    C

    Sobo

    nC

    Lwin

    gyi C

    Kaka

    iuC

    Kon

    yw

    a C

    Gya

    ung

    wi

    ne

    Yeng

    anY

    Thaungg

    yi C

    Kasin C

    Kon daing C

    Kaw

    hmu

    C

    Apyauk C

    Sa daing mut C

    Yan

    gon

    bauk

    C

    Shit pe C

    Pa ya gyi C

    Let p

    an go

    n C

    Ohn bin C

    Kyaik tha l

    e C

    Pein

    ne go

    n C

    Ywa dan she

    C

    Ta da C

    Seik gyi C

    Ayun

    zok

    C

    Pa ya gyi C

    Nyau

    ng le

    bin

    C

    Kun gyan gon C

    Myauk C

    Let kaik C

    Ka bin Y

    Kyon da ye C

    Tan

    ma

    nain

    g C

    Ano gyaung CYe b

    yu dwin C

    Htan ma naing C

    Chaung gauk C

    Tha kut pin (B asse

    in) Cre

    ek

    Ka ma aun

    g

    Pyaw bwe C

    Kha ya C

    Po

    mau

    ng C

    In ga bo Y

    Ko daun C

    Le b

    o C

    Ma-e-myaung C

    Htaw auk

    C

    Nyan gyaung C

    YANGON RIVER

    Ka wet C

    Chaung gyi C

    Taw kha yan

    C

    Taw

    ku

    C

    Hnget kyi daung C

    Nyaun

    g bin

    C

    Pa kauk C

    Kya bin gan C

    Sapa

    gan

    C

    Let kalk C

    Da y e lu

    C

    Taw

    dun

    C

    Kyo

    ngya

    n C

    Ale gya u ng C

    Ze po thwe ga le C

    Ze po thwe ga le C

    Taung gon C

    Sa g

    yin C

    Dat taw C

    Minga lun C

    Ye ng

    an C

    Taw

    pa lw

    e C

    Thon

    gw

    a C

    Tha

    kut p

    in C

    TOE RIVER

    Tawthur C

    Nga pa C

    We gyi Y

    Ninbaing C

    Kamon C

    Myoyo C

    Be in daw C

    Aie

    ywa C

    Ma

    so Y

    Towthur C

    Baw C

    Kondan C

    Kamataw Y

    Thon gwa C

    La ha

    yet C

    Min gyaung C

    Pet let Yo

    Min ga lun Y

    Hle la

    n Yo

    Nyaun

    g ni C

    Ma gyi gan C

    Win yo C

    Min we C

    Ka wet C

    Maung m

    a ga le Y

    Pauk

    pin C

    Win ka

    ni C

    Maung m

    a C

    Ba yet C

    Win

    gau

    k C

    Ka yan C

    Pa gan

    daung

    C

    Baw C

    BAGO

    R

    IVER

    BAGO

    R I VE R

    Kayin

    gyaun

    g C

    Kan byaung C

    Ye-nwe C

    Pyin ma gan C

    Hie

    Yo

    Zwe ka na C

    Kyon pe C

    Kayat C

    Pa lan C

    Shwe by

    auk C

    Seikgyi C

    Myoyo C

    Thon

    gw

    a Y

    Pa-aung gyi Y

    Pi la kat C

    Da min zeik C

    Ka ia ma C

    Baw ka lut C

    Ka lauk swe C

    San di CChaung bya C

    Ase-m

    in ga lun C

    Kam

    akan

    a C

    Ka ma ian C

    Kon d

    an C

    Kya gan C

    Aingnla Y

    Kaw d

    un C

    Kam

    apayon C

    Ka ma ka lok Y

    Kyon don C

    San di

    C

    Kya win C

    Sin m

    a kaw C

    Be in daw C

    Kunhnl C

    Tu myaung C

    Pa da gyi C

    Ayun zok C

    SIN KAN LAKE

    Ta taik cha

    ung

    Hmaw wun

    C

    Ka naung C

    Hmaw wun C

    Pi la kat C

    Taw ka laik C

    Pa

    kauk C

    YANGON RIVER

    Y A N G O N R I V E R

    HLAING RIVER

    PANHLAING RIV E R

    Twan te Ca

    nal

    Za Ma Ni Dam

    Thi la wa Dam

    Ban bwe gon Dam

    2.0

    3.0

    6.4

    1.3

    4.1

    3.3

    3.2

    2.5

    1.6

    3.7

    3.7

    3.5

    2.63.3

    3.1

    2.4

    1.9

    1.7

    0.32.1

    0.8

    4.0

    2.8

    1.9

    2.0

    5.3

    3.1

    5.5

    3.8

    2.9

    3.5

    3.2

    6.5

    4.7

    4.2

    4.7

    4.5

    2.0

    5.2

    4.6

    3.0

    3.7

    4.5

    3.5

    2.4

    2.8

    1.5

    2.1

    1.9

    1.1

    1.1

    1.4

    2.9

    3.1

    2.5

    2.3

    2.7

    0.9

    1.7

    1.2

    2.1

    2.2

    2.2

    3.0

    3.0

    3.12.4

    3.8

    2.3

    2.7

    1.6

    3.5

    2.3

    3.0

    2.5

    3.1

    2.7

    4.2

    3.1

    1.9

    0.4

    12.6

    9.9

    25.9

    28.0

    20.4

    24.0

    27.3

    14.3

    19.0

    14.4

    26.5

    16.9

    12.0

    4.0

    2.5

    2.6

    4.7

    7.1

    4.8

    8.8

    12.6

    6.6

    3.6

    3.3

    3.2

    4.6

    4.8

    15.3

    24.2

    3.7

    4.8

    4.4

    3.5

    4.9

    5.2

    4.4

    1.1

    3.6

    2.1

    2.5

    3.1

    2.8

    4.5

    3.2

    4.5

    4.2

    4.8

    6.5

    2.7

    1.0

    4.03.0

    3.7

    3.2

    3.7

    4.7

    3.2

    1.6

    3.1

    2.1

    3.3

    3.8

    4.0

    3.2

    5.4

    4.54.83.4

    2.8

    2.9

    2.1

    1.1

    2.5

    2.4

    3.9

    4.5

    21.2

    8.0

    3.0

    1.6

    2.9

    5.7

    5.03.5

    5.9

    5.2

    5.3

    4.1

    5.0

    4.6

    4.8

    5.4

    10.3

    3.2

    3.7

    4.0

    4.6

    4.6

    4.6

    6.9

    4.9

    8.3

    5.5

    4.33.7

    4.03.0

    3.6

    3.8

    3.96.3

    4.4

    6.1

    4.2

    2.2

    11.0

    18.07.7

    8.5

    14.7

    22.4

    22.4

    16.0

    8.7

    3.92.8

    6.3

    5.2

    5.3

    4.8

    5.0

    2.2

    4.2

    4.8

    3.6

    4.5

    6.3

    4.5

    1.4

    23.4

    20.7

    29.2

    26.7

    19.7

    14.5

    13.2

    14.5

    7.43.2

    5.7

    9.6

    4.7

    1.4

    0.5

    2.0

    2.2

    1.9

    4.0

    3.6

    6.6

    2.32.3

    4.8

    3.7

    2.6

    2.5

    2.3

    4.8

    5.5

    5.7

    4.5

    2.9

    2.8

    1.8

    2.4

    3.92.2

    4.3

    1.8

    4.1

    3.9

    14.3

    2.7

    6.8

    9.7

    10.9

    18.3

    14.2

    31.9

    26.3

    0.9

    2.6

    2.0

    3.9

    3.2

    2.4

    3.0

    4.2

    5.2

    4.5

    3.1

    2.5

    4.7

    6.3

    22.0

    1.1

    1.5

    1.7

    1.3

    1.6

    1.8

    0.70.6

    1.51.4

    1.7

    0.6

    1.2

    1.6

    1.7

    0.6

    1.8

    1.7

    1.8

    1.6

    0.8

    1.1

    1.6

    1.5

    1.3

    1.7

    1.2

    4.4

    4.4

    2.0

    3.3

    2.3

    2.4

    2.5

    3.2

    2.7

    4.5

    3.5

    5.0

    6.0

    5.3

    5.4

    6.3

    5.4

    6.3

    7.7

    7.9

    8.0

    1.8

    4.5

    2.8

    2.6

    2.1

    3.4

    1.9

    2.4

    2.0

    2.1

    2.5

    1.9

    2.9

    2.9

    3.1

    2.1

    2.5

    2.5

    2.3

    2.6

    2.3

    2.0

    1.9

    2.2

    1.9

    2.4

    2.5

    2.6

    1.9

    1.9

    3.0

    3.3

    2.7

    3.1

    2.9

    2.7

    3.5

    4.0

    4.8

    4.3

    3.8

    3.5

    4.0

    3.5

    3.5

    4.6

    4.7

    3.6

    4.1

    3.8

    3.7

    4.5

    2.2

    2.3

    2.6

    2.2

    2.0

    2.6

    2.0

    2.6

    2.4

    2.3

    2.4

    2.4

    2.9

    3.0

    3.1

    2.9

    3.4

    3.2

    2.7

    2.7

    2.6

    2.5

    3.3

    2.7

    3.3

    3.4

    2.0

    2.2

    1.9

    2.6

    2.5

    2.7

    3.5

    3.3

    3.1

    2.9

    2.7

    3.9

    3.9

    4.0

    3.5

    4.0

    3.7

    3.9

    4.4

    4.5

    4.9

    4.5

    3.5

    4.7

    3.8

    4.1

    4.2

    3.7

    3.6

    4.1

    5.8

    5.2

    6.2

    7.3

    1.6

    1.6

    1.0

    1.4

    1.1

    1.6

    1.3

    1.5

    1.2

    1.8

    1.7

    1.7

    2.5

    1.9

    2.6

    3.2

    2.4

    2.0

    2.9

    2.8

    3.1

    3.2

    3.4

    2.9

    3.1

    3.2

    3.0

    2.2

    2.2

    2.6

    3.2

    2.5

    2.3

    2.9

    3.3

    3.3

    4.5

    3.8

    3.8

    4.0

    3.6

    3.7

    3.8

    4.5

    4.9

    4.4

    4.8

    4.3

    4.4

    5.4

    5.4

    12.1

    8.8

    8.9

    10.6

    11.6

    11.2

    14.1

    20.5

    21.2

    20.9

    16.6

    18.8

    16.1

    26.6

    22.6

    24.6

    24.5

    23.6

    28.2

    29.0

    28.8

    29.1

    31.0

    31.3

    32.6

    34.0

    35.1

    36.3

    42.3

    9.0

    3.8

    4.2

    4.0

    7.2

    5.8

    3.4

    3.9

    3.3

    13.94.1

    3.1

    3.9

    3.9

    3.72.8 3.0

    4.24.0

    4.0

    4.14.7 3.7

    3.44.5

    2.8 2.6

    2.9

    3.2

    3.3

    4.1

    4.8

    3.2

    5.14.0

    3.7

    4.6

    4.9

    3.4

    3.5

    3.2

    3.4 2.0

    3.2

    1.5

    2.7

    3.2

    2.9 3.9

    3.6

    2.5

    2.1

    1.7

    3.0

    3.3

    5.3 3.53.4

    3.43.2

    2.62.9

    1.12.2

    1.2

    1.4

    1.31.5

    2.9 2.8

    2.63.0 3.0 2.8

    1.62.4

    0.70.3

    4.1

    1.6 1.3

    1.31.1 0.7 1.4

    0.91.51.3

    1.4

    1.1

    2.9

    4.9

    1.6

    4.5

    1.6

    3.0

    2.2

    3.8

    2.1

    4.0

    0.7

    2.8 4.3

    3.6

    3.7

    2.8

    4.1

    3.7

    4.3

    3.4

    1.7

    2.1

    2.6

    2.2

    1.4

    2.3

    2.9

    2.2

    1.9

    2.7

    3.6

    3.4

    3.3

    4.3

    4.8

    3.9

    3.6

    2.1

    3.5

    4.1

    2.52.7

    4.3

    4.2 4.3

    1.6

    3.8

    3.9

    3.1

    2.2

    4.1

    1.4

    3.3

    3.8

    3.3

    1.4

    3.1

    4.6

    4.8

    4.3

    4.1

    4.5

    4.8

    2.2

    3.1

    3.6

    3.8

    1.5

    1.7

    3.8

    4.4

    4.8

    2.0

    4.0

    2.0

    2.8

    4.3

    3.3

    4.1

    2.9

    2.5

    2.8

    4.7

    3.6

    4.2

    3.9

    3.2

    3.3

    2.6

    3.5

    2.5

    2.6

    2.2

    0.8

    3.73.7

    2.9

    2.7

    2.0

    1.3

    1.2

    4.2

    2.6

    4.2

    4.6

    4.8

    3.8

    0.5

    1.2

    1.6

    4.0

    5.7

    5.5

    3.5

    2.2

    4.7

    4.2

    3.7

    2.9

    3.5

    3.6 2.6

    1.50.4

    0.7

    1.3

    4.5 3.4

    4.2

    5.3

    4.4

    4.9

    2.0

    2.8

    2.2

    2.8

    2.4

    3.3

    3.85.7

    5.8

    4.8

    3.7

    2.4

    2.7

    4.2

    5.0

    24.3

    23.3

    3.7

    2.1

    3.8

    4.0

    2.8

    4.0

    3.7

    3.9

    3.7

    5.51.2

    1.1

    2.2

    2.6

    3.1

    5.2

    3.0

    3.2

    1.7

    3.3

    3.2

    3.2

    2.6

    3.03.5

    4.8

    5.3

    4.9

    2.5

    1.6

    24.6

    1.5 2.5

    1.3

    1.4

    1.0

    1.1

    3.0

    3.1

    0.6

    0.9

    1.4

    1.1

    13.7

    22.5

    25.6

    9.2

    6.0

    6.0

    1.9

    3.8

    2.3

    1.9

    1.2

    3.9

    2.0

    3.5

    3.8

    1.5

    1.0

    3.3

    2.2

    3.7

    2.8

    2.3

    0.4

    1.6

    3.8

    8.012.8

    21.9

    12.7

    2.6

    4.5

    5.3

    2.8

    6.5

    1.99.9

    22.9

    16.7

    25.9

    3.3

    1.1

    2.2

    3.6

    2.4

    2.94.2

    2.8

    1.6

    1.9

    2.4

    1.92.0

    0.9

    4.5

    3.9

    1.1

    3.8

    2.6

    2.1

    1.1

    2.92.6

    3.9

    2.1

    2.1

    2.7

    1.7

    0.9

    1.4

    3.9

    2.3

    3.0

    1.9

    4.2

    4.2

    2.6

    2.1

    3.9

    2.1

    4.9

    4.3

    2.9

    3.7

    2.7

    3.5

    6.2

    4.6

    6.6

    3.3

    3.6

    4.7

    10.28.15.4

    1.5 5.0

    4.5

    4.7

    4.5

    3.44.4

    3.6

    4.4

    4.6

    3.3

    3.1

    2.6

    2.8

    4.9

    3.6

    1.3

    3.2

    1.0

    3.2

    3.7

    2.8

    4.3

    3.31.5

    4.7

    4.7

    1.9

    2.2

    2.7

    2.0

    0.8

    3.5

    3.7

    2.7

    2.1

    1.4

    4.8

    1.5

    2.3

    2.2

    1.6

    1.7

    2.9

    5.2

    3.1

    1.5

    3.1

    3.0

    0.9

    1.9

    5.4

    4.3

    1.9

    3.2

    1.3

    3.3 1.2

    0.6

    1.0

    3.2

    1.7

    0.8

    2.3

    1.0

    1.5

    1.3

    1.0

    1.2

    1.4

    1.1

    1.0

    1.4

    1.7

    1.3

    1.3

    1.2

    1.3

    1.5

    1.3

    1.4

    1.3

    1.3

    1.5

    1.61.6

    1.21.6

    1.9

    1.9

    2.0

    2.02.1

    2.2

    2.1

    2.2

    2.3

    2.5

    2.5

    2.6

    2.6 2.6

    2.7

    2.7

    2.9

    3.0

    2.9

    3.3

    4.3 3.4

    5.5

    GULF OF MOTTAMA

    MYET SEIN KYUN

    KYUN GYA

    YELE KYUN

    KYUN GYA

    MYET SEIN KYUN

    Creek Point

    Entail Point

    Elephant Point

    Rattery Point

    Than lyin Point

    Bago Point

    Monkey Point

    Thi la wa Jetty

    Thi la wa Jetty

    Ferry

    Ferry

    Ferry

    Ferry

    Ferry

    Ferry

    Ferry

    Ferry

    Ferry

    Ferry

    Ferry

    Ferry

    Ferry

    10

    20

    10

    10

    20

    10

    10

    20

    30

    20

    10

    5

    5

    30

    5

    5

    5

    5

    5

    5

    10

    10

    10

    5

    5

    5

    10

    5

    5

    5

    5

    52020

    10

    20

    20

    5

    10

    5

    5

    5

    5

    5

    5

    5

    5

    5

    5

    5

    55

    5

    5

    5

    5

    5

    25

    25

    5

    5

    25

    15

    15

    15

    5

    5

    5

    5

    5

    5

    5

    5

    5

    5

    15

    5

    25

    5

    5

    5

    5

    5

    20

    20

    20

    20

    10

    10

    30

    20

    20

    20

    20

    20

    20

    20

    10

    10

    10

    10

    10

    10

    10

    10

    10

    10

    10

    10

    20

    10

    15

    15

    25

    35

    35

    25

    25

    25

    5

    5

    5

    5

    5

    15

    15

    15

    15

    15

    15

    5

    5 10 15

    10 515

    5

    5

    5

    5

    55

    5

    5

    30

    5

    5

    5

    5

    10 10

    10

    10

    10

    5

    5

    5

    5

    5

    5

    10

    5

    5

    5

    5

    Shwe p

    yi tha

    Bridge

    Ba yint n

    aung Br

    idge

    Aung ze y

    a Bridge

    Yangon-Than Lyin Bridge

    Wa ta ya ashe

    Wa ta ya anauk

    Ye dwin gon

    Deik kon

    Ya kaing yo gyiAle ywa

    Htein gon

    Tu gyaung

    Kha yan wa

    Kha yan gyi

    Kha lauk chaik

    Wa yon zeik

    Kha yan ga lay

    Ta man gyiAlat chaung

    Gyaung waing

    Kyun ka layPyauk yo

    Kan ywa

    Kyi dan

    Let pan gwa

    Ta ma ta kaw atet

    Pa ya gyi

    Pyaw bwe ga le

    Pa yar ngok to

    Peik swe

    Kan be

    San ywa

    Pauk taw

    Yan gon bauk

    Tha yaw dan

    Pein ne gon

    Ywa dan she

    Apyauk

    Nat sin gon

    Kaw hmu myauk gyaung

    Kaw hmu taung gyaung

    San kauk

    La wa di Wa ba lauk thauk

    Ka yaik ka ni

    Kyu daw chaung

    Kha ma kha ni

    Da not

    Tha kut pin

    Nyaung gyaung

    Ya kaing gyaung

    Ton tin kan taung

    Kha naung

    Kha naung shan su

    Ta da chaung

    Tha bye gon

    Nuaung ngok to

    Ye gyaung gyiYe gyaung wa

    Htwe auk

    Tu gyi

    Pyaw bwe gyi

    Shwe hle gyaung

    Kywe lu aing

    Nyaung bin

    Myat san ni

    Ko daung

    Kan thon gan

    Pha yon chaung

    Tan ma naing

    Kywe lu aing

    Ma-wun

    Kya gan

    Ye byu dwin

    Kyon da ye

    Bo gyoke

    Ma gyi gan

    Seik kyi

    In ga lon

    De da naw

    Nyaung ngu

    Ka ma ba

    Ma yan

    Taung gon

    Chaung gyi

    Ka wet

    Ta ma ta kaw

    Taw pya

    Taw lan anauk

    Me ya gon

    Hnget kyi daung

    Kya khat kon gyi

    Wet kaik

    Kan ya she

    Let kok kon

    Ka nyin gon

    Hmaw bi

    Bo din

    Nyaung bin tha

    Pya mut

    Pyi daw tha

    Taw kha yan anauk

    Mya le yon

    Kya khat kon lay

    Kant ma larTaw kha yan ashe

    Kaw dun

    Hna khaung gyaung

    Pauk pin

    Maung ma

    Kyu daw

    Ka mar chaik

    Hla ba lu

    Ma gyi gan

    Zwe ka daw

    Nyaung ni

    Pa le

    Aye ywaPa gan daung

    Ale ywaTha bye gon

    Ka yin zeik

    Baw tha bye gan

    Ka dat pya

    De zat

    Tha yet pin chaung

    Nyaung binPha gu anuk

    Pha gu ashe

    Win ka ni

    Le daung gan

    Thon gwa

    Ywa tha gyi

    Ka la we

    Nga bye ma

    Tha nat pin

    Ba yet Sit pin kwin

    Nyaung thon bin

    Nyaung le bin

    Tha bye gan

    Tha htay gwin

    Yo gyi

    Pein kan

    Min gyaung

    Pa ya gonKyaung gon seik gyi

    Let yet san

    Ayun zok

    Nyaung waing

    Pa da gyi

    Shwe pyi tha ya

    Se lon gyi

    Baw ka lut

    Chaung wa

    Mi bya

    Chaung zauk

    Kan myin

    Kan byaung

    Ye gyaw

    Kya gan

    Pan daw

    Kyan bin

    Ywa thit ga le

    Ka ma ka lok

    Zwe ba kon dan

    Thaik tu gan

    Pyin ma gan

    Kya win

    Ban bwe

    Nyaung waing

    We gyi

    Ywa thit gyi

    Min ga lun

    Aye mya thi da

    Kyon gan

    Taw ka lu

    Kha lauk ta

    Thaung khon

    Si pin tha gyi

    Si pin tha lay

    Bon she gon

    Zie gon

    Sit pin myauk

    Sit pin taung (Ahtet)

    Sit pin taung (Auk)

    Akauk yone

    Wai bar gi myo thit

    Apyin padan

    Le ein

    Awa set ga le

    Nga zin Seik kyi

    Kha naung to

    Ta gyi

    Pauk tan

    Sin pon

    Shwe pauk kan myo thit

    Nin gyan

    Ya kaing yo ga lay

    Kon ta li

    Ye ta li

    Ka byo

    Kin ywa

    Ka lauk ka lu

    Pa ya ngu

    Hting zu

    Mi gyaung wa

    Ma myo asu

    Ma nge

    Ale ywa

    Htein gon

    Ta man gyi ka naung

    Ta gun daing

    Ye gyaw ohn bin zu

    Ye gyaw

    Kan ywa ka yin zu Kun ta

    Aing gyi

    Myet ni gon

    U-pelaw-asu

    Daing zu

    Aye ywa

    Set ga lay

    Kon ywa

    Kayin zu

    Kan hla

    Ka naung do

    Kan gyi gon

    Seik kyi

    Pyin ma gon

    Aye myo ywa

    Ta ma ta kaw auk

    Pa le myo thit

    Pauk ngu

    Thin gan gyun

    Tan bin gan

    Let kaik

    Ka mar pat

    The ganThe gon

    Pa ya lay ngu

    Tha yet thon bin Le bo

    Kwin waing

    Za lok kyi

    Nyaung le bin

    Don nyo zu We gyi gwa

    Kyi zu

    Kon dan

    That kai kwin

    Shan gan

    Ya gyaw zu

    Than byu yonThan ban gyaung

    Sat chaung

    Po myat ni su

    E-ywa

    Tha min gon

    Sin gyan Chaw le

    We gyi

    Gat ywa Leik kon

    Ano gyaung ga le

    Shwe ga byan

    Ano gyaung gyiNga phaw

    Ze gon

    Za yat gon

    Be zu

    Da ni daw

    Gat kon

    Ka bin

    Ywa thit ga lay

    Hle zeik

    Kya byu gan

    Nga dan ta yar

    Ka la asuGwa Seik gyi

    Pyin ma gon

    Let pan gon

    Wet su

    Daung gwe

    Tha zi

    Ka la dan

    Than byu yon

    Thon ein

    Chaung oo

    Shan su

    Ta gu gyan

    Htan pin gyaung

    Bi lin

    Banbwe ngu

    Kun gyan su

    Ye da sheChaung kaw gyan

    Tar taik

    Set su

    Kha naung chaung wa

    Min su

    Taung than gyo

    Hin tha gon

    Taung ma yo gon

    A kauk yone

    Pa ya gyi

    Kha lauk ka le

    Pain ne gan

    Tha yet taw

    Hla ka bon

    Pauk kon

    Hle seik

    Ale ywa

    Tha ya gon

    Yo kant lant

    Ma ke

    Ya khaing chaung wa

    Ta gyi

    Kyaik tha le

    O bo

    Chaung wa

    Kya bin gan

    Shan kan

    Taw ku ashe

    Taw ku anauk

    Ka lauk ta ya

    Pauk taw

    Gu gyi gonYe dwin kon

    Sun pa lun kon

    Ye ngan chaung zu

    Kyi zu

    Kyauk sa rit (Ase le)

    Pa zun myaung

    Ale ywa Se ein dan

    Chaung wa auk seik

    Pi kon

    Pin le kon

    Ain hint kon

    Aung ze yaMyaing tha ya

    Ye da gar

    Kan gyi kwin

    Abyit kon

    Anauk kon

    Kha ye gon

    Myo nwe gon

    Let kok kan

    Tan bin ganTar taikBi lin

    Kyaik pat

    Myo gon

    Ta yoke kon

    Sa pa gan

    Ka lauk ka me

    Ye de in

    Ka ya zu

    Hnget kwa

    Kye ta ya

    Htan ta binTha min gyan

    Po thi gon

    Taw lan ashe

    Taw ya gon

    The kon dan

    Pon gyi gon

    Taik kon

    Baw sa gaingAle gyaung

    Dat taw

    Da ye lu

    Awaing gyaung

    Po loung

    Myauk zu

    Kya gaik

    Taw twin gon

    Ta man gyi

    Ywa thit

    Seik gyi

    Kyun gyaung

    Kan waing

    Ka nyin bin

    Kya khat wa

    Tha ya gon

    Ywa thit kon

    Taik kon

    Kyaung gon

    Kywe gyan kwin

    Tu myaung

    Ka thit kon

    Thit kya gon

    Yan gyi aung

    Mye ni gon

    Htan taw

    Taw da ye gon

    Adat ywa

    Seik kan tha

    Baw di gon

    Hle seik

    Pa zun chaung

    U-do

    Tha ya ayeAhtet seik

    Sa gyin

    Toe kwinKyon ka nan chaung wa

    Nyaung bin

    Shwe hle

    Kyu chaung

    Taung ta lok

    Kya ni gan

    Tha ya gonKyaung ywa

    Min we

    Da la ban

    Aye ywa

    Maung gwe

    Kyaung sha kan

    Ok pho

    Ka ma sein

    Ma so

    Kyi zu

    La ha yet

    Ka ma ka leik

    Win gyi

    Ta ma ta kaw

    Nyaung bin

    Chaung wa

    Let pan

    Ywa thit

    Kywe gu zeik

    Nga pa

    Nyaung lan gan

    Tan bin chaung

    Nyaung gale

    Ma U ta thi

    Ywa thit ga le

    Tha yet kon

    Ka lar te waing gyi

    U yin daw

    On hne gan

    Ma gyi pauk gan

    Auk te zu

    Kyon ma yan

    Ywa thit gyi

    Nyaung pin gyi su

    Kan hla

    U yin

    Kan gyi su

    Hla kyu win

    Taung ywa

    Se gon

    Pyi taw tha

    Ka mar ka lok

    Nan yaw in

    Htaw thun

    Kan tha myint

    Pauk taw

    Kun daing

    Nyaung Waing

    Ma gyi gan

    Ye kyaw Te su

    Pa don gyaung

    The byu gyaung

    Nat sin gon

    Kan nyin bin gyaung

    Kyauk ye dwin

    Kun gyan gonKyaik ain

    Pyin daung gyaung

    Ale ywa

    Ohn hne gon

    Kun bo dein

    Ta man gyi

    U yin

    Kwin bauk

    Pan chaung

    Kayin gyaung Zwe ka na

    Ase ywa

    Kwa hne

    Ka ma lan

    Ka la htan

    Kyaung kan

    Shan zu

    Shwe byauk

    A dut taw

    Kya gan deikKyaik ka maw

    Pa da wa

    Kyauk ma ye

    Thaung gyi

    Kun ga lay

    A ngu

    Tha nat pin gyin

    Ka me

    Pa ya ngok to

    Ka lauk swe

    Sa daing hmu

    Pi la kat

    San di

    Kya gan

    The gon

    Tha yet taw

    Min ya za

    Htan pin zeik

    Hta ma lon

    Kya kan gyi gon

    Te waing gyi

    Ka lar tan

    Taung gon lay

    Taw ta lok

    Tan te zu

    Myaing tha ya

    Thi da myaing

    Ka la pi la khat

    Kon gyi

    Tan te zu Gar te zu

    Ashe swe taw

    Ngwe thaung yan

    Anauk swe taw

    Ze gon

    Pi la kat

    Ale gon

    Taw ka laik

    Taw ka

    Taw ka sauk

    Pa kauk

    Shan gyi gon

    Ywa thit kon

    Kywe kan gon

    Aung ze ya

    Thanlyin

    Kawhmu

    Kungyangon

    Thanlyin

    Thanlyin

    Kyauktan

    YANGON CITY

    SOUTHERN YANGON DISTRICT

    WESTERN

    YANGO

    NDISTRICT

    NORTHERN

    YANGO

    NDISTRICT

    NORT

    HERN

    YANG

    ONDISTRICT

    EAST

    ERN

    YANG

    ON DIS TRIC

    T

    NORTHERN YANGON DISTRICT

    PYAPON DISTRICT

    SOUTHERN YANGON DISTRICT

    BAGO DISTRICTSOUTHERN YANGON DISTRICT

    SOU

    THERN YANGO

    N D

    ISTRIC

    T

    NORTHER N YANGON DISTRICT

    EASTERN YANGON DISTRICT

    WES

    TERN

    CH

    ANN

    EL

    THILAWATHILAWAAREA PORTAREA PORT

    YANGONYANGONMAIN PORTMAIN PORT

    YANGONYANGON

    Port L

    imit

    Port Limit

    Port Limit

    Port Limit

    0 2 10 km4 6 8

    SCALE

    N

    Copyright © 2010-2015 NIPPON KOEI CO., LTD. All right reserved.

    ヤ ン ゴ ン 港 位 置 図

  • S

    Htee Dan Rice Berth

    Round Chy

    Square Chy

    Aisa World Port Terminal

    Chy

    Seik

    Gyi

    Bn

    West

    Bagayar

    Ahlone

    Reach

    Fisheries Dept Jetty

    Fish

    Jetty

    Obstn

    Timber Yard

    KAMAKASIT

    Se

    i k G

    y

    i T r a i n i n g W a l l

    Spire

    AHLONE

    Power

    Station

    LATHA

    MEPE Done

    C

    o

    n

    t

    a

    i

    n

    e

    r

    s

    Wk

    Wk

    Obstns

    Obstn

    Obstn

    Obstn

    Obstns

    Obstn

    Obstns

    Obstns

    Obstn

    Obstn

    Obstn

    Obstns

    Obstn

    Fl.5s

    RT.Wall

    Wk

    Wk

    Wks

    Wks

    Dalla Dockyard

    DALLA

    Dalla Pagoda

    S

    u

    le

    W

    h

    a

    r

    v

    e

    s

    W

    h

    a

    rv

    e

    s

    B

    S

    W

    Tel

    Pylons

    Obstn

    Obstns

    Obstn

    Botahtaung

    Pagoda

    Containers

    Containers

    SS (Storm)

    MPA Office Tower

    MEB Dome

    Freedom Monument

    Sule Pagoda

    T a n k s

    Pyl

    Monkey Point

    Thanlyetsoon Point Channel

    Tide gauge

    SS(Tide)

    RTA

    Wk

    Wk

    CCA

    C a r g o

    B o a t

    Wk

    Wk(awash)

    Wk

    Obstns

    AINGYI

    Obstns

    Fl.R2s

    Fl.G2s

    Obstns

    Obstns

    Wk

    Wk

    Assama

    UMP

    Fl.4s

    LMP

    Shukhintha

    Mahabadoola Bridge

    Thaketa Bridge

    East Pylon

    Signal Pagoda

    Chys

    West Pylon

    B A

    G O

    R I

    V E

    R

    T

    h

    a

    n

    l

    y

    i

    n

    F

    l

    a

    t

    Ferris

    Wheel

    Bago Point

    Hasting No1

    Hasting No 2

    Obstn

    Hasting No 3

    Obstns

    Obstn

    Wk

    Kvartia

    Q.G

    Depths and Aids to Navigation

    (see Note)

    Survey Bn

    No. 10

    New Wall Lt Bn

    (exiting)

    Foul

    S

    h

    ip

    s

    Thanlyin Point

    THANLYIN

    Back Mark

    Front Mark

    Passenger Jetty

    Crane Jetty

    TANKS

    Black Chimney

    Passenger Jetty

    LUB Oil Jetty

    Wk

    (awash)

    West Bn Section 3

    Sunken

    Wrecks

    Fl.2s

    Upper Hastings

    Petroleum

    HASTINGS SAND

    LPG Jetty

    THAKETA

    DAWBON

    Chy

    Yuzana

    Jetty

    Obstn

    Obstn

    Obstns

    MFSL Jetty

    MOGE Wharf

    Tanks

    P A Z U N D A U N G C R E E K

    P

    o

    r

    t

    a

    n

    d

    H

    a

    r

    b

    o

    u

    r

    L

    i

    m

    i

    t

    2

    9

    0

    1

    5

    0

    0

    350

    3

    4

    0

    3

    3

    0

    3

    2

    0

    3

    1

    0

    3

    0

    0

    2

    8

    0

    270

    260

    2

    5

    0

    2

    4

    0

    2

    3

    0

    2

    2

    0

    2

    1

    0

    2

    0

    0

    1

    9

    0

    180

    170

    1

    6

    0

    1

    4

    0

    1

    3

    0

    1

    2

    0

    1

    1

    0

    1

    0

    0

    090

    0

    8

    0

    0

    7

    0

    0

    6

    0

    0

    5

    0

    0

    4

    0

    0

    3

    0

    0

    2

    0

    0

    1

    0

    Spires

    O

    b

    s

    t

    n

    A

    h

    l

    o

    n

    e

    S

    h

    o

    a

    l

    12

    0

    10

    116

    175

    172

    16

    Shwe Dagon Pagoda

    (143)

    500 0 1000 m

    123

    138

    55

    5

    10

    7

    106

    1512

    13

    24

    95

    149

    25

    23

    122

    822

    191 8

    6

    1

    0

    133

    0335

    25

    2

    5

    24

    2

    0

    133

    1

    0

    0

    12

    12

    37

    245 15

    24

    195

    2115

    5

    54 154

    5

    10

    21

    92

    46

    5

    10

    36

    56

    58

    93

    147 14

    6

    155

    188

    2117

    73 3

    1

    27

    185

    185

    159

    5

    22 4Tw

    ante

    Canal

    4

    52

    58

    137 118

    61

    135

    167

    136

    104

    3.6kn

    107

    108

    96

    136

    125

    103

    1

    0

    5

    105

    05

    1

    0

    108

    11

    135

    111

    119

    118

    113

    112

    111

    64

    64

    61

    67

    9

    58

    128

    79

    73

    74

    62

    58

    23

    67

    76

    67

    58 9

    3

    7

    96

    55

    7

    73

    23

    5

    3

    61

    9

    M

    26

    86 7

    8

    18

    75

    7

    63

    63

    58

    57

    15

    49

    09

    3

    55

    58

    51

    79

    52

    12

    39

    6

    5

    5

    52

    51

    44

    45

    45

    5

    22

    53

    M

    3.3k

    n

    57

    27

    35

    25

    33

    3

    .5

    k

    n

    3

    51

    41

    45

    42

    11

    25

    47

    47

    47

    35

    23

    17

    15

    17

    2

    12

    25

    03

    06

    ( )

    36

    48

    3

    2

    1

    0

    125

    52

    54

    71

    21

    21

    09

    08

    59

    21

    17

    12

    08

    1

    5

    2

    32

    2 13

    11 2

    4

    25

    25

    35

    29

    56

    86

    67

    33

    59

    39

    543

    7

    29

    09

    03

    02

    28

    25

    42

    42 2

    4

    27

    3

    32

    25

    24

    3

    18

    02

    02

    03

    03

    01

    2

    ( )

    09

    09

    15

    16

    15

    18

    13

    14

    14

    24

    2

    5

    21

    3

    55

    78

    85

    82

    87

    87

    78

    58

    13

    18

    18

    18

    16

    05 07

    05

    04

    03

    32

    32

    52 38

    21

    88

    87

    61

    61

    61

    62

    69

    54

    12

    23

    35

    32

    36

    25

    37

    2

    0

    0

    05

    5

    4

    42M

    29

    45

    23

    18

    47

    05

    2

    5

    68

    29

    51

    19

    2

    54

    93

    10

    57

    02

    5

    06

    05

    89

    5

    1

    625

    27

    5

    82

    1

    4

    34

    38

    32

    23

    52

    44

    4

    4

    29

    29

    29

    32

    3

    66

    93 58

    32

    1

    0

    2

    0

    14

    19

    14

    24

    42

    5

    37

    71

    71

    12410

    4

    9145

    128

    132

    57

    25

    122

    102

    9

    31

    12

    53

    63

    98

    06

    ( )

    116

    52

    83

    105

    67

    0

    07

    17

    21

    21

    07

    1

    62

    93

    71

    72

    718

    9

    76

    67

    67

    35

    18

    59

    73

    61

    11

    29

    12

    13

    05

    02

    03

    05

    08

    01

    1

    3

    .

    2

    k

    n

    5

    15

    49

    67

    91

    92

    43

    78

    38

    02

    22

    14

    12

    13

    02

    0

    2

    04

    98

    51

    03

    509

    12

    31

    76

    6

    37

    22

    22

    2

    29

    25

    39

    17

    3

    .

    6

    k

    n

    Mowe r ' s Po i n t

    2

    0

    73

    37

    0

    4

    B

    D

    D

    C

    A

    A

    A

    1000 m

    B

    C

    to MITT

    Study on Marine Disaster Risk Management

    • To supplement the programme and guidelines of Myanmar byanalyzing the risk of cyclones, storm surges and tsunamis and some

    parts of risk evaluation and countermeasure

    A

    Capacity Development

    for Ship Crew and Navigation

    For the safety of inland waterway transport and

    Yangon Port;

    Step 1: Transfer navigation skills to IWT ship crew

    through lecture and practical training, and

    provide navigation instruments

    Step 2: Transfer knowledge to MPA on

    international regulation of navigation aids

    system and Restore two leading lights and

    one sector light destroyed by cyclone

    Nargis.

    Step 3: Transfer navigation skills to IWT ship crew

    through lecture and provide auto-recorded

    eco-sounder with GPS

    B

    Capacity Development

    for Repairing Ships and Metal Structures

    For the improvement of repairing and construction

    skills through lecture and practical training;

    Step 1: Transfer welding skills to engineer and

    skilled technicians and provide welding

    machines

    Step 2: To achieve sustainable education from

    skilled technicians to unskilled workers

    through cradle construction practice

    Step 3: Transfer CO2 welding and the

    testing/inspection skills

    Step 4: Transfer up to date construction method

    (Block method) to IWT

    C

    Study of Tide Observation System

    • Technological transfer for improving ability of tidegauge utilization

    • Install automatic recording tide gauges at MonkeyPoint and MITT for establishing the future tide

    observation system

    D

    Design and Implementation

    of Pilot Project for Jetty Restoration

    • Plan, design and tender for Botahtaung JettyRestoration

    • Design and implementation of Pilot Project forDalla Ferry Terminal Restoration

    • Technical transfer for design, construction,maintenance, environmental and safety of port

    facilities

  • 1

    2(1a)

    3(1b)

    4(2)

    7(2c)

    5(2a)

    10(3a)

    9(3)

    12(3c)

    11(A-5)

    6(2b)

    18(4a)

    13

    16(3g)

    19(A-6)

    17(4)

    20(5)

    21(6)

    22(7)

    23(8)

    24(9)

    27(10b)

    25(10)

    26(10a)

    28(11)29(12)

    30(12a)

    46(24)

    47(23)

    43(21)

    42(20)

    31(13)

    32(13b)

    33(14)

    34(16)

    35(16a)

    36(16b)

    44(22)

    37(16c)

    45(23)

    38(17)39(18)

    40(19)

    41(19m)

    48(26)

    49(26a)

    50(27)

    51(27a)

    55(29)

    53(28a)

    54(28e)

    58(30a) 59(30b)

    61(31a)56(29a)

    57(30)

    65(32)

    68(34b)

    66(33)

    62(31b)

    60(31)

    63(31d)64(31e)

    67(34)69(34d)

    52(28)

    -10m

    -10m

    -10m

    -10m

    -5m

    -10m-5m-1

    5m

    -15m

    -10m

    -10m

    -10m

    -5m

    -10m

    -15m

    -5m

    -15m

    -20m

    -15m

    -20m

    -30m

    -20m

    -15m

    -15m

    -10m

    -5m

    -15m

    -10m

    -15m-10m

    -5m-20m-25m

    -30m

    -25m

    -20m

    -15m

    -15m

    -10m

    -15m

    -15m

    -10m

    -5m

    -20m

    -25m

    -25m-20m

    -15m-10m

    -5m

    -15m-10m

    -15m

    -10m

    -5m

    -10m

    -10m

    -10m-10m

    -10m

    -10m

    -15m

    -15m

    -10m

    -5m

    -5m

    -5m

    -5m

    -10m

    -5m

    -5m 0m

    0m

    -5m

    -5m

    -10m -10m

    -5m

    -10m-5m

    -10m-5m

    0m

    -5m

    -5m

    -5m -5m

    -5m

    -10m

    -10m-5m

    -5m

    -5m

    -15m

    -0m-5m

    -15m

    -15m

    -15m

    0m

    -5m

    -20m

    -5m

    -5m

    -10m

    -15m

    -5m

    -10m

    -13m

    -14m

    -12m

    -17m

    -9m

    -3m

    -12m

    -11m

    -16m

    -7m

    -23m

    -3m

    -4m

    -2m

    -4m

    -7m

    -6m

    -6m-7m

    -8m

    -9m

    -9m

    -6m

    -6m

    -6m

    -6m

    -7m

    -8m

    -7m

    -8m

    -9m

    -4m

    -3m

    -2m

    -13m

    -7m

    -3m -2m-1m

    -4m

    -6m

    -12m-8m

    -9m

    -9m

    -8m -7m -6m

    P

    A

    N

    H

    L

    A

    I

    N

    G

    R

    I

    V

    E

    R

    K

    A

    N

    A

    U

    N

    G

    ID

    T

    W

    A

    N

    T

    E

    C

    A

    N

    A

    L

    P

    A

    Z

    U

    N

    D

    A

    U

    N

    G

    C

    R

    E

    E

    K

    B

    A

    G

    O

    R

    I

    V

    E

    R

    C

    R

    E

    E

    K

    Y

    A

    N

    G

    O

    N

    R

    IV

    E

    R

    Y

    A

    N

    G

    O

    N

    R

    I

    V

    E

    R

    39(18)

    8

    B

    A

    Z

    A

    R

    J

    E

    T

    T

    Y

    (

    K

    Y

    E

    E

    M

    Y

    I

    N

    D

    I

    N

    E

    )

    A

    H

    L

    O

    N

    E

    W

    H

    A

    R

    F

    (

    A

    S

    I

    A

    W

    O

    R

    L

    D

    )

    M

    Y

    A

    N

    M

    A

    R

    I

    N

    D

    U

    S

    T

    R

    I

    A

    L

    P

    O

    R

    T

    (

    M

    I

    P

    )

    S

    U

    L

    E

    W

    H

    A

    R

    V

    E

    S

    M

    P

    A

    O

    F

    F

    I

    C

    E

    T

    O

    W

    E

    R

    P

    O

    R

    T

    H

    E

    A

    L

    T

    H

    J

    E

    T

    T

    Y

    2

    B

    O

    A

    U

    N

    G

    G

    Y

    A

    W

    C

    O

    N

    T

    A

    I

    N

    E

    R

    Y

    A

    R

    D

    MONKEY

    POINT

    M

    Y

    A

    N

    M

    A

    R

    F

    I

    V

    E

    S

    T

    A

    R

    L

    I

    N

    E

    S

    E

    I

    K

    G

    Y

    I

    T

    R

    A

    I

    N

    I

    N

    G

    W

    A

    L

    L

    P

    O

    R

    T

    H

    E

    A

    L

    T

    H

    J

    E

    T

    T

    Y

    3

    N

    A

    N

    T

    H

    I

    D

    A

    2

    N

    A

    N

    T

    H

    I

    D

    A

    3

    &

    4

    T

    H

    E

    I

    N

    B

    Y

    U

    J

    E

    T

    T

    Y

    M

    P

    A

    (

    S

    H

    I

    P

    Y

    A

    R

    D

    )

    M

    P

    A

    (

    C

    I

    V

    I

    L

    D

    E

    P

    T

    .

    D

    O

    C

    K

    Y

    A

    R

    D

    )

    B

    O

    T

    A

    H

    T

    A

    U

    N

    G

    3

    B

    O

    T

    A

    H

    T

    A

    U

    N

    G

    4

    B

    O

    T

    A

    H

    T

    A

    U

    N

    G

    5

    H

    O

    T

    E

    L

    (

    V

    I

    N

    T

    A

    G

    E

    L

    U

    X

    U

    R

    Y

    )

    I

    W

    T

    D

    O

    C

    K

    Y

    A

    R

    D

    A

    N

    T

    G

    Y

    I

    J

    E

    T

    T

    Y

    K

    I

    N

    G

    '

    S

    B

    A

    N

    K

    J

    E

    T

    T

    Y

    C

    R

    A

    N

    E

    J

    E

    T

    T

    Y

    M

    I

    N

    Y

    E

    K

    Y

    A

    W

    T

    H

    U

    J

    E

    T

    T

    Y

    M

    .

    O

    .

    G

    .

    E

    J

    E

    T

    T

    Y

    W

    A

    D

    A

    N

    J

    E

    T

    T

    Y

    1

    &

    2

    ,

    3

    &

    4

    ,

    5

    &

    6

    ,

    Y

    O

    Y

    O

    J

    E

    T

    T

    Y

    S

    I

    N

    O

    H

    D

    A

    N

    G

    1

    S

    H

    W

    E

    T

    A

    U

    N

    G

    D

    A

    N

    1

    H

    L

    E

    D

    A

    N

    1

    L

    A

    N

    T

    H

    I

    T

    K

    A

    I

    N

    G

    D

    A

    N

    J

    E

    T

    T

    Y

    2

    K

    A

    I

    N

    G

    D

    A

    N

    J

    E

    T

    T

    Y

    1

    H

    L

    E

    D

    A

    N

    2

    S

    H

    W

    E

    T

    A

    U

    N

    G

    D

    A

    N

    2

    S

    I

    N

    O

    H

    D

    A

    N

    G

    2

    M

    E

    C

    W

    H

    A

    R

    F

    F

    I

    S

    H

    E

    R

    Y

    D

    E

    P

    T

    .

    J

    E

    T

    T

    Y

    M

    E

    C

    W

    H

    A

    R

    V

    E

    S

    B

    A

    G

    A

    Y

    A

    J

    E

    T

    T

    Y

    1

    &

    2

    &

    3

    C

    E

    N

    T

    R

    A

    L

    F

    I

    S

    H

    M

    A

    R

    K

    E

    T

    J

    E

    T

    T

    Y

    P

    A

    N

    S

    O

    D

    A

    N

    J

    E

    T

    T

    Y

    L

    A

    N

    M

    A

    D

    A

    W

    1

    &

    2

    P

    H

    O

    E

    G

    Y

    I

    L

    A

    N

    1

    &

    2

    K

    Y

    E

    E

    M

    Y

    I

    N

    D

    I

    N

    E

    J

    E

    T

    T

    Y

    3

    &

    5

    C

    H

    A

    U

    N

    G

    W

    A

    M

    Y

    A

    N

    M

    A

    R

    S

    H

    I

    P

    Y

    A

    R

    D

    A

    N

    T

    G

    Y

    I

    D

    O

    C

    K

    Y

    A

    R

    D

    J

    E

    T

    T

    Y

    T

    H

    E

    I

    N

    B

    Y

    U

    D

    O

    C

    K

    Y

    A

    R

    D

    S

    A

    T

    S

    A

    N

    D

    O

    C

    K

    Y

    A

    R

    D

    N

    Y

    A

    U

    N

    G

    D

    A

    N

    J

    E

    T

    T

    Y

    (

    M

    P

    A

    L

    I

    G

    H

    T

    H

    O

    U

    S

    E

    D

    E

    P

    T

    .

    J

    E

    T

    T

    Y

    )

    D

    A

    L

    A

    P

    O

    R

    T

    J

    E

    T

    T

    Y

    B

    A

    G

    A

    Y

    A

    C

    O

    N

    C

    R

    E

    T

    E

    S

    H

    O

    R

    T

    J

    E

    T

    T

    Y

    C

    O

    N

    C

    R

    E

    T

    E

    J

    E

    T

    T

    Y

    N

    o

    .

    4

    C

    O

    N

    C

    R

    E

    T

    E

    J

    E

    T

    T

    Y

    N

    o

    .

    5

    (

    P

    R

    I

    V

    A

    T

    E

    :

    S

    H

    W

    E

    P

    Y

    I

    T

    A

    N

    )

    (

    B

    O

    T

    A

    H

    T

    A

    U

    N

    G

    6

    )

    D

    A

    L

    A

    Y

    O

    Y

    O

    J

    E

    T

    T

    Y

    (

    B

    O

    T

    A

    H

    T

    A

    U

    N

    G

    2

    )

    (

    W

    O

    R

    K

    S

    H

    O

    P

    P

    O

    N

    T

    O

    O

    N

    J

    E

    T

    T

    Y

    )

    C

    O

    N

    C

    R

    E

    T

    E

    J

    E

    T

    T

    Y

    (

    B

    A

    G

    A

    Y

    A

    N

    o

    .

    4

    )

    N

    1000 20000

    SCALE

  • ミャンマー国ヤンゴン港・内陸水運施設改修調査 最終報告書 要約

    日本工営/OCDI S-i

    ミャンマー国 ヤンゴン港・内陸水運施設改修調査

    最終報告書

    要 約

    調査対象地域の内陸水運主要港および航路位置図 ヤンゴン港位置図 研修、検討および実証事業の概要 ヤンゴン本港における港湾施設位置図

    目 次

    第 1 章 はじめに ......................................................................................................................................... 1 1.1 調査の背景 .......................................................................................................................... 1 1.2 調査の対象 .......................................................................................................................... 1 1.3 調査対象地域、スコープおよび調査スケジュール ...................................................... 1 1.4 先方実施機関 ...................................................................................................................... 3 1.5 報告書の構成 ...................................................................................................................... 4 1.6 調査団員 .............................................................................................................................. 4

    第 2 章 ミャンマーの水運の状況 ............................................................................................................. 6 2.1 水 運 .......................................................................................................................... 6 2.2 組 織 .......................................................................................................................... 6 2.3 施 設 .......................................................................................................................... 7 2.4 輸送実績 ............................................................................................................................ 10

    第 3 章 サイクロン-ナルギス ................................................................................................................. 11 3.1 ナルギスの特徴 ................................................................................................................ 11 3.2 被 害 ........................................................................................................................ 12

    第 4 章 ヤンゴン港の航行安全のための対策 ....................................................................................... 13 4.1 航 路 ........................................................................................................................ 13 4.2 沈船引上げ ........................................................................................................................ 14 4.3 航行条件 ............................................................................................................................ 14 4.4 航路浚渫 ............................................................................................................................ 14 4.5 航路ブイ ............................................................................................................................ 14 4.6 導 灯 ........................................................................................................................ 15 4.7 航路標識などの評価 ........................................................................................................ 15 4.8 復旧計画 ............................................................................................................................ 17

    第 5 章 ヤンゴン港の復旧 ....................................................................................................................... 19 5.1 MPA の岸壁と造船所 ...................................................................................................... 19 5.2 MPA 桟橋の構造 .............................................................................................................. 19 5.3 MPA 施設の状況 .............................................................................................................. 19 5.4 IWT の貨物輸送 ............................................................................................................... 20 5.5 MPA 施設の評価 .............................................................................................................. 20

  • ミャンマー国ヤンゴン港・内陸水運施設改修調査 最終報告書 要約

    日本工営/OCDI S-ii

    5.6 桟橋破損の原因 ................................................................................................................ 20 5.7 復旧の考え方 .................................................................................................................... 21 5.8 解決すべき問題 ................................................................................................................ 21 5.9 復旧計画 ............................................................................................................................ 22

    第 6 章 内陸水運復旧計画 ....................................................................................................................... 24 6.1 貨物および旅客輸送 ........................................................................................................ 24 6.2 水運網 ................................................................................................................................ 25 6.3 施 設 ........................................................................................................................ 25 6.4 IWT 船隊と損傷 ............................................................................................................... 26 6.5 造船所 ................................................................................................................................ 27 6.6 航行用計器 ........................................................................................................................ 27 6.7 復旧の考え方 .................................................................................................................... 28 6.8 復旧計画 ............................................................................................................................ 28

    第 7 章 能力開発計画および構成内容 ................................................................................................... 30 7.1 実証事業および能力開発トレーニング ........................................................................ 30 7.2 能力開発トレーニング .................................................................................................... 31 7.3 調査 .................................................................................................................................... 32 7.4 実証事業 ............................................................................................................................ 33

    第 8 章 環境社会配慮 ............................................................................................................................... 36

    第 9 章 航行安全確保に関する研修事業 ............................................................................................... 37 9.1 IWT の船員に対する能力開発(ステップ 1) ............................................................. 37 9.2 船舶の運航に係る能力開発(ステップ 2) ................................................................. 40 9.3 IWT の船員に対する能力開発(ステップ 3) ............................................................. 43

    第 10 章 船舶および鋼構造物修理能力向上に関する研修事業 ........................................................... 46 10.1 船舶および鋼構造物修理能力向上(ステップ 1) ..................................................... 46 10.2 船舶および鋼構造物修理能力向上(ステップ 2) ..................................................... 48 10.3 船舶および鋼構造物修理能力向上(ステップ 3) ..................................................... 50 10.4 船舶および鋼構造物修理能力向上(ステップ 4) ..................................................... 53

    第 11 章 防災能力向上策の検討 ............................................................................................................... 55 11.1 経緯と検討目的 ................................................................................................................ 55 11.2 災害リスク・危機管理 .................................................................................................... 56 11.3 ミャンマーの海洋防災計画 ............................................................................................ 56 11.4 ヤンゴン港における高潮シミュレーションとサイクロンの分析 ............................ 57 11.5 ヤンゴン港における高潮・サイクロン被害の分析 .................................................... 59 11.6 ヤンゴン港におけるサイクロン・高潮災害への対策の検討 .................................... 60 11.7 ヤンゴン港における津波シミュレーションと被害推定 ............................................ 61 11.8 デルタにおける高潮・津波シミュレーション ............................................................ 63 11.9 海洋防災計画への助言 .................................................................................................... 67

    第 12 章 潮位観測システムの検討 ........................................................................................................... 68 12.1 ミャンマーの潮位観測システム .................................................................................... 68 12.2 潮位観測データの解析 .................................................................................................... 68 12.3 潮位推算 ............................................................................................................................ 69 12.4 現行 TIDE TABLE と潮位推算結果の適用性 ............................................................... 70

  • ミャンマー国ヤンゴン港・内陸水運施設改修調査 最終報告書 要約

    日本工営/OCDI S-iii

    12.5 ミャンマー国の潮位観測体制の提案 ............................................................................ 72

    第 13 章 桟橋の改修に関する実証事業の設計と実施 ........................................................................... 73 13.1 概 要 ........................................................................................................................ 73 13.2 自然条件 ............................................................................................................................ 74 13.3 ボタトゥン桟橋の実証事業計画(計画・設計・入札のみ) .................................... 76 13.4 ダラフェリーターミナル実証事業 ................................................................................ 79 13.5 セミナーおよびワークショップ .................................................................................... 85

    第 14 章 まとめ(実施内容とその成果および評価) ........................................................................... 87 14.1 報告書概要 ........................................................................................................................ 87 14.2 各章概要(Part 1) ........................................................................................................... 87 14.3 各章概要(Part 2) ........................................................................................................... 89

  • ミャンマー国ヤンゴン港・内陸水運施設改修調査 最終報告書 要約

    日本工営/OCDI S-iv

    表リスト 表 1.1 全体工程 ......................................................................................................................................... 2 表 1.2 調査団員 ......................................................................................................................................... 5 表 2.1 港湾施設の名称 ............................................................................................................................. 7 表 2.2 ヤンゴン港の貨物取扱量 ........................................................................................................... 10 表 2.3 ヤンゴン港における内陸水運輸送貨物量 ............................................................................... 10 表 2.4 ヤンゴン港における内陸水運旅客数 ....................................................................................... 10 表 3.1 ナルギスによる人的被害の推定(2008 年 6 月現在) .......................................................... 12 表 4.1 ヤンゴン港における沈船と座礁船 ........................................................................................... 14 表 4.2 航路標識等の評価(2009 年 7 月現在) .................................................................................. 16 表 4.3 段階計画の定義 ........................................................................................................................... 17 表 4.4 航行安全のための復旧計画工程 ............................................................................................... 18 表 5.1 ヤンゴン港のための復旧計画工程 ........................................................................................... 23 表 6.1 ヤンゴン港における IWT Jetty の状況 ..................................................................................... 25 表 6.2 ナルギス前後の IWT 船隊の状況 .............................................................................................. 26 表 6.3 航行用計器の設置状況 ............................................................................................................... 27 表 6.4 内陸水運のための復旧計画工程 ............................................................................................... 29 表 7.1 能力開発計画実施工程 ............................................................................................................... 35 表 9.1 研修の場所とスケジュール ....................................................................................................... 38 表 9.2 研修の場所とスケジュール ....................................................................................................... 41 表 10.1 訓練場所とスケジュール ........................................................................................................... 47 表 10.2 訓練場所とスケジュール ........................................................................................................... 49 表 10.3 直流アーク溶接訓練の評価結果 ............................................................................................... 50 表 10.4 クレードル製作の評価結果 ....................................................................................................... 50 表 10.5 訓練場所とスケジュール ........................................................................................................... 52 表 10.6 指導内容 ....................................................................................................................................... 53 表 11.1 代表的なサイクロンの気圧・風速・上陸時間 ....................................................................... 57 表 11.2 気象モデル実験結果から抽出したサイクロン ....................................................................... 57 表 11.3 ベンガル湾で発生するサイクロンとミャンマーに上陸するサイクロンの数 .................... 58 表 11.4 ヤンゴン港高潮シミュレーションの検討ケース ................................................................... 58 表 11.5 ヤンゴン港の船舶漂流シミュレーション結果 ....................................................................... 59 表 11.6 ヤンゴン港の高潮建物被害検討ケース ................................................................................... 59 表 11.7 ヤンゴン港の高潮建物被害の推定結果 ................................................................................... 60 表 11.8 ヤンゴン港の津波建物被害の推定結果 ................................................................................... 62 表 11.9 海洋防災セミナー概要 ............................................................................................................... 67 表 12.1 潮位諸元の比較 ........................................................................................................................... 69 表 12.2 観測データとの潮位差比較 ....................................................................................................... 70 表 12.3 観測潮位と潮位推算値の比較 ................................................................................................... 71 表 12.4 ミャンマー国の潮位観測体制の提案 ....................................................................................... 72 表 13.1 ミャンマー国における過去の地震の記録 ............................................................................... 75 表 13.2 実証事業の設計対象船舶の大きさ ........................................................................................... 77 表 13.3 桟橋の設計条件 ........................................................................................................................... 77 表 13.4 渡橋およびポーターウェイの設計条件 ................................................................................... 78 表 13.5 ドルフィンの設計条件 ............................................................................................................... 78 表 13.6 プロジェクトの概要 ................................................................................................................... 80 表 13.7 設計土質条件 ............................................................................................................................... 81 表 13.8 実証事業の対象船舶 ................................................................................................................... 81 表 13.9 ポーターウェイの設計条件 ....................................................................................................... 82 表 13.10 鋼製橋梁の設計条件 ................................................................................................................... 82

  • ミャンマー国ヤンゴン港・内陸水運施設改修調査 最終報告書 要約

    日本工営/OCDI S-v

    表 13.11 ポンツーンの設計条件 ............................................................................................................... 83 表 13.12 環境モニタリング ....................................................................................................................... 85 表 13.13 港湾施設建設セミナー ............................................................................................................... 86 表 13.14 鉄筋コンクリートの維持管理に関するワークショップ ....................................................... 86

    図リスト 図 1.1 研修・追加調査および実証事業の実施工程 ............................................................................. 3 図 2.1 MPA 港湾施設の位置図(2009 年当時) ................................................................................... 9 図 2.2 造船所の位置図(2009 年当時) ................................................................................................ 9 図 3.1 ナルギスの通過コースとデルタ地域での浸水深さ ............................................................... 11 図 4.1 進入航路 ....................................................................................................................................... 13 図 4.2 Monkey Point Channel におけるブイと導灯の位置 ................................................................. 15 図 5.1 MPA Jetty の構造 ......................................................................................................................... 19 図 6.1 IWT の月別貨物輸送量 ............................................................................................................... 24 図 6.2 IWT の月別旅客輸送量 ............................................................................................................... 24 図 6.3 内陸水運網 ................................................................................................................................... 25 図 7.1 全体計画図(ボタトゥン桟橋) ............................................................................................... 34 図 9.1 Monkey Point Channel の航路標識システム ............................................................................. 40 図 10.1 5 つのカテゴリーによる理解度の分析 .................................................................................... 47 図 10.2 熟練技術者およびグループリーダーの実技溶接訓練結果 ................................................... 48 図 10.3 CO2 溶接の実地訓練結果 ............................................................................................................ 52 図 11.1 防災計画に係る JICA 調査団の担当範囲 ................................................................................. 55 図 11.2 ハード・ソフト対策による災害防止軽減 ............................................................................... 56 図 11.3 ヤンゴン港の高潮シミュレーション結果 ............................................................................... 58 図 11.4 ヤンゴン港の高潮人的被害の推定 ........................................................................................... 60 図 11.5 ヤンゴン港避泊地の安全度・重要度評価結果 ....................................................................... 61 図 11.6 ヤンゴン港津波シミュレーションの結果 ............................................................................... 62 図 11.7 ヤンゴン港の津波ハザードマップ ........................................................................................... 63 図 11.8 デルタ地区の高潮シミュレーション結果 ............................................................................... 64 図 11.9 デルタ地区津波シミュレーションの断層モデル ................................................................... 65 図 11.10 デルタ地区の津波シミュレーション結果(Snapshot) ......................................................... 66 図 11.11 デルタ地区の津波シミュレーション結果(時系列) ........................................................... 66 図 12.1 MITT と Monkey Point での潮位観測状況 ................................................................................ 68 図 12.2 推算潮位(補正後)と観測潮位の比較 ................................................................................... 69 図 13.1 ボタトゥン桟橋およびダラフェリーターミナル桟橋の位置 ............................................... 73 図 13.2 ボタトゥン桟橋 CG イメージ図 ................................................................................................ 74 図 13.3 ダラフェリーターミナル CG イメージ図 ................................................................................ 74 図 13.4 ボタトゥンにおける計画レイアウト ....................................................................................... 76 図 13.5 施工工程 ....................................................................................................................................... 79 図 13.6 ダラフェリーターミナル実証事業計画のレイアウト ........................................................... 79 図 13.7 土層構成図 ................................................................................................................................... 80 図 13.8 組織全体図 ................................................................................................................................... 83 図 13.9 事業実施の進捗 ........................................................................................................................... 84

  • ミャンマー国ヤンゴン港・内陸水運施設改修調査 最終報告書 要約

    日本工営/OCDI S-vi

    写真リスト 写真 6.1 ボタトゥン桟橋の被災状況 ....................................................................................................... 26 写真 6.2 Phonegyilan 桟橋の被災状況 ...................................................................................................... 26 写真 6.3 IWT の旅客船 .............................................................................................................................. 26 写真 6.4 IWT の貨物船 .............................................................................................................................. 26 写真 9.1 航海安全に関する研修 ............................................................................................................... 39 写真 9.2 安全航行に係る研修 ................................................................................................................... 42 写真 9.3 安全航行に係る研修 ................................................................................................................... 45 写真 10.1 訓練状況(左:講義および議論、右:実地訓練) ............................................................... 51 写真 10.2 ポンツーンの建造状況 ............................................................................................................... 54

  • ミャンマー国ヤンゴン港・内陸水運施設改修調査 最終報告書 要約

    日本工営/OCDI S-1

    要 約

    第1章 はじめに

    1.1 調査の背景

    2008 年 5 月 2 日にサイクロン・ナルギスが、ミャンマー国最大の都市ヤンゴン市をはじめ、ヤンゴン管区およびエーヤワディ管区を中心とする地域を直撃し、死者・行方不明者 13 万人以上、被災者200 万人以上が生じた。主要交通インフラである港湾施設・船舶も大きな被害を受け、被災地域への支援物資・生活物資の運搬に支障が出て、そのことが同地域での生活再建が進まない主要な要因の1

    つとされた。

    被災後 8 ヵ月間のうちにミャンマー国の自助努力および日本を含めた海外からの緊急援助によって、復旧作業がなされたが、内陸水運の物資を送り出す拠点であるヤンゴン港の内陸水運航路・施設の復

    旧は遅れ、調査対象地域(1.3 参照)の内陸水運網のボトルネックとなっていた。

    その様な状況下、ミャンマー国側より、ヤンゴン港の内陸水運用施設を中心とした港湾施設の早急な

    復旧のために必要な、短中期的な復旧計画策定に加え、ミャンマー国側が独自に実施する被災地域に

    おける内陸水運機能回復のための事業実施に必要な技術支援が、併せて要望された。

    1.2 調査の対象

    本調査の目的は以下のとおりである。

    ヤンゴン港における港湾施設復旧計画の策定(Phase 1) 調査対象地域における主要内陸水運の復旧計画の策定(Phase 1) カウンターパート機関であるミャンマー港湾公社(MPA)および内陸水運公社(IWT)

    の能力開発を伴う実証事業・訓練・追加調査の実施(Phase 1 & 2) 実証事業で建設した施設の 1 年間の瑕疵対応の補助(Phase 3)

    1.3 調査対象地域、スコープおよび調査スケジュール

    1.3.1 調査対象地域

    調査対象地域は、ヤンゴン港、エーヤワディデルタ地区の主要 4 航路および拠点港の港湾施設を対象とする。航路と拠点港の位置は巻頭の口絵に示した。

    1.3.2 調査スコープ

    Phase 1 のスコープは以下のとおりである。

    インセプション・レポートの提出および協議 データ収集 ヤンゴン港における航路・停泊地の安全確保策の提案 ヤンゴン港・港湾施設の復旧策の提案 対象地域の主要内陸水運の復旧策の提案 プログレス・レポートの提出および協議 航行安全確保に関する研修事業(ステップ 1)

  • ミャンマー国ヤンゴン港・内陸水運施設改修調査 最終報告書 要約

    日本工営/OCDI S-2

    船舶修理および鋼構造物修理に関する研修事業(ステップ 1) 潮位計利活用能力向上策に関する技術移転(Phase 1) 防災能力向上策の検討(Phase 1) 実証事業の準備(Phase 1) 環境調査の実施 インテリム・レポートの提出および協議

    Phase 2 のスコープは以下のとおりである。

    航行安全確保に関する研修事業(ステップ 2 および 3) 船舶修理および鋼構造物修理に関する研修事業(ステップ 2~4) 潮位計利活用能力向上策に関する技術移転(追加調査) 防災能力向上策の検討(追加調査) 桟橋改修実証事業の準備(Phase 2)および進捗管理 環境調査の実施 最終報告書(案)および最終報告書の提出および協議

    Phase 3 は、1 年間の瑕疵担保期間において、問題が生じた場合、必要に応じ現地調査を行い、施設の状況、原因把握を行う。問題が生じなかった場合については、完工検査を行うこととする。

    1.3.3 調査スケジュール

    表 1.1 に本案件全体のスケジュールを示す。

    表 1.1 全体工程

    出典: JICA 調査団

    Year 2010 2011 2012 2013

    Month 3 4 5 6 7 -- 11 12 1 -- 11 12 1 2 3 -- 11

    Phase 1

    Phase 2

    Phase 3

    Report ∆IC/R ∆PR/R ∆IT/R ∆DF/R ∆F/R

    2009 2014 2015

    IC/R; Inception Report , PR/R; Progress Report, IT /R; Interim Report, DF/R; Draft Final Report, F/R; Final Report

  • ミャンマー国ヤンゴン港・内陸水運施設改修調査 最終報告書 要約

    日本工営/OCDI S-3

    研修・調査および実証事業のフローチャートを図 1.1 に示す。

    出典: JICA 調査団

    図 1.1 研修・追加調査および実証事業の実施工程

    1.4 先方実施機関

    本調査では、ミャンマー国側に 2 つのカウンターパート機関があり、それぞれの主な所轄業務は以下のとおりである。

    - MPA:主要港湾の整備・管理・運営 - IWT:内陸水運の貨物・旅客の輸送および船舶の修理・建造

    本調査では、運輸省副大臣を議長とするステアリングコミティが組織され、調査期間中に 3 回の会議が開催された。メンバーは以下のとおりである。

    - ミャンマー国運輸省(MOT) - ミャンマー国運輸省ミャンマー港湾公社(MPA) - ミャンマー国運輸省内陸水運公社(IWT) - 在ミャンマー日本大使館 - JICA ミャンマー事務所 - JICA 調査団団員

    Phase 1 Phase 32009 2010 2011 2012 2013 2014 2015

    Capacity Development forShip Crew and Navigation

    Capacity Development forRepairing Ships and MetalStructures

    Study on Disaster RiskManagement

    Study of Tide ObservationSystem

    Design and Implementationof Pilot Project for JettyRestoration

    Phase 2

    Step‐1Ship Crew

    Step‐2Navigation System

    Step‐1Arc  Welding (Basic)

    Step‐2Sustainable Arc  Welding  & Cradle

    Step‐3CO2  Welding & Test

    Installation of 2 ATG at MP & MITT

    Analysis for 1 year's data 

    Analysis for confirmation for Yangon and Tide  Analysis for Delta

    Design (1)

    PQ (1)

    Tender(1)

    Tender (2)

    PQ (2)

    Relocation(Botahtaung to Dalla)

    PQ & Tender(3)

    Construction

    Defect liability period

    Tide Observation in Yangon 

    Seminar Seminar Seminar

    Design (2)

    Step‐3Ship Crew

    Step‐4Pontoon Construction

    Tide Observation in Delta 3 time for 1 month

    Simulation of Nargis

    Analysis of Future Cyclone & Tsunami(Yangon)

    Analysis of Future Cyclone & Tsunami (Delta Area)

  • ミャンマー国ヤンゴン港・内陸水運施設改修調査 最終報告書 要約

    日本工営/OCDI S-4

    1.5 報告書の構成

    本案件の Scope は、前述のとおり、以下の 2 つに大別される。

    Part 1(2009 年当時): サイクロン・ナルギスの復旧・復興計画の策定 Part 2(2010 年以降、一部 2009 年も含む):

    復旧・復興を通じたカウンターパートの Capacity Development

    サイクロン・ナルギスの復旧・復興計画の策定として、まず、第 2 章にミャンマーの水運に係る組織とその業務、第 3 章にサイクロン・ナルギスの特性を示す。次に、MPA および IWT 関連施設の詳細、被災状況と 2009 年に策定した復旧・復興計�