Examples: In all cases a Parent Reservation to be Redirected must be Firm Point-to-Point. Unless noted otherwise, example Redirect requests may be on either a firm or non-firm basis. Reservations that are shaded show Capacity Available to Redirect. MW’s in Gray are no longer available to Redirect. Requests that are cross-hatched are outside the bounds of the Parent Reservation.
R05002 Redirect Examples Appendix
Example 1 – Capacity Available to Redirect against Parent ARef# 1000 would be 60 MW for Day one and 30 MW for Day two. See Standards 9.4, 9.5, 10.4 and 10.5 and definition of Capacity Available to Redirect.
Day 1 Day 2 Day 3 Day 4
60 MW -
30 MW -
100 MW -
Confirmed Resale ARef# 1001
Confirmed Redirect ARef# 1002
Pending Redirect
ARef# 1004
Confirmed Redirect
ARef#1003
Pending Tag ID# 101
Implemented Tag ID# 100
Day 1 Day 2 Day 3 Day 4
60 MW -
20 MW -
100 MW -
Confirmed Firm Parent ARef# 1000
RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE
Requesters: Electronic Scheduling Subcommittee and
Information Technology Subcommittee
Request No.: R05002
Request Title: Revision of Redirect Standards 9 and 10
Example 1: Parent Reservation
Example 1: Capacity Available to Redirect on Parent Reservation (shaded area) after Various events
Day 1 Day 2 Day 3 Day 4
60 MW -
20 MW -
100 MW -
Confirmed Firm Parent ARef# 2000
Outage
Example 2 – The Capacity Available to Redirect is unaffected by the outage. The Capacity Available to Redirect against Parent ARef# 2000 would be 100 MW’s for all four days. See Standards 9.2 and 10.2.
Example 2: Capacity Available to Redirect on Parent Reservation Not Affected by Outage
RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE
Requesters: Electronic Scheduling Subcommittee and
Information Technology Subcommittee
Request No.: R05002
Request Title: Revision of Redirect Standards 9 and 10
Example 3 – The TP must deny Request 3001 because the time period is invalid (i.e. extends past the time period of the Parent Reservation). The Capacity Available to Redirect on the Parent Reservation remains at 100 MW for the duration of the reservation. See Standards 9.3, 9.4.1, 10.3 and 10.4.1
Day 1 Day 2 Day 3 Day 4
60 MW -
20 MW -
100 MW -
Confirmed Firm Parent ARef# 3000 Invalid
Redirect ARef# 3001
Example 3: Redirect Request with Invalid Time Period
RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE
Requesters: Electronic Scheduling Subcommittee and
Information Technology Subcommittee
Request No.: R05002
Request Title: Revision of Redirect Standards 9 and 10
Example 4 – With a Non-Firm Redirect Request where the capacity requested exceeds the Capacity Available to Redirect of the Parent, if ATC is available, the TP may Counteroffer ARef# 4001 at 100 MW (See Example 4a) or deny ARef# 4001 (See Example 4b). In 4a, assuming the customer confirmed the Counteroffer, the Capacity Available to Redirect on Parent Reservation ARef# 4000 would be 100 MW for the first two days and zero for days 3 and 4. See Standards 10.2, 10.3, 10.4, 10.4.1, 10.4.3 and 10.5.
Day 1 Day 2 Day 3 Day 4
60 MW -
20 MW -
100 MW -
Confirmed Firm Parent ARef# 4000
Non-Firm Redirect Request ARef# 4001
Example 4: Non-Firm Redirect with Capacity Requested exceeding Capacity Available to Redirect on Parent Reservation.
Day 1 Day 2 Day 3 Day 4
60 MW -
20 MW -
100 MW -
Confirmed Firm Parent ARef# 4000
Non-Firm Redirect ARef# 4001
Counteroffered and Confirmed at 100 MW
Example 4a: Non-Firm Redirect with Optional Counteroffer.
RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE
Requesters: Electronic Scheduling Subcommittee and
Information Technology Subcommittee
Request No.: R05002
Request Title: Revision of Redirect Standards 9 and 10
Example 4b – In this scenario, the TP denied the Non-Firm Redirect ARef# 4001. The Capacity Available to Redirect on Parent Reservation ARef# 4000 remains 100 MW for all four days. The TP could also Counteroffer Request 4001 at 100 MW (See Example 4a). See Standards 10.3, 10.4.1 and 10.4.3.
Day 1 Day 2 Day 3 Day 4
60 MW -
20 MW -
100 MW -
Confirmed Firm Parent ARef# 4000
Denied Non-Firm Redirect ARef# 4001
Example 4b: Non-Firm Redirect with Optional Deny.
RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE
Requesters: Electronic Scheduling Subcommittee and
Information Technology Subcommittee
Request No.: R05002
Request Title: Revision of Redirect Standards 9 and 10
Day 1 Day 2 Day 3 Day 4
60 MW -
20 MW -
100 MW -
Confirmed Firm Parent ARef# 5000
Firm Redirect ARef# 5001
Counteroffered and Confirmed
at 100 MW
Example 5 - With a Firm Redirect Request where the capacity requested exceeds the Capacity Available to Redirect of the Parent, assuming ATC is available, the TP must Counteroffer ARef# 5001 at 100 MW. Assuming also that the customer confirmed the Counteroffer, the Capacity Available to Redirect on Parent Reservation ARef# 5000 would be 100 MW for the first two days and zero for days 3 and 4. See Standards 9.3 and 9.4.3.
Day 1 Day 2 Day 3 Day 4
60 MW -
20 MW -
100 MW -
Confirmed Firm Parent ARef# 5000
Firm Redirect Request ARef#
5001
Example 5: Firm Redirect with Counteroffer
Example 5: Firm Redirect with Capacity Requested exceeding Capacity Available to Redirect on Parent Reservation.
RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE
Requesters: Electronic Scheduling Subcommittee and
Information Technology Subcommittee
Request No.: R05002
Request Title: Revision of Redirect Standards 9 and 10
Confirmed Firm Parent Reservation 5000
Example 7 – The Customer may have multiple requests for Firm or Non-Firm Redirects pending against the same Capacity Available to Redirect. Once Request 7001 is Confirmed, Non-Firm ARef# 7002 may be Refused by the TP or Withdrawn by the Customer. The Capacity Available to Redirect is 40 MW for days 1 and 2. (The TP could also Counteroffer non-firm ARef# 7002. This scenario is not shown). See Standards 10.4.2, 10.4.3, 10.5 and 10.5.1.
Day 1 Day 2 Day 3 Day 4
60 MW -
20 MW -
100 MW -
Confirmed Firm Parent Reservation ARef# 7000Accepted Non-Firm
Redirect ARef# 7001
Accepted Non-Firm Redirect ARef# 7002
Day 1 Day 2 Day 3 Day 4
60 MW -
20 MW -
100 MW -
Confirmed Non-Firm Redirect ARef# 7001
Withdrawn Non-Firm Redirect ARef# 7002
Confirmed Firm Parent Reservation ARef# 7000
RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE
Requesters: Electronic Scheduling Subcommittee and
Information Technology Subcommittee
Request No.: R05002
Request Title: Revision of Redirect Standards 9 and 10
Day 1 Day 2 Day 3 Day 4
60 MW -
20 MW -
100 MW -Accepted Firm Parent
ARef# 8000
Example 8 – The Customer may only Redirect against capacity of a reservation that is in a Confirmed State. ARef# 8001 would be Refused and the Capacity Available to Redirect against Parent ARef# 8000 would be zero MW’s for all four days because the reservation is not Confirmed. See Standards 9.1.1 and 10.1.1.
Refused Redirect ARef# 8001
RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE
Requesters: Electronic Scheduling Subcommittee and
Information Technology Subcommittee
Request No.: R05002