r27-sp42 bridge beams - kickoff meetingnsel.cee.illinois.edu/new/idotfeb26/tom_presentation.pdf ·...

19
1 R27-SP42 Bridge Beams - Kickoff Meeting January 30, 2020

Upload: others

Post on 27-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • 1

    R27-SP42 Bridge Beams - Kickoff

    MeetingJanuary 30, 2020

  • 2

    Bridge Location

  • 3

    Bridge Location

  • 4

    Bridge Location

  • 5

    IDOT Structure No. 020-3087

  • 6

    IDOT Structure No. 020-3087

  • 7

    IDOT Structure No. 020-3087

  • 8

    IDOT Structure No. 020-3087

  • 9

    IDOT Structure No. 020-3087

  • 10

    Beam in Newmark Structural Engineering Laboratory

  • 11

    Beam in Newmark Structural Engineering Laboratory

  • 12

    Beam in Newmark Structural Engineering Laboratory

  • 13

    Rebound Hammer Testing

    • Compare concrete

    quality at ends vs

    midspan

    • Rebound hammer

    test results show

    similar concrete

    quality along the

    length

    • Supports to stay at

    beam ends.

  • 14

    • 3 point bending

    • On NON-skewed supports

    • Displacement control

    • Deliverable: force and

    displacement response for

    loading to failure

    • Force from actuator/load

    cells

    • Displacement from two

    midspan potentiometers

    • Non-contact displacement:

    • Krypton system for

    measuring displacements.

    Test Setup

    3d model link

    https://app.sketchup.com/app?hl=en-US

  • 15

    • Determine an upper bound on

    force & displacement required

    of test setup.

    • Reponse2000

    • 5ksi concrete

    • 0.108 in2/strand

    • 250 ksi PS strands

    • 18.9 kip preload (no

    losses)

    • Mult ≈ 366 kip*ft

    • Pult ≈ 52.5 kip

    • Δult ≈ 6 in

    • Actuator is 300 kip ±15” stroke

    Bounding Analysis

  • 16

    Beam supports

    Test Setup

  • 17

    Bearings for beam supports:

    5” roller on each end, 6”x1” plate between roller and beam.

    Wide flange for load distribution across mid-span

    (TBD)

    Test Setup

  • 18

    • NTP on 11/16/19

    • Kickoff meeting in Springfield on 12/17/19

    • Scheduled for testing the week of 18th-21st

    • 19th preferable for IDOT

    Schedule

    From the

    signed work

    agreement:

  • 19

    • Krypton system

    • Identification and tracking of points in

    space and time

    • Targets along each side at 1/8th points

    • Mounted to blocks hot glued to beam

    • Camera location? (TBD)

    Discussion

    Krypton