rab establishment scenario

Upload: mousam-jha

Post on 07-Jul-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/18/2019 Rab Establishment Scenario

    1/1

    Performance Management Areas

    C 00 01220N

    RAB mappingsuccessful?

    (RANAP) RAB ASSIGNMENTREQUEST

    NO

     YES

    This message triggers the

    RAB Establishment process

    This process maps thereceived QoS parameters

    onto a supported RAB type

    Start of RAB Establishment

    Perform RAB mapping

    Initial RAB state?

    Capability checksuccessful?

    This process determinesif the UE can support therequested service (RAB)

    NO

     YES

    NO

     YES

    PS-Interactive-FACH

    Failure?

    Perform UECapability Check

     ADM REQ

    NO

     YES

     Admission

    Control successful?

    Perform Admission ControlStep any of counters:

    pmNoFailedRabEstAttemptExceedConnLimit +

    pmNoFailedRabEstAttemptLackDlPwr  +

    pmNoFailedRabEstAttemptLackDlChnlCode +

    pmNoFailedRabEstAttemptLackDlAse +

    pmNoFailedRabEstAttemptLackUlAse +pmNoFailedRabEstAttemptLackDlHwBest +*pmNoFailedRabEstAttemptLackUlHwBest +*

    pmNoFailedRabEstAttemptLackDlHw +pmNoFailedRabEstAttemptLackUlHw +

    pmNoRabEstBlockRnBestPsStreamHs +pmNoRabEstBlockRnPsStreamHs +

    pmNoRabEstablish

    -FailureUeCapability +

    * Stepped for the

    best cell in the

    active set.

    The counter to step is determined by whether theCM method has changed or if the CM is newlyactivated (if CM is UL&DL then step both UL and DL).

    The relevent counter from the following:pmCmAttUlSf2 +, pmCmAttDlSf2 +,pmCmAttUlHls +, pmCmAttDlHls +

    Counter incremented if CM is stopped. This occurs if :· gsmHoAllowed changes from “Allowed” to “Not Allowed”,· or if the value of Service Handover = “Handover to GSM shall not be· performed” for this RAB or in an earlier RAB in the case of Multi-RAB.

    · ifHoAllowed = “Not Allowed”. This is for the target RAN state.

    The counter to step is determined by whether theCM method has changed or if the CM is newlyactivated (if CM is UL&DL then step both UL and DL).

    SRB-DCH, CS-Speech, Ps-Interactive_64/64,

    Ps-Interactive_64/128, Ps-Interactive_64/384,

    Ps-Interactive_128/64, Ps-Interactive_384/64,Ps-Interactive_384/128, Ps-Interactive_128/384,

    CS-Speech AMR 7950, CS-Speech AMR 5900,

    CS-Speech AMR 4750, Ps-Interactive_64/Hs,

    Ps-Interactive_384/Hs, Ps-Interactive_Eul/Hs,

    Ps-Interactive_128/128, Cs64,

    CS-Speech + Ps_interactive_0/0, CS-Speech +

    Ps_interactive_64/64,

    CS-Speech + Ps_interactive_64/128, CS-Speech +

    Ps_interactive_128/64,

    CS-Speech + Ps_interactive_64/384, Ps_interactive_64/64 +Ps_interactive_64/64, Ps_interactive_64/128 +

    Ps_interactive_64/128,

    Ps-Streaming 128/16 + Ps_interactive_8/8,

    Ps-Streaming 16/128 + Ps_interactive_8/8

    NO

     YESStep the relevant counters.X= One of Speech, Cs57,Cs64, PsIntNonHs, PsIntHs,PsStreamNonHs, PsStreamHs

    Radio Link Setup

    Radio Link Reconfiguration Commit

    pmNoInvalidRabEstablishAttempts +

    pmNoNormalNasSignReleaseCs/Ps +

    Message received

    pmCmStop +

    The relevent counter from the following:pmCmSuccUlSf2 +, pmCmSuccDlSf2 +,pmCmSuccUlHls +, pmCmSuccDlHls +

    Radio Link Reconfiguration

    Failure due

    to TN or Node

    Block?

    1   42

    Re-attemptwithout capability?

    NO

    Go to Perfrom AdmissionControl step

     YES

    Go to Re-attempton RACH/FACH?

    step in Part C

    3

    pmNoRabEstBlockNodeXBest +

    Figure 5 RAB Establishment Scenario (Part A) 

    15103/1551-AXD 105 03/1 Uen G | 2010-08-24