Date Project Client Distance/depth Details
September 2018Kincardine Offshore
Windfarm Cobra Wind 17.3km / 1.5m DOL
Hybrid trenching of 17.3km 33kV export cable at Kincardine Offshore Windfarm
July 2018Shell Gannet GC4-04
Tie Back Subsea 7 3.2km / 0.8m DOC
Hybrid trenching of 3km flexible flowline at Shell Gannet C
July 2018 Shell Nelson SouthShell UK Limited
6km
0.6m DOC
Hybrid mode trenching of 6km replacement umbilical at Shell Nelson South
June 2018 Shapinsay to Stronsay SSE14km 1.75 DOL
Jet trenching of 14km replacement 33kV HVAC submarine cable
May 2018 Westray - Rousay SSE 2.5km0.75m DOC
Jet trenching of 2.5km replacement 33kV HVAC interconnector from Westray to Rousay
March 2018 Merkur Tideway 17 x array cablesJet trenching of 17 array cables at Merkur Offshore Wind Farm
September 2017 Hywind Subsea 78km
1.0m DOL
Jet trenching of four array cables at Hywind Scotland
Pilot park
September 2017 Mallard Technip15.28km
0.6m DOL
Jet trenching of Enquest Mallard 8’’ water injection
pipeline
September 2017 Hywind Subsea 725km
0.5m DOL
Cutting / hybrid trenching of 25km export cable at
Hywind Scotland Pilot Park
August 2017 Rampion E.ON81km
0.8m TOP
Installation and burial on second phase of 33kV array
cables on Rampion Offshore Wind Farm total 62
cables between turbines with a 81km total length
May 2017 Maria Subsea 722.5km
1.4m DOL
Jet trenching of Maria pipelines – Tyrihans GLL /
Infield GLL
March 2017 Gannet Bibby5.2km
0.6m DOCJet trenching of Shell Gannet 6’’ pipeline replacement
November 2016 Rampion E.ON75km
0.8m TOP
Installation and burial on first phase of 33kv array
cables on the Rampion Offshore Wind Farm
For further information on Global Offshore please visit: GLOBALOFFSHORE.CO.UK or contact our sales team.
UK: +44 1245 702000 | Asia: +65 65131300
GO
01
0 v
6
November 2016 Engie CygnusBibby/
Engie600mm TOP
Jet trenching of 8km long umbilical in the southern
North Sea
August 2017 BP – ETAPBibby/
BP600mm TOP Jetting and cutting on ETAP replacement umbilical
June 2016 Ivar Aasen NorwayEMAS/
Aker BP
500mm TOP
300mm cover
Jet trenching on 1 umbilical and 3 pipelines 2 x 8” and
1 x 10”on Ivar Assen project
January 2016 Egmond on Zee VBMS0.8km long
1.5m TOP
Jet trenching on Egmond on Zee Offshore Wind Farm
for replacement array cable
December 2015 Baltica Prysmian4km long
3m TOPRemedial jet trenching on TDC fibre optic cable
August 2015 Borkum II VBMS1km
1.5m TOP
Jet trenching on Borkum II Offshore Wind Farm for
array cable replacement
October 2015 Gemini Van Oord60km
1.5m TOP
Jet trenching 150x Gemini Offshore Wind Farm array
cables
July 2015 Gemini Van Oord130km
1.5m TOP
Jet trenching 200km of 132kv export power cable for
Gemini Offshore Wind Farm
December 2014 Humber Gateway E.ON 7.0km
Installation of 8 array cables and second end pull-in
to TP of 2 prelaid cables. Work carried out during
trenching campaign
August 2014 Humber Gateway E.ON43.4km
600mm TOP
Chain cutting of 77 cables at Humber Gateway
Offshore Wind Farm; inter array cables and 2 export
cables, average length 800m
January 2014 Gwynt y Môr RWE32.0km
1.2m TOP
Chain cutting of 40 inter array cables at the Gwynt y
Môr Offshore Wind Farm, each cable approximately
800m long, working in extremely variable soils
October 2013 Bittern
Ocean
Installer/
Shell
22.5km Chain cutting on 2 Shell Bittern umbilical
replacements; 1 x 2.5km and 1 x 20km
September 2013 Golden Eagle Technip4.5km
600mm TOP
Chain cutting on Nexen Golden Eagle development
on 4.5km umbilical where very fast track project was
completed
July 2013 Arkwright
Ocean
Installer/
Talisman
10km
800mm TOP
Chain cutting of 10km umbilical replacement working
in 100m water depth in central North Sea in mixed soil
conditions with sand and hard clays
May 2013 CorribTechnip/
Shell
16km
600mm TOP
Jet trenching of 16km on Shell Corrib umbilical from
shallow water 12m LAT out to deep water 60m
January 2013 Humber Gateway E.ON3.0km
1m TOP
Trenching trials undertaken for E.ON at their Humber
Gateway Offshore Wind Farm using the Q1400 in
chain cutting configuration, trialling different chain
configurations
July 2012 Lincs Offshore Centrica16km
800mm TOP
Inaugural trenching project using the Q1400 in
mechanical cutting mode, scope of work was to post
trench 16x120mm diameter array cables