Page 1: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Racetrack Progress and Near-Term Plans

WBS 2.3.3.n

Peter WandererDOE Review of LARP

June 12-14, 2006

Page 2: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

Topics• LRS: long racetrack + shell support; SRS = short …

• 0.3 m SRS tasks (status, schedule)• LBL to BNL: support structure, some parts, cable• BNL - Wind coils, react, pot, assemble, test

• 4 m LRS tasks (status, schedule, examples of work)• LBL to BNL: support structure, tooling for assembly:

design, build, assemble w. dummy coils• BNL (mostly) + LBNL + Fermilab: wind, react, pot

coils, assemble in support structure, test

• FY06 Budget overview

Page 3: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

Short racetrack SRS01 (0.3 m)

•Technology transfer from LBL to BNL• also-BNL engineering, technical staff spent time at LBL

•Test will begin this week

Page 4: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

LRS “shell” support structure (4m)

• Design of support structure complete• 2D, 3D models• Magnetic, mechanical analysis• Based on 0.3 m SRS support structure• Full-length aluminum shell• Half-length bladders and keys

Page 5: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

3D LRS support structure design

Magnetic model

Mechanical Model

Model has 300 mm straight section

Page 6: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

LRS support structure tooling• Handling rafts (green)• Installation beam (purple)

Page 7: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

LRS support structure status

•Procurement:•Shell, tie rods, dummy coils at LBNL (photos)•Assembly rafts fabricated•Pads shipped to LBL•Yoke by end of June

Page 8: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

LRS support fixture next steps• June - July

• Handling structure design & detail drawings• Cradles (detail drawings in progress)• Assembly beam (to be designed)• Winch mounts & pulling structure (to be designed)

• Design and fabrication of shell trace• Aug – Sept

• Shell instrumentation• Assembly preparation, and pre-assembly

• October• Magnet assembly with dummy coils• Load test (pressurize bladders, measure shell tension)• Ship to BNL

Page 9: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

BNL - coil winding machineExisting equipment

Built for LARP 4m coils

Page 10: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

Lift coil in reaction fixture• Want coil strain < .05% (25% of conductor limit)• Fixture, support beam keep coils strain < .01%• Max deflection 0.003” (0.08 mm)

•Two-point support•Lift from center

Page 11: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

Install coils into support fixture

Existing flat support beam

Piston to remove bladders

Fixtures from LBL

Page 12: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

Quench protection, instrumentation

• Sketch shows concept for coil sides w/o taps, heater.• Quench protection: (4 parallel ss heater strips) X 2 (redundant)

• each strip ~ 3, 100A, 0.001” thick; 334 V p.s.• design uses data from LBL dipole HD1

• Instrumentation: spot heater with nearby voltage taps• “Quench origin” voltage taps in critical areas (9/inner coil)

Page 13: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

LRS01 – LBL/FNAL/BNL items• Items to come from LBNL to BNL:

• ProE models of support structure, fixtures that will be used at BNL: July 1 - ok

• Support fixture: late October• Item coming from Fermilab to BNL:

• Insulated copper practice cable: July 1 - ok• Joint LBNL/FNAL/BNL item:

• Insulated Nb3Sn cable: July 15 - ok• Joint LBL/BNL item: kapton/ss instrum. “trace”

• Conceptual design completed• Traces needed mid-September

Page 14: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

LRS01 critical path highlights• Wind copper practice coil: July 1

• Winding base plate, insulated Cu practice cable• React first Nb3Sn coil: September 19

• Nb3Sn cable due July 15• Reaction oven due August 4 (a good vendor …)

• Impregnate first Cu/Nb3Sn coil: Aug. 1/Oct. 3• Trace (conceptual design ok) + tooling (in shops)

• Assemble LRS01: November 15• Support fixture, tooling

• Test: December, 2006• Minor test facility work

Page 15: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

FY06 LRS, SRS Budget• Budget ($k) by institution: total/BNL/FNAL/LBL

• WBS 2.3.2.2 + WBS 2.3.2.3

• FY06 – Initial: $1608 / $1262k / $32k / $314k

• FY06 – Final: $ 1737 / $1399k / $24k / $314k• BNL increase (items > $10k): reaction oven,

coil reaction tooling, winding machine design carryover, copper practice coil (not in baseline)

• FNAL decrease: FNAL staff travel to BNL

Page 16: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

Summary• Schedule

• SRS01, LRS01 schedules somewhat delayed, relative to baseline. No fundamental problems.

• Rearrangement of magnet construction sequence (SRS02 before test of LRS01), addition of a winding base plate LRS02 still on schedule, Sept. 07, for use in LQ construction decisions.

• Cost• Cost growth mostly due to added cost of oven,

added scope.

Page 17: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

Appendix• Web site and talks for work at LBL:

• https://dms.uslarp.org/Presentations/LRS01_review/• “Support Structure Design…” (Ferracin)• “Support Structure Fabrication…” (Cheng)

• Web site for talk for work at BNL:• http://larpdocs.fnal.gov/LARPpublic/DocDB/ShowDocument?docid=213 • Racetrack coil fabrication (Schmalzle)

• Web site for LR schedule (pages 6-8)• http://www.bnl.gov/magnets/Magnet_Schedule/smdplan.pdf

Page 18: Racetrack Progress and Near-Term Plans WBS 2.3.3.n

Peter WandererJune 12, 2006

SRS, LRS sched., highlight test dates

LRS01

SRS01

LRS02

SRS02