radial velocity follow-up of swasp-north candidates with sophie (1.93-m ohp) g. hébrard & f....
TRANSCRIPT
Radial Velocity follow-up Radial Velocity follow-up of SWASP-North candidates of SWASP-North candidates with SOPHIE (1.93-m OHP)with SOPHIE (1.93-m OHP)
G. Hébrard & F. Bouchy(IAP/OHP)
July 2006: telescope integration
Aug 2006: first light
- Fiber fed cross-dispersed echelle spectrograph- Res = 40’000 (H.E.) = 75’000 (H.R.)- 2k x 4k EEV 15 m pixel CCD- 387-694 nm (39 orders)- two pairs of 3’’ optical fibers- gain of 10 in efficiency / ELODIE- present precision of 4-5 m/s in H.R.
Perruchot. Kohler, Bouchy, et al. 2008
Bouchy, Hébrard, Udry, et al. 2010
mvRV [m/s] in 1 hour (H.E.)
vsini < 2 km/s vsini ~ 5 km/s vsini ~ 10 km/s
12 4 8 12
13 6 12 18
14 15 30 45
Photon noise uncertainties
+ 10-15 m/s of systematic in H.E. mode
1 - CCD Charge Transfer Inefficiency function of flux level at low S/N
(Bouchy et al. 2008)
Correction of systematic effects
2 - Seeing effect due to imperfect fiber scrambling effect (Boisse et al. 2010)
Correction of systematic effects
3 - Moon light contamination
Correction of systematic effects
Blended Eclipsing Binaries(inside seeing)
Deep inspection of CCFs Bisector Span
Amplitude changeWith CCF template
Reprocessing of all SOPHIE data in our IAP database:
- moon light correction
- computation of CCFs with F0, G2 and K5 masks
- Bisector span computation
- Complete listing of all observations
SOPHIE ++ADC
telescope
1
1
2
1
New N2 Dewar filling system + thermal isolation improvement
22
New Fiber scambling
New Calibration Unit
Expected end of optimisation phase : mid 2011
Expected accuracy ~ 1-2 m/s
Developpement of AstrAcad :
an automatic 50-cm telescope
for photometric follow-up (2012)
Goals : establish the true nature of transiting events characterize the true mass of secure planets determine central star parameters
Main Actors : G. Hébrard, F. Bouchy (IAP/OHP)C. Moutou (LAM) / Udry (Geneva)B. Loeillet (IAP/LAM - 2006-2009)I. Boisse (IAP - 2010)A. Santerne (LAM -2011-2012)Cameron, Pollacco, Skillen, Barros, Faedi (WASP)
SWASP-North follow-up with SOPHIE
WASP-113.7 days/ 0.5 MJup
West et al. (2009)
WASP-121.9 day / 1.4 MJup
Hebb et al. (2009)
WASP-142.2 days / 7.3 MJup
Joshi et al. (2009)
WASP-31.8 day / 1.8 MJup
Pollacco et al. (2008)
WASP-12.5 days / 0.9 MJup
Cameron et al. (2007)
WASP-22.1 days / 0.9 MJup
Cameron et al. (2007)
WASP-214.3 days / 0.3 MJup
Bouchy et al. (2010)
WASP-134.4 days / 0.5 MJup
Skillen et al. (2009)
Published SuperWASP planets with SOPHIE RVs
WASP-103.1 days / 3.0 MJup
Christian et al. (2009)
New SuperWASP planets with SOPHIE RVs
WASP-373.6 days / 1.7 MJup
Simpson et al.
New SuperWASP planets with SOPHIE RVs
WASP-386.9 days / 2.7 MJup
Barros et al.
New SuperWASP planets with SOPHIE RVs
WASP-394.1 days / 0.3 MJup
Faedi et al.
New SuperWASP planets with SOPHIE RVs
WASP-403.0 days / 0.6 MJup
West et al.
Another planet?Another planet?
CaII emission: active star
New SuperWASP planets with SOPHIE RVs?
2.1 days / 0.7 MJup
Semester nights PI Planets detected
2006B 4n Cameron WASP-1 / WASP-2
2007A 8n Pollacco WASP-3
2007B 5n Cameron WASP-10 / WASP-11 / WASP-12WASP-13 / WASP-14
2008A 4n Skillen WASP-21
2008B 4.5n Pollacco 2009A 3n Cameron WASP-27 (published as HAT-P-14) 2009B 3n Barros 2010A 8n Faedi WASP-37 / WASP-38 / WASP-39
WASP-40 2010B 5.7n Faedi (Opticon) 4n Hébrard
Semester nights PI systems observed
2008B 4n Simpson (RM) WASP-3 / WASP-12 / WASP-14bad weather: WASP-10 / WASP-
13
2009A 3n Simpson (RM) WASP-14bad weather: WASP-13 / J1508
2009B 4n Simpson (RM) WASP-21 / WASP-1 / WASP-10canceled: WASP-11 (2010B)
2010A 3n Simpson (RM) WASP-27 / J003750bad weather: WASP-13
WASP-3 SOPHIE
WASP-3bWASP-3b = 15° (+10°/-9°)
Simpson et al. (2010)
Miller et al. (submitted)
WASP-27/ HAT-P-14
``French’’ team involved : G. Hébrard, F. Bouchy (OHP) C. Moutou, A. Santerne (LAM)
- Close to the instrument - In charge of the observations - In charge of the upgrade & optimization of instrument- In charge of the Data Reduction Software- Close interaction with observers in case of service mode
Means to optimize SWASP-North follow-up
- Increase Nb nights (Opticon + French applications) (5.7 + 4 = 9.7 nights in 2010B)
- Large flexibilities with other Large programs CoRoT (PI: C. Moutou) SOPHIE consortium (PI: F. Bouchy) 9.7 SWASP nights spread over all the semester
- One identified RV responsible in close contact with one identified SWASP responsible for each semester
- Better coordination with other facilities (FIES and Coralie)
Proposed Schedule for 2010B
15 - 20 Oct [5 nights] 4 nights SWASP
8 - 13 Nov [5 nights] 3.5 nights SWASP
+ 2.2 nights spread over the semester
Observers : G. Hébrard, F. Bouchy, A. Santerne, & C. Moutou
and some others SOPHIE consortium observers (service mode).