OutlineOutline
• Introduction
• Frequency Bands
• Plans
• Lists
• Compatibility Criteria
• Main Regulatory Aspects
• Processing of Article 4 Submissions
FREQUENCY BANDSFREQUENCY BANDS
The BSS Plans and Lists cover the following frequency bands:
Region 1: 11.7 - 12.5 GHz (space-to-Earth)14.5 - 14.8 GHz (Earth-to-space)17.3 - 18.1 GHz (Earth-to-space)
Region 2: 12.2 - 12.7 GHz (space-to-Earth)17.3 - 17.8 GHz (Earth-to-space)
Region 3: 11.7 - 12.2 GHz (space-to-Earth)14.5 - 14.8 GHz (Earth-to-space)17.3 - 18.1 GHz (Earth-to-space)
BSSBSS PLANS PLANS• Appendix 30 Downlink Plans (12 GHz)
- Regions 1 and 3 Plan (234 beams) - Region 2 Plan (238 beams)
• Appendix 30A Feeder-link Plans (14 & 17 GHz)- Regions 1 and 3 Plans (308 beams)
- Region 2 Plan (238 beams)
APPENDICES 30 & 30A APPENDICES 30 & 30A PPLANSLANS
PLAN REGION FREQ.(GHz) YEAR
Downlink 2 12.2 - 12.7 1983 / 85
Downlink 1 11.7 - 12.5 1977/2000
Downlink 3 11.7 - 12.2 1977/2000
Feeder-link 2 17.3 - 17.8 1983 / 85
Feeder-link 1 & 3 14.5 - 14.8 1988/2000
Feeder-link 1 & 3 17.3 - 18.1 1988/2000
ELEMENTS OF PLANSELEMENTS OF PLANS
National assignments are included in:• Articles 10 & 11 of Ap.30 (downlink)• Articles 9 & 9A of Ap.30A (feeder-link)
These Articles describe:orbital position, channels, polarisation, power levels, antenna patterns, emission designation, beam coverage, grouping ...
PPlan & List Beamslan & List Beams
WRC-2000 PWRC-2000 PLANLAN WRC-2000 developed a new Plan that included:• 10 channels in Region 1 and 12 channels in Region 3;• new national beams/assignments for East Timor and the
Seychelles;• 5 extended-coverage national beams for 15
administrations;• 30 "composite" beams;• new protection ratios and other technical parameters;• orbital position preferences for 63 administrations; and• 20 other national preferences.
REGIONS 1 AND 3REGIONS 1 AND 3 L LISTISTSS
Regions 1 and 3 Lists of Additional Uses:
• Downlink List- 12 GHz List (currently 32 networks/3329 assignments)
• Feeder-link List- 14 GHz List (currently 1 network/6 assignments) - 17 GHz List (currently 34 networks/2064 assignments)
ELEMENTS OF LISTELEMENTS OF LISTSS
• Created at WRC-2000.• Separated from the Plans and annexed
to the Master Register (MIFR).• Lists are evolving and will be updated
and published periodically by the BR.• Assignments in the Lists must be
compatible with the Plans and other services.
ELEMENTS OF LISTELEMENTS OF LISTSS (cont’d) (cont’d)
• Digital modulation only• Data elements submitted using Appendix 4• Non-monopolisation provisions• 15 year time limit • Provisions for use of assignments on a non-
interference basis in case of disagreements• Provision to accommodate assignments for
new ITU Member States
COMPATIBILITY BETWEEN COMPATIBILITY BETWEEN PLAN AND LIST ASSIGNMENTSPLAN AND LIST ASSIGNMENTS
• Plan assignments– Regions 1 & 3 Plan based on EPM– Region 2 Plan based on OEPM
• List assignments– Regions 1 & 3 List based on EPM and also
PFD for the downlink.
Compatibility Criteria forCompatibility Criteria forRegions 1 & 3 Plan AssignmentsRegions 1 & 3 Plan Assignments
Equivalent Protection Margin (EPM) is used as compatibility criteria for the Regions 1 & 3 Plans as follows:
Mi = protection margin = (dB)
i = interference type (1=co-channel, 2 & 3 = upper & lower first adjacent channels);
PRi = protection ratio for a given interference type i.
3
1
)10/(10log10i
M iEPM
ii
PRI
C
aggr
Compatibility Criteria forCompatibility Criteria forRegion 2 Plan AssignmentsRegion 2 Plan Assignments
Overall Equivalent Protection Margin (OEPM) is used as compatibility criteria for the Region 2 Plan as follows:
Mi = protection margin = (dB)
i = interference type (1=co-channel, 2&3=upper & lower first adjacent channels, 4&5= upper & lower second adjacent channels);
PRi = protection ratio for a given interference type i.
5
1
)10/(10log10i
M iOEPM
ii
PRI
C
aggr
Compatibility Criteria forCompatibility Criteria forRegions 1 & 3 List AssignmentsRegions 1 & 3 List Assignments
• Based on both EPM and PFD criteria.– EPM criteria as per the Regions 1 & 3 Plan– PFD criteria also used to identify affected
assignments as per Annex 1 of Ap.30
MAINMAIN REGULATORY REGULATORY ASPECTS ASPECTS
• BSS Downlink/ Feeder-link- Modification/Addition/Coordination (Article 4) - Notification/Implementation (Article 5)
• Terrestrial - Coordination/Notification (Article 6)
• FSS - Coordination/Notification (Article 7)
• Space Operation/TT&C in the Guardbands - Coordination/Notification (Article 2A)
AARTICLERTICLE 5 5 EXAMINATION EXAMINATION
• conformity with the Convention, Table of Allocations, other provisions
• conformity with the Plan and List (except reduced e.i.r.p, reduced coverage etc.)
• protection of other services in specific cases• Notified technical characteristics have to be
the same as those in the Plans or Lists except those allowed in provision 5.2.1 d)
AARTICLERTICLE 4 4 EXAMINATION EXAMINATION (Appendix (Appendix 3030 Regions Regions 1 1 && 3)3)
• Protection of the Regions 1 & 3 Plan and List - SPS/MSPACE: EPM & PFD calculations
• Protection of Region 2 Plan - GIBC(PXT)/GIMS: PFD
• Protection of Terrestrial Services - GIBC/GIMS: PFD
• Protection of Region 2 and Region 3 FSS - GIBC(PXT)/GIMS: PFD
AARTICLERTICLE 4 EXAMINATION 4 EXAMINATION (Appendix (Appendix 3030A Regions 1&3)A Regions 1&3)
• Protection of Regions 1&3 Plan and Lists - SPS/MSPACE: EPM calculation
• Protection of the Region 2 Plan - GIBC(Appendix 8): delta T/T
• Protection of Region 2 FSS receiving feeder-link space stations (17.8-18.1 GHz) - GIBC(Appendix 8): delta T/T
Processing of Article 4 Processing of Article 4 Submissions Submissions (1)(1)
• Bureau is currently processing all as yet unpublished submissions received under Article 4 using the revised Appendices 30 and 30A in accordance with Resolution 546 (WRC-03).
• Special Sections, that contain the filed satellite network characteristics and potentially affected administrations, are being published in BR IFICs.
• Administrations should examine each BR IFIC to see if it’s assignments are affected and respond within 4 months.
Processing of Article 4 Processing of Article 4 Submissions Submissions (2)(2)
• Affected administrations that do not comment within the 4 month period are deemed to have agreed.
• After the 4 month period has expired, the BR prepares a list of coordination agreements required and publishes this in a Part D Special Section.
• Results of the Bureau’s MSPACEg calculations are also placed on the BR IFIC.
• Workshop session will explain this in more detail.
Plan and List dataPlan and List data• All Plan and List assignment data can be found on
the BR IFIC & the ITU website at:
http://www.itu.int/ITU-R/space/plans/index.html
• Contained in the SPS database (SNS Version 5 format).
• Contains the technical characteristics and reference situation for all Plan, List and pending Article 4 assignments.
• The SPS database is evolving and is updated regularly.
Post WRC-03 ActivitiesPost WRC-03 Activities
• Update of the Reference Situation (EPM/OEPM) for Plan & List assignments;
• Implementation of Resolution 548 (WRC-03);• Implementation of the grouping concept in
Regions 1 & 3; • Processing of Article 2A, 4 & 5 notices;• Implementation of Resolution 547.
Assignments in theAssignments in theSPS DatabaseSPS Database
2145 2407 41924108 2291 0
30545 34188
10411
0
5000
10000
15000
20000
25000
30000
35000
40000
R1/3 Down R1/3 Up R2 Plan
Ass
ign
men
ts
Article 4
List
Plan
Workshop SessionsWorkshop Sessions
• How to determine if an administration is identified as affected by a proposed Article 4 satellite network in BR Publications;
• Using the SPS and other BR software applications to obtain the technical examination results;
• Part A and Part B Examination of an Article 4 network;
• Submission of Appendix 4 information under Articles 4 and 5 & Res.49 using SpaceCap v5