rafael correa cv (ingles)

5
Urb Saman la Ceiba condo “c” house N·271, Tipuro Maturín City, Monagas state zip code: 6201, Venezuela +58 (0426) 5940907 / +58 (0291) 6418365 email: rafael [email protected] RAFAEL JOSÉ CORREA MATA Personal data: C.I. .: 11,827,657. Date of birth: 01/24/1975 Marital Status: Married Birthplace: Cumana, Edo. Sucre. Nationality: Venezuelan Passport: 104695047 Visa n#:E3653627 PETROLEUM ENGINEER OBJECTIVE Perform, provide, develop and apply all my skills, innate and acquired knowledge, achieving excellent results in the work and assigned area; besides get through responsibility and trust placed in me, a unique experience, which I'll get to important steps forward in my personal development, along with the pride of being part of your team. SKILLS & ABILITIES Software in drilling fluid. Well Control. Drilling Engineer Experience Running Water Base Fluids, 100% Oil- In Drill in Northern Monagas (Field Carito, Mulata, Musipán). Southern Monagas (Morichal), North-East Field Orocual. Chemical Engineer Experience, Treatment in Field and Flow Stations PDVSA (Bare 5.7, 10, Ofc-18, Santa Rosa, Compressor Plant Jusepín, Carito, Santa Barbara, Musipán Morichal) .Petroquiriquire (Field Quiriquire Qe-1 Qe-2) Petro Onado (Onado, Leona, Fox-1, Araibel, Ored-5). Identification and Quantification of corrosion. Chemical Treatment in Oil, Gas And Water. Formulation of chemicals.

Upload: antonio-correa

Post on 24-Jan-2017

20 views

Category:

Engineering


0 download

TRANSCRIPT

Urb Saman la Ceiba condo “c” house N·271, TipuroMaturín City, Monagas state zip code: 6201, Venezuela

+58 (0426) 5940907 / +58 (0291) 6418365 email: [email protected]

RAFAEL JOSÉ CORREA MATA

Personal data:

C.I. .: 11,827,657.

Date of birth: 01/24/1975

Marital Status: Married

Birthplace: Cumana, Edo. Sucre.

Nationality: Venezuelan

Passport: 104695047

Visa n#:E3653627

PETROLEUM ENGINEER

OBJECTIVE Perform, provide, develop and apply all my skills, innate and acquired knowledge, achieving excellent results in the work and assigned area; besides get through responsibility and trust placed in me, a unique experience, which I'll get to important steps forward in my personal development, along with the pride of being part of your team.

SKILLS & ABILITIES

Software in drilling fluid.

Well Control.

Drilling Engineer Experience Running Water Base Fluids, 100% Oil-In Drill in Northern Monagas (Field Carito, Mulata, Musipán). Southern Monagas (Morichal), North-East Field Orocual.

Chemical Engineer Experience, Treatment in Field and Flow Stations PDVSA (Bare 5.7, 10, Ofc-18, Santa Rosa, Compressor Plant Jusepín, Carito, Santa Barbara, Musipán Morichal) .Petroquiriquire (Field Quiriquire Qe-1 Qe-2) Petro Onado (Onado, Leona, Fox-1, Araibel, Ored-5). Identification and Quantification of corrosion. Chemical Treatment in Oil, Gas And Water. Formulation of chemicals.

Knowledge of drilling fluids and drilling operations.Extensive knowledge in Microsoft Office, Internet, Free Software

ACTUAL EXPERIENCE

Currently the Carabobo division has 49 drill rig and 16 rig for services, these operates with vertical and horizontal wells, J type, stratigraphic. The surface phase is drilled with a diameter of 17.5 "and native mud formulated with water and bentonite, intermediate phase is pierced with an inhibited polymer fluid, the production phase drilling with viscoelastic fluid. It is noteworthy that

currently I manage nine contracts of different companies of fluid, four of those contracts of solid control. I have a number of ten engineers under my charge to handle both, the technical field fluid conducting audits and providing recommendations and solutions to the problems presented. We also perform administrative tasks to perform well due bill or section and cancel the service provided agree to the contract. It is evaluated in conjunction with Intevep new products to reduce the torque to achieve greater number of feet drilled in the producing section.

EDUCATION Postgraduate: Specialty in metal corrosion. 2009-2011

Universite:UNEXPO. Puerto Ordaz city. Bolivar state

Average 16.4 points, waiting for thesis.

Universidad de Oriente. Puerto La Cruz city, Anzoategui state. 1992-1999. Degree:

PETROLEUM ENGINEER

LICEO CRUZ SALMERON ACOSTA – CUMANA – HIGH SCHOOL DIPOLMA1986-1991 [Degree in Science]

PROFESSIONAL TRAINING COURSES

PREVENTION AND CONTROL OF WELLS ONSLAUGHT. 28/02/98 SPE. UDO. ANZOATEGUI 32 HOURS.

MICROSOFT OFFICE 97, WORD, EXCEL, POWER POINT, ACCESS 28/11/98 INFOTRONIT ORIT. CUMANA-SUCRE 32 HOURS

TECHNOLOGY OF ASPHALTENES. COMPANY PQB VEN. 04/10/03. 24 HOURS.

ISO 9000: 2000. 05/31/03 KAIZEN CONSULTANTS, C.A. 16 HOURS

SALES TECHNIQUES. 18/08/03. COMPANY PQB VEN. 32 HOURS

EXTINGUISHER PROPER HANDLING. 03/06/04 COMPANY PQB VEN. 16 HOURS

CRUDE DEHYDRATION 3/13/04. COMPANY PQB VEN. 30 HOURS

DEFENSIVE DRIVING. 16/10/04. TRANSFI. 16 HOURS

APPLICATION AND FUNDAMENTALS OF CORROSION. 06/01/05 COMPANY PQB VEN. 60 HOURS

Page 2

SAFE HANDLING OF CHEMICALS 06/01/05 COMPANY PQB VEN. 32 HOURS

CHEMICAL HAZARD COMUNICATION 31/03/06. HALLIBURTON. 8 HOURS

SAFETY ORIENTATION COASTAL 31/03/06. HALLIBURTON. 8 HOURS

ENERGY SERVICES EMPLOYEE ORIENTATION 31/03/06. HALLIBURTON. 8 HOURS

DEFENSIVE DRIVING COASTAL MULTIMEDIA. HALLIBURTON 30/03/06. 8 HOURS

PERSONAL PROTECTIVE EQUIPMENT. HALLIBURTON 31/03/06. 8 HOURS

STOP FOR SAFETY 11/11/06. HALLIBURTON-ACTIMAR 32 HOURS

MANAGEMENT OF CHEMICALS 05/03/07 HALLIBURTON. 20 HOURS

ENVIRONMENTAL AWARENESS. HALLIBURTON 10/01/2007. 16 HOURS

INTEGRATE FLUIDS TEC. I, II, III 05/01/08. HALLIBURTON. 150 HOURS

WELL CONTROL. 22/02/2010. HALLIBURTON. WELL CONTROL SCHOOL 50 HOURS

BAROID DRILLING THECNOLOGY FLUIDS. 19/03/2010 HALLIBURTON-HOUSTON 3 MONTHS

STUCK PIPES. SCHLUMBERGER 24 HOURS

FORMATION DAMAGE. SCHLUMBERGER INTEVEP 40 HOURS

IADC WELL CONTROL. 40 HOURS

DIRECTIONAL DRILLING SEMINAR. SCHLUMBERGER 24 HOURS

SAFETY DRIVING. PDVSA. 8 HOURS

EXCEL BASIC. PDVSA. 24 HOURS

Note: The documents supporting this information are available.

WORK EXPERIENCE Engineer fluids II. Halliburton (March 2006/ August 2011)

Job Description:

To act as a fluids engineer in vertical and deviated wells in HP/HT areas with 4 drilling phases: first phase of 22 "native mud, playoff 17.5" lignosulfonate mud, 100% oil third phase, fourth phase-in drill mud.

Act as coordinator of fluids having four Engineers under my charge in exploratory wells in HT/HP areas

Page 3

Fluid engineer in Colombia in horizontal wells in the area of Yopal, drilling with inhibited viscoelastic polymer fluid.

Chemical treatment Engineer. PQB Venezuela. (January 2001/ January 20 05)

Job Description:

Treatment of wet gas H2S inhibitors, injection of corrosion inhibitors, emulsifiers for heavy and light crude in bottom and surface water treatment through biosidas, scale inhibitors, clarifiers etc.

Intern degree. PDVSA. (June 1999)

Job Description:

Develop drill in densified fluids with calcium carbonate.

Page 4