1 Rail and Underground Panel Date: 10 July 2014 Item 7: Crossrail Update This paper will be considered in public 1 Purpose 1.1 The accompanying presentation provides an overview of Crossrail Operations. 1.2 The presentation covers: (a) the scope of Crossrail; (b) the service frequency; (c) project progress, covering tunnelling, infrastructure works, Network Rail works, station construction; (d) train control systems; (e) rolling stock; (f) the passenger offering; (g) Crossrail Train Operating Company (CTOC); (h) current issues; and (i) railway integration. 2 Recommendation 2.1 The Panel is asked to note this paper and presentation List of Appendices to this Report: Appendix 1: Crossrail Presentation List of Background Papers: None Contact Officer: Howard Smith, Operations Director, Crossrail Number: 020 3197 5976 Email: Howard [email protected]

Upload: others

Post on 02-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

1

Rail and Underground Panel

Date: 10 July 2014

Item 7: Crossrail Update

This paper will be considered in public

1 Purpose

1.1 The accompanying presentation provides an overview of Crossrail Operations.

1.2 The presentation covers:

(a) the scope of Crossrail;

(b) the service frequency;

(c) project progress, covering tunnelling, infrastructure works, Network Rail works, station construction;

(d) train control systems;

(e) rolling stock;

(f) the passenger offering;

(g) Crossrail Train Operating Company (CTOC);

(h) current issues; and

(i) railway integration.

2 Recommendation

2.1 The Panel is asked to note this paper and presentation

List of Appendices to this Report:

Appendix 1: Crossrail Presentation

List of Background Papers:

None

Contact Officer: Howard Smith, Operations Director, Crossrail Number: 020 3197 5976 Email: Howard [email protected]

Page 2: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Crossrail Operations Rail and Underground Panel 10 July 2014

Howard Smith, Operations Director Crossrail

Appendix 1

Page 3: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters

Project background and progress

Project: next phases

Moving towards Operations

Rolling Stock

CTOC

Potential Change

To Cover

Page 4: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters

£14.8bn

40 stations – with Reading

120 route km

2x21km new tunnels

8km of existing tunnels

65 Class 345 units

3 signalling systems

Regulated and interoperable

Crossrail Scope

Page 5: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Peak Frequencies

4 trains ph H’row – c. London 4 trains ph Rdg/Mdhd – c. London 2 trains ph c. London – W. Drayton

24 trains ph. 14 starting or ending at Paddington

12 trains ph between c. London - Shenfield

12 trains ph between Whitechapel – Abbey Wood

Page 6: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters

52.7% complete

TBM’s 88% complete

Very good confidence of completing Stage 3 on time December 2018

Tunnel services phased opening 2018-19

Project Progress Period 2 14/15

Page 7: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters 42km of Tunnels – 8 TBMs

Page 8: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Stepney Green Caverns

Page 9: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Project Phasing

13 14 15 16 17 18

Railway Systems

Stations

Rolling Stock & Depot

NR Surface Works Test and C

omm

ission

Trial O

peration

Crossrail TOC

2012

Civils and Tunnelling

Page 10: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters

60 platform extensions

179 switch & crossing units

1000 OLE structures, 150 km OLE

c25% complete

Stockley viaduct on track for 50% complete milestone Dec 2014

Network Rail Surface Works

Stockley

Page 11: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Surface

West Drayton – track works

Ilford Yard (C828) – Logistics Building

Stockley flyover Bridge launch

Page 12: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Central Stations - Scale

Page 13: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Central Stations: Whitechapel and Paddington

Page 14: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Platforms – PEDS/PES

Page 15: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Systems Integration

2014 integration activities

Page 16: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Train Control Systems

Liverpool Street Main Line

NR IECC Liverpool

Street

NR Signalling Great Eastern Mail Line

Central Operating Section (COS)

S&CS IXL

S&CS IXL S&CS ATP & ATO

S&CS ATP & ATO

NR TVSC Didcot

Paddington High Level

NR Signalling Great Western Mail Line

London Bridge Via North Kent Line

NR Signalling North Kent

Line

NR MCS

Ashford

Stratford Ealing

Broadway Acton Shenfield Maidenhead

BUCF S&CS ATS

Romford RCC

Page 17: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Rolling stock - Class 345

Page 18: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Rolling Stock

65 x 200m long, air-conditioned, walk-through trains

Procurement completed Feb 2014 - 2 months ahead of programme

Trains enter service 2017

Also work residual services into Liverpool Street

74% of the value of the contract will be spent in the UK

Support 840 UK manufacturing jobs building the trains in Derby

Maintenance at OOC, Ilford and stabling at Plumstead and Maidenhead

Page 19: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Old Oak Common

Page 20: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Moving towards Operations

Page 21: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters What Passengers Want from Crossrail

Reliability 95% PPM

Timetable development with NR and DfT Iteration 5

TRAIL modelling underway to October

Seamless, reliable information Integrating with TfL on brand new ticke machines, digital screens, social media

A great environment – stations

Friendly, well informed staff - CTOC All stations staffed - first to last

Page 22: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters The Whole Customer Journey

Page 23: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters An Unusual Railway

Page 24: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters

COS Highly resourced, but any incident requires near instant response or results in ‘stalled’ trains

Limiting factors are ‘technical’ risks but also things like PIOTs, access/response times

On-Network Lower density of traffic but lower resource (time to site)

Limiting factors are other trains including longer distance and freight

Significant interworking on GWML with FGW, HEX, Freight

Need to recover timetable not just headway

Operations and management over the interfaces are key to success

An Unusual Railway

Page 25: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters CTOC – The Ambition

Recognised as world class and setting the benchmark for metro railway services in Europe

A unique railway but fully integrated with TfL’s transport network

Offering a step change in quality beyond anything we have achieved before

Page 26: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Crossrail Train Operating Company

Starts operations May 31st 2015 taking over existing Shenfield-Liverpool Street services

Based upon highly successful LO structure

Paid by performance, no revenue risk transfer

Take share of RSD and NR delays

Partnership between the Operator and TfL

Incentives to support Crossrail programme

Page 27: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Crossrail Train Operating Company

OJEU March 2013 Shortlist June 2013 Arriva Keolis/Go Ahead MTR National Express ITT September 2013 Return of Bids February 2014 Contract Award No later than Nov 2014 Operations May 2015

Page 28: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Potential Change

Extension to Reading Confirmed March 2014

HS2

Stations/Accessibility

Future increased frequency

Page 29: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters 31st May 2015

Page 30: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Railway Integration Timeline

Stage 1: May 2017 - Introduction of new rolling stock on Great Eastern – start of ‘Crossrail’

2017 2016 2012

1

2013

2

2014

3

2015

4 5 6

Q1 Q2

Stage 1

Stage 1

Page 31: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Railway Integration Timeline

Stage 2: May 2018 - Heathrow to Paddington - surface

2018 2017 2016 2012

1

2013

2

2014

3

2015

4 5 6

Q1 Q2 Q3 Q4 Q1 Q2

Stage 2 Stage 1

7 8

Stage 1

Stage 2

Page 32: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Railway Integration Timeline

Stage 3: Dec 2018 – Trains run through Central Section

2018 2017 2016 2012

1

2013

2

2014

3

2015

4 5 6

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Stage 3 Stage 2 Stage 1

7 8

Stage 3

Page 33: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters Railway Integration Timeline

Stage 4: May 2019 - Central Section passenger service connected to Great Eastern Surface Section

2018 2017 2016 2012

1

2013

2

2014

3

2015

4 5 6

Q1

2019 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

Stage 3 Stage 2 Stage 1

7 8 9

Stage 1

Stage 2 Stage 3 Stage 4

Page 34: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Railway Integration Timeline

Stage 5: Dec 2019 – Full service operating incl Reading

2018 2017 2016 2012

1

2013

2

2014

3

2015

4 5 6

Q1

Stage 5

2019 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Stage 4 Stage 3 Stage 2 Stage 1

7 8 9 10

Stage 1

Stage 2

Stage 3 Stage 4

Stage 5

Page 35: Rail and Underground Panel Date: 10 July 2014 Item 7 ...€¦ · 24 trains ph. 14 starting or ending at Paddington 12 trains ph between c. London - Shenfield 12 trains ph between

Header here max 30 characters