railway development between hong kong & prdprojectchambers.com.hk/uploads/upload_1343720722.pdf ·...
TRANSCRIPT
-
Railway Development between Hong Kong & PRD
Russell BlackProjects Director
MTR Corporation Hong Kong
WithProject Chambers26 June 2009
-
2009/7/28MTR Corporation Page 2
MTRs Existing Network
-
2009/7/28MTR Corporation Page 3
Tseung Kwan O South (LOHAS Park Station)
LOHAS Park
LHP
-
2009/7/28MTR Corporation Page 4
Kowloon Southern Link (KSL)
NN
Nam Cheong
Austin
East Tsim Sha Tsui
Hung HomKSL
-
2009/7/28MTR Corporation Page 5
Northern Link
West Rail Line
Shenzhen
East Rail Line
Ma On Shan Line
Tseung Kwan O Line(LOHAS Park Station)
Island Line
South Island Line (E)
West Island Line
Tung Chung Line
Airport Express Line
Lok Ma Chau Spur Line
Disneyland Resort Line
Express Rail Link
Tsuen Wan Line
Kowloon Southern Link
Kwun Tong Line
Shatin Central Link
Kwun Tong Line Extension
MTRC Future Projects
-
2009/7/28MTR Corporation Page 6
Tung Chung Line Airport Express
Kennedy Town
UniversitySai Ying Pun
Sheung Wan
NN
Island Line
West Island Line (WIL)
Tunnel Section
West Island Line
Route Length: 3 km
Station: 3
Journey Time: 8 mins(KET to SHW)
Route Length: 3 km
Station: 3
Journey Time: 8 mins(KET to SHW)
2 Cavern Stations
703
704
705
704
-
2009/7/28MTR Corporation Page 7
Futian
Humen
Shibi
Longhua
GuangShen Railway
West Kowloon
Dongcong
To Fuzhou /Hangzhou
To Beijing
Shilong
Changping
Zhengmutou
Gongming
XRL (HK Section)
GDS Intercity Rail
Route JourneyLength Time
HK to Futian (Shenzhen) 30 km 14 minsHK to Shibi (Guangzhou) 142 km 45 mins
Route JourneyLength Time
HK to Futian (Shenzhen) 30 km 14 minsHK to Shibi (Guangzhou) 142 km 45 mins
Express Rail Link (XRL)
Gongming
-
2009/7/28MTR Corporation Page 8
Shek Kong Stabling Sidings &
Emergency Rescue Station
West Kowloon Terminus
Mai Po V.B.
Ngau Tam Mei V.B.
Tai Kong Po EAP
Pat Heung V.B.
Shing Mun V.B.
Kwai Chung V.B.
Nam Cheong V.B.
Mongkok West V.B.
Ventilation Bldg / Emergency Access Point
XRL Alignment HK Section
-
2009/7/28MTR Corporation Page 9
West KowloonTerminus
Kowloon Station
Austin Station
WKT (XRL) Site Location
-
2009/7/28MTR Corporation Page 10
Sai Ying Pun
Sheung Wan
Island Line
Hong Kong
Tung Chung LineAirportExpress Line
University
Wong Chuk Hang
Ocean Park
Admiralty
Lei Tung
South Horizons
NNNN
West Island Line
Kennedy Town
Tunnel Section
Viaduct Section
South Island Line (East) (SIL(E))
Route Length: 7 km
Station: 5
Journey Time: 9 mins(SOH to ADM)
Features:
Medium capacity of 20,000 pax/hour
3-car Urban Line type trains
Small stations, all other respects MTR service
-
2009/7/28MTR Corporation Page 11Page 11
Kwun Tong Line Extension (KTE)Alignment Proposal
Route Length: 3 km
Journey Time: 5 mins(YMT to WHA)
2 underground stations
- Ho Man Tin Station
- Whampoa Station
Interchange with KTE /
SCL at Ho Man Tin
Route Length: 3 km
Journey Time: 5 mins(YMT to WHA)
2 underground stations
- Ho Man Tin Station
- Whampoa Station
Interchange with KTE /
SCL at Ho Man Tin
-
2009/7/28MTR Corporation Page 12
Ma On Shan Line
Tsuen Wan Line
Kwun Tong Line
Tseung Kwan O Line
NN
Island Line
West Rail Line
Shatin to Central Link (SCL/EWL) Phase I
Tai Wai
Diamond Hill
Kai Tak
To Kwa Wan
Ma Tau Wai
Ho Man Tin
Hung Hom
AirportExpress
Line & Tung Chung Line
Kowloon Southern Link
Kwun Tong Line Extension
Hin Keng Shatin to Central Link Ph I
East Rail Line
-
2009/7/28MTR Corporation Page 13
Tsuen Wan Line
Kwun Tong LineAirport Express
Line & Tung Chung Line
Tseung Kwan O Line
NN
Kwun Tong Line Extension
Island Line
Shatin to Central Link (SCL/NSL) Phase II
ExhibitionAdmiralty
East Rail Line
Shatin to Central Link Ph I
Shatin to Central Link Ph II
-
2009/7/28MTR Corporation Page 14
NORTHERN LINK
Northern LinkNorthern LinkLok Ma Chau
Spur Line
Express Rail Link
West Rail
East Rail
Airport Express Line&Tung Chung Line
Ma On Shan Rail
Disneyland Resort Line
Tseung Kwan O Line
Island Line
Tsuen Wan Line
ShenzhenLine 1
Line 4
Kwun Tong Line
KwuKwu TungTung
Kam Kam SheungSheung RoadRoad
-
2009/7/28MTR Corporation Page 15
ARL Possible Alignment
Tuen Mun
Yuen Long
Lo Wu
Shatin
Tsuen Wan
Hong Kong Island
Disney
Shekou
ShenzhenAirport
Qianhai
Hung Shui Kiu
Hong Kong Airport
Route length
HKIA to SZA: 42 km
: 42
HSK to QIH: 21 km
: 21
SHENZHEN
HONG KONG
Shenzhen Airport
Qianhai
Hong Kong Airport
Hung Shui Kiu
-
2009/7/28MTR Corporation Page 16
Road and BCF Arrangement
-
2009/7/28MTR Corporation Page 17
NORTH ISLAND LINK
ExhibitionExhibitionTamarTamar
Construction ScopeConstruction Scope
North Island LinkNorth Island Link
Airport Express Line
ExistingTung Chung Line
Existing Tseung Kwan O Line
ExhibitionExhibitionTamarTamar
Airport Express Line Existing Tseung Kwan O Line
Island Line
TseungTseung Kwan O LineKwan O Line
Tung Chung LineTung Chung Line
Operating ArrangementOperating Arrangement
ExistingTung Chung Line
Causeway Bay Causeway Bay NorthNorth
Causeway Bay Causeway Bay NorthNorth
Future Shatin Central Link
Future Shatin Central Link
-
2009/7/28MTR Corporation Page 18
Sai Ying Pun
Sheung Wan
Island Line
Hong Kong
Tung Chung LineAirportExpress Line
University
Cyberport
Wah Fu
Aberdeen
Wong Chuk Hang
Ocean Park
Admiralty
Lei Tung
South Horizons
NNNN
West Island Line
Kennedy Town
South Island Line (West) (SIL(W))
South Island Line (West)
-
2009/7/28MTR Corporation Page 19
Kai Tak EFTS Possible Route Options
Total Route Length: 6 kmNo. of Station: 9Status: Under study by HK Gov.
Existing Kwun Tong LineProposed Shatin - Central Link
-
2009/7/28MTR Corporation Page 20
Kai Tak EFTS Possible Route Options
EFTS routeEFTS station
Existing KTLProposed SCL
Route Line: 10 kmNo. of Station: 16Status: Under study by HK Gov.
-
2009/7/28MTR Corporation Page 21
Hangzhou-Fuzhou-SZ High Speed Rail
GDS Intercity Rail-87km
ShibiShibi(New GZ)(New GZ)
HumenHumen
SZ AirportSZ Airport
GZ-ZH Freight Line-
ZhuhaiZhuhai
ZhongshanZhongshan
DongguanDongguan
Guangzhou EastGuangzhou East
HengqinHengqin
YuzhuYuzhu
Express Rail Link (HK Section) ()-26km
GZ-SZ Rail
Wuhan-GZ High Speed Rail-
QianhaiQianhai
HongmeiHongmei
GZ-ZH Intercity Rail--143km
HuizhouHuizhou
LonghuaLonghua
FutianFutian
PRD Intercity Rail Network
JiangmenxiJiangmenxi
XiaolanXiaolan
Airport Rail Link
XXintangintang
DH Intercity Rail-99kmGZ-SZ-HK High Speed Rail
-116km
-
2009/7/28MTR Corporation Page 22
Intercity Rail Network in PRD Long Term
Guangzhou Qingyuan
Shenzhen Huizhou
Guangzhou Huizhou
Foshan Dongguan
Zhaoqing Nansha
GZ-FS-ZH
Jiangmen Enping
Zhuhai DoushanZhuhai Zhuhai Airport
Shenzhen Zhuhai
Zhongshan Humen
Huicheng Huidong
Huiyang Huidong
Humen Longgang
GZ-FS Circle Line
Foshan Zhaoqing -
-
-
-
-
-
-
-
- -
-
-
329103016601900
60210300360
GZ-DG-SZ (RTS)
Guangzhou Zhuhai
DG-HZ Intercity Rail
2014(construction in progress)
-
2009/7/28MTR Corporation Page 23
Comparison with London / Paris / Ruhr
London
Paris
Ruhr
PRD
150
km
150 km
150
km
150 km
150
km
150 km
150
km
150 km
Humen
Guangzhou
Gongming
Shibi
Longhua/New Shenzhen
Futian
Hong KongZhongshan
Zhuhai
Hengqin
HuizDongguan
Macau
ZHUJIANG
SOUTH CH
Year 2006: 12,300,000
Year 2006: 12,700,000Year 2006: 47,000,000
Year 2006: 12,000,000
-
2009/7/28MTR Corporation Page 24
1
Shenzhen Metro Network Existing
Louhu
Futian Kouan
ShenzhenAirport
HONG KONG
DONGGUAN
HUIZHOU
4
4L4
18L1
Length (km)Line No
Shaoniangong
Windows of the World
-
2009/7/28MTR Corporation Page 25
New Shenzhen Railway Station
3
5
4
2
1
Shenzhen Metro Network - Under Construction
QianhaiLouhu
Futian Kouan
Buji
HONG KONG
DONGGUAN
HUIZHOU
201140L5
201115L4 (Phase 2)
201141L3
201135L2
201123L1 (Phase 2)
Target OpeningLength (km)Line No
Qinghu
Longxingjie
Shenzhen Airport
Shekou
-
2009/7/28MTR Corporation Page 26
143
16
12
85
9
4
2
11
15
13
6
10
1
7
Shenzhen Metro Network Long Term
QianhaiLouhu
Futian Kouan
Buji
Pinghu
HONG KONG
DONGGUAN
HUIZHOU
4
16no. of Lines
Total Length: 580km
Longxingjie
Shenzhen Airport
Shekou
Pingdi
Kengzi
PingshanTiyuxincheng
Xiaomeisha
Guanlan
Shiyan
Guangming
Songgang
New Shenzhen Railway Station
-
2009/7/28MTR Corporation Page 27
Shenzhen Line 4Longhua New Extension
Longhua Town
Meilin Control Point
Shangtanglu
Longhua Central
Longhua Railway Station
Baishilong
Meilin
Lianhuabei
Juvenile Activity Centre
Civic Centre
Exhibition Centre
Fumin
Huanggang
Phase 2
Depot Station
Phase 1
Build Operate Transfer
Route Length (km) 15 (Phase 2)
Stations 10
Target Opening (Phase 2) Mid 2011
Operate: 15 stations for 30 years
Shangtanglu
Longhua Railway Station
-
2009/7/28MTR Corporation Page 28
Other China Projects
Beijing Line 4 (24 stations)Public-Private Partnership (PPP) JV modelRoute Length: 28.7kmTarget Opening: Sept 2009
Daxing Line MOU (operation &
maintenance) signed on Nov 2008
Route length: 22km Stations: 11 Target opening: 2010
-
2009/7/28MTR Corporation Page 29
Other China ProjectsHangzhou Line 1 Entered into Principle
Agreements (PPP) in Jan 2009 for investment, construction, and operation
Route length: 48km Stations: 30
Shenyang Line 1 & 2Principle Agreements (operation and maintenance) signed in Nov 2008Station: 22/L1, 19/L2Route Length (km): 28/L1, 22/L2Target Opening: Mid 2010/L1, Mid 2012/L2
-
THANK YOU