RAILWAY TRANSPORTATION
Total length of the railways 12.008 km
27 % is electrified
34 % is signallized
Private companies can operate own wagons
Monthly block train departures has reached to 5700
1000 block trains for international operations
13 block train routes to Europe
Automotive transportation by rail
![Page 3: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/3.jpg)
RAILWAY NETWORK
Total Lines: 12.008 km (Convantional+High Speed)
![Page 4: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/4.jpg)
FREIGHT TRANSPORTATION
Freight Transportation Nettonne (Thousand)
Freight Transportain On the Basis of Goods Nettonne
![Page 5: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/5.jpg)
ELECTRIFICATION
27 %
73 %8.792 km
3.216 km Conventional lines : 2.328 kmHigh Speed Train lines : 888 km
![Page 6: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/6.jpg)
SIGNALIZATION
4.016 km
7.992 km34 %66 %
Conventional lines : 3.128 kmHigh Speed Train lines : 872 km
![Page 7: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/7.jpg)
LIBERALIZATION OF TURKISH RAILWAYS
“Rail transport will increase in Turkey”
Liberalization Law has entered into force as of 1 May 2013 Turkish State Railways Transportation Company is established TCDD will be the operator of the national rail infrastructure network Private companies can operate own locomotives & wagons
![Page 8: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/8.jpg)
With the railways being the prioritized transport policy since 2003, significant
steps were taken towards the development of advanced railways industry with
the cooperation of domestic and foreign private sector
entities and in this scope;
• Adapazarı High Speed Train Factory (EUROTEM)
• Çankırı High Speed Turnout Factory (VADEMSAŞ)
• Sivas Modern Concrete Sleeper Factory (SİTAŞ)
were established
PUBLIC - PRIVATE SECTOR COOPERATION
![Page 9: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/9.jpg)
LOGISTICS CENTERS
Samsun, Denizli and İzmit Logistics Centers are opened 1. step of Eskişehir and Kayseri Logistics Centers are completed 2. step of Eskişehir and 1. step of Erzurum Logistics Center are beginning to work Balıkesir Logistics Center is under construction, 2. step of Kayseri Logistics Center will be begin Other logistics centers’ projects are continuing
![Page 10: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/10.jpg)
LOGISTICS CENTERS IN TURKEY
KOSEKOY / IZMIT HALKALI / ISTANBUL KEMALPASA / IZMIR
BOGAZKOPRU / KAYSERI HASANBEY / ESKİŞEHİR
![Page 11: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/11.jpg)
LOGISTICS CENTERS IN TURKEY
![Page 12: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/12.jpg)
RAILWAY PROJECTS
TRACECA
BALO PROJECTMARMARAY PROJECT
KARS-TBILISI-BAKU PROJECT
VIKING TRAIN PROJECT
SILK WIND BLOCK TRAIN
![Page 13: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/13.jpg)
MARMARAY PROJECT
“Marmaray Project will be opened on 29 October 2013”
Rail tunnel under Bosphorus
Marmaray project will provide a continuous communication between the Asian with European continents.
Linking Europe rail network to Middle East and CIS
75.000 pax per hour in one direction / Total travel time: ~ 105 min.A new capacity for the freight traffic (42 train per day)
![Page 14: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/14.jpg)
BALO PROJECT
“Great Anatolian Logistics Organizations Project”
UTIKAD:Shareholder of BALO
![Page 15: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/15.jpg)
KARS - TBILISI – BAKU RAILWAY PROJECT
The foundation of the part in Turkey was laid on 24 July 200892% realization of the project in Turkish side was achievedIt is planned to complete the project within 2014
![Page 16: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/16.jpg)
TRACECA
“The New Silk Road”
Aim:Strengthening of economic relations, trade and transport communication in the regions of the Black Sea basin, South Caucasus and Central Asia owing to active work based on political will and common aspirations of all member-states
Member Countries:
• Armenia• Azerbaijan• Bulgaria• Georgia• Iran• Kazakhstan• Kyrgyzstan
![Page 17: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/17.jpg)
SILK WIND BLOCK TRAIN
Route: China - Kazakhstan - Caspian Sea - Black Sea
Countries:
China Kazakhstan Azerbaijan Georgia Turkey
![Page 18: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/18.jpg)
VIKING TRAIN PROJECT
The Black Sea is connecting with the Baltic Sea by the “Viking Train”
The connection of the Viking Train will be able to be established to Mediterranean, Europe, Middle East and Central Asia via Turkey.
It is targeted to connect Europe to Middle East and Cental Asia through TRACECA Corridor in the shortest way.
![Page 19: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/19.jpg)
HIGH SPEED LINE PASSENGER TRANSPORTATION
Opened Lines Ankara-Eskisehir High Speed Train Ankara – Konya High Speed Train
8.741.921 passengers were transported and 31.320 services were rendered by HST between March 2009 - December 2012 on Ankara-Eskişehir and Ankara Konya lines. 3.349.524 passengers were transported in 2012, corresponding to 31% increase as compared to 2011.
Under Construction Lines Ankara – Sivas High Speed Train Ankara – Izmir High Speed Train Bursa High Speed Train
Ankara-Istanbul High Speed Train Line will be opened on 29 October 2013
![Page 20: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/20.jpg)
HIGH SPEED RAILWAY LINES
Total Invest Amount : 16 Billion 617 Million $ Construction Amount : 14 Billion 487 Million $High Train Multiple Unit (74 pcs) : 2 Billion 130 Million $Residuary Invest Amount : 14 Billion 5 Million $
While High Speed Train Project Completed;As year ;
48 million passenger 2 billion 105 million $ revenue 916 million $ net revenue
![Page 21: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/21.jpg)
ANKARA - ISTANBUL HIGH - SPEED TRAIN PROJECT
![Page 22: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/22.jpg)
FIATA WORLD CONGRESS 2014 - ISTANBUL
www.fiata2014.org
13 - 18 OCTOBER 2014 BOMONTI HILTON HOTEL & CONFERENCE CENTER
![Page 23: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/23.jpg)
ASSOCIATION OF INTERNATIONAL FORWARDING AND LOGISTICS SERVICE PROVIDERS
General Manager : Mr. Cavit UGUR
E-mail Address : [email protected]
Web Site : www.utikad.org.tr
Phone : + 90 212 663 62 61
Fax : + 90 212 663 62 72
Address : Senlikkoy Mahallesi, Saci Sokak,
No:4/F, Florya 34153
Bakirkoy – Istanbul / TURKEY
CONTACT DETAILS OF UTIKAD
![Page 24: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD](https://reader036.vdocument.in/reader036/viewer/2022062409/56649d135503460f949e6aeb/html5/thumbnails/24.jpg)
Thank YouThank YouHacer Uyarlar
Board Member of UTIKAD