Capital Projects Division Recovery and Resilience tinyurl.com/SANDYRECOVERY (212) 306-8532 — [email protected] RANGEL HOUSES Existing Funded Buildings Boiler Plants Community Center & Childcare Center Back-up Generators Annex Buildings Unfunded Buildings Existing Retail (Supermarket) Development Information Development Statistics Elected Representative: Tenant Association: Buildings benefiting from FEMA funding: Building heights: 14 stories Total Buildings: 8 5 Property Size: Congressional (D-13): Tenant Association President: NYS Assembly (D-71): NYS Senate (D-30): NYC Council (D-9): • Adriano Espaillat • Bernadette McNear • Alfred Taylor • Brian A. Benjamin • Bill Perkins 10.92 acres

Upload: others

Post on 06-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RANGEL HOUSES Development Information - New York City · 2021. 1. 5. · RANGEL HOUSES. Conceptual. Existing Funded Buildings Boiler Plants Community Center & Childcare Center Back-up

Capital Projects Division Recovery and Resilience

tinyurl.com/SANDYRECOVERY(212) 306-8532 — [email protected]

RANGEL HOUSES

Conceptual

Existing Funded Buildings

Boiler Plants Community Center & Childcare Center

Back-up Generators Annex Buildings Unfunded Buildings

Existing Retail (Supermarket)

Development Information

Development Statistics

Elected Representative:

Tenant Association:

Buildings benefiting from FEMA funding:

Building heights:14 stories

TotalBuildings: 8

5

Property Size:

Congressional (D-13):

Tenant Association President:

NYS Assembly (D-71):

NYS Senate (D-30):

NYC Council (D-9):

• Adriano Espaillat

• Bernadette McNear

• Alfred Taylor

• Brian A. Benjamin

• Bill Perkins

10.92 acres

Page 2: RANGEL HOUSES Development Information - New York City · 2021. 1. 5. · RANGEL HOUSES. Conceptual. Existing Funded Buildings Boiler Plants Community Center & Childcare Center Back-up

Project Scope

NYCHA’s Recovery & Resilience Department Questions/Problems, 疑 问/家 里 的 问 题,

Вопросы / проблемы, Preguntas/Problemas (212) 306-8532 — [email protected]

Resiliency• Manually dry flood proof areas below the FEMA flood level

Safety• Install new security cameras per funding availability• Install upgraded door security access systems per funding availability

Development Improvements• Resurface site pavement affected by construction activities

Building Improvements• Construct new MEP annexes above the FEMA flood level to house automatic transfer switch,

current transformer cabinet, distribution panels and gas equipment for the generators• Replace roofs on 5 buildings (Buildings 1, 2, 6, 7 and 8)• Replace and/or repair doors, door frames, and hardware damaged by water• Replace and/or repair mechanical, electrical and plumbing equipment damaged by water to

include: sump pumps, vacuum/condensate pumps and related piping, and the replacement of hot water tank in Building 1

• Install back water valves on sewer/storm plumbing lines• Remove hazardous materials and clean building crawl spaces

Energy• Install of full backup power generators for Buildings 1, 2, 6, 7, and 8• Implement sitewide energy and sustainability measures