Detailed Rate Catalog of Residential Buildings An Assignment of ‘Quantity Surveying and Costing’ 2012 Sir Syed University of Engineering and Technology Karachi 2012

Upload: engr-syed-faraz-jafri

Post on 17-Jul-2015

189 views

Category:

Data & Analytics


0 download

TRANSCRIPT

Detailed Rate Catalog of Residential Buildings An Assignment of ‘Quantity Surveying and Costing’

2012

Sir Syed University of Engineering and Technology Karachi

2012

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 2

GROUP MEMBERS S. No. Name of Student Roll No. 1. Iftikhar Hussain 2010 – CV – 324 2. Zahid 2010 – CV – 321 3. Naeem Ali 2010 – CV – 326 4. Irshad Hussain 2010 – CV – 305 5. Shakeel Ahmed 2010 – CV – 288 6. Jamil Ahmed 2010 – CV – 300 7. Ibrar Hussain 2010 – CV – 311 8. Azhar Uddin 2010 – CV – 343 9. Moin Uddin 2010 – CV – 344 10. Bilal 2010 – CV – 291

Submitted to:

Sir Faraz Jaffri

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 3

PREFACE This report is prepared keeping in view the importance of rate analysis in estimation and costing of civil engineering projects. Rate analysis is the backbone of estimation, therefore it is very important to analyze current market rates as well as past market rates before starting the process of estimation and valuation. For this purpose rates of different items of work are obtained from the market periodically, and kept in record for future analysis. The following report also contains current market rates of materials, services and labor taken from three different locations within the city of Karachi, during 05-09-2012 to 20-10-2012.

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 4

ACKNOWLEDGEMENTS We would like to thank Mr. Nasir Rasheed, Project Electrical Engineer at Orient Energy Systems, who provided valuable information about electrical, water supply and sanitary items. We also thank Engineer Affan Ali, Civil Engineer at IKAN Engineering, and Mr. Mobeen, Site Supervisor at IKAN Engineering, for their generous support. We acknowledge the support and help provided by Engineer Asif at Saima Royal Residency, Gulshan-e-Iqbal. We would also like to thank Engineer Murtaza at United Construction Company for providing us with labor and material rates.

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 5

TABLE OF CONTENT

Group Members ................................................................................................................................................................ ........... 2

Preface ................................................................................................................................................................ .............................. 3

Acknowledgements ................................................................................................................................................................ ... 4

Table of Content................................................................................................................................................................ ........... 5

Earth Work and Labor Rates ................................................................................................................................................ 6

Excavation:................................................................................................................................................................ ................. 6

Contractor: ................................................................................................................................................................ ................. 6

Excavator: ................................................................................................................................................................................... 6

Labor Rates: .............................................................................................................................................................................. 6

Excavation and Backfilling: .............................................................................................................................................. 7

Materials: .................................................................................................................................................................................... 7

Labor Rates: .............................................................................................................................................................................. 7

Cement and Steel ......................................................................................................................................................................... 9

Electrical Works ................................................................................................................................................................ ....... 11

Water Supply and Sanitary ................................................................................................................................................. 16

Fixing: ................................................................................................................................................................ ........................ 19

Doors and Windows ............................................................................................................................................................... 21

Doors: ................................................................................................................................................................ ........................ 21

Windows: ................................................................................................................................................................................. 21

Doors and Window Frames ................................................................................................................................................ 23

Door Frames ................................................................................................................................................................ .......... 23

Window Frames ................................................................................................................................................................ ... 23

Steel Works in Galleries and Windows ........................................................................................................................ 24

Making: ................................................................................................................................................................ ..................... 24

Fixing: ................................................................................................................................................................ ........................ 24

Concrete Blocks ................................................................................................................................................................ ........ 26

Rate per Block ................................................................................................................................................................ ....... 26

Rate per Truck Load .......................................................................................................................................................... 26

Paint ................................................................................................................................................................ ................................ 28

Flooring ................................................................................................................................................................ ......................... 30

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 6

EARTH WORK AND LABOR RATES

EXCAVATION: Per day: Type of Soil Rate per Day Normal Soil Rs.350/- Hard Soil Rs.450/- CONTRACTOR: Type of Soil Unit Rate Soft Soil Ft3 Rs.10/- to Rs.12/- Hard Soil Ft3 Rs.10/- to Rs.15/- Rocks Ft3 Rs.15/- to Rs.20/- EXCAVATOR: Type of Work Rate Excavation Rs.3500/- per Day Operator Rs.10000/- per Month LABOR RATES: S.No. Activity Labor Type Rate per Day

1 Plastering Skilled Rs.700/- Unskilled Rs.400/-

2 Form Work Skilled Rs.700/- Unskilled Rs.350/-

3 Tiles Skilled Rs.800/- Unskilled Rs.400/-

4 Steel Work Skilled Rs.700/- Unskilled Rs.350/-

5 Paint Skilled Rs.600/- Unskilled Rs.250/-

6 Weather Shield Skilled Rs.800/- Unskilled Rs.350/-

Contact:

United Construction Company

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 7

Earth Work and Labor Rates

EXCAVATION AND BACKFILLING: Type of Soil Unit Rate Excavation Ordinary Soil Ft3 Rs.5/-

Hard Soil Ft3 Rs.15/- Backfilling --- Ft3 Rs.17/-

MATERIALS: Item Unit Rate Crush Stone Ft3 Rs.30/-

Sand Ft3 Rs.25/-

LABOR RATES: S.No. Activity Labor Type Unit Rate per Day

1 Plastering Outer Side Ft2 Rs.14/-

Inner Side Ft2 Rs.12/-

2 Form Work Cost Ft2 Rs.16/- Skilled Day Rs.800/- Unskilled Day Rs.500/-

3 Block Masonry Skilled Block Rs.7/-

4 Steel Work Cut and Prepare Ton Rs.4000/- Skilled Day Rs.600/- Unskilled Day Rs.400/-

5 Paint Skilled Ft2 Rs.4/-

Contact: Abdullah B-212, Block 2, Gulistan-e-Johar, University Road, Karachi Cell # 0300-2371302

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 8

Earth Work and Labor Rates Excavation: Item Rate Excavator Rs.16000/- per Day Damper (450 ft3) Rs.12000/- per Day Note: Fuel and operator charges are also included. Material: Item Rate Crush Stone Rs.13500/- per Damper Sand Rs.9500/- per Damper Water Rs.1500/- per Tanker Note: Material rates are for construction site at Nipa. Labor Rates: Type Rate Skilled labor Rs.800 – 1000 per day Unskilled labor Rs. 400 – 700 per day Contact: Haji Gulam Rehman & Sher Hakim Iqbal Nagar, Manghopir Road, Karachi

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 9

CEMENT AND STEEL S.No. Item Address Company Rate

1 Cement

OPC Imran Cement and Steel Gulshan-e-Iqbal

Falcon Rs.445/- Lucky Rs.440/- Thata Rs.420/- Raj Rs.410/-

OPC Mujahid Steel and Cement Dipo, Gulistan-e-Johar

Falcon Rs.445/- Lucky Rs.430/-

OPC Cement House Water pump, Block 14

Falcon Rs.445/- Lucky Rs.435/- Pak Land Rs.430/- Raj Rs.415/- State Rs.420/-

Sulphate Falcon Rs.460/- lucky Rs.450/-

White Maple Leaf Rs.740/-

2 Steel

a. Imran Cement and Steel Gulshan-e-Iqbal --- Rs. 70,000/-

per ton

b. Saima Royal Residency Gulshan-e-Iqbal

Amerely Rs. 77,000/- per ton

Other types Rs. 75,000/- per ton

c. Mujahid Steel and Cement, Gulistan-e-Johar --- Rs. 69,000/-

per ton

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 10

Contact: a. Imran Cement and Steel Gulshan-e-Iqbal

b. Saima Royal Residency Gulshan-e-Iqbal

c. Mujahid Steel and Cement, Gulistan-e-Johar

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 11

ELECTRICAL WORKS

S.No. Item/ Description Maker/ Made by Unit Cost/

Price Rs.

01 Fan Milat Unit Rs.2300/- Pak Unit Rs.2700/- G.F.C. Unit Rs.2400/-

02 Tube-light Philips Unit Rs.95/- 03 Tube-light holder (Single) Philips Unit Rs.200/-

04 Energy saver 18W Philips Unit Rs.170/- 25W Philips Unit Rs.185/-

05 Switch board

Room Crescent Unit Rs.400/- Kitchen Crescent Unit Rs.250/- Wash room Crescent Unit Rs.200/- TV Lounge Crescent Unit Rs.500/-

06 Main Switch Sobo Unit Rs.240/- 07 Circuit Breaker Auger Unit Rs.120/-

08 Fuse Large Dijee Unit Rs.70/- Small Dijee Unit Rs.35/-

09 Bulb holder Crescent Unit Rs.25/- 10 Fan Dimmer Crescent Unit Rs.70/-

11 Pipes ½” dia -- Per ft Rs.3/- ¾” dia -- Per ft Rs.6/-

12 Wires

3/29 -- Per m Rs.10/- 7/29 -- Per m Rs.20/- 7/36 -- Per m Rs.30/- 7/44 -- Per m Rs.50/-

13 Emergency light Philips Unit Rs.350/-

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 12

Contact: Noor Paint, Electric, Hardware and Sanitary Store Gulshan-e-Iqbal, Block-11.

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 13

Electrical Works

S.No. Item/ Description Maker/ Made by Unit Cost/

Price Rs.

01 Fan

Pak Unit Rs. 2800/- Millat Unit Rs. 2600/- Royal Unit Rs. 3000/- G.F.C. Unit Rs. 2500/-

02 Tube-light (60W) Orient Unit Rs. 120/- 03 Tube-light holder (Single) Unit Rs. 220/-

04 Energy saver 18W Datichi Unit Rs. 125/- 25W Datichi Unit Rs. 160/-

05 Switch board Room Unit Rs. 1200/- Kitchen Unit Rs. 300/- Wash room Unit Rs. 500/-

06 Main Circuit Board Unit Rs. 2500/- 07 Main Switch Unit Rs. 550/- 08 Circuit Breaker (100 Amp) Unit Rs. 325/- 09 Fuse Unit Rs. 50/-

10 Bulb holder Pin Unit Rs. 20/- Ring Unit Rs. 25/-

11 Fan Dimmer Unit Rs. 60/-

12 Pipes ½” dia Per ft Rs. 2.5/- 1” dia Per ft Rs. 3/- 1.5” dia Per ft Rs. 5/-

13 Wires 1 mm dia Per coil Rs. 500/- 1.5 mm dia Per coil Rs. 1100/- 2.5 mm dia Per coil Rs. 1700/-

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 14

Contact: WIN-TEC Gulshan-e-Iqbal, University Road

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 15

Electrical Works

S.No. Item/ Description Maker/ Made by Unit Cost/

Price Rs.

01 Fan

Pak Unit Rs. 2400/- National Unit Rs. 1200/- Royal Unit Rs. 2100/- G.F.C. Unit Rs. 2250/-

Contact: Al Tawakal Corporation, Liaqatabad

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 16

WATER SUPPLY AND SANITARY S.No. Description Unit Rate Water Supply 01 Pipes (½“Dia) PVC Per ft Rs.11/-

02 Tapes Washroom (Single) Unit Rs.160/- Kitchen (Double) Unit Rs.750/- Wash Basin (Double) Unit Rs.750/-

03 Wash Basin (Ceramics) Unit Rs.1050/- 04 Kitchen Sink (Steel) Unit Rs.550/- 05 Shower Unit Rs.110/- 06 Valve (Shower & W. Basin) Unit Rs.110/- 07 Tee (½“Dia) Unit Rs.10/- 08 Elbow (½“dia) Unit Rs.8/- 09 Union (½“Dia) Unit Rs.40/- 10 Valve (Water tank) Unit Rs.110/- 11 Electric Motor (2Hp) Unit Rs.11500/- 12 Pipe (1.25” Dia) Per ft Rs.750/- Sanitary

01 Toilet English (With Tank) Unit Rs.2850/- Indian (Without Tank) Unit Rs.550/-

02 Toilet water tank Unit Rs.550/- 03 Valve & pipe for water tank Unit Rs.80/- 04 Pipes 4” Dia Per ft Rs.42/- 3” Dia Per ft Rs.30/-

05 Tee 3” dia Unit Rs.120/- 4” dia Unit Rs.180/-

06 Elbow 3” dia Unit Rs.80/- 4” dia Unit Rs.120/-

07 Lid of holes Unit Rs.60/-

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 17

Contact: Saqlain Jilani Sanitary Store, Liaqatabad

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 18

Water Supply and Sanitary S.No. Item/Description Maker/Made By Unit Rate Water Supply 01 Pipes (½“Dia) PVC Per ft Rs.14/-

02 Tapes Washroom (Single) Bed-cock Unit Rs.250/- Kitchen (Double) Bed-cock Unit Rs.600/-

03 Kitchen Sink (Steel) Asia Unit Rs.450/- 04 Shower National Unit Rs.110/- 05 Valve (Shower & W. Basin) Steel–X Unit Rs.110/- 06 Tee (½“ Dia) Steel–X Unit Rs.10/- 07 Elbow (½“dia) Steel–X Unit Rs.10/- 08 Union (½“Dia) Steel–X Unit Rs.45/- 09 Bent Steel–X Unit Rs.10/- 10 Joint Steel–X Unit Rs.10/- 11 Bridge Steel–X Unit Rs.35/- 12 Connecter Steel–X Unit Rs.10/- 13 Electric Motor Jawad company Unit Rs.5500/- Sanitary

01 Toilet English (With Tank) -- Unit Rs.1600/- Indian (Without Tank) -- Unit Rs.450/-

02 Toilet water tank -- Unit Rs.500/- 03 Valve & pipe for water tank Steel–X Unit Rs.220/- 04 Pipes (2” dia) Steel–X Per ft Rs.37/- 05 Tee (2” dia) Steel–X Unit Rs.65/- 06 Elbow (2” dia) Steel–X Unit Rs.55/- 07 Union (2” dia) Steel–X Unit Rs.190/-

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 19

Contact: Noor Paint, Electric, Hardware and Sanitary Store Gulshan-e-Iqbal, Block-11.

FIXING: Type Rate Ordinary Rs.6000/- Special Rs.10000/- Contact: Shakeel Plumber Cell # 0322-2734622

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 20

Water Supply and Sanitary S.No. Description Unit Rate Water Supply

01 Pipes ½“Dia GI Per ft Rs.25/- 1” dia GI Per ft Rs.35/-

02 Tapes Washroom (Single) Unit Rs.250/- Kitchen (Set) Unit Rs.1800/- Wash Basin (Set) Unit Rs.1200/-

03 Wash Basin (Ceramics) Unit Rs.1500/- 04 Kitchen Sink (Steel) Unit Rs.2000/- 05 Shower Unit Rs.1800/- 06 Valve (Shower & W. Basin) Unit Rs.300/- 07 Tee (½“Dia) Unit Rs.80/- 08 Elbow (½“dia) Unit Rs.60/- 09 Union (½“Dia) Unit Rs.150/- 10 Valve (Water tank) Unit Rs.500/- 11 Electric Motor (2Hp) Unit Rs.10000/- Contact: WIN-TEC Gulshan-e-Iqbal, University Road

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 21

DOORS AND WINDOWS

DOORS: S.No. Maker Door Type Material Rate Unit 1. Ali Brothers Timber

Mart Oiled Chip-Board Rs. 230/- Ft2

Malaysia Chip-Board Rs. 120/- Ft2 Pakistani Chip-Board Rs. 90/- Ft2 Pure Wood Rs. 350/- Ft2

2. Imran Aluminum National Complex, Rashed Minhas Road

Aluminum Rs. 360/- Ft2

Malaysia Chip-Board Rs. 120/- Ft2 Pakistani Chip-Board Rs. 90/- Ft2

S.No. Maker Material Color Rate Unit 3. Deluxe

(Gulshan Aluminum and Glass Emporium)

Aluminum (Sliding)

White Rs. 240/- Ft

Shampian Rs.290/- Ft Brown Rs.280/- Ft Golden Rs.250/- Ft

Aluminum (Swing)

White Rs. 320/- Ft

Shampian Rs.370/- Ft Brown Rs.350/- Ft

Note: Rates change with the change of color.

WINDOWS: S.No. Maker Wood Type Rate Unit 1. Ali Brothers Timber Mart Pure Wood Rs. 80/- Running Ft

S.No. Maker Material Color Rate Unit 3. Deluxe

(Gulshan Aluminum and Glass Emporium)

Aluminum (Sliding)

White Rs. 240/- Ft

Shampian Rs.290/- Ft Brown Rs.280/- Ft Golden Rs.250/- Ft

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 22

Contact: 1. Mr. Riyaz

Cell # 0301-2998370

2. Imran Aluminum National Complex, Rashed Minhas Road

3. Gulshan Aluminum and Glass Emporium

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 23

DOORS AND WINDOW FRAMES Material: Steel

DOOR FRAMES

Length Width Height Price 4’- 0” 0’- 6” 7’- 0” Rs. 2130/- 3’- 6” 0’- 6” 7’- 0” Rs. 1925/- 3’- 0” 0’- 6” 7’- 0” Rs. 1870/- 2’- 6” 0’- 6” 7’- 0” Rs. 1815/-

WINDOW FRAMES Length Width Height Price 6’- 0” 0’- 6” 4’- 0” Rs. 2200/- 5’- 0” 0’- 6” 4’- 0” Rs. 1980/- 4’- 0” 0’- 6” 4’- 0” Rs. 1760/- For window frames additional charges will be added for each vertical member and its hinges. Contact:

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 24

STEEL WORKS IN GALLERIES AND WINDOWS

MAKING: S.No. Maker Type Rate Unit 1 Faraz Iron and

Steel Work Bars Rs.120/- Per Kg

2 Strips Rs.130/- Per Kg S.No. Maker Material Color Rate Unit 1. Deluxe

(Gulshan Aluminum and Glass Emporium)

Steel White Rs. 120/- Ft2

Shampian Rs.140/- Ft2

Golden Rs.130/- Ft2

FIXING: S.No. Type Size Unit Rate

1 Window Upto 5’x6’ Unit Rs.500/- Bigger Unit Rs.800/-

2 Gallery All sizes Unit Rs.1500/-

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 25

Contact: Making:

Fixing:

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 26

CONCRETE BLOCKS

RATE PER BLOCK S.No. Maker Size Price

1. Shahab Uddin Cement Dipu Liaqatabad

3 in Rs. 14/- 4 in Rs. 15/- 5 in Rs. 17/-

2. S.Sultan, Block 3, Gulshan-e-Iqbal, Rajput Colony

2 in Rs. 14/- 3 in Rs. 15/- 4 in Rs. 16/- 5 in Rs.19/- 6 in Rs.26/-

3. Abdul Razaq Enterprises, Sohrab Goth

Solid 4 in Rs.16/- 6 in Rs.22/-

Hollow 6 in Rs.32/-

RATE PER TRUCK LOAD Length Width Height Price 12 in 3 in 8 in Rs. 1400/- 12 in 4 in 8 in Rs. 1500/- 12 in 5 in 8 in Rs. 1700/-

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 27

Contact: 1. Shahab Uddin Cement Dipu Liaqatabad

2. S. Sultan

Block -3, Gulshan-e-Iqbal, Rajput Colony Cell # 0342-2981623

3. Abdul Razaq Enterprises, Sohrab Goth, Karachi Cell # 0321-2213883

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 28

PAINT Company Name

Address S.No. Item Amount Price

Nelson

Diamond Paint Liaqatabad 1. Distemper 24 Kg Rs. 3750/- 2. Color Paint 6 Kg Rs. 950/- 3. Oil Paint 3.64 Ltr Rs. 1720/-

Noor Paint, Electric, Hardware and Sanitary Store

1. Distemper 4 Kg Rs. 900/- 2. Oil Paint 3.64 Ltr Rs. 1650/-

New Wear Paint House, Malir Halt

1. Distemper 24 Kg Rs. 3600/- 2. Mat Finish 24 Kg Rs.3100/- 3. Oil Paint 24 Kg Rs. 6800/-

Kansi Diamond Paint Liaqatabad 1. Distemper 24 Kg Rs. 2400/- 2. Color Paint 6 Kg Rs. 750/- 3. Oil Paint 3.64 Ltr Rs. 1300/-

ICI Delux

Diamond Paint Liaqatabad 1. Distemper 24 Kg Rs. 2900/- 2. Color Paint 6 Kg Rs. 760/- 3. Oil Paint 3.64 Ltr Rs. 1400/-

New Wear Paint House, Malir Halt

1. Distemper 24 Kg Rs. 3900/- 2. Mat Finish 24 Kg Rs. 7000/- 3. Oil Paint 24 Kg Rs. 6500/-

SAASI Gulzar Paint House Liaqatabad 1. Distemper 24 Kg Rs. 3400/- 2. Color Paint 6 Kg Rs. 900/- 3. Oil Paint 3.64 Ltr Rs. 1650/-

Burger New Wear Paint House, Malir Halt

1. Distemper 24 Kg Rs. 3600/- 2. Mat Finish 24 Kg Rs. 7000/- 3. Oil Paint 24 Kg Rs. 6600/-

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 29

Contact:

DETAILED RATE CATALOG OF RESIDENTIAL BUILDINGS 2012

Sir Syed University of Engineering and Technology Karachi | 30

FLOORING Tiles:

1. Farrukh Traders, Golimar # 2 Quality Unit Rate High Meter (m) Rs.480/- Normal Meter (m) Rs.430/-

2. Moiz Tiles, F.B. Area Size Unit Rate 8” x 12” Meter (m) Rs.480/- 10” x 13” Meter (m) Rs.520/- Contact:

1. Farrukh Traders, Golimar # 2

2. Moiz Tiles, F.B. Area