Erosion & Sediment Control for
Stream Restoration Projects
Greg Jennings, PhD, PE
Professor & Extension Specialist
Biological & Agricultural Engineering
North Carolina State University
Thanks to Wyatt Brown, LSS, CPESC
NC Ecosystem Enhancement Program
![Page 2: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/2.jpg)
NC Sediment Pollution Control Act, 1973
• 15A NCAC 04B .0105
PROTECTION OF PROPERTY
• Persons conducting land-disturbing activity shall take all reasonable measures to protect all public and private property from damage caused by such activities.
• History Note: Authority G.S. 113A-54(b); 113A-54(d)(2);
• Eff. February 1, 1976;
• Amended Eff. August 1, 1988; November 1, 1984.
![Page 3: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/3.jpg)
1. Site Preparation
2. Grading
3. Structures
4. Site Stabilization
Construction Practices
![Page 4: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/4.jpg)
• Construction entrance
• Silt fence
• Staging & stockpile
• Temporary crossings
• Stream flow diversion
1. Site Preparation
![Page 5: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/5.jpg)
Silt Fence• Metal Posts 8 feet apart
• Reinforcing wire backing (14 ga. w/ 6-inch mesh)
• Bury fence 8 inches deep
![Page 6: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/6.jpg)
Silt Fence
Problems
![Page 7: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/7.jpg)
Silt Fence
Problems
![Page 8: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/8.jpg)
Staging and Stockpile
![Page 9: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/9.jpg)
Stockpile Area
Silt fence &
seeding
![Page 10: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/10.jpg)
Problems?
![Page 11: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/11.jpg)
Temporary Stream Crossing
• Rock ford
• Culvert
• Portable
log mat
![Page 12: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/12.jpg)
![Page 13: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/13.jpg)
Problems?
![Page 14: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/14.jpg)
![Page 15: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/15.jpg)
Prevent erosion
around culvert
![Page 16: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/16.jpg)
![Page 17: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/17.jpg)
Problems?
![Page 18: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/18.jpg)
Stream Flow Diversion
• Open channel
• Pipe
• Pump around
• Work in wet
![Page 19: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/19.jpg)
Open channel
Must dissipate
energy at end
![Page 20: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/20.jpg)
Problems?
![Page 21: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/21.jpg)
Pipe
![Page 22: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/22.jpg)
Pipe Undersized
![Page 23: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/23.jpg)
Pump Around: Match pump to 2 x base flow
![Page 24: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/24.jpg)
Check dam to
retain base flow
Quiet pump in
residential area
![Page 25: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/25.jpg)
Pump
discharge
downstream
![Page 26: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/26.jpg)
Problem?
![Page 27: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/27.jpg)
Special Stilling Basin: Filter Bag
![Page 28: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/28.jpg)
Problem?
![Page 29: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/29.jpg)
Problem?
![Page 30: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/30.jpg)
1. Stage project to limit exposed areas
2. Use temporary ground cover
3. Use track equipment if possible
4. Keep stormwater runoff away from site
2. Grading
![Page 31: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/31.jpg)
Clearing & Grubbing
Followed by Survey Stakeout
![Page 32: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/32.jpg)
![Page 33: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/33.jpg)
Problem?
![Page 34: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/34.jpg)
Problem?
![Page 35: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/35.jpg)
1. Build according to design
2. Check elevations (twice)
3. Footer boulders and backer logs
4. Seal structures to prevent piping
• “Chink” rock structures
• Filter fabric for all structures
3. Structures
![Page 36: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/36.jpg)
Boulder Cross Vane
20-30 degree angles
2-5 % arm slopes
20-30 degrees
2-5 % arm slopes
![Page 37: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/37.jpg)
Laser Level for Grade Check
![Page 38: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/38.jpg)
![Page 39: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/39.jpg)
![Page 40: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/40.jpg)
![Page 41: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/41.jpg)
Log Vane (with
root wad)
Backer Log
![Page 42: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/42.jpg)
Woven filter
fabric nailed to
top log
![Page 43: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/43.jpg)
Geotextile nailed to top log
![Page 44: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/44.jpg)
Overhanging top
log for fish cover
![Page 45: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/45.jpg)
Why do structures fail?
• Rocks or logs not placed properly
• Piping under or through rocks or logs
• Lack of geotextile, improperly placed
• Excess scour
• Poor vegetation & bank stability
![Page 46: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/46.jpg)
Structure Problems
• Wrong Location
• Too Steep
• Not Keyed Into Bank
• Poor Vegetation Establishment
• Not Sealed
![Page 47: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/47.jpg)
Poor placement
and not keyed in
![Page 48: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/48.jpg)
Drop too great
![Page 49: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/49.jpg)
Easy to spot during high flows…
![Page 50: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/50.jpg)
Also easy to spot…
after the flows have receded
![Page 51: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/51.jpg)
Too steep
![Page 52: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/52.jpg)
How about this one?...
Keep log wet…even
at normal daily flow
Too steep
![Page 53: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/53.jpg)
Structural
collapse
![Page 54: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/54.jpg)
Root Wads Too High
Too Few & Washed
Out Behind
![Page 55: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/55.jpg)
Problem?
![Page 56: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/56.jpg)
Problem?
![Page 57: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/57.jpg)
Problem?
![Page 58: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/58.jpg)
4. Site Stabilization
• Temporary ground cover (mulch & matting)
• Permanent ground cover (vegetation)
• Prepare for rain!
![Page 59: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/59.jpg)
Straw Mulch: 75% cover (2 tons/acre)
![Page 60: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/60.jpg)
Hydroseeder
(mulch, seed, f
ertilizer)
![Page 61: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/61.jpg)
Matting
• Biodegradable (coir, jute, excelsior, straw)
• Seed and straw UNDER matting
• Keep matting relaxed
• Stakes: wood or biodegradable plastic
![Page 62: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/62.jpg)
![Page 63: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/63.jpg)
No Plastic!
![Page 64: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/64.jpg)
![Page 65: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/65.jpg)
Each Day:
Seed, straw, ma
tting
![Page 66: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/66.jpg)
Erosion control every day
![Page 67: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/67.jpg)
Large stakes at toe of slope
![Page 68: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/68.jpg)
Problem?
![Page 69: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/69.jpg)
Irrigation
![Page 70: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/70.jpg)
Overland
Flow
![Page 71: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/71.jpg)
Straw Wattle used as Berm
![Page 72: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/72.jpg)
Straw Wattle used as Berm
![Page 73: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/73.jpg)
Site Inspection
![Page 74: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/74.jpg)
Note: Channel stabilized before floodplain
![Page 75: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/75.jpg)
Successful Project:
1. Good design considering hydraulic & sediment
transport processes
2. Communication between designer & contractor
3. Flexibility to make field changes
4. Understanding of environmental regulations
5. Prepare for flooding!
![Page 76: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/76.jpg)
Use Common Sense
![Page 77: Rc401 construction jennings e&s](https://reader033.vdocument.in/reader033/viewer/2022060205/55a0bd871a28ab6f5e8b46a0/html5/thumbnails/77.jpg)
Thanks to:
Wyatt Brown, NC EEP
Dan Clinton, Cary
Darrell Westmoreland, North State Environmental
Jan Patterson, Cary, NC